PROBABLE ABM LAUNCH COMPLEX UNDER CONSTRUCTION SAM SITE E33-1, MOSCOW, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A001700020016-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 23, 2007
Sequence Number: 
16
Case Number: 
Publication Date: 
May 4, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A001700020016-4.pdf152.69 KB
Body: 
Approve 01/23: CIA-RDP78T05929A001700020016-4 TOP SECRET= Page 1 C opy___j II PROBABLE ABM LAUNCH COMPLEX UNDER CONSTRUCTION SAM SITE E33-1, MOSCOW, USSR INITIAL IDENTIFICATION OF 8 PROBABLE ABM LAUNCH POSITIONS UNDER CONSTRUCTION AROUND THE ASSOCI- ATED ELECTRONICS FACILITY (TRIAD 1) AT MOSCOW SAM SITE E33-1, AND IDENTIFICATION OF A PROBABLE ELECTRONICS FACILITIES (TRIADS) HAVE BEEN IDEN- TIFIED AT FOUR OTHER MOSCOW SAM SITES, E05-1, E15-1, E24-1, AND E31-1. SIMILAR FACILITIES HAVE BEEN OBSERVED AT INSTRUMENTATION SITES 2 AND 10, "SITE 13", AND LAUNCH COMPLEX "B" AT THE SARY-SHAGAN ANTIMISSILE TEST CENTER. ALTHOUGH CONSTRUCTION ACTIVITY AT THE LAUNCH POSITIONS HAS BEEN OBSERVED FOR SOME TIME, THIS MISSION PROVIDES THE FIRST PROB- ABLE ABM ASSOCIATION AND THE FIRST IDENTIFICATION OF These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. GROUPI Approved 7/01/23: CIA-RDP78TO5929AO01 16-4 TOP SECRET 5. FIRST IDENTIFICATION: I I PROVIDED THE FIRST SATELLITE PHOTOGRAPHY OF MOSCOW SAM SITE E33-1. THIS MISSION PERMITS THE FIRST ASSOCIATION OF PART OF THE FACILITIES WITH ABM DEPLOYMENT. 8. DIMENSIONS/ SPECIFICATIONS: TRIAD 1: DOME AT BUILDING "A": 110 FT (MAXIMUM DIAMETER) DOME AT BUILDING "B" & "C": MAXIMUM DIAMETER). These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRE~ Approved For Release 2007/01/23 : CIA-RDP78T05929A0 Approve /01/23 : CIA-RDP78T05929A0017016-4 TOP SECRETI I TRIAD 2: BUILDING "A": 120 FT X 155 FT BUILDINGS "B" & "C": 95 FT X 105 FT GUILD MISSILES: FIRST GENERATION SAM, DEPLOYED AT THE MOSCOW SA-1 SITES. T-SHAPED BUILDINGS: OVERALL LENGTH: 320 FT DRIVE-THROUGH BUILDING : 40 FT LONG 9. MISSION READOUT: CONSTRUCTION ACTIVITY IS OBSERVED AT TRIAD 1, BE- LIEVED TO BE FOR PROBABLE ABM LAUNCH POSITIONS. THE PLACEMENT OF THE PRO- BABLE LAUNCH POSITIONS APPEARS SIMILAR AROUND TRIAD BUILDINGS "B" AND "C". THERE ARE 2 PROBABLE LAUNCH POSITIONS ON THE ACCESS ROAD NORTH OF THE SMALL TRIAD BUILDING AND 2 ON THE ACCESS ROAD SOUTH OF THE BUILDING, THE MINIMUM AVERAGE DISTANCE FROM THE SMALL TRIAD BUILDINGS IS APPROXIMATELY 180 FT ON THE NORTH AND 275 FT ON THE SOUTH. ON THE NORTH ACCESS ROAD THE LAUNCH POSI- TIONS HAVE A LATERAL SEPARATION DISTANCE OF APPROXIMATELY 345 FT AT TRIAD These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET Approved For Release 2007/01/23 : CIA-RDP78T05929A001700020016-4 Approved/01/23 : CIA RDP7EC 16 4 TOP OP SECRET RET 25X 4 May 1966 Page 4 BUILDING "B" AND 365 FT AT TRIAD BUILDING "C". WORK ON THE LAUNCH POSITIONS THEMSELVES APPEARS TO BE ONLY IN THE FOUN- DATION PREPARATION STAGE. RING-LIKE OBJECTS ARE OBSERVED AT THE 2 LAUNCH POSITIONS ON THE SOUTH ACCESS ROAD AT TRIAD BUILDING "B". IT IS POSSIBLE THAT SIMILAR ACTIVITY IS UNDERWAY ON THE ACCESS ROAD NORTH OF TRIAD BUILDING "C" AT TRIAD 2, ALTHOUGH ONLY GRADING IS APPARENT AT THIS TIME. AT TRIAD 1, THE ENVIRONMENTAL SHELTER APPEARS EXTERNALLY COMPLETE WITH THE CAPPING SECTION IN PLACE. IN ADDITION, THE RAIL-MOUNTED GANTRY CRANE HAS BEEN REMOVED. THE SMALL TRIAD BUILDINGS APPEAR COMPLETE AND NO CHANGE IS DISCERNIBLE. AT TRIAD 2, RING STRUCTURES ARE PRESENT ON THE ROOFS OF ALL THREE BUILD- INGS. AT TRIAD BUILDING "A", THE RING SURROUNDING THE PEDESTAL MOUNT IS 90 FT IN DIAMETER, AND 60 FT IN DIAMETER ON TRIAD BUILDINGS "B" AND "C". TWO WING-TYPE STRUCTURES, NOT PREVIOUSLY OBSERVED IN TRIAD CONSTRUCTION, ARE LOCATED AT THE REAR CORNERS OF TRIAD BUILDINGS "A", PROJECTING BEHIND AND PARALLEL TO THE BUILDING, TWO RINGS, WITH AN OUTSIDE DIAMETER OF APPROXI- MATELY = ARE LYING ON THE GROUND NEAR TRIAD BUILDING "A". NINE PROBABLE GUILD MISSILES ARE OBSERVED SOUTH OF THE PROBABLE ABM LAUNCH COMPLEX AT SAM SITE E33-1. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support pproved For ReIR&O ,k5/2ABMIAI H59CQMOLtMo: thNDER CONSTRUCTION SAM SITE E33-1, MOSCOW, USSR 56-20N 36-48E ~r4l '77Approved For Release 2007/01/23 : CIA-RDP78T05929A001700020016-4