AIRFRAME PLANT PEIPING, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A001600020003-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 17, 2007
Sequence Number: 
3
Case Number: 
Publication Date: 
February 24, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A001600020003-9.pdf206.08 KB
Body: 
Approved For Release 2QO7/,Q1J:17u-CIS,-R DP78T05929A001600020003-9 2 FEBRUARY 1966 PAGE /5 AIRFRAME PLANT PEIPING, CHINA 2. REMARKS: CONSIDERABLE CONSTRUCTION ACTIVITY IS EVIDENT THROUGHOUT THE PLANT AREA. THE PLANT CONTAINS STRUCTURES WHICH COULD POSSIBLY ASSOCIATE IT WITH MISSILE PRO- DUCTION. IN :TUNE 1959 THE PEIPING AIRFRAME PLANT CONTAINED 1,208,825 SQ FT OF FLOORSPACE. BETWEEN JUNE 1959 AND AUGUST 1962, DESPITE THE WITHDRAWAL OF SOVIET TECHNICIANS AND THE MATERIAL SHORTAGES CAUSED BY TIM "GREAT LEAP FORWARD," AN ADDITIONAL 1,787,325 SQ FT WERE CONSTRUCTED. BETWEEN AUGUST 1962 AND SEPTEMBER 1965 ANOTHER 680,125 SQ FT WERE ADDED FOR A TOTAL OF 3,676,275 SQ FT. 7.5 NM SOUTH OF THE CENTER OF PEIPING AND ADJACENT TO THE PEIPING/NAN-YUAN AIRFIELD AT 39148N 11625E . These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing beard(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. esu zs.:.; y CIA- R D P78T05929A001600020003-9 Approved For Release 2QQT10? 1 TL 5. FIRST IDENTIFIED: 6. NEGATION DATE: 7. SLMSEQJENT COVERAGE: 8. DIMENSIONS/ SPECIFICATIONS: 180 FT. HIGH BAY SECTION: 195 X 110 X 75 FT. PROBABLE HYDROSTATIC TEST TOWER: 4O X )+O X These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. 1IA-RIlP78T05q29A0f1& )f02ff03-l Approved Fo BUILDINGS HAVE BEEN ADDED SINCE 24 FEBRUARY 1966 PAGE 9. MISSION READOUT: LONG RAIL CARS, APPROXIMATELY I I ARE ADJACENT TO THE TRANS- 2 07jb 111'T.;' ! I ONE OF THESE, AN AIRCRAFT ENGINE TEST BUILDING, CONTAINS 2 ENGINE TEST CELLS. CON- STRUCTION ACTIVITY APPEARS TO BE THROUGHOUT THE PLANT AREA. THREE IDENTIFIED AS A PROBABLE VERTICAL ASSEMBLY BUILDING AND A PROBABLE ASSOCIATE THIS PLANT WITH MISSILE PRODUCTION. THE TWO STRUCTURES ARE A REANALYSIS OF PHOTOGRAPHY HAS REVEALED TWO STRUCTURES WHICH COULD NEITHER OF THESE STRUCTURES WAS PRESENT ON AUGUST 1962; HOWEVEE, ON BOTH BUILDINGS 2 APPEARED TO BE IN THE LATE STAGES OF CONSTRUCTION. THE FOLLOWING AIRCRAFT WERE OBSERVED AT PEIPING/NAN-YUAN AIRFIELD: 3 BEAGLE 1 FARMER 41 FAGOT These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. Approved For Release 2007/01/17: CIA-RDP78TO5929A001600020003-9 AIRCRAFT 96 FARMER 2 CRATE 2 CAB 2 COLT 3 CREEK 4 HOUND 1 HARE 2 FARMER FUSELAGES 5 PROB FARMER FUSELAGE SHIPPING CRATES 5 PROB FARMER WING SHIPPING CRATES NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ODESSA/FONTAN AIRFIELD ODESSA, USSR 46-25N 30-42E FARIVIER~ FUSELAGES Approved For Release 2007/01/17: CIA-RDP78TO5929AO01600020003-9 Approved For Release 2007/01/17: CIA-RDP78T05929A001600020003-9