G-CLASS SSB, LU-TA SHIPYARD, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A001400030001-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 28, 2006
Sequence Number: 
1
Case Number: 
Publication Date: 
February 16, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A001400030001-2.pdf94.12 KB
Body: 
16 FEBRUARY 1966 PAGES 3 PAGE 1 OF 3 COPY OF 3 G-CLASS SSB, LU-TA SHIPYARD, CHINA 1. SIGNIFICANCE: THE G-CLASS SSB IS CHINA'S ONLY BALLISTIC MISSILE-FIRING SUBMARINE. IT IS THE MOST AD- VANCED SUBMARINE BUILT BY THE CHINESE COMMUNISTS. 2. LOCATION: ON KOREA BAY IN THE EASTERN SECTION OF THE CITY OF LU-TA AT 3855N 12138E. 3. FIRST IDENTIFICATION: G-CLASS SSB UNDER CONSTRUCTION. PRESENCE OF COMPLETED 4. NEGATION DATE : 5. COVERAGE: 6. DIMENSIONS/SPECIFICATIONS: LOA- BEAM- SAIL- G-CLASS SSB CONFIRMED. AT LEAST 12 KH MISSIONS. G-CLASS SSB: 320 FT MAXIMUM SPEED- 17.5 KNOTS RADIUS OF ACTION- 4700 NM (10 DAYS ON STATION These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue. GROUP I :xcludel from aotoma; dour,! ra~;n, a.', an :E.,z .iuii Q.4 ^PT^.;u~ao nnh 400030001-2 Appr bved For SWJ~T1 FEBRUARY 1966 PAGE 2 OF 3 ARMAMENT- THE G-CLASS SUBMARINE CAN CARRY 24 TORPEDOES OR 48 MINES (TORPEDO TUBE TYPE IN LIEU OF TORPEDOES). THREE BALLISTIC MISSILES ARE CARRIED IN AND LAUNCHED FROM VERTICAL TUBES LOCATED IN THE SAIL. MISSILES ARE BELIEVED LAUNCHED WHILE THE SUBMARINE IS SURFACED. THE ASSOCIATED MISSILES ARE ESTIMATED TO BE OF THE SS-N-4-TYPE WHICH ARE AND HAVE A MAXIMUM RANGE OF 7. CHRONOLOGY: THE G-CLASS SSB WAS CONSTRUCTED AT THE LU-TA SHIPYARD BETWEEN JUNE 1962 AND SEPTEMBER 1964. SINCE NOVEMBER 1964 THE SUB- MARINE WAS OBSERVED IN THE SAME POSITION ALONGSIDE A COMMERCIAL PIER FOR A PERIOD OF 11 MONTHS. PHOTOGRAPHY OF JANUARY 1966 REVEALED THAT THE G-CLASS WAS NO LONGER AT LU-TA. A. THE G-CLASS SSB WAS CONSTRUCTED AT THE LU-TA SHIPYARD. I I THE CENTER BUILDINGWAY. SECURITY SCREENS HAD BEEN ERECTED ON EACH SIDE TO DENY GROUND OBSERVATION. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of is REVEALED UNIDENTIFIED BUILDING MATERIALS Aptroved For Release 7Sgr` ,f-RDP78TO5929A00 Y 1966 PAGE 3 OF 3 REVEALED A G-CLASS SSB UNDER CONSTRUCTION ON THE CENTER BUILDINGWAY. REVEALED THE G-CLASS SSB IN AN ADVANCED STAGE OF CONSTRUCTION. B. CONSTRUCTION OF THE G-CLASS SSB WAS COMPLETED BY SEPTEMBER 1964. REVEALED A PROBABLE G-CLASS SSB IN A POSSIBLE FLOATING DOCK MOORED AT THE SHIPYARD. CONFIRMED THE IDENTIFICATION OF A COM- PLETED G-CLASS SSB MOORED AT THE NORTHERNMOST COMMERCIAL PIER. C. BETWEEN NOVEMBER 1964 AND OCTOBER 1965, ONE []AND FIVE KH MISSIONS REVEALED THAT THE G-CLASS SSB WAS IN THE SAME POSITION ALONGSIDE THE COMMERCIAL PIER AT LU-TA. REVEALED THAT THE G-CLASS SSB WAS NO LONGER AT THE LU-TA SHIPYARD. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the reporting period as indicated by the date of issue.