MISSION 1023-1 17 -22 AUGUST 1965 PART I
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500290067-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
46
Document Creation Date:
December 28, 2016
Document Release Date:
January 16, 2001
Sequence Number:
67
Case Number:
Publication Date:
August 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T05439A000500290067-6.pdf | 1.24 MB |
Body:
Nallo Yip
TAtEN1-KEIHOIE
Control System Oaly
TOP SECRET CHESS RUFF
MISSION 1823-1 17-22 AUG 1965
TABLE OF CONTENTS
PREFACE
TRACK OF MISSION
HIGHLIGHTS
MISSILES '
Q
AIR FACILITIES
NUCLEAR ENERGY ?
NAVAL ACTIVITY/PORTS
ELECTRONICS/COMMUNICATIONS
COMPLEXES
OTHER ACTIVITY
ATTACHMENTS
1
TOP SECRET CHESS RUFF
TGS-811 /65
APPENDIX-
Hindle t!i~
TALENT?KETHOLE
Control System Onlr
x,ene rie
T~IENT-KETNOIE
Ceetrel Srste^ OeIY
TOP SECRET CHESS RUFF
MISSION 1023-1 17-22 AUG 1965
OAK -PART I
MISSION 1023-I
THIS IS THE FIRST OF TND OAK REPORTS ON MISSION 1023-1
AND PROVIDES INFDRMATION ON THOSE COMMITTEE ON OVERHEAD
RECONNAISSAN1f3E (COMDR) TARGETS OBSERVED ON THE PHOTOGRAPHY.
? TARGETS ARE ARRANGED IN THE OAK BY SUBJECT AND HITHIN EACH SUBJECT
-.BY COMDR TARGET NUMBER. TARGETS OF OPPORTUNITY OBSERVED DURING
THE OAK REPORTING PERIOD Af)2E LISTED NUMERICALLY UNDER THE
APPROPRIATE SUBJECT AFTER THE LISTING OF COMDR TARGETS. LOCATIONS
OF TARGETS IN TH3S REPORT ARE INDICATED BY THE COUNTRY CODE
SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND
REPORTED FOLLOM THE DESCRIPTION OF THE TARGET. PASS NUMBERS ARE
SUFFIXED KITH EITHER AN A FOR ASCENDING (SOUTH-TO-NORTH), D FOR
DESCENDING (NORTH-TO-SOUTH), OR M FOR A MIXED ASCENDING AND
DESCENDING PASS. THE LETTER F PRECEDING FRAME NUMBERS INDICATES THE
FORNARO CAMERA, AND THE LETTER A INDICATES THE AFT CAMERA.
UNIVERSAL REFERENCE GRID (X-Y) COORDINATES ARE GIVEN IN PARENTHESIS
AFTER THE FRAME TO NHICH THEY APPLY. THIS GRID IS IDENTIFIED AS
UNIVERSAL GRID NO 1, FEB 64. SYMBOLS INDICATING CONDITIONS NHICH
AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE --
C (CLEAR), SC (SCATTERED CLOUDS), HG (HEAVY CLOUDS), H (HAZE).
CS (CLOUD SHADON), S (SNON), 0 (OBLICUITY), SD (SEMIDARKNESS),
GG (GROUND COVER), CF (CAMOUFLAGE). AND GR (GROUND RESOLUTION).
INTERPRETABILITY OF THE PHOTOGRAPHY IS CATEGORIZED AS G (GOOD),
F (FAIR), OR P (POOR). THE EXTENT OF PHOTOGRAPHIC COVERAGE
IS DENOTED BY THE SYMBOLS T (TOTAL) OR PT (PARTIAL). THE MODE?
OF COVERAGE IS INDICATED BY ST (STEREO), NS (NON-STEREO),?OR PS
(PARTIAL STEREO).
0
OAK RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF THE
PHOTOGRAPHY IS BEING ACCOMPLISHED IN A SHORT TIME AND PRIOR TO
FINAL REFINEMENT OF EPHEMERIS DATA. GONSEDUENTLY, FUTURE DETAILED
ANALYSIS MAY RESULT IN MINOR ALTERATIONS.
? 2
TOP SECRET CHESS RUFF
Hendle Yie
TALENT?KETxOIE
Control System Only
Approved For Release 2001/11/07 :CIA-RDP78T05439A000500290067-6
Next 2 Page(s) In Document Exempt
Approved For Release 2001/11/07 :CIA-RDP78T05439A000500290067-6
Highlights
0
Nredl, Yir
TALENT-IIFTHOLE
Coatrel System 0,1~
TOP SECRET CHESS RUFF
MISSION 1023-1 17-22 AUG 1965
1. EIGHT OF THE 25 KNOWN DEPLOYED ICBM COMPLEXES ARE COVERED
BY PHOTOGRAPHY. TATISHCHEYO AND TEYKOVO ARE COVERED BY CLEAR
PHOTOGRAPHY. DROVYANAYA. KOSTROMA, KOZELSK, KARTALY,
OLOVYANNAYA, AND ZHANGIZ-TORE ARE COVERED BY SCATTERED-TO-HEAVY
CLOUDS. THE REMAINING"17 COMPLEXES AND THE TYURATAM MISSILE
TEST CENTER ARE EITHER CLOUD COVERED OR NOT COVERED. THIRTEEN
TYPE IIID AND 2 TYPE IIIC LAUNCH SITES ARE NEWLY IDENTIFIED.
SEVEN CONFIRMED AND 4 PROBABLE IIID SITES AT OLOVYANNAYA, 2
PROBABLE IIID SITES AT TATISHGHEVO, AND 1 CONFIRMED AND 1
PROBABLE IIIC SITE AT ZHANGIZ-TORE.
2. KAPUSTIN YAR~,VLADIMIROVKA MISSILE TEST CENTER
CENTER IS 'COVERED BY FAIR-TO-POOR QUALITY PHOTOGRAPHY.
MISSILE ACTIVITY/EXERCISES ARE OBSERVED AT LAUNCH AREAS 1C, 2G,
4C, 5G?AND THE TROOP TRAINING ARFA WEST OF LAUNCH COMPLEX E. A
NEW LOOP ROAD NON EXTENDS FROM THE RAIL LINE TO THE LAUNCH
SITE 4G-1 ROAD NETWORK. THE POSSIBLE LAUl~CH AREA PREVIOUSLY
IDENTIFIED IN THE SAM LAUNCH COMPLEX IS NOM CONFIRMED AS
A SAM LAUNCH.AREA. ?
A SMALL BLAST MARK iS VISIBLE AT A TEST BUILDING IN THE
COMPONENTS TEST AREA LOCATED IN THE NW CORNER OF THE FACILITY.
A FIXED FIELD SITE IS NEWLY IDENTIFIED 4.5 NM EAST OF SHATSK
AT 53-26-10N O2T-~s9-38E.
5. SKRUNDA DUAL HEN HOUSE-.TYPE STRUCTURE (MISSILE BONUS)
A NEWLY OBSERVED HEN HOUSE-TYPE ACTIVITY SIMILAR TO THE
STRUCTURE NEAR OLENEGORSK IS LOCATED 3.5 NM NW OF SKRUNDA.
A NEWLY IDENTIFIED AMM/SAM LAUNCH COMPLEX UNDER CONSTRUCTION
IS LOCATED 4.5 NM ENE OF LIEPAJA. '
TOP SECRET CHESS RUFF
Hondle Yip
TALENT?KETHOIE
Coetrol System Only
Needle Yie
TALENT?KETNOIE
Cntrel STste.Ool~
TOP SECRET CHESS RUFF
MISSION 1023-1~ 17-22 AUG_1965
7. ZAOZERNYY ATOMIC ENERGY COMPLEX 25X1A
ROOF OF CASCADE BUILDING D?IS NEARING COMPLETION. NEH SECURITY
FENCE UNDER CONSTRUCTION WEST OF BUILDING D INCLUDES AREA
FOR POSSIBLE FUTURE EXPANSION.
VISIBLE DETAILS OF THE 645-FT HULL SUGGEST THAT IT IS A COMBATANT.
A TRIANGULAR TOFIER MAST IS LOCATED AMID-SHIPS AND A SMALL
RECTANGULAR STRUCTURE IS LOCATED AT ABOUT THE NORMAL FORWARD
GUN POSITION.
8. NIKOLAYEV SHIPYARD NOSENKO 444
9. KEM PROB TALL KING FACILITY -
A TALL KING FACILITY IS NEMLY IDENTIFIED 1.5 NM HEST OF KEM.
0
10. BELEV SENSITIVE OPERATIONS COMPLEX -
TWO BUNKERS, BUNKERS 3 AND 4, ARE NEMLY IDENTIFIED.
FIFTY COMDR TARGETS HERE OBSERVED DURING THE OAK REPDRTING
PE~tIOD ANO ARE CONTAINED IN THIS OAK.
TOP SECRET CHESS RUFF
25X1A
Needle Yie
TAIENT?KETHOIE
Control System Only
xe.dle r.
TALEMT?KETxOIE
Ceetrsl S~ste^ Odd
a ? TOP SECRET CHESS RUFF
o 'MISSION 1023-1 17-22 AUG 1965
TCS-81140/65
MISSILES 25X1A
DROVYANAYA ICBM COMPLEX UR 513,1N 11300E
NO SIGNIFICANT CHANGE OBSERVED AT THE COMPLEX SUPPORT
FACILITY, RAIL-TO-ROAD TRANSFER POINT, THE UNIDENTIFIED
AREA TO THE NORTH OF THE COMPLEX SUPPORT FACILITY,
LAUNCH AREAS A (SITE 1), B (SITE 2~), G (SITE 4), D
(SITE 3), E (SITE 5), OR F (SITE 6). CONSTRUCTION
CONTINUES AT LAUNCH GROUP G ISITES 7-14, 16, 16). ALL.
OF THE SITES EXCEPT G4 (SITE 101 AND G7 (SITE 13) ARE
IN A LATE STAGE OF CONSTRUCTION. CONSTRUCTION
CONTINUES AT LAUNCH GROUP H (SITES 15, 19'-26) AND ALL
OF THE SITES REMAIN IN A MID-STAGE OF CONSTRUCTION.
.KDSTROMA ICBM COMPLEX UR 5746N O41HLE
LAUNCH AREAS B ISITE 2), E (SITE 5), ANO F (SITE 6) GAN
BE IDENTIFIED ONLY. REMAINDER OF COMPLEX IS CLOUD
COVERED.
NO SIGNIFIGANT'GHANGE OBSERVED IN ANY OF THE COMPONENTS
OF THE COMPLEX.
KOIELSK ICBM COMPLEX UR .5356N 03549E
NO SIGNIFICANT CHANGE OBSERVED AT.7HE CDMPLEX SUPPDRT
FACILITY. RAIL-TO-ROAD TRANSFER POINT. OR LAUNCH AREAS
A (SITE 3l, 8 (SITE 2l, D (SITE 4), AND E (SITE 5l.
LAUNCH AREA F .(SITE 6)~CAN BE IDENTIFIED ONLY.
ACTIVITY CONTINUES AT THE UNIDENTIFIED AREA 13.7 NM SSW
OF THE COMPLEX SUPPORT FACILITY. NO SIGNIFICANT CHANGE
SINGE THE AREA WAS REPORTED ON MISSION
THE OTHER AREAS OF UNIDENTIFIED ACTIVITY ARE
TOP SECRET CHESS RUFF
H.ndle rid
TAIEHT~KEYHOIE
CentfOl System Oely
x,.dle ri^ TOP SECRET CHESS RUFF Tcs-a1140i65
tALEMt?KErxoLE MISSION 1023-1 17-22 AUG 1965
Control System Oalr
OLOVYANNAYA ICBM COMPLEX UR 5049N 11550E '
ELEVEN TYPE IIIO SITES HAVE BEEN NENLY,IDENTIFIED.
SEVEN OF THESE SITES (G4-G10) COMPLETE LAUNCH GROUP G.
THE 4 OTHER SITES HAVE BEEN TENTATIVELY DESIGNATED
PROBABLE SITES F2-F5. ALL OF THE NEW SITES IN. LAUNCH
GROUP G ARE SECURED ANO IN THE MID-STAGE OF
LONSTRUCTION. SITE G4 (50-45N 115-48E)?IS SITUATED 3
NM NE OF G1. GS (50-42N 115-50E) IS SITUATED 4.7 NM SE
OF G1. SITE G6 (56-40N.115-46E) IS 3.7 NM SSE OF G1.
SITE G7 (50-41N 115-41E) IS 3 NM SSN OF Gl. G8 (50-39N
115-49E) IS 5.7 NM SSE OF G1. G9 (SH-39N) 115-4LE) IS
5.5 NM SSW OF G1. G10 .(50-49N 115-43E) IS 5.3 NM NORTH
OF G1. PROBABLE F2 l50 ~0N 115-56E} IS 3.5 NM ESE OF _
F1. F3 (50-47N 115-58E) IS 6.1 NM SE OF?F1. F4 +S
(50-46N 115-54E1 IS 4.7 NM SSE OF F1. FS (SH-49N
115-52E) IS 3 NM SSW OF F1.
NO SIGNIFICANT CHANGE IS OBSERVED AT LAUNCH AREAS A
(SITE 1), B (SITE 2), C (SITE 3) OR AT SITES D1-7
(SITES 4-10). SITES D8-10 (SITES 11-13) ARE CLOUD .
COVERED OR NOT COVERED. CONSTRUCTION CONTINUES AT
SITES E1-10 (SITES 14-23). A GABLE DITCH NETNORK IS
APPARENT BETWEEN THE SITES.
NO SIGNIFICANT CHANGE ,IS OBSERVED AT SITES F1 (SITE 24)
OR G1-3 (SITES 25-27) BUT CONSTRUCTIQN CONTINUES.
PHOTOGRAPHIG.REFERENGES?FOR SIGNIFICANT ITEMS ON PASS
TOP SECRET CHESS RUFF
Hnndle ri^
TIILENT?KEIH0LE
Control System Only
Hedle Yip TOP SECRET CHESS RUFF Tcs-8114065
TAIENi-KEBxOIE MISSION 1023-1 17-22 AUG 1965
Control Sistem Oel~
~. 25X1 D
ONE CONFIRMED AND 1 PROBABLE LAUNCH AREA (G AND H), IN
EARLY.STAGES OF CONSTRUCTION, ARE NEWLY .IDENTIFIED ON
THIS
MISSION. CONSTRUCTION STARTED ON BOTH THESE TYPE
25X1D
IIIC
LAUNCH AREAS AS EARLY AS
MISSION
25X1D
BUT
CAN BE NEGATED ON MISSION
LAUNCH AREA G.IS LOCATED '14 NM NN OF'THE COMPLEX '
SUPPORT FACILITY AT 49-20N 080-51E. ?IT CONSISTS OF A'
SQUARE EXCAVATION CONTAINING AN APPARENT SILO GORING.
TNO ?EARTH RAMPS EXTEND INTO THE:. EXCAVATION. A
RECTANGULAR MOUND IS ON THE NN SIDE OF~THE EXCAVATION.
GROUND SCARRING ANO tRACK ACTIVITY .EXTEND APPROXIMATELY
2,500 FT TO THE SE. -
PROBABLE LAUNCH AREA H IS LOCATED 16 NM NN1i OF THE
COMPLEX SUPPORT FACILITY AT 49-26N 080-57 E.. IT.
CONSISTS OF A SQUARE EXCAVATION WITH 1, PDSSIBLY 2, -
EARTH RAMPS. A RECTANGULAR MOUND IS ON THE NN SIDE OF
THE EXCAVATION. NO SECURITY FENCING IS OBSERVED.
THE COMPLEX SUPPORT FACILITY, LAUNCH AREAS B (SITE 2) .
AND C (SITE 4) GAN BE IDENTIFIED ONLY. LAUNCH AREAS A
(SITE 1), D (SITE 5), E (SITE 3), AND F (SITE b) ARE
CLOUD COVERED.
NO SIGNIFICANT CHANGE OBSERVED IN COMPLEX SUPPORT- -
FACILITY, THE RAIL-TO-ROAD TRANSFER POINT, OR LAUNCH
GROUP A (SITES 1-3, 5-11)~
LAUNCH SITE B3 (SITE 17) IS NOW A CONFIRMED TYPE IIID
LAUNCH SITE.
1 0 Heedle Vie
TOP SECRET CHESS RUFF ceni of sr temTO~ir
x,adit rt TOP SECRET CHESS RUFF
TALENT-KEYHOLE MISSION- 1023-1 17-22 AUG 1965
Cetir,l S~st,m Odd
TWO NEW PROBABLE LAUNCH SITES ARE LOCATED AT
APPROXIMATELY 51-44N 045-16E AND 51-40N 845-03E. IT
CANNOT BE DETERMINEO?IF THESE NEW SITES ARE ASSOCIATED
WITH EXISTING LAUNCH GROUPS OR IF THEY ARE PARTS OF A
NEW GROUP. THEY ARE TENTATIVELY DESIGNATED C10 AND
C11. .
PHOTOGRAPHIC REFERENCES FOR SIGNIFICANT ITEMS ON PASS
JABAL HAMZI SSM COMPLEX EG 3007N 03037E
KAPUSTIN YAR/VLADIMIROVKA MSL TEST CTR UR 4835N 04545E
CONSTRUCTION CONTINUES AT LAUNCH SITE 4C-1. THE
ARCH-ROOFED BUILDING AND THE BUILDING PREVIOUSLY
OBSERVED IN THE NEARBY EXCAVATION ARE NOW BOTH EARTH
COVERED AND A NEW LOOP ROAD NON EXTENDS FROM THE RAIL'
LINE TO THE SITE ROAD NETNORK. -
MISSILE ACTIVITY/EXERCISES ARE OBSERVED AT LAUNGH,AREAS
1C (SITE 71, 2C '(SITE 6), 4C (SITE 4I, SG (SITE 2I, AND
THE TROOP TRAINING AREA NEST QF.LAUNCH COMPLEX E (SITE
.25X1 D
NEW CONSTRUCTION ACTIVITY IS PRESENT ALONG THE ROAD
BETWEEN LAUNCH COMPLEXES E AND H. ?
THE POSSIBLE LAUNCH AREA IN THE SAM LAUNCH COMPLEX,
PREVIOUSLY IDENTIFIED ON MISSION IS NON A
CONFIRMED SAM LAUNCH AREA. IT.CONSISTS OF 1 LAUNCH
SITE (WITH A HEXAGONAL ROAD CONFIGURATION UNDER
CONSTRUCTION) CONTAINING AT LEAST 2 PROBABLE LAUNCH
POSITIONS, A CENTRAL GUIDANCE/CONTROL AREA. AND A LARGE
REVETMENT OF UNIDENTIFIED FUNCTION. THE MISSILE SYSTEM
TOP SECRET .CHESS RUFF
Hondlt Yip
TALENT?KETHOLE
_ Control STslem Only
N~nAle Yip
1AlENT?KEIHOLE
Control STstem Oaly
TOP SECRET CHESS RUFF, Tcs-81140/65
MISSION 1023-1 ~17-22 AUG 1965
AT THE NEW LAUNCH AREA CANNOT BE SPECIFICALLY
DETERMINED AT THIS TIME. ALL OTHER SAM FACILITIES
' OBSERVED SHOW NO SIGNIFICANT GRANGE.
_ CONSTRUCTION CONTINUES IN THE PROBABLE ASSEMBLY AND
CHECKOUT AREA.
THE INTERFEROMETER FACILITY LOCATED 0.5 NM NORTH OF THE
FORMER ROCKET LAUNCH COMPLEX IS STILL UNDER
CONSTRUCTION. A CONTROL BUILDING HAS BEEN COMPLETED
? 25X1D SINCE MISSION IN THE CENTRAL CONTROL AREA.
SARY-SHAGAN ANTIMISSILE TEST CENTER
25X1 D
ALl FACILITIES AT THE TEST CENTER ARE COVERED BY FAIR
IMAGE QUALITY PHOTOGRAPHY EXCEPT SITE 13. SITE 14. AND
POSSIBLE SITE 16.
NO SIGNIFICANT CHANGES ARE OBSERVED SINCE MISSION -
- EXCEPT AS FOLLOWS --
AMM/SAM LAUNCH AREA I -- CONSTRUCTION CONTINUES.
AMM/SAM LAUNCH AREA 2 --.MINOR CONSTRUCTION CONTINUES.
TWO VEHICLES/PIECES OF EQUIPMENT ARE POSITIONED IN THE
CENTRAL GUIDANCE/CONTROL POSITION OF BOTH LAUNCH SITES.
AT THE ELECTRONIC SITE SUPERIMPOSED ON SAM SITE BO4-2,
AN UNIDENTIFIED RADAR tHORIZONTAL REFLECTORISII IS ON A
SLIGHTLY ELEVATED PREPARED POSITION ALONG EACH OF THE
TWO NEW LOOP ROADS. WORK CONTINUES ON THE GROUND SCAR
FOR A PROBABLE CABLE LINE WHICH WILL PROBABLY EXTEND TO
LAUNCH AREA B.
12
Hendle Yie
TAIENT?KETHOIE
TOP SECRET CHESS RUFF ccntral sr:tem only
H?n, Yl, TOP SECRET CHESS -RUFF TGS-81140/65
? TALENT?KETHOLE
Control System Oaly M I S$ I ON 1023-1 17-22 AUG 1965
PROBABLE LAUNCH AREA A -- MINOR 'CONSTRUCTION OBSERVED.
THE PREVIOUSLY REPORTED,SECOND BACKNET RADAR IS NON
POSITIONED ON A MOUND IN THE ELECTRONIC SITE.
- PROBABLE LAUNCH AREA B -- A GROUND SCAR (PROBABLY A
o CABLELINE) AND SEVERAL NEN TRAILS ARE OBSERVED.
LAUNCH COMPLEX A (SITE 2B3~1 -- NORK CONTINUES IN SE
SECTOR OF LAUNCH SITE'S. THE ENTIRE AIRSTRIP AT THE'
COMPLEX IS BEING WIDENED. ~WU PARKING-APRONS.AND
SEVERAL TAXIWAYS ARE UNDER CONSTRUCTION.
LAUNCH COMPLEX B (SITE 1614) -- A RELATIVELY LONG
LINEAR OBJEC~'IS OBSERVED CLOSE TO THE P~ISSIBLE LAUNCH
POSITION ON WESTERN LOOP ROADeAT?LAUNCH FACILITY 8.
INSTRUMENTATION SItE 2 -- WORK HAS PROGRESSED ON THE
ROOF OF LARGE TRIAD BUILDING.
INTERFEROMETER SITE IN THE SUPPORT BASE -- ACTIVITY IS
OBSERVED IN VICINITY.
NGES FOR SIGNIFICANT
25X1A
SHUANG-CHENG-TZU MISSILE TEST CENTER
CH 4107N 10020E
NO SIGNIFICANT CHANGES OBSERVED AT ANY OF THE
COMPONENTS OF THE TEST CENTER WITH THE EXCEPTION OF THE
FOLLOWING -- AT THE SAM R6D AREA, 3 PIECES OF EQUIPMENT
ARE LOCATED IN THE CENTRAL GUIDANCE AREA OF LAUNCH AREA
A, AND 1 PIECE OF EQUIPMENT IS LOCATED IN THE HOLD
AREA. FIVE UNIDENTIFIED OBJECTS ARE LOCATED NEAR THE
? 13
TOP SECRET CHESS RUFF
Handle Yin
TALENT-KETHOIE
Control System Only
xee~le Yie TOP SECRET CHESS RUFF TGS-81140/65
tAIENT?KErxolE MISSION 1023-1 17-22 AUG 1965
Ceetnl STstem Ootr
MOTOR POOL AT THE SAM HOUSING AND SUPPORT AREA. TWO
SMALL BUILDINGS AND AN UNIDENTIFIED STRUCTURE ARE
OBSERVED ALONG THE NORTH SIDE OF THE SSM ASSEMBLY AND
- CHECKOUT AREA. FIVE BUILDINGS AND 2 POSSIBLE BUILDING
_ FOUNDATIONS ARE NON LOCATED IN AN~AREA OF CONSTRUCTION
_ACTIVITY FIEST OF THE SSM-SAH ASSEMBLY AND CHECKOUT
GONPLEX. TNO POSSIBLE BUILDING FOUNDATIONS ARE VISIBLE
- IN THE PREVIOUSLY REPORTED AREA OF-NEW ACTIVITY .W NN OF
THE POSSIBLE PROPELLANT HANDLING AND STORAGE AREA.
ACTIVITY AT SHUANG-CHENG-TZU AIRFIELD IS REPORTED UNDER
25X1A coMOR ~ -
NO NEW SAM ACTIVITY NOTED IN W T RN 85 PERCENT OF T.HE
50-NM-RADIUS SEARCH AREA ON PA OR IN THE WESTERN 25X1D
10 PERCENT OF THE AREA ON PASS EMAINING PORTIONS
OF THE SEARCH AREA NOT COVERED.
p a
MAGADAN SUSPECT MISSILE TEST FACILITY UR 6000t~t 15300E
NO SSN OR UNIDENTIFIED ACTIVITY OBSERVED IN CLOUD-FREE
DNEPROPETROVSK MISSILE DEVELOP PROD CTR UR 4826N 03459E
A SMALL SECTION HAS BEEN AOOED TO BUILDING 13, A
SECTION HAS BEEN AODEO TO THE NEST END DF BUILDING 8,
ANO A SMALL BULLDING HAS BEEN ADDED IN THE CENTER OF
THE NORTH PRODUCTION AREA. BUILDING 2 IN THE SOUTH
PRODUCTION AREA IS COMPLETE. CLOUD SHADOW?PRECLUDES
DETERMINATION OF ACTIVITY IN THE TEST AREA.
TAI-YUAN SOLID PROPELLANT TEST FACILITY CH 3759N 11233E
NO EVIDENCE OF MISSILE PRODUCTION OR REGENT. ACTIVITY
OBSERVED.
TOP SECRET CHESS RUff
Hendle Yie
TALENT?KETxOIE
Control System Onlr
Na.eia ri? TOP SECRET CHESS RUFF TCS-8I 140/65
TALENT?IIETxOLE MISSION? 1023-1 17-22 AUG 1965
Control Systes Odd ~ ? -
PEIPING RKT ENG TEST FAG GHANG-FtSIN-TIEN GH 3950N 11608E
THREE~BUILOINGS INTERCONNECTED BY PIPELINES AND SEVERAL
SMALL STRUCTURES ARE VISIBLE IN THE AREA OF CONTINUING
CONSTRUCTION AT THE NORTH END OF THE TEST FACILITY. NO
? OTHER SIGNIFICANT CONSTRUCTION ACTIVITY OBSERVED.
A SMAt,L BLAST MARK IS-VISIBLE AT A.TEST BUILDING IN THE
GOMPONENTS_ TEST AREA LOCATED IN THE NN CORNER OF .THE
FACILITY. STAINS IN THE EFFLUENT SUMPS AND EARTH
SCARRING IN-THE BLAST PITS OF THE 3 VERTICAL TEST
STANDS-ARE INDICATIVE OF CONTINUING TEST ACTIVITY.
? o
ENTIRE SEARCH AREA IS COVERED. NORTHERN THIRD IS
OBSCURED BY.~CATTEREO-TO-HEAVY CLOUDS. THE REMAINDER
OF THE SEARCH AREA IS COVERED BY GOOD, STEREO.
PHOTOGRAPHY. NO NEN SAM AG7IVITY OBSERVED IN -
CLOUD-FREE AREAS. _ _
25X1 D
PERM ROCKET ENGINE TEST FACILITY UR 5801N 05634E
- AREA ?75 PERCENT IN CLOUD SHADON. NO NEN CONSTRUCTION,
MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. ?
ZHOANOV SUSPECT ANTI-SATELLITE LNGH FAG UR 4705N 03730E
NO ANTI-SATELLITE LAUNCH FACILITY OBSERVED NITHIN 50-NM
RADIUS OF ZHDANOV.
- 15 N~ndle Yia
TAIENT~KETHOLE
.TOP SECRET CHESS RUFF Coalrol STslem Only
ONE FLOATING DOCK OCCUPIED BY A PARTIALLY SHED-COVERED
LARGE SS ANO ONE UNIDENTIFIED OBJECT REMAIN OUT OF
HATER ON UNFLOOOED.SHALLON SIDE OF MAIN LAUNCH BASIN.
TNO BARGES REMAIN IN FLOODED SIDE OF MAIN BASIN.
VESSELS PRESENT 'IN REMAINDER OF YARD/BASE INCLUDE 2 ,
LARGE UNIDENTIFIED SS, 3 LARGE POSSIBLE UNIDENTIFIED
SS, 1 POSSIBLE J-CLASS SSG, 1 POSSIBLE MEDIUM
UNIDENTIFIED SS,~2 PROBABLE DE, 1 POSSIBLE DE,~1
'PROBABI-E APL,~AND SEVERAL UNIDENTIFIED SURFACE VESSELS.
POSSIBLE DOUBLE-HULLED GRAFT UNDER CONSTRUCTION REMAINS
ON SIpE LAUNCHING NAY.
CUBA OLENYA SUBMARINE BASE UR 6913N 03323E
NO MISSILES OR RELATED ECUIPMENT, NEN CONSTRUCTION,
CAMOUFLAGE OR CONCEALMENT OBSERVED.
VESSELS -- 11 MEDIUM SS.
o
N~n11, rig ~ TOP SECRET CHESS RUFF Tcs-81148/65
TALENT-KETNOIE M I SS I ON 1023-1 17-22 AUG 1965
coetrol s~a,m only 25X1A
25X1D TWO BARRACKS HAVE BEEN CONSTRUCTED IN THE SOUTH AREA
SINGE MISSION TWO ANTI-SUBMARINE NETS
_ ARE NENLY IDENTIFIED AT THE ENTRANCE TO CUBA LITSA.
25X1 D
VESSELS -- 1 POSSIBLE E-CLASS.SSGN, 7 PROBABLE N-CLASS
SSNs 6 LARGE UNIDENTIFIED SS, 2 POSSIBLE LARGE
UNIDENTIFIED SS, 1 PROBABLE DON-CLASS AUXILIARY. AND
.SEVERAL-SMALL CRAFT.
CUBA LITSA NAVAL MISSILE STORAGE UR 6925N 03226E
NO CHANGI= OBSERVED IN FACILITIES IN STORAGE AREA SINCE
MISSION ?
TWO NEN BARRACKS, 1 POSSIBLE PROCESSING BI~ILDING, AND
SEVERAL STORAGE BUILDINGS HAVE BEEN CONSTRUCTED IN THE
BARRACKS/ADMINISTRATIVE AREA SINCE MISSION
CUBA URA NAVAL BASE UR 6920N 03249E
25X1 D
PP ENT CHANGE IN FACILITIES SINCE MISSION _
VESSELS -- 18 POSSIBLE N/R-CLASS SS, 1 POSSIBLE ATREK
ASL, AND 2 SMALL UNIDENTIFIED SURFACE CRAFT.
CUBA PALA NAVAL BASE AND SHIP REPAIR YARD UR 6912N 03326E
25X1D THE LARGE NEW BUILDING REPORTED ON MISSION
IS COMPLETE AND APPEARS TO BE A FABRICATION BU L N .
VESSELS -- 1 PROBABLE LARGE SS IN FLOATING DOCK, 1
POSSIBLE MEDIUM SS, ANO APPROXIMATELY 7 POSSIBLE
SURFACE VESSELS.
TOP SECRET CHESS RUFF
N~ndle Yio
TALENT?KETNOLE
Control System Only
Naedie Yia ? ~ TOP SECRET CHESS RUFF Tcs-81140ib5
TALENi?KEYHDIE M I S S I ON 1023-1 17-22 AUG 1965
CeetrOi S]ftem Oei]
_ LENINGRAD AMM/SAM LAUNCH COMPLEXES UR 5955N 03020E
THE LENINGRAD NW, SW, AND NE AMM/SAM LAUNCH COMPLEXES
ARE NOT COVERED.
NO APPARENT CHANGE OBSERVED A7 THE AMM/SAN TRAINING
SITE CO-LOCATED WITH LENINGRAD SAM TRAINING FACILITY
' C-06.
ONLY EXTREME EAST AND SE TIONS OF SEARCH AREA ARE
25X9 COVERED ON((?~~P~H070GRAPHY. NEW
AMM/SAM LAt~NGH FACILITIES, OR NEW P ECTRONIG
FACILITIES ASSOCIATED WITH THE AMM/SAM ltki~NCH.GOMPLEXES
OBSERYEO. `~~
OLENEGDRSK DUAL HEN HOUSE-TYPE STRUCTURE UR 6806N 03355E
25X1D NO APPARENT CHANGE SINCE MISSION NO NEW
COMMUNICATIONS OR ELECTRONIC FACILITIES OBSERVED.
.? c?
25X1 D
TALLINN AMM/SAM LAUNCH COMPLEX UR 5924N 02419E
COMPLEX IS CLOUD COVERED.
NO ASSOCIATED ELECTRONIC OR COMMUNICATIONS FACILITIES
IDENTIFIED IN CLOUD-FREE PORTIONS OF THE 25-NM SEARCH
AREA.
CHEREPOVETS AMM/SAM LAUNCH COMPLEX UR 5906N 03810E
COMPLEX IS CLOUD COVERED.
NO ASSOCIATED ELECTRONIC OR COMHUNICATION~FACILITIES
IDENTIFIED IN CLOUD-FREE PORTIONS OF THE 50-NM SEARCH
TOP SECRET CHESS RUFF
Handle Yia
TAIENT~KETHOIE
Control S]stem Onl]
Ne.dlevie - TOP SECRET CHESS RUFF Tcs-s1140i6s ?
TALENT-KETNOIE
CeetrelSTSteAOei~ MISSION 1023-1 17-22 AUG 1965
SHATSK FIXED FIELD MRBM SITE 2 UR 5326N 02749E BONUS 1
4.5 NH EAST OF SHATSK ANO 2.5 NM EAST OF MARINA GORKA
MRBM LAUNCH SITE AT 53-26-1ON 027-49-3OE.
SITE CONSISTS OF 4 ELONGATED `LAUNCH POSITIONS IN A
DIAMOND PATTERN SITUATED ON AN IRREGULAR ROAD PATTERN
IN A WOODED AREA. EACH OF THE LAUNCH POSITIONS
CONTAINS A POSSIBLE SMALL UNIDENTIFIED OBJECT. AN ,.
ASSOCIATED LARGE CLEARING CONTAINS 3 POSSIBLE READY
TENTS. A SMALL CIRCULAR AREA BETWEEN 2 OF THE LAUNCH
POSITIONS ALSO CONTAINS A SMALL UNIDENTIFIED OBJECT. .
THE AZIMUTHS OF THE LAUNCH POSITIONS CLOSELY
APPROXIMATE THE AZIMUTHS OF THE LAUNCH PADS AT MARINA
GORKA MRBM LAUNCH SITE. SITE CAN BE NEGATED ON MISSION
SKRUNDA DUAL HEN HOUSE-TYPE STRUCTURE UR 5643N 02157E BONUS 2
25X1 D
NENLY OBSERVED HEN HOUSE-TYPE ACTIVITY CONSISTS OF AN
OPERATIONS AREA, A POWER SUBSTATION APPROXIMATELY 0.5
NM NE AND A SUPPORT AREA APPROXIMATELY 1 NM NE.
THE OPERATIONS AREA CONSISTS OF A CENTRAL CONTROL
BUILDING AND 2 LINEAR STRUCTURES WHICH FORM A BOWED
PATTERN, SIMILAR TO THE DUAL HEN HOUSE-TYPE STRUCTURE
NEAR OLENEGORSK, PROBABLY FACING IN A GENERALLY NW
.DIRECTION. THE CENTRAL BUILDING AND LINEAR STRUCTURES
APPEAR TO BE EXTERNALLY COMPLETE. MENSURATION AND
ISEE ATTACHMENT)
TOP SECRET CHESS RUFF
Hendle Yie
TALENT?KETHOLE
Coettol STslem Only
",.ale Yia TOP SECRET CHESS RUFF TGS-81140/65
TAIENT?IIETNOLE
CootrelS~stem0el~ MISSION 1023-1 17-22 AUG 1965
PROBABLY SECURED COMPLEX UNDER CONSTRUCTION INCLUDES 3
LAUNCH SIYES UNDER CONSTRUCTION, EACH SERVED BY AN
ACCESS ROAD LEADING FROM THE LAUNCH AREA MAIN ROAD, AND
AN ,ELECTRONIC SITE WITH.3 fLEYATED POSITIDNS AND
CLEARINGS .FOR TNO ADDITIONAL PROBABLE POSITIONS. A.'
RECTANGULAR ROAD PATTERN AND A LOOP ROAD EXTEND TO THE
NEST FROM THE LAUNCH AREA MAIN ROAD. A RECTANGULAR
BUIlOING IS UNDER CONSTRUCTION HEST OF THE LAUNCH AREA.
A SMALL SUPPORT AREA IS LOCATED ON 7HE SOUTHERN EDGE OF
THE COMPLEX.
THE COMPLEX
SOME'OF
HAS
THE
NOT PRESENT ON MISSION
COMPLEX SERVICE ROADS
HERE PRESENT 20 DAYS LATER
ON
MISSION
25X1D
ESEE ATTACHMENT)
q TOP SECRET CHESS RUFF
Hee11e Vie
1ALENT?1(EYHOLE
Coelrol System Only
Air
Facilities
HI.111 r. TOP SECRET CHESS RUFF_
.TI1lENT?KETHOIE MISSION 1023-1 ~17-22 AUG 1965
laltnl STsUn OdY
TGS-81140/65
GHEPELEYKA AIRFIELD UR 4947N 03026E
NO NEW SPECIAL WEAPONS STORAGE FACILITIES OR CHANGES IN
EXISTING?FAGILITIES OBSERVED.
AIRCRAFT -- 29 BEAR, 1 BEAR/BISON, AND 2 MEDIUM
STRAIGHT-WING ON HARDSTANDS AND PARKING APRONS ALONG
LOOP.TAXIWAY, 4 BEAR AND 1 BEAR/BISON ON TAXIWAYS ANO
APPRDXIHATEIY 20 UNIDENTIFIED:SMALI SWEPT-WING IN
LOADING AREA. `
ENGELS AIRFIELD =UR 5129N 04611E
A IRGRAFT -- 38 B I SON ON -FIAi~N PARKING APRON, 2 BADGER, 1
GAB; 2 LARGE AND 4 SMALL SWEPT-WING FIGHTERS ON PARKING
APRON OFF SW END OF RUNWAY? 2 GAB, 2 MEDIUM'
STRAIGHT-NING,~A ND 1 SMALL STRAIGHT-WING ON PARKING
APRON AT SW -E ND OF RUNWAY, AN0 2 POSSIBLE SMALL '
SWEPT-WING FIGHTERS ON PARKING APRON AT NE END OF
RUNWAY.
SIAUIIAI AIRFIELD UR 5553N 02323E
AIRCRAFT -- 8 BISON AND 6 SMALL SWEPT-WING ON
HARDSTANDS AND PARKING APRONS ALONG LOOP TAXIWAY, 7
LIGHT STRAIGHT-WINGr 32 SMALL SWEPT-WING/ AND ,S SMALL
STRAIGHT-WING ON APRON WEST OF NORTH END OF-RUNWAY, AND
7 SMALL SWEPT-WING IN NW MAINTENANCE AREA. NO ASMS
OBSERVED.
TOP SECRET CHESS RUFF
Hlndl/ Yip
TALENT-KEYHOLE
Coltfll System Only
25X1 D
NeeQt Yie
TALENT-KEYNOTE
C,etrel S~ste^ OeIY
TOP SECRET CHESS RUFF
MISSION 1023-1 1T-22 AUG 1965
BARANOVICHI AIRFIELD UR 5306N 02603E
AIRCRAFT -- 19 BLINDER, 15 BADGER, 1 CAB, ANO 25 SMALL
SWEPT-WING.
NO APPARENT CHANGE SINGE MISSION -
AIRCRAFT -- 18 BLINDER, 4 ~ADGER, 1 MEDIUM
STRAIGHT-WING, ANO 27 SMALL SWEPT-WING.
MOtDOK AIRFIELD ''~
25X1D NO APPARENT CHANGE SINGE MISSION
UR 4347N 04436E
AIRCRAFT -- 21 BEAR AND 19 PROBABLE AIR TO SURFACE
MISSILES. ~,
A NEW CONCRETE PARKING APRON HAS BEEN GONSTRUGTEO ALONG
TAXIWAY BETWEEN EAST AND WEST PARKING APRONS.
NO ELECTRONIC, NUCLEAR OR ASM FACILITIES OBSERVED.
AIRGRAFT?-- 20 BLINDER AND 5 BADGER-ON NEST PARKING
APRON.
AIRCRAFT -- 8 BEAR (2 WITHOUT TAIL ASSEMBLIES) AND 50
BADGER ON HARDSTAND$ AND GRASS ALONG LOOP TAXIWAY AND 6
BADGER jN MAINTENANCE AREA.
22 - Handle Yie
~ TALENT-KEYHOLE
TOP SECRET CHESS RUFF @ceetrei sr:tam oeiY
N~:dla Ylt TOP SECRET~CHESS RUFF Tcs-81140/bs
TALENT?KETNOLE
CtttrtlS~stte0al~ MISSION 1023-1 17-22 AUG 1965'
ZHI70MIR/SKOMORKHI AIRFIELD UR S010N 02844E
AIRCRAFT -- 29 BADGERr 1 CABr AND 1 SMALI~STRAIGHT-KING
ON HARDSTANDS AND GRASS ALONG LOOP TAXIWAY, 3 PROBABLE
SMALL DELTA-RING IN MAINTENANCE AREA AT SE END OF
FIELO, AND 2 BADGER IN NE MAiNTENANGE~.AREA. `
NEZHIN AIRFIELp
UR 5105N
03152E
RUNMAY EXTENSION ON THE NSN END APPEARS TO BE IN
THE
FINAL STAGES OF CONSTRUCTION. NO OTHER CHANGES
_
OBSERVED.
a
AIRCRAFT -- NDNE OBSERVED:
GOMEL/PRIBYTKI AIRFIELD UR 5218N
03110E
TOP SECRET CHESS RUFF
Handle Yia
TAIENT?KETHOIE
Loatrol STslem Only
Nuclear
Ener9Y
Approved For Release 2001/11/07 :CIA-RDP78T05439A000500290067-6
Next 1 Page(s) In Document Exempt
Approved For Release 2001/11/07 :CIA-RDP78T05439A000500290067-6
Nava
Activity/
Ports
xeed~e vie TOP SECRET CHESS RUFF
TAIENT?KETNOLE TG$-81 140/65
CeetretS~stee0el~ MISSION 1023-1 17-22 AUG 1965 .
PECHENGA PtAVAL BASE LINAKHAMARI UR 6939N 03122E
25X1 D
25X1 D
NO 'APPARENT CHANGE, IN FACILITIES SINCE MISSION
VESSELS -- 8 POSSIBLE MEDIUM S5, 11 PROBABLE MSF, 7
PROBABLE PC, AND 3 UNIDENTIFIED VESSELS UNDERWAY
OUTBOUND.
NIKOLAYEV SHIPYARD NOSENKO 444 ~ UR 4657N 03159E
25X1 D
25X1 D
N0~ ENT CHANGE IN FACILITIES S1~NCE`MISSION -
NO IDENTIFIABLE SUBMARINE FACILITIES OBSERVED.
VISIBLE DETAIL-S OF THE 645-F7 HULL SUGGEST THAT IT IS A
COMBATANT. A TRIANGULAR TOWER MAST IS LOCATED
AMID-SHIPS ANO A SMALL RECTANGULAR STRUCTURE IS LOCATED
AT ABOUT THE NORMAL FORWARD GUN POSITIDN FOR A VESSEL
{lF THIS SIZE. THE AFT PORTION OF THE VESSEL IS ?
CLUTTERED WITH PROBABLE TEMPORARY STRUCTURES ASSOCIATED
WITH~'SHIP BUILDING. A SECOND VESSEL OF THE SAME HULL
CONFIGURATION AND DIMENSIONS IS UNDER CONSTRUCTION ON
THE SAME BUILDING NAY ON WHICH THE FIRST 645-FT HULL
WAS BUILT.
VESSELS -- 1 MERCHANT VESSEL ON THE BUILDING WAYS, 2
SMALL MERCHANT SHIPS IN THE FITTING OUT SLIP, 1 LARGE
AND 1 SMALL MERCHANT SHIP IN THE BASIN, 1 DNEPR-GLASS
AR ANO 2 SMALL MERCHANT VESSELS AT THE QUAYS, AND 1
FLOATING ORYDOCK AND 1 SMALL MERCHANT VESSEL AT THE
WEST END OF THE .YARD..
(SEE ATTACHMENT)
. NIKOLAYEV SHPYD NORTHERN 61 KOMMUNA 445 UR 4659N 03201E
25X1 D
NO APPARENT CHANGE IN FACILITIES SINGE MISSION -
- NO SHORE-BASED SUBMARINE FACILITIES OBSERVED.
GLUUD-SHADOW OBSCURES VESSELS ON THE BUILDING WAYS.
TOP SECRET CHESS RUFF
25X1A
Handle Yie
TAIENT?KEYHOIE
Control System Only
Naadla Yia
TAIENT?tiETHOIE
Coatrol System Oal1
TOP SECRET CHESS RUFF
MISSION 1023-1 17-22 AUG 1965
VESSELS'-- 2 DD, 1 PROBABLE OD, 1 PROBABLE DE, 2 LARGE
MERCHANT VESSELS, 1 MERCHANT VESSEL IN A FLOATING
ORYDOCK, AND 2 UNIDENTIFIED VESSELS.
25X1 D
27
TOP SECRET CHESS RUFF
Handla ria
TAIENT NETHOIE
Coatrol System Onlr
?~ Electronics/
Communications
xnad~e rin TOP SECRET CHESS RUFF TGS-81140/65
TAIENT?KEYHOIE M I S S [ ON 1023-1 17-22 AUG 1965
Control System Oair
25X1 D
VINNITSA SUSPECT SPACE TRACKING FACILITY UR 4913N 0284bE ~,
NO APPARENT CHANGE SINCE MISSIDN NO
RADAR OBSERVED.
KEM PROB TALL KING FACILITY UR 6457N 3429E
1.5 NM NEST OF KEM.
SINGLY SECURED FAGIIiTY CONTAINS 1 PROBABLE TALL KING
ANTENNA, 1 PROBABLE ANTENNA BUILDING, 1 PROBABLE
SUPPORT BUILDING, 1 POSSIBLE GENERATOR BUILDING. AND
APPROXIMATELY 5 UNIDENTIFIED OBJECTS SCATTERED
THROUGHOUT THE FACILITY.
TOP SECRET CHESS RIFF
Hindle ru
TALENT KEYHOLE
Control System Onlr
xendit vi, TOP SECRET CHESS RUFF TCS-81140/65
TALENT?KETHOIE
CottrolSrstemOnly MISSION 1023-1 17-22 AUG 1965
PING-HSIANG GOMPLEk CH 2207N 10646E
TRANSSHIPMENT FACILITY IS FILLED 70 50 PERCENT OF
CAPACITY. OBLIQUITY PRECLUDES FURTHER INTERPRETATION.
TOP SECRET CHESS RUFF
Hindle Vii
TIILENT?KETHOIE
Control System Onlr
ottie~
act~~~ty
Heelle Yie
TAIENT?KEYNOIE
C,etrol System Otly
70P SECRET CHESS RUFF
MISSION 1023-1 17-22 AUG 1965
TGS-81140/65
OTHER ACTIVITY ~ 25X1A
BELEV SENSITIVE OPERATIONS COMPLEX UR 5332N 03630E
A SINGLE RAIL SPUR HAS BEEN EXTENOEO FROM THE RAIL
FACILITY INTO THE OPERATIONS AREA. THE SPUR TERMINATES
ALONGSIDE A LOOP ROAD AND IS THE PROBABLE FUTURE
LOCATION OF THE BRIDGE CRANE.
BUNKER 1, FIRST OBSERVED ON , IS IN
A VERY EARLY STAGE OF CONSTRUCTION. BUNKER 2, ALSO
FIRST~OBSERVED ON IS CLOUD COVERED.
BUNKER 3, AN .ETA BUNKER UNDER CONSTRUCTION IS NEWLY
IDENTIFIED ANO BUNKER 4, NEWLY IDENTIFIED, IS ,ALSO I~N
AN EARLY STAGE OF CONSTRUCTION.
lSEE ATTACHMENT) ~ '
TOP SECRET CHESS RUFF
Hendlt Yie
TAIENT~KETHOIE
Control Systtm Only
Attact~rr~ents
H~ndlc YID
TALENT-KEYHOLE
Control System Only
~Ga_
RAIL-LINE
TOP SECRET CHESS RUFF
MISSION 1023-1. 17-22 AUGUST 1965
~~~ ~i. ~
EARTH?COVERED
~BUILDING~
1~.'=~
TOP SECRET CHESS RUFF -
H~nCle Vii
TALENT-KEYHOLE
Control System OnIY
~~iu
REVETMENT
Haodle Yip
TALENT-KEYHOLE
Cootrol System OnIT
TOP SECRET CHESS RUFF
MISSION 1013.1,17.21 AUGUST 1965
Hindle Yie
TALENT-KEYHOLE
TOP SECRET CHESS RUFF Control System onlT
-i -~
O ~ O
N
N ? V1
m rn
n ~ ?~ o
~ w ~
. ~~~ -_.
('~ CENTRAL _ r? ~ ~, P1
= CONTROL BUILDING ~ ~ rn
N \ _ a =~ \ ~. ~ V1
C r, J POWER SUBSTATION "' C
~. P
`~
T1 "' TI
;~
e~
N T
2
~ ~-1 Z
C = w
~ O L
Approved For Release 2001/11/07 :CIA-RDP78T05439A000500290067-6
Next 1 Page(s) In Document Exempt
Approved For Release 2001/11/07 :CIA-RDP78T05439A000500290067-6
x,.dl. r.
TALEMT?KETNOIE
Cntrel STStem OdE
TOP SECRET CHESS RUFF
MISSION 1023-1, 17.22 AUGUST 1955
TOP SECRET CHESS RUFF
Handle Yie
TAIEMT?KETHOLE
Control System Only