SOVIET MILITARY ORDER OF BATTLE MOSCOW MD
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000500200030-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
June 28, 2001
Sequence Number:
30
Case Number:
Publication Date:
June 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 359.35 KB |
Body:
Approved For Release 2001/08/07 : CIA-RDP78T05439~R 0200030-5
Approved For Release 2001/08/07 : CIA-RDP78TO5439A000500200030-5
y
Copy 1 `.
6. Pagls
PHOTOGRAPHIC INTERPRETATION REPORT
VIET -:M 1LITAFY ORDER.,'OF~f BATTLE
MOSCOW MD
~~~a 3'r 6 ra "~
/`
C I A .
Hand
Declass Revielw by NIMA/DOD
e Via
TCS-80722/65
June 1965
'LENT - KEYHOLE',control Only
WARNING
This.doeument contains classified?information affecting the national security of ttlT~United States within the
Meaning of i'ho espionage laws, U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission
" or the revs' cM ofts''confents in any manner To ian unauthorized person, as well as its use in any manner
~reivdiciol':to.lhe sofefy or interest of the United States' or for the benefit.of any foreign government to the
detriment of'the United States.' Itis to be seen.only'by personnel ==especially indoctrinated and authorized to
iewivs TALENT-KEYHOLE=information Its security must be maim?ained in'accordonce with KEYHOLE and
TALENT repi-ldtions.
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
GROUP I
E..Iya" F- .. .ot.s.
TOP SECRET RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
PREFACE
This report is one in a series on Soviet Ground Force and Logistic
installations being prepared for a DIA/CIA Panel. The series is being
coordinated, published and disseminated- by NP IC. The photographic
analysis is being performed by1thp NPIC Photographic Analysis Group,
the CIA Photographic Intelligence Division (NPIC), and the Production
Center 1Pla (DIA). The photographic analysis for this particular re-
port was performed by the NPIC Photographic Analysis Group.
In the interest of uniformity, the titles and-letter designators for
the facilities observed at these insta'1lations are identical with those
appearing in the project requirement. When a specific facility is not
observed both it's title and letter designator are omitted in the report.
,Titles and letter designators for the various facilities are as
follows: (A) railroad service, (B) road service, (C) landing strips,
(D) administrative and troop housing areas, (E) storage area, (F) am-
munition storage areas, (G) POL storage areas, (H) other buildings and
facilities, (J) equipment storage/maintenance areas, (K) athletic fields,
(L) small arms firing ranges, (NI) driver training areas, (N) tank'
assault gun firing ranges, (P) flat trajectory firing ranges, (Q) artillery
emplacements (batteries), (R) infantry or combined` arms. field train-
ing area or courses, (5) special training facilities, (T) unidentified
.facilities or tracking activity.
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET RUFF
DOBRYATINO AMMUNITION DEPOT RAILROAD STATION
(55-30N 041-19E)
DOBRYATINO, VLADINIIRSKAYA OBLAST, USSR
MOSCOW MD
25X1C
FIGURE 7. LOCATION OF DOBRYATINO AMMUNITION DEPOT RAILROAD STATION.
t_: TOP SECRET RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
TCS-80722/65
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET RUFF
Handle Via
TALENT-KEYHOLE
Control System Only
TOP SECRET RUFF
TCS-80722/65
Dobryatino Ammunition Depot Railroad Sta-
tion is located on the south edge of Dobryatino
(Figure 1).
The installation covers approximately 250
acres and contains 2 administration buildings,
21 support /quarters, 30 ammunition storage
buildings, and 7 support buildings (Figures 2
and 3).
The area is covered on KEYHOLE mis- 25X1 D
sions between
There has been no discernible change in 25X?-
the installation and a light level of activity is
observed on all coverage.
DESCRIPTION OF INSTALLATION
The depot is served by a spur from the Mos-
cow-Murom. rail line and has 1 trackside dock of
undetermined length.
The installation is served by the primary
road network of Dobryatino.
Administratiye and Troop Housing Area
Area D contains 2 administration buildings
and 21 support buildings/quarters.
Area F is double-fenced and contains 30 am-
munition storage buildings and 7 support build-
ings.
Handle V.a
TALENT-r EYt,OLE
Control System Only
TOP ' SECRET- RUFF
DOBRYATINO
M
OSCOW
34 KM
M U R OM -
47 KM
r--"---- - -----
------~
D
41
Railroad, single track
Road
Fence
--
-----Area outline
-
-
-
100
0 500
METERS (APPROXIMATE)
NPIC K-1699 (6/65)
Control System Only
MAPS OR CH.JRTS
REQUIREMEITS
11-709/64
TOP SECRET RUFF
REFERENCES
TOP SECRET RUFF
Handle V.a
TALE-NT.KEYr,OLE
Control System Only