ICBM COMPLEX, VERKHNYAYA SALDA, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000300320078-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
24
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 28, 2000
Sequence Number: 
78
Case Number: 
Publication Date: 
June 1, 1964
Content Type: 
REPORT
File: 
Body: 
ILLEGIB Approved For Release 2000/08/23 :CIA-RDP78T05439A000300320078-2 Next 8 Page(s) In Document Exempt Approved For Release 2000/08/23 :CIA-RDP78T05439A000300320078-2 PWd'~Q~RA1'tltC tM'ER~'RE~tsT{C}h4 R~i~t"~ ~~ 4sr0~~/~y ~~~ ~~n~l~' ~i?~ ~~~ ~ ~~~~ ~r~~r~~ only dafrin Eni ?- i~t? ~eeitaS ~taf~s, if ;s rp ~a sewn psi., #e ~e ~~?:~4i l9 ~3z~331p =-?-#3z'#fit~Sf#~ :#'?~ 3tlf?ggrf#$ fo reze3.,a TAL?4~_~~~~{~~s ,n~a~af?ar.~ Irk 4arurg#~ mint ~a ~s_~zst..~.d :~ ~x=~a?d-s?~Cf+ wifi. ~'f~iCaLE and T~tzIVT ?a ~~I~f~e~~., _ Declassification Review by NIMA/DOD TOP SECRET CHESS RUFF ICBM COMPLEX, VERKHNYAYA SALDA, USSR TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF Launch Site A (TDI Site 2) ~8-09\ 60-16E Launch Site B (TDI Site 1) ~8-06N 60-22E Launch Site C (TDI Site 3) 58-lON 60-28E Launch Site D (TDI Site 4) 58-12N 60-3-1E Launch Site E (TDI Site S) 38-1-IN 60-S-IE Launch Site F (TDI Site 7) 58- 14N 60--I1 E Launch Site G (TDI Site 8) ~8-13N 60-49E Launch Site H (TDI Site 9) 58-05N 60-13E Launch Site I (TDI Site 10) 58-07N 60-33E 25X1A 25X1 D 25X9 Voskresenskoy>e ?E C132 ? TOP SECRET CHESS RUFF Nikolopavlovskope TOP SECRET CHESS RUFF ICBM COMPLEX, VERKHNYAYA SALDA, USSR 25X9 25X9 25X1 D 25X1 D 25X1 D The Verkhnyaya Salda ICBA4 Complex is located in a forested area of gently rolling hills north of the to"?n of Verkhnyaya Salda, along the south bank of the Tagil river (Figure 1). It ex- tends 23.E nautical miles (nm) in a generally northeast-southwest direction, and consists of a complex support facility, grail-to-road transfer point, - an auxiliary support facilit}?, and nine launch areas. The launch areas include 2 T}?pe IIA sites (B and C), 3 Type IIB sites (A, D, and E), 2 Type IIC sites (H and I), and 2 Type III?A sites (F and G). The T}ape II sites all have an orientation of, 345 degrees, The Type III sites are oriented on an , azimuth of 45 degrees ~'1'ide-radius turns are present throughout the Nizhniy Tagil SAM Site B36-2, Nizhniy Tagil SAM Site B27-2, Nizhniy Tagil SAM Site C13-2, Nizhniy Tagil St4M Site D28-2, 25X1 D There was no evidence of the complex on TALENT photography of _ although the rail spur which serves the complex' support facility was under construction. The complex support facility and launch areas A and B were visible on. KEYHOLE photography .25X1 D 25X1 D 25X1 D The complex is situated in an area of heavy 25X1A Verkhnyaya Salda IGBn1 Complex SAM Site B12-2, Verkhnyaya Salda ICBM Complex SAI\4 Site B33-2, Verkhnyaya Salda ICBM Complex SAM Site D03-2, The complex support facility at 58-02N 60-23E is S nm west-northwest of Verkhnyaya Salda. It contains a railhead and storage area, an administration and housing area, and a housing area (Figures 2 and 3). The entire facility covers an area approximately 1.5 by 0.7 nm and contains about 318 buildings. No security meas- ures are evident. The facility is road and rail served. The complex main road leads from the Nizhniy Tagil- Verkhnyaya Salda highway through the complex support facility to the launch areas. It is also served b}' a spur that branches from the Nizhniy Tagil- Verkhnyaya Salda rail line at a point 13 nm east of Nizhniy Tagil. The main spur branches into three spurs that serve the railhead and storage area east of TOP SECRET CHESS RUFF TOP SECRET CHESS -RUFF TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF ? I Building 290' x 60' ~ - 1 Building 255' x 45' Ro`~d 1 Building 160' x 45 ----Trail 1 Building 130' x 50' Railroad 1 Building 140' k 80' -?- Powerline RAIL-TO-ROAD 1 Building 100' x 20' 91Mr Earth-mounded building TRANSFER POINT 2 Buildings 270' x 40' r~ 'Building under construction 2 Buildings 235' x 50' ? Buried tank 2 Buildings 190'-x 45' 4 Buildings 175' x 40' 700o I o 700o aooo ildin s 2 B x 145' 50' .FE ET IAPPFtOxIMATE7 g u - 6 BUlydings-__ ' . , 140' X30' ? 12 Buildings 90' x 30' j ^ 14 Tanks 55' Diam. ? l Building 17S is 60' N I ~ 1 Building , 150' x 65' } . ~ ,,, _ 1 Building- 130' X 35' r ~ ~ 1 Building 120' x 45' oircri ?? 1 Building 90' x.45 j _ :: ~ 4 Buildings 105' x 20' ~ 2 Buildings 85' x 20' +ME ? ~ l } . I 2 Bui ldings 65' x 20' HOUSING AREA ~~. ~ .~.~ ADMINISTRATION AND HOUSING AREA ?r RAILt1EAD AND STORAGE AREA 130' x 45' 45' x 45' 2'T' Buildings 180' x.40'" 90' X so' 14 Buildings . 2 Buildings ' . 2 Buildings. I Building 9 Buildings 220' 240' ' '140' 140' -135 5 Buildings. 120' 9 Buildings 50' 33 Buildings 70' -HOUSING AREA 1 'U' Building 180' x 30' i80' x 30' :' ` 180' x .30' 70 Buildings.` li0` x 30' 3. Buildings 90` x 25'. 13 Buildings 140'.x 20' r 1 Building 70' x:70' 2 Buildings ' , -.65' x 40` -: TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF the housing area. T~+?enty-seven medium-to- very-large ~sarehouse-type structures and about ~0 associated smaller structures are located adjacent to the three spurs in an area 1.0 by 0.4 nm square. The