THEODOLITE STATIONS AT SPECIFIED MRBM SITES IN CUBA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05439A000200400016-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
July 6, 2000
Sequence Number:
16
Case Number:
Publication Date:
October 21, 1963
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP78T05439A000200400016-2.pdf | 58.18 KB |
Body:
ILLEGIB
Approved For Release 2000/08/04: CIA-RDP78TO5439A000200400016-2
Approved For Release 2000/08/04: CIA-RDP78TO5439A000200400016-2
Approved For Release 2000/08/04: CIA-RDP78T05
Declassification review by NIMA/DOD
M/EB 451/63
21 October 1963
Copy /
M MORANDtK FOR: Chief, Military-Economics Division, ORR
ATTENTION 25X1 A
THROUGH: Chief, Requirements Branch, Reconnaissance Group, CGS
FROK: Chief, CIA/PID (NPIC)
SUBJECT Theodolite Stations at Specified NR EM Sites in Cuba
REF~RIIQCE : (a) Requirement C -RR -3-80, 678
(b) CTA/PID Project c 1446-63
(c) Informal Report M/EB 84/63
25X1A
1. This memorandum is. in response to your requirement dated 10 October 1963
which requests a re-evaluation of theodolite stations at certain specified-. aunch
sites near San Cristobal, Cuba.
2. Study of applicable photography revealed the
following. All azimuths are accurate to within a plus or minus of 5 degrees.
25X1A
25X1D
,k-a) At Pad 4 of San Cristobal Launch Site 1, the pad azimuth is
degrees an& the azimuth fro$t the theodolite to the launch stand is
25X1 D
(b) The azimuth of Pad 1 of San Cristobal Launch Site 2 is 25X1D
degrees, however it was not possible to identify an associated theodolite station.
(c) The azimuth of Pad 3 at San Cristobal Launch Site 2 is 25X1D
degrees and the azimuth from the theodolite to the launch stand is 045 degrees.
This theodolite station never progressed.farther than'an early stage of construction.
(d) The azimuth of Pad 3 at San Cristobal Launch Site 3 is
and the azimuth from-the theodolite to the launch stand is 25X1 D
3. All of the above angular measurements were double checked when found o XlD
to be in agreement with those transmitted to your. office in Informal Report M/EB
84/63 dated7 March 1963. 25X1A
4.' The photo analyst on this project is who may be contacted-on
extension 2079 should you have any further questions concerning this project. _
25X1A