PERM ROCKET TEST FACILITY, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200340055-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 6, 2000
Sequence Number: 
55
Case Number: 
Publication Date: 
June 1, 1963
Content Type: 
BRIEF
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200340055-6.pdf159.67 KB
Body: 
Approved For Release 2001/08/20 : CIA-RDP78TO5439A000200340055-6 ILLEGIB Approved For Release 2001/08/20 : CIA-RDP78TO5439A000200340055-6 Copy 70 I Page PHOTOGRAPHIC INTERPRETATION BRIEF Declassification. review by NIMA/DoD 'NPIC/R-118/63 June. 1963 PERM ROCKET TEST FACILITY, USS R ~a_6a7' ARMY i.. Handle AIR EORCE PUNCHED END Via TALENT =KEYHOLE WARNING This document contains classified infonnofion affecting the national security pf the United States within the meaning'of-ihe.espionage_ laws U.S. Code Title 18,Sections"-793 and 794. The low prohibits its transmission or the revelation of its contents in any `manner to an unauthorized person, as well as its; use in any manner prejudicial to the safety or interest of the United States 'or for the benefit of` any foreign government to the detriment of the United States. It is to be seen only bypersonnel especially indoctrinatedand authorized-to - receive TALENT-KEYHOLE, information. its security must be maintained in accordance with KEYHOLE and TALENT, regulations. NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ? S T TOP SECRET CHESS RUFF NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Perm Rocket Test Facility, USSR Geo Coords: 58-O1N 56-34E NPIC Target No- 0156-16C SAC 200. Sheet 0156- 11AL, 2d ed, Nov 59, scale 1:200,000 (S) NPIC Project No J-84/63 (partial answer) The Perm Rocket Test Facility is located in a wooded area 10.5 nm east of Perm at 58-01N 56-34E. It is served., bv both road and rail and has two security fences, the inner fence enclosing approximately 120 acres. The facility has one road-served vertical test stand measuring ap- proximately 60 by 55 feet and 170 feet high, a drive-through checkout building about 185 by 100 feet and 55 feet high, ano 40 miscellaneous storage and administration buildings. Within the facility are four rail spurs, one of which Publication No: NPIC/R-118/63 Date: June 1963 terminates approximately 1,8.00 feet ENE of the test stand at a possible fuel-storage area (reported in OAK-Part II, page 14, as a possible test site). The facility was first seen on Poor-'- uality photography from permitted identi- fication only. Good-quality photography from provides more detail than previously observed at this facility. TOP SECRET CHESS RUFF