PHOTOGRAPHIC INTELLIGENCE REPORT AIRCRAFT HIGHLIGHTS (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A001200010026-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
10
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 5, 2003
Sequence Number: 
26
Case Number: 
Publication Date: 
October 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A001200010026-8.pdf2.4 MB
Body: 
GERY ALYSIS B''ISION 25X1 CIA/PIR75044 Declass Review by NIMA/DOD GROUP I E, I.dad from a~romoric d..-.di, and d.cbasili-i- 25X1 DATE October 1966 MP MCWT PAOGES 6 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010026-8 25X1 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010026-8 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010026-8 CUT TO COPIES CUT TO COP I ES D I Apprlaeecbf w(Release 2003/03/04 :1 ATKRDP78T0 CUT TO COP I ES CUT TO COPIES Dist. Unit #39-48 ,VP/c, 4 E' /o3-Q12 Approv ed For Release 2p O (RE1R 25X1 25X1 Significant changes in facilities or aircraft observed were noted at two plants. significant changes at Sino/Soviet aircraft production facilities from AIR PIR 75044 This report presents interpretation and accompanying photography showing KAZAN AIRFRAME PLANT B-387 FIGURE 1 Construction is underway on two large unidentified buildings and also a. new landing pad and a number of new taxiways and hardstands. The large circular landing pad is now complete. Five HOUND crates and two HOUND are present in the shipping area (Figures 2 and 3). The lower illustration on Figure 3 shows a, closeup of HOUND crates on board ship. KHARKOV AIRCRAFT ASSEMBLY PLANT 135 FIGURE 4 25X1 A significant amount of new construction has taken place since the last coverage A small workshop and an engineering/administration building have been built in the main plant area. At the flyaway field, a large repair and modification facility is under construction. New facilities in this area presently include a. hangar/workshop, one taxiway and one large parking apron, a. smaller hangar, two large workshops under construction, and a steam plant to serve this repair facility. Completion of this area will give this plant a significant repair and modification area, equal to or larger in size than those at Kazan Airframe Plant Gorbunov 22 and Kuybyshev Airframe Plant Lenin 18. -1- Approved For Release 2Ti0POS5tRETF 25X 25X 25X 25X 25X Approve d For Release 2p10YPERE4 RDP78 SHIPPING AREA KAZAN AIRFRAME PLANT B-387 X1 TWO HOUND WITHOUT ROTORS BEING DISASSEMBLED FOR SHIPPING HOUND FUSELAGE AND PARTS CRATES PIR 750)+x+ FIGURE 2 ONE HOUND WITHOUT ROTORS APPROACHING SHIPPING AREA TRUCK CRANE 25X 25X 25X Approved For Release 2MPOSMRR Approv SHIPPING AREA KAZAN AIRFRAME PLANT B-387 HOUND FUSELAGE CRATES HOUND FUSELAGE CRATES PIR 75o44 FIGURE 3 25X1 25X1 25X1 Approved For Release A ~d For Release 21T0DjD3(ij 96 o$ I L 0- AIRCRAFT ASSEMBLY PLANT 135 KHARKOV. USSR Apps 25X1 25X1 ACIC, U.S. Air Target Chart, Series 200, Sheet 0163-IM, 3ca.le 1:200,000 3rd Edition, July 1964 (SECRET ACIC~ U.S. Air Target Chart, Series 200, Sheet 0234-12HL, Scale 1:200,000, 3rd Edition, January 1964 (SECRET) REQUIREMENT C-RR6-83,752 CIA/IAD PROJECT 30021-7 25X 25X roved For Releasq "~3 9LP E IA-RDP 8TO5161AO01200010026-8 25X1 25X1 PIR 7504 Approved For ReleaseTD931 EF Approved For Release TOP/0SEC T05161A001200010026-8 Approved For Release 20Q/03/0$ cRTO5l 61 A001 200010026-8