LU-CHOU NITROGEN FERTILIZER PLANT LU-CHOU, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A000600010081-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
11
Document Creation Date:
December 28, 2016
Document Release Date:
November 7, 2003
Sequence Number:
81
Case Number:
Publication Date:
May 1, 1966
Content Type:
IR
File:
Attachment | Size |
---|---|
CIA-RDP78T05161A000600010081-4.pdf | 4.69 MB |
Body:
Approved For Release ~AQ4(9~/0~~~~nT0516 1AO
q .1f U 7 IIIUUJ~~~vv1l ~~ IIUUII
~,-S I-&I -(~m
UC
EERY
HO
M N DTIOGE IIEI T U ZEQ PL MT
LU-C
Dug cmm
1s
D\
ON
Declass Review by NIMA/DOD
MAY 1966
MP SECRU
PAS
Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010081-4
25
25
25X1 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010081-4
Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010081-4
RECORD
COPY
COPY NO.
PUB. DATE
LOCATION
MASTER
DATE RECEIVED LOCATION
D 1 X196 ~b W~6Iease 2004/05/05
d ` DP78T0
1 4'11AV0060d010081- MAXIMUM 3
CUT TO
COPIES 0
DATE
7/72
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
NUMBER OF COPIES
MO.
DAY
YR.
RECEIVED OR ISSUED
RECD
ISS'D
DAL
MO.
DAY
YR.
RECEIVED OR ISSUED
RECD
ISSO
BAL
9
5
68
li -'t. Unit #41 - 43
3
3
tl
~~
'~?
rv~ i v~tl
aj
8
-~3
19-
41
1/
e-
TITLE SL LASS. LOCATION
X1 T'PTC PTR 65136 Ma.y 1966 T3 25
25
25
Approved For Release 2004/JJPo~E 8 RDP7 T05161A000600010081 4
PIR - b~17b 2b
FIGURE 1
e \ ULR?,
1 C3ATOR
ANDU
INDIA
r.tklsT:%x
PREPARED BY:
CHEMICAL AND SCIENTIFIC SECTION
INDUSTRIAL BRANCH, IAD
LU-CHOU NITROGEN FERTILIZER PLANT
Approved For Release 29041 W(f:6CRC1 -RDP718TO5161A000600010081-4
25
25
Approved or Release 2004rWbS1 P78T05161 00060 019081-4 26X
LU-CHOU NITROGEN FERTILIZER PLANT
LU-CHOU,, CHINA
The Lu-chou Nitrogen Fertilizer Plant is located at 28 46N - 105 22E
and is approximately 8 nm south-southwest of Lu-chou (Lu-hsien) in Szechwan
Province, China (Figures 1 and 2). The plant is situated near the village
of Na-ch'i on the east bank of the Ch'ang Chiang (Yangtze River) and
is served by water as well as by road.
The plant is in a mid-stage of construction on the latest coverage
will be used to produce the hydrogen necessary for ammonia synthesis.
The specific facilities present at this stage of construction have been
identified on Figure 5.
Figure 5). Analysis of this coverage indicates that
it will produce synthetic ammonia and grilled urea. Natural gas probably
All available photographic coverage during the period 25X
was examined in order to follow the construction or is
plant. Enlargements from the best coverage have been included. The
following discussion describes the significant changes and activity by
mission (all annotation numbers refer to Figure 5):
(1) Figure 3 - The smaller of the
two power plants (Annotation 5), an associated control building and spray
pond (Annotation 6) were present at this time. One of the fabrication
buildings (Annotation 12) was under construction and excavation for the
small gasholder (Annotation 8) had begun. Operation of the spray pond
indicated that the small power plant was in use.
(2) I I- The small gasholder and
fabrication building mentioned under (1) appeared nearly complete while
construction of three other fabrication buildings was underway. Awater
treatment facility, a processing building, and a wharf (Annotations 14, 15
and 17) were also under construction. Construction of a bridge over the
Yung-ning Ho (Annotation 18) and additional road construction in the plant
area were in progress. The spray pond was operating, indicating that
the small power plant was in use.
(3) Figure 4 - The larger
power plant (Annotation 5) was in a mid-stage of construction and the
bridge (Annotation 18) appeared nearly complete. Further progress on the
wharf (Annotation 17) was noted. The ammonia synthesis building, urea
prilling tower, and settling tanks (Annotations 4, 9, and 11) were
under construction.
25X
Approved For Release 2004IO?5S R-b
Approved F
61A0006 0010081-4
Apr Release 20Q /6, (J4
(4)1 1 Figure 5 - The prilling
tower, the four fabrication buildings, and the water treatment facility
(Annotations 9, 12, and 14) appeared complete on this mission. The
larger power plant (Annotation 5) also appeared complete and in operation
as indicated by smoke coming from its stacks. In addition, the spray
pond was in operation indicating that either one or both power plants were
in use. Construction of a cooling tower and water intake (Annotations 1
and 16) had taken place. Under construction were two probable spheroidal
tanks, the ammonia synthesis building, a probable prilled urea storage
building, and a conveyor (Annotations 3, 4, 10, and 13). The footings
for a conveyor or pipeline were under construction (Annotation 7) as well
as pipelines serving the various facilities. A tall structure was apparent
on the southwest side of the processing building (Annotation 15).
Approved For Release 201OR51ECRU
25
Approved ute 2Q
PIR - 65136
FIGURE 3
LU-CHOU NITROGEN FERTILIZER PLANT
LU-CHOU, CHINA
28 46N - 105 22E
6V,
I
Approved For Release 2004/
LU-CHOU NITROGEN FERTILIZER PLANT
LU-CHOU, CHINA
28 46N - 105 22E
Approved For Release 2004/0j@5SE@jDP78 05161A000600010081-4
26x1
ib
FIGURE 5
1. Downdraft cooling tower
2. Probable hydrogen plant
under construction
Two probable spheroidal tanks
under construction
Ammonia synthesis building
under construction
Power plants and associated
facilities
Spr