SHIH-MEN NITROGEN FERTILIZER PLANT SHIH MEN, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A000600010024-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
11
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 7, 2003
Sequence Number: 
24
Case Number: 
Publication Date: 
February 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A000600010024-7.pdf2.14 MB
Body: 
Approved For Release 25 HMI GERY Declass Review by NIMA/DOD 25 C I AR 65082 25X _J U UU 5KUUEU \.%.ar P/,GES 6 Approved For Releas 2004/05/05: CIA-RDP78T 5161A000600010024-7 FEB. 1966 25X 25X1 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010024-7 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010024-7 RECORD COPY COPY NO. PUB. DATE LOCATION MASTER DATE RECEIVED LOCATION i W6bV*bV4d ?o&* (ease 2004/05/05 : k,'RDP78T0 l b"iXd0060 010024- MAXI MUM 7 CUT TO COPIES DATE ~I CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE CUT TO COPIES DATE MASTER DATE DATE NUMBER OF COPIES DATE NUMBER OF COPIES MO. DAY YR. RECEIVED OR ISSUED REC D ISS~D SAL NO. DAY YR. RECEIVED OR ISSUED RECD ISS'D BAL 9 4 68 Dist. Unit #92-98 7 7 -74 9~4, - 6- SEC. CLASS. LOCATION X1 PIR 65082 Feb. 1966 TS 25135 25 Approved For Release 2004/05/05 : CIA-RDP78T05161A000600010024-7 NITROGEN SI ULAN' BATOR Yln.ch' 8~ I ) T'ai `11"?' 1 ~.L/ J l(/ i T ~?r+O41~ Approved For Release 2004/05/05 : CIA-RDP78T05161A000600010024-7 EAST GKI NA SEA 25X5 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010024-7 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010024-7 d For Release AQR 5 REI- DP78T 5161A0006 =':_-_65082 Approvfe SHIH-MEN NITROGEN FERTILIZER PLANT SHIN-MEN, CHINA A nitrogenous fertilizer plant is located in the northeast outskirts of Shih-men, approximately 5 nautical miles directly east of the south end of the main runway at Shih-men airfield, at the approximate geographic coordinates of 38 O4N - 114 32E. Photography from missions of s examined in order to follow the development o this plant through the various stages of construction. Included with this report are photographic enlarge- ments from and satellite mission 0 (Figures 3 and , which span the period of special interest. When first observed in mid-1959, the Shih-men nitrogen fertilizer plant was in the early stages of construction. By most major buildings in the production area were under construction. On photographic coverage of (Figure 3), this plant had reached the middle to late stages of construction. Most major features in the production sections were under construction and in some cases appeared to be nearing completion. The production sections and changes or additions to the plant between are noted in the following descriptions which are ieye to figure 1) This section produces the hydrogen gas for the synthesis of ammonia. Facilities present include: a coal processing building and open coal storage, a boiler house, retort building, with only the coal processing area still in the early stages of construction. on this section was in an advanced state in and facilities for processing and storing gas. Construction 2) The ammonia synthesis section contains a large compressor building with an attached ammonia converter. Adjacent units are probably gas purification and separation facilities. Visible changes in this area between nclude: probable scrubbing towers attached to the compressor building and an unidentified small processing unit north of the compressor building. 3) This is a possible nitric acid production section. The silo-like objects are possibly nitric acid absorption towers. Approved For Release 2 25 25 25 25 25 25 25 25 25 25 Approved or Release 2 55K.R - DP78 05161AO0 600010024-7 26 PIR - 650 2 25 Other features in this section are a large waste disposal stack and processing buildings. No major external changes have been made in this area since 4) The nitrogenous fertilizer section, possibly producing ammonium nitrate, includes: a reactor building connected by conveyor to the nearby rail served fertilizer storage, packaging, and shipping building. Two small structures erected south of the reactor building after possibly include acid storage tanks. No other c oted in this section. The remaining portion of this installation appears to contain mainly administrative and other types of support buildings, rather than production facilities. A very large rail served possible warehouse, erected west of the ammonia synthesis section and two probable administration buildings south of the plant entrance are the major additions to these support facilities between 196 In general, the construction of this installation has proceeded at a slow pace. The main structures in the production sections appeared to be nearing completion byl however, the first indication of productive activity, open coal storage near the coal processing building does not appear untill covera e. No significant additions are apparent between At least some production is probably taking place at this plant, the best indicator being the slightly changed configuration of the gas holders on comparative coverage from Approved For Release 200 105f85' P78TQ5161AOO0600010024-7 F7 I 25 25 25 25 Approv ~d For Release 2TQR li 5161AOO MAPS OR CHARTS Locator Map, Communist China, 26906, 10-59 (NOT CLASSIFIED) ACIC, US Air Target Chart, Series 200, Sheet 0382-14AL, 2nd Edition, February 1961, Scale 1:200,000 (SECRET) REQUIREMENT CIA C-RR5-83,036 PROJECT CIA/IAD - 30432-6 Approved For Release 1PSOgc!IT3JRDP7RTJ15I6lA00060 25 25 25 25 25 25X1 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010024-7 Approved For Release 2004/05/05 : CIA-RDP78TO5161A000600010024-7