PROBABLE SAM TRAINING SITE SAM R AND D COMPLEX SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A000400010020-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
10
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 15, 2003
Sequence Number: 
20
Case Number: 
Publication Date: 
February 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A000400010020-3.pdf1.62 MB
Body: 
SAM R AND D COMPLEX CODA Declassification by NIMA/DoD 25 25 S UANG-CHENG TZU MO SS O LF TEST CE GROUP 1 Eaal d d { a m agradin4 nd d 1 ..ifi-ti- CIA/PIR 61088 DATE Feb 1966 MP ZOO P O PAS g:~ 6 Approved For Release 2003/08/05 : CIA-RDP78T05161A000400010020-3 25X1 Approved For Release 2003/08/05 : CIA-RDP78TO5161A000400010020-3 Approved For Release 2003/08/05 : CIA-RDP78TO5161A000400010020-3 RECORD COPY COPY NO. PUB. DATE LOCATION MASTER DATE RECEIVED LOCATION D I sA ~6 Jiff t,elease 2003/08/05 $, RDP78T ItIfAb00 0010020 TAX "U' 3 CUT TO o COPIES DATE 7/72 CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE CUT TO COPIES DATE MASTER DATE DATE NUMBER OF COPIES DATE R NUMBER OF COPIES NO. DAY YR. RECEIVED OR ISSUED REC D ISSN D BAL MO. DAY YR. ECEIVED OR ISSUED RECD ISS'D BAL 9 4 68 Dist. Unit #93-95 3 3 5 12 4-- X1 SEC. CLASS. LOCATION PIR 61088 FEB. 1966 25136 Appro ed For Release 2P0?ISEEREI' PROBABLE SAM TRAINING SITE SAM R AND D COMPLEX SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA CIA/PIR-61088 This report has been prepared to present a chronological study of a probable SAM training site at the SAM R and D Complex, Shuang-Cheng-Tzu Missile Test Center (SCTMTC), China (Figure 1). The site is located approximately 1.7 nautical miles (nm) south of R and D SAM Launch Site A at 41-02-38N 100-31-10E (Figure 2). It was first 25 25 observed on photography of and cannot be negated. 25 The site consists of a probable central guidance area and six unrevetted launch positions which are arranged in a fan configuration, similar to both R and D launch sites. No interior road pattern i_s visible within the site. The average distance between launch positions at the probable training site is approximately 190 feet, which is similar to both R and D sites. No vehicles or equipment have ever been identified at the probable training site, although numerous trails link it to both the main access road serving the SAM R and D rangehead and to R and D Launch Site A (Figure 2). No support facilities are present in the immediate site area. However, since this site is relatively close to the other ranghead facilities, support is undoubtedly provided by the SCTMTC SAM Housing and Support Area located 2.8 nm to the north-northwest (Figure 2). The following table presents a chronological study of this site on all The difference in the number of launch positions visible during the period of photographic surveillance is possibly due to a variation in photo quality. It is therefore possible that the training site had six launch positions through- out the period of coverage. available photographic coverage through 25 25 -1- Approved For Release 20~RM RDP78TO51 25 25 Appro ed For Release pp0N?R RDP78T0 25; 25 CIA PIR-61088 OPERATIONAL SUPPORT AND STORAGE FACILITIES SAM LAUNCH n ITI I ES 4_-- - PROBABLE SAM PATTERN 'I 1 __-__--_- 3 PV ~~ ZE_~ SHUANG-CHENG-TZU AIRFIELD ----- Trail _T Railroad Concrete road Dirt road --- Cable scar ? Support area o Launch site Tactical SAM site e Transmitting site ? Receiving site o Radar site Approved For Release 2T(W0$3ECKW 25 25 aA For Release 20031 0 ME" FAA- MIMM, 11 FRUP7qT05161AO0040001P xi ed For Release 4WOSE?RW RDP7 T05161A000400010020-3 25 25 CIA PIR- 10 MAPS AND CHARTS SAC. US Air Target Chart, Series 200, Sheet 0287-16HL, 1st edition, May 1962, Scale 1:200,000 (SECRET) C-S15-82,619 CIA/IAD PROJECT 30731-5 -2- Approved For Release 2f Wb6(RRI'fk RDP78 05161A00040 25 25 X1 Appro ed For Release IOP/OSR&T -RDP78T0 161 A000400010020-3 Construction Number of Status Launch Positions CIA/PIR-61088 Remarks 1 possible position Site Identification Only visible -- Site Identification Only -- Site Identification Only 2 possible posi- Site Identification Only tions visible Probably Complete 4 positions and 2 probable positions visible Only 4 positions Site Identification Only visible Site Area Identification Only X1 No apparent change 6 positions 0 Only 4 positions Site Identification Only visible Only 2 positions Site Identification Only visible Only 4 positions Site Identification Only visible Undetermined * 6 positions visible Site Identification Only * Due to poor quality photography. Approved For Release J /[{TI~-RDP70T05161A0004000I 25 25 25 25 Approv$ d For Release OPOE?RE RDP78TO Table I continued... Undetermined * Only 4 positions visible 25 25 CIA PIR-61088 6 positions Site Identification Only visible No apparent change 6 positions since visible Construction Number of Status Launch Positions Only 4 positions visible No apparent change 6 positions visible Undetermined * Only 4 positions visible No apparent cha e 6 positions since visible No apparent change No apparent change * Due to poor quality photography. -4- Approved For Release IOR/C&H5RE1i[ 25 25 Approved For TM 8/OSEARpT8T05161A000400010020-3 Approved For Release ] O1 10SECR . IT05161A000400010020-3