TIKHVIN PROBABLE LONG RANGE SAM LAUNCH COMPLEX USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A007300010047-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
November 8, 2001
Sequence Number:
47
Case Number:
Publication Date:
September 1, 1967
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 963.35 KB |
Body:
~~o~~~R~lease 2002/01/02 :CIA-RDP78T04759A007300010047-6
PHOTOGRAPHIC INT.ERPREfiATION REPORT
TIKHVIN
PROBABLE LONG RANGE
SAM LAUNCH COMPLEX
USSR
Declass Review by N I MA/DOD
TCS-80551 / 67
SEPTEMBER 1967
COPY 1 ~,;~
GROUP t EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For~R~ea~~~06g/?1/02 :CIA-RDP78T04759A0~300010047-6
.Approved For Release 2002/01/02 :CIA-RDP78T04759A007300010047-6
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or For the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive Information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining toTALENT-KEYHOLE Control System.
Approved For Release 2002/01/02 :CIA-RDP78T04759A007300010047-6
25X1 D
Handle Via Approved For Release 2 TO4759AOO73OOO 47
Talent-KEYHOIE -g 55167
Control System Only September 1967
Tikhvin Probable Long Range SAM Launch Complex 2 5X1A
USSR 59-~+~+N o33-2~+E
015+
The Tikhvin Probable Long Range SAM (PCBs) Launch Complex is
approximately 6.7 nautical miles NNW of Tikhvin, USSR. The complex, in
an early stage of construction, consists of 2 launch sites, the clearing
for a third, a tracking guidance facility and clearing activities for a
missile-handling facility.
At'La-unch Sites A and B the loop roads have been graded and construction
for 6 launch positions is observed. No revetments are discernible. Only
preliminary tree clearing is observed at Launch Site C.
The tracking guidance facility is connected by road to r.aunch Site B
and consists of 3 clearings, 2 probably for radar mounds and the third for
the control center.
Tree clearance for the missile-handling facility is observed just north
of the launch area.
No support facilities are discernible.
25X1 D
Orientation of the complex is approximately and it is
situated approximately 150 feet above mean sea level. _ e complex can be
negated on KEYHOLE photography of with the
first construction activit observea az i!~auncn ~l~e ~ aiiu pile ~ia~ning~
25X1 D guidance facility on
25X1 D
Handle Via
T ~~~+~r~ r Talent-KEYHOLE
Approved For Release 200'I~ariq'.I~-T8TO4759AOO73OOO1O~dit7a~6system On~y
25X1 D
Handle via Approved For Release 2(~q~~p1~1~-F~~6T04759A0073000~~~Q4~~~51/67
Talent-KEYHOLE ' ur n~ Harr September 1867
Control System Only
Handle Via
Talent-KEYHOLE
Approved For Release 2aQ~0'~~i~1~1' -~d~~8T04759A00730001QiQ4~aF~ystem Only