PROBABLE ABM LAUNCH COMPLEX E24 MOSKVA, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04759A006200010027-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
11
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 29, 2003
Sequence Number: 
27
Case Number: 
Publication Date: 
March 1, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04759A006200010027-0.pdf1.4 MB
Body: 
3/06/20 I?7 _, , 59ap 0 001" 0 - 0 PHOTOGRAPHIC INTERPRETATIC VITAL RECLJAIIS e~P PROBABLE ABM 25X1 25X1 Declass Review by NIMA/DOD GROUP 1: EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION MIJFJIUVCU ruf MWr-d D/LU '.IM-F IJ 10 1 U' 1 ) MUU UVU IUUL/ -u 25X1 Approved For Release 2003/06/20 : CIA-RDP78TO4759AO06200010027-0 Approved For Release 2003/06/20 : CIA-RDP78TO4759AO06200010027-0 25X1 2C1 25X1 TOP SECRET PREFACE This photographic interpretation report is one of a series published in partial response to CIA requirement C-DI5-83,143 which requests detailed line drawings, to scale, of facilities associated with probable ABM deployment in the Moskva area. The information contained in this report is based on photography of I and does not reflect changes observed. since that time. The precision target plots included in this report are mathematically rectified projections of the area. Plots are compiled by utilizing precision mensuration instruments. However, stereoscopic imagery was not available for photo inter- pretation. Identifiable image points are measured and their coordinate values mathematically transformed by a computer. This transformation corrects for camera and attitude (pitch, roll, and yaw) induced distortions but does not correct for displacement due to ground relief and object height. All mensuration utilized in the preparation of this report was accomplished by NPIC/TID. The horizontal and vertical measurements cited are computed values, as derived, and do not reflect numerical round-off unless otherwise specified. The horizontal measurements are accurate to within plus or minus 5 feet or 3 percent, whichever is greater. Vertical measurements are accurate to These target plots represent the most accurate data compiled to date, but the user is cautioned to exercise care in scaling distances or determining azimuths from these plots for relief can introduce errors in distance and alignment. Approved For ReleasJ 25X1 25X1 25X1 25X1 25X1 25X1 Appr~ Uubno E 32 0 Solnechnogorsk E 31000 ? ved For RelealP2003}6'/70T so E30 1tra QC3'o 0 C 28 0 C25 QC31 b E35 C33 0 C35 Q C02 (;he rnayaQ 0 MOSCOW iVNUKOVO AIRFIELD Mozhaysk Nero-Foninsk 0 C22 C200 b 2 9A006200010026 Railroad Road Canal O SA-1 SAM site SA-2 SAM site ? SA-3 SAM site Missile assembly and support facility ?? Probable ABM complex ? (dual triad) Probable ABM complex (single triad) 5_ -5 10 15 NAU TICAL MILES Q 0E 04 Zigor5k Makerovo 0 C07 Kiyn *00 C09 E07 0 Q A,ltepa.novo C10 E10 0 Ramenekoye WA 0 C12 E12 0 0 C14 Y'egory evsk Q E13 Q 1 C17 Klimovsk 0 C19 00 Serpukhov E15 Kolomn FIGURE 1. LOCATION OF PROBABLE ABM LAUNCH COMPLEX E24, MO KUBINKA' AIRFIELD Q C27 Approved For Ref vjl~ WE Q4 0 0 Q6 E17 E19 CIA-RDP78T0 759AO0620001 Q E16 E05 a? E 06 0 E 08 0 25X1 25X1 25X1 25)1 TOP SECRET A0062000100; PROBABLE ABM LAUNCH COMPLEX E24 MOSKVA, USSR Approved For Relea aa" W 9A00620001 25X1 25X1 25X1 2X1 25X1 Probable ABM Launch Complex E24 is located approximately 45 nautical miles (nm) southwest of Moskva, USSR, at 55-21N 36-29E (Figure 1). 1/ The complex consists of a dual triad superimposed on the southwest end of the Launch Area of SA-1 SAM Site E24-1. The probable ABM launch complex is separately secured by a triple fence. Although the presence of the triple security fence has been verified on previous photographic coverage of the com- plex, the tree canopy present in 0 precludes a determination of the 25X1 exact alignment of the inner and outer fences. The complex also contains a T-shaped earth-mounded building with a possible security building at the entrance, a transformer substation, a heating plant, a probable security building at the main entrance to the complex, and 6 support buildings (Figures 2 and 3). Construction of launch positions had not started as of 25X1 Construction activity was first observed at Triad 1 ( igure ) in 25X1 A circular ground pattern I is visible on the northwest side The buildings and environmental shelters now appear to be externally complete. Building A measures 235 by 140 by 40 feet high. A solid parabolic dish 60 feet in diameter is on the ground at the southwest corner of the building. An environmental shelter 110 feet in diameter has been mounted on the roof of the building; a capping section 70 feet in diameter is in place. of the building. This may have been used as a form for assembling sections of the environmental shelter on the ground. Buildings B and C measure 120 by 105 by 40 feet high. An environmental shelter is mounted 25X1 on the roof of each. The distances between the estimated centers of the en- vironmental shelters on the buildings in Triad 1 are as follows: between Build- ings A and B, 1,010 feet; between Buildings B and C, 825 feet; and between Buildings C and A, 860 feet. Construction was first observed at Triad 2 (Figure 3) in 25X1 1/ It now appears to be in a midstage of construction. Building A meas- ures 155 by 120 by 40 feet high. Two wings, each measuring 25X1 high, are situated at the southwest end of the building and are parallel to the long axis of the building. A circular base F_ I for an environ- 25X1 mental shelter is on the roof of the building. A structure 25X1 high is located at the center of the circular base and is probably associated with the pedestal or mount for the radar antenna. Buildings B and C measure A circular base F_ I for an environ- 25X1 mental shelter is situated on the roof of each building. A counterpart of Building D in Triad 1 has not been constructed in Triad 2. The distances be- tween the estimated centers of the circular bases for the environmental shelters on the buildings in Triad 2 are as follows: between Buildings A and B, 845 feet; between Buildings B and C, 835 feet; and between Buildings C and A, 940 feet. The distance between the estimated center of the environmental shelter on Building A in Triad 1 and the estimated center of the circular base for the shelter on Building A in Triad 2 is 2,100 feet. The distance between the esti- mated center of the environmental shelter on Building B in Triad 1 and the estimated center of the circular base for the shelter on Building C in Triad 2 is 885 feet. The T-shaped earth-mounded building 2/ 3/ located between Building A in Triad 1 and Building A in Triad 2 measures approximately 315 by 125 feet on the crossbar of the T. The stem is approximately 140 feet wide; the length cannot be determined. A flat-roofed high bay I uis lo- 25X1 cated near the center of the crossbar. The high bay appears to be higher than the earth-mounded portions of the building, although the exact height TOP SECRE Approved For Release 5 A006200010027-0 FIGURE 2. PROBABLE ABM LAUNCH COMPLEX E24, MOSKVA, USSR. TOP SECRET D 25X1 25X1 25X1 25X1 25X1 Approved For Release 2003106120 : CIA-RDP78T04759A006200010027-0 ROAD FENCE -- * - FENCE APPROXIMATE ALIGNMENT --- -- CABLE SCAR ----- POSSIBLE DITCH SCARRED AREA 100 0 111111 - FEET 250 J SCALE 13000 THIS RECTIFIED PLOT MAKES NO CORRECTION FOR RELIEF DISPLACEMENT. Approved For Releas OP SECRET 027-0 FIGURE 3. LAYOUT OF PROBABLE ABM LAUNCH COMPLEX E24. TOP SECRET Approved For Release 2003106120 : CIA-RDP78T04759A006200010027-0 ITEM DESCRIPTION 1 BLDG A, TRIAD 1 a ENVIRONMENTAL SHELTER b CAPPING SECTION 2 BLDG B, TRIAD 1 a ENVIRONMENTAL SHELTER 3 BLDG C, TRIAD 1 a ENVIRONMENTAL SHELTER 4 BLDG D, TRIAD 1 5 SOLID PARABOLIC DISH 6 SUPPORT BLDG 7 SA-1 CONTROL BUNKER 8 POSSIBLE CONSTRUCTION FORM FOR ENVIRON- MENTAL SHELTER 9 1-SHAPED, EARTH- MOUNDED BLDG a CROSSBAR b STEM C HIGH BAY 10 POSSIBLE SECURITY BLDG, GABLE ROOF 11 SUPPORT BLDG, GABLE ROOF 12 SUPPORT BLDG, GABLE ROOF 13 TANK 14 L-SHAPED PROBABLE SECURITY BLDG a MAIN SECTION b WING 15 SUPPORT BLDG, FLAT ROOF 16 TRANSFORMER SUB- STATION, FLAT ROOF 17 SUPPORT BLDG, FLAT ROOF 18 HEATING PLANT, FLAT ROOF a STACK 19 SUPPORT BLDG 20 POSSIBLE BLDG 21 BLDG A, TRIAD 2 a CIRCULAR BASE FOR ENVIRONMENTAL SHELTER b STRUCTURE C Z WINGS 22 BLDG B, TRIAD 2 a CIRCULAR BASE FOR ENVIRONMENTAL SHELTER 23 BLDG C, TRIAD 2 a CIRCULAR BASE FOR ENVIRONMENTAL SHELTER 24 SA-1 CONTROL BUNKER APPROXIMATE DIMENSIONS. 25X1 2~1 25X1 25X1 TOP SECRET Approved For 59A00620001 0027-0 FIGURE 4. SUPPORT AREA, MOSKVA PROBABLE ABM LAUNCH COMPLEX E24 AND SAM SITE E24.1. TOP SECRET 25X1 25X1 25X1 Approved For Release 2003106120 : CIA-RDP78T04759A006200010027-0 SCALE 16000 TNlS RECTIFIED PLOT MANES NO CORRECTION FOR RELIEF DISPLACEMENT. 103 105 104 ROAD DIRT R0+1D WALKWAY TRAIL FENCE WALL DITCH SCARRED AREA 250 0 500 11111 I I I I FEET ATHLETIC FIELD T Approved For Release OP SECRET 2003/06/20 : CIA-RDP78TO4759Y ITEM DESCRIPTION 8 MULTIFAMILY-TYPE DWELLING, GABLE ROOF 9 SUPPORT BLDG, FLAT ROOF 10 SUPPORT BLDG, FLAT ROOF a 2 LOW WINGS 11 SINGLE-FAMILY-TYPE DWELLING, GABLE ROOF 12 MULTIFAMILY-TYPE DWELLING, GABLE ROOF 13 PROBABLE SHED, FLAT ROOF 14 STRUCTURE 15 STRUCTURE 16 STANDPIPE 17 PROBABLE SHED 18 SUPPORT BLDG, GABLE ROOF FIGURE 5. LAYOUT OF THE SUPPORT AREA. OP SECRET ITEM DESCRIPTION 19 STRUCTURE 20 SUPPORT BLDG, FLAT ROOF, U/I OBJECT ON ROOF 21 SUPPORT BLDG, FLAT ROOF 22 SUPPORT BLDG, FLAT ROOF 23 SUPPORT BLDG, FLAT ROOF 24 SUPPORT BLDG, FLAT ROOF 25 SINGLE-FAMILY-TYPE DWELLING, GABLE ROOF 26 3 MULTIFAMILY-TYPE DWELLINGS, HIPPED ROOFS 21 SINGLE-FAMILY-TYPE DWELLING, GABLE ROOF 28 SUPPORT BLDG, GABLE ROOF 29 3 SINGLE-FAMILY-TYPE DWELLINGS, GABLE ROOFS 30 EARTH-COVERED PROBABLE TANK WITH 2 PROBABLE VENTS 31 SUPPORT BLDG, FLAT ROOF 32 SUPPORT BLDG 33 STRUCTURE 34 SUPPORT BLDG 35 SUPPORT BLDG, GABLE ROOF 36 BLDG U/C 37 SUPPORT BLDG 38 BLDG U/C 39 BLDG 40 SUPPORT BLDG, GABLE ROOF 41 HEATING PLANT, FLAT ROOF a STACK 42 BLDG, FLAT ROOF 43 PROBABLE EARTH FILL 44 SUPPORT BLDG, FLAT ROOF 45 PROBABLE SECURITY BLDG, FLAT ROOF 46 SUPPORT BLDG, FLAT ROOF 47 SUPPORT BLDG, FLAT ROOF 48 SUPPORT BLDG, FLAT ROOF a HIGH BAY 49 SUPPORT BLDG, FLAT ROOF 50 PROBABLE SECURITY BLDG, FLAT ROOF 51 ADMIN-TYPE BLDG, GABLE ROOF 52 ADMIN-TYPE BLDG, GABLE ROOF 53 SUPPORT BLDG, GABLE ROOF 54 SUPPORT BLDG, GABLE ROOF 55 POSSIBLE BLDG FOUNDATION 56 SUPPORT BLDG, GABLE ROOF 57 SUPPORT BLDG, FLAT ROOF 58 SUPPORT BLDG, FLAT ROOF 59 SUPPORT BLDG, GABLE ROOF 60 SUPPORT BLDG, GABLE ROOF 61 SUPPORT BLDG, GABLE ROOF 62 SUPPORT BLDG, GABLE ROOF 63 PROBABLE HARDSTAND 64 POSSIBLE EARTH-COVERED STRUCTURE 65 SUPPORT BLDG, PROBABLE FLAT ROOF 66 SUPPORT BLDG, GABLE ROOF 67 FIELD ITEM DESCRIPI1ON 68 SUPPORT BLDG, GABLE ROOf~ 69 SUPPORT BLDG 70 SUPPORT BLDG, FLAT ROOF 11 SUPPORT BLDG, FLAT ROOF 72 POSSIBLE BLDG U/C 73 WAREHOUSE-TYPE BLDG, GABLE ROOF 14 SUPPORT BLDG, ARCHED ROOF 75 SUPPORT BLDG, FLAT ROOF 16 SUPPORT BLDG, FLAT ROOF, CONCRETE APRON ON NORTH & EAST SIDES 71 SUPPORT BLDG, GABLE R00f~ 78 SUPPORT BLDG, HIPPED ROOF a MAIN STRUCTURE b EXTENSION ON WEST SIDE 79 SUPPORT BLDG, FLAT & GABLE ROOFS a MAIN STRUCTURE b EAST WING 80 SUPPORT BLDG, GABLE R00 81 SUPPORT BLDG, GABLE R00 82 SUPPORT BLDG, PROBABLE FLAT ROOF 83 SUPPORT BLDG, GABLE R001~ 84 SUPPORT BLDG, FLAT ROOF 85 WAREHOUSE-TYPE BLDG, GABLE ROOF 86 WAREHOUSE-TYPE BLDG 81 SUPPORT BLDG, PROBABLE FLAT ROOF 88 CIRCULAR APRON 89 STRUCTURE 90 STRUCTURE 91 WAREHOUSE-TYPE BLDG 92 WAREHOUSE-TYPE BLDG, GABLE ROOF 93 WAREHOUSE-TYPE BLDG, GABLE ROOF 94 POSSIBLE BLDG U/C 95 WAREHOUSE-TYPE BLDG, GABLE ROOF a MAIN STRUCTURE b SOUTH WING % SUPPORT BLDG, GABLE R00~ 91 POSSIBLE VEHICLE SHED, FLAT ROOF 98 SUPPORT BLDG, GABLE ROO 99 SUPPORT BLDG, GABLE R00 100 SUPPORT BLDG, FLAT ROOF 101 SUPPORT BLDG, FLAT ROOF 102 SUPPORT BLDG, FLAT ROOF 103 POSSIBLE GENERATOR BLDG, FLAT ROOF WITH CENTER HIGH BAY 104 2 PROBABLE SEMI BURIED TANKS 105 PROBABLE BLDG FOUNDATIO 106 SUPPORT BLDG, FLAT ROOF 101 SUPPORT BLDG, FLAT ROOF 108 POSSIBLE SHED, FLAT ROOF 109 MULTIFAMILY-TYPE DWELLING HIPPED ROOF * OVERALL DIMENSIONS. 2f1 25X1 25X1 25X1 25X1 25X1 25X1 ITEM DESCRIPTION 1 5 MULTISTORY APARTMENT- TYPE BLDGS, FLAT ROOFS 2 SUPPORT BLDG, FLAT ROOF 3 SUPPORT BLDG a ROOF HEIGHT b ROOF HEIGHT 4 MULTIFAMILY-TYPE DWELLING, GABLE ROOF 5 SUPPORT BLDG, POSSIBLE GABLE ROOF 6 MULTIFAMILY-TYPE DWELLING, GABLE ROOF 1 MULTIFAMILY-TYPE DWELLING, GABLE ROOF OO62OOO1 0027-0 Approved For Release 2003106120 : CIA-RDP78T04759A006200010027-0 2s3* 1 Appr~ ved For Releaj cannot be determined from photography. The building appears to have a drive- through capability, but no road is visible at the entrance to the stem of the T. The Support Area (Figures 4 and 5), which is utilized by the SA-1 SAM site and the probable ABM launch complex, is located approximately 5,000 feet northwest of the SA-1 SAM site Launch Area. The multistory apartment-type buildings, which were first observed in before con- struction had started on the probable ABM launch complex, are the only facilities in the Support Area which can be associated with Probable ABM Launch Complex E24. This type of building has been seen only in the support areas of those Moskva SA-1 SAM sites where probable ABM launch complexes have been constructed. Whether the other buildings and structures in the area are associated with the SA-1 SAM site or with the probable ABM launch nle?x cannot. be determined from aerial photography. A comparison of photography with earlier large-scale pnotograpny cu we iupj%I Area reveals that some multifamily-type dwellings and support buildings are being razed. 4/ 25X1 25X1 25X1 25X1 "ZAPS OR CHAR"IS .1.C1(; series, scale 1:200,000 DOCUl1I:NTS 1. N1'Lls. Cnnstruateot< C:hrortnl,;r o~ L) pbeid Probablc ABM and Long Range SAM Launch Complexes. 25X1 Dec: 66 (1 U1, - s 2 NPIC. T Shaped Bath,n({s at P,ahable AB.4 Facd:tie), AfosAva Area, USSR, Dcc 66 ("I'OI' SLCRI; I' I'll All 1 (+seci~.t,'d Actwih. tilosnu' Arne, USSR, September 196dMarch 1905, Aug 65 TOP SECRKl R EQU J R EM ENI' CIA. C-D15-83,143 (revised) 1PIC PROJECT 11333/66 (partial answer) 25X1 Approved For Release 204 1086/SK8 [FkDP78TO4759Aa 06 5fffl110027-0 25X1 25X1 Approved For Release 2003/06/20 : CIA-RDP78TO4759AO06200010027-0 Approved For Release 2003/06/20 : CIA-RDP78TO4759AO06200010027-0