IMENI GASTELLO ICBM COMPLEX USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04759A004800010019-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 27, 2001
Sequence Number: 
19
Case Number: 
Publication Date: 
September 1, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04759A004800010019-5.pdf550.49 KB
Body: 
T pv tI ftIease 2001/09/01 : CIA-RDP78TO4759AO04800010019-5 PHOTOGRAPHIC INTERPRETATION REPORT IMENI GASTELLO ICBM COMPLEX USSR LAUNCH SITE 21 TCS-80848/66 SEPTEMBER 1966 COPY 101 1 PAGE handle via 1ALENT-KEYHOLE control only Declass Review by N I MA / DoD GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION VA Approved ForTRUeaSE 2E/09/01 : CIA-RDP78TO4759A0 800010019-5 Approved For Release 2001/09/01 : CIA-RDP78T04759A004800010019-5 This document contains Information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining toTALENT-KEYHOLE Control System. Approved For Release 2001/09/01 : CIA-RDP78T04759A004800010019-5 Approved For Release 2001/09/01 : CIA-RDP78TO4759AO04800010019-5 Handle Via TOP SECRET RUFF TCS_80848/66 Talent-KEYHOLE September 1966 Control System Only Imeni Gastello ICBM Complex, Launch Site 21 Location:' Adjacent to transfer point Type: IIIC Stage of Construction: Early The launch site consists of a shallow, U-shaped excavation and ground scarring. The coring is visible at the base of the excavation. The site has no separate site support facility. It is connected to the rail-to-road transfer point by road. A single security fence surrounds the site. Handle Via Approved For Release 20pop9SEC F PT04759AO04800010219Tglent KEYHOLE ontrol System Only