HTAUTOMAT REQUIREMENT RE USSR MOLOTOV RADIO PLANT IN MINSK

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04753A000100090025-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
July 2, 2001
Sequence Number: 
25
Case Number: 
Publication Date: 
October 12, 1956
Content Type: 
REQ
File: 
AttachmentSize
PDF icon CIA-RDP78T04753A000100090025-7.pdf80.93 KB
Body: 
Approved For RejWse 2001/08/13 : CIA-RDP78T04753A0Q9,100090025-7 DECLASS AUTOMAT RE 'JIREMENT F UESTOR 25 1 UIREMENT NO. Division BoAcktrical f A/E/RU.8/56 mm" Industrial Equipment Veto. 12 Date TARGET IN?0 +AT IO T MGZ o l / iu 1 N -~ Tarp t b n o ref nc ~ sa + $- ; ~ - ~ge 18 Possibly n Country Wac No. B. E. No, Coordinates ~R 168 53 55 N - 27 35 R PHOTOGRAPHIC INFORMATION SPECIFIC PHOTO I''TELLIGENCE REQUESTED: it 1s reported that one of the largest electronics plants in the S is located in Minsk., with a production program including military electronics and radar. Other evidence suggests that there may be two electronics plants in i[insk r One of these is certainly liinek Radio Plant "Molotov", believed to be located in the 2+N section, 1/8 NM from the X.nsk Technical College, Just off the main road, Minsk to bksacow, location of the second plant (which may be the "large radar plant") is not confirmed. It may be near Molotov"; low-level reps rts have suggested a location south of the city, on a Lakovs 'a Ul.itsa. The following P1 is requested; 1 Confiria location, size of "Molotov" plant. Describe briefly. J 2 If possible, indicate probable location and size of the second electronics plant. (3) Examine lblotov" plant and otter unidentified end-equipment type plants in Minsk for evidence of radar-type antennae - as test units on roof or as inventory in compound. If possible, sketch antennas in rough. k) Report new plant construction which may be as d with either of these EV~iyi `A/DOD OR VIC - 4q ACTION BY D/GP a 1- ` Recd As signed G\ a - P. I. tF~?I ; ~ Q~a~ G -tssigned Comaleted ` 2esearch ~ ZF" Project Control Noe R4_Ps1 -5 G Approved For Release 01 t,+ 3 F ification