OAK KH-9 MISSION 1208-2 25 APRIL - 22 MAY 1974
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04752A001500010011-9
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
222
Document Creation Date:
December 28, 2016
Document Release Date:
May 1, 2014
Sequence Number:
11
Case Number:
Publication Date:
June 1, 1974
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T04752A001500010011-9.pdf | 6.85 MB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
?
NATIONAL PHOTOGRAPHIC
INTERPRETATION CENTER
25X1
OAK
KH-9 MISSION 1208-2
25 APRIL - 22 MAY 1974
25X1
-111P-STeRfT
25X1
JUNE 1974
COPY NO. 97
228 PAGES
(1208) IPIR 11/74
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
.1. 11.......I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
WARNING
This document contains information affecting the national security of the United States within the meaning
of the espionage lows U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining to TALENT-KEYHOLE Control System.
TARGET CATEGORIES
AND
ASSOCIATED NTP FUNCTIONAL AREAS (CODES)
1. STRATEGIC SSM
Deployed Strategic SSM Facilities (A)
2. MISSILE RANGES
Missile Ranges: Strategic SSM/Space Facilities (PI
Missile Ranges: Air- Launched Missile Facilities (0)
Missile Ranges: Naval -Launched Missile Facilities (R)
Missile Ranges: Tactical SSM Facilities (S)
Missile Ranges: SAM/AMM Facilities (T)
3. AIR DEFENSE MISSILES
Deployed AMM Facilities (B)
Deployed SAM Facilities (D)
4. ELECTRONICS/COMMUNICATIONS
Deployed Communication/Electronic/Radar Facilities (C)
5.
AIR
Air Base Facilities (E)
6. NAVAL
Naval Base Facilities (F)
7. GROUND
Ground Force Facilities (6)
8. TACTICAL SSM
Deployed Tactical SSM Facilities (H)
9. LOGISTICS
Military Logistics Facilities (K)
10. NUCLEAR ENERGY
Atomic Energy Facilities (0)
11. CBR
CBR Facilities (V)
12. INDUSTRY
Strategic Weapons Industrial Facilities (.1)
General Purpose Weapons Industrial Facilities (L)
Non -Military Industrial Facilities (N)
Communication/Electronic/Radar R&D Facilities (U)
13. MISCELLANEOUS
Non-Military Logistics Facilities (M)
Miscellaneous/Unidentified Facilities (Z)
These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National
Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional
association (i.e., missile range tracking facilities are reported under "MISSILE RANGES: fly-away airfields at aircraft plants are reported
under "INDUSTRY: airfield nuclear weapons storage facilities are reported under "AIR: etc.).
WARNING NOTICE
Sensitive Intelligence Sources
and Methods Involved.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SFCRFT RUFF 25X1
11
KH-9 MISSION 1208-2
TABLE OF CONTENTS
PAGE
PREFACE
1
ALGERIA
AIR BASE FACILITIES
3
CHINA' COMMUNIST
DEPLOYED STRATEGIC SSM FACILITIES
5
MISSILE RANGES
12
AIR DEFENSE MISSILES
16
COMMO/ELEC/RADAR FACILITIES
18
AIR BASE FACILITIES
19
NAVAL BASE FACILITIES
20
GROUND FORCE FACILITIES
28
LOGISTICS
30
NUCLEAR ENERGY
31
INDUSTRY
32
CUBA
NAVAL BASE FACILITIES
37
LOGISTICS
38
CZECHOSLOVAKIA
LOGISTICS
-39
UNITED ARAB REPUBLIC
AIR DEFENSE MISSILES
41
AIR BASE FACILITIES
45
NAVAL BASE FACILITIES
54
GROUND FORCE FACILITIES
57
DEPLOYED TACTICAL SSM FACILITIES
61
LOGISTICS
62
HUNGARY
GROUND FORCE FACILITIES
73
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 -
?
11 V . 1..v..1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
KH-9 MISSION 1208-2
25X1
TOP SECRET RUFF --RELEASABLE TO UKr
CA. AS, AND NZ ONLY IN ACCORDANCE
WITH AGENCY OR DEPT. DIRECTIVES
PAGE
IRAQ
COMMO/ELEC/RADAR FACILITIES
AIR BASE FACILITIES
KOREA. NORTH
AIR BASE FACILITIES
NAVAL BASE FACILITIES
GROUND FORCE FACILITIES
DEPLOYED TACTICAL SSM FACILITIES
LIBYA
LOGISTICS
SPRATLY IS.
MISCELLANEOUS
81
82
85
90
92
96
97
99
PAKISTAN
AIR BASE FACILITIES 105
GROUND FORCE FACILITIES 107
POLAND
GROUND FORCE FACILITIES 109
NUCLEAR ENERGY 110
SOMALIA
AIR DEFENSE MISSILES
AIR BASE FACILITIES
NAVAL BASE FACILITIES
GROUND FORCE FACILITIES
111
113
115
116
SYRIA
AIR DEFENSE MISSILES 117
GROUND FORCE FACILITIES 119
LOGISTICS 127
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES 129
MISSILE RANGES 156
AIR DEFENSE MISSILES 167
AIR BASE FACILITIES 169
NAVAL BASE FACILITIES 171
II
25X1
25X1
TOP cECRET RUFF
Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 225X1
1
KH-9 MISSION 1208-2
PAGE
GROUND FORCE FACILITIES 179
LOGISTICS 191
NUCLEAR ENERGY 193
INDUSTRY 201
VIETNAM' NORTH
AIR DEFENSE MISSILES 211
AIR BASE FACILITIES 212
GROUND FORCE FACILITIES 215
LOGISTICS 219
SOUTHERN YEMEN
AIR BASE FACILITIES 225
III
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 _
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP cFCRFT RUFF 2oA1
25X1
KH-9 MISSION 1208-2
11 PREFACE
PREFACE
THIS OAK REPORT ON MISSION 1208..2 PROVIDES INFORMATION ON THE A
AND B PRIORITY COMIREX TARGETS OBSERVED ON PHOTOGRAPHY.
TARGETS IN THIS REPORT ARE SEQUENCED ALPHABETICALLY WITHIN THE
13 TARGET CATEGORIES ESTABLISHED BY COMIREX. A LISTING OF THE
TARGET CATEGORIES APPEARS ON THE INSIDE FRONT COVER OF THIS
REPORT. TARGETS ARE FURTHER SEQUENCED BY COUNTRY AND DIVIDED
INTO TWO SECTIONS -- SIGNIFICANT RESULTS AND OTHER RESULTS.
THE SIGNIFICANT RESULTS SECTIONS INCLUDE NEW TARGETS'
PERISHABLE ITEMS, AND TARGETS WHICH REFLECT CHANGE AND/OR ORDER
OF BATTLE. ALL REMAINING TARGETS ARE INCLUDED IN THE OTHER
RESULTS SECTION.
A CUMULATIVE INDEX WILL BE PUBLISHED AT THE CONCLUSION OF EACH
OAK REPORTING PHASE. AN INDEX WILL BE INCLUDED WITH EACH OAK
SUPPLEMENT.
FOR EXPLANATION OF PREFIXES AND CODES USED IN THIS REPORT, SEE
THE NATIONAL STANDARD MESSAGE FORMAT FOR ELECTRICAL
TRANSMISSION OF FIRST? AND SECOND?PHASE _EXPLOITATION
(COMIREX.-D-31.2/11, 1ST REVISION, JANUARY 1969 AND
JUNE 1968' THE SUPPLEMENT_ TO COMIREX?D-31.2/11).
THE ORDER OF BATTLE REPORTED IS CONFIRMED UNLESS OTHERWISE
QUALIFIED AS PROBABLE (PROB) OR POSSIBLE (POSS).
RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF PHOTOGRAPHY
IS ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT
OF EPHEMERIS DATA. CONSEQUENTLY, FUTURE ANALYSIS MAY RESULT IN
ADDITIONAL INFORMATION, MOREOVER, RECIPIENTS ARE CAUTIONED
THAT THE IDENTIFICATION OF TARGETS IS BASED PRIMARILY ON
PHOTOGRAPHY AND DOES NOT CONSTITUTE A FINISHED INTELLIGENCE
JUDGMENT.
1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
11 V . ,
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
Top SECRET RUFF
KH-9 MISSION 1208-2
1 ALGERIA
AIR BASE FACILITIES
SIGNIFICANT RESULTS
LA REGHAIA/ALMA AIRFIELD
STATUS: NOT OPERATIONAL
36-45--17 003-23-24E
REMARKS:
Two SA-2 SITES WERE OBSERVED COMPLETE WITH MISSILES ON
LAUNCHERS AT THIS NON?OPERATIONAL AIRFIELD ON OBLIQUE COVERAGE
THE SITES WERE SET UP IN A PROBABLE TRAINING MODE.
ALTHOUGH SA-2 EQUIPMENT WAS INITIALLY IDENTIFIED IN THE
COUNTRY IN OCT 72' THIS IS THE FIRST INDICATION OF TRAINING
WITH ANY OF THE EQUIPMENT.
THERE HAVE BEEN NO SAM SITES IDENTIFIED OR OBSERVED UNDER
CONSTRUCTION IN ALGERIA TO DATE.
MicSilF ORDER OF BATTLE:
12 SA-2 MISSILE (CANVAS 14 SA-2 TRANSPORTER
COVERED) 12 SA-2 LAUNCHER
GROUND FORCE ORDER OF BATTLE:
25 pROB PRIME MOVER
TRANSPORTER)
ELECTRONIC ORDER OF BATTLE:
2 FAN SONG
6 FAN SONG RADAR VAN
12 ELECTRONICS VAN
3
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
I I I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-9 MISSION 1208-2
CHINA. COMMUNIST
DEPLOYED STRATEGIC SSM FACILITIES
r)av
25X1
25X1
CHING?YU
SIGNIFICANT RESULTS
MISSILE TEST COMPLEX SSM
STATUS:OPERATIONAL
REMARKS:
42-17.-05N 126-53-20E
25X1
THE COMPLEX WAS COVERED THE SILO DOOR WAS
25X1
CLOSED ON BOTH DAYS. THE PREVIOUSLY OBSERVED PROBABLE CSS-2
TRANSPORTER WAS STILL IN THE SITE SUPPORT AREA. NO SIGNIFICANT
ACTIVITY WAS OBSERVED.
25X1
CHIN?HSI SSM R+D TEST COMPLEX
40-41-26N 120-53-09E
25X1
STATUS: OPERATIONAL
REMARKS:
A POSSIBLE STRUCTURAL TEST VEHICLE (STV),
REPORTED
25X1
AS A POSSIBLE FULLY ASSEMBLED
INERT SLBM, PROBABLY
25X1
REMAINED AT ITS LOCATION. (POSITIVE
IDENTIFICATION WAS
25X1
NOT POSSIBLE BECAUSE OF THE INTERPRETABILITY
OF THE
PHOTOGRAPHY.) AN OBJECT/PIECE OF EQUIPMENT WAS ADJACENT TO THE
POSSIBLE STV, A POSSIBLE PARTIALLY ASSEMBLED STV. REPORTED ON
AS A POSSIBLE PARTIALLY INERT SLBM, WAS NOT AT ITS
25X1
LOCATION AND COULD NOT BE IDENTIFIED
IN THE COMPLEX. TWO
25X1
POSSIBLE SLBM?ASSOCIATED TRAILERS WERE
IN THE LOGISTICS SUPPORT
AREA* THE THREE DUMMY SLBM REPORTED REMAINED AT THE
25X1
SAME LOCATION. NUMEROUS VEHICLES/PILCES OF EQUIPMENT WERE
OBSERVED THROUGHOUT THE COMPLEX' BUT THE INTERPRETABILITY OF
THE PHOTOGRAPHY PRECLUDED THEIR IDENTIFICATION.
THE NEW BUILDING UNDER CONSTRUCTION ADJACENT TO THE ENGINE
TEST CELL HAS 7T CHANGFD IN APPEARANCE SINCE ITS INITIAL
IDENTIFICATION 25X1
ALL OF THE PREVIOUSLY REPORTED SAMLET CRATES AND SOME OF THE
STYX CRATES WERE BEING USED AS SUPPORT BUILDINGS. THESE CRATES
WILL NO LONGER BE REPORTED IN THE ORDER OF BATTLE LIST.
THE NAVAL GUN POSITIONS AND ASSOCIATED INSTRUMENTATION SITE
5
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF 2bAl
25X1
CHINA. COMMUNIST
KH-9 MISSION 1208...2 DEPLOYED STRATEGIC SSM FACILITIES
WERE OCCUPIED. BUT THE EQUIPMENT COULD NOT BE IDENTIFIED. THE
STYX LAUNCH FACILITY AND ASSOCIATED ELECTRONICS AREA REMAINED
UNOCCUPIED.
ASSOCIATED OBJECTS:
25X1
1 POSS STV 3 DUMMY
SLBM
2 POSS FLATBED TRAILER 2 LONG RAILCAR
(SLBM ASSOCIATED) VEHICLE/PIECE OF EQUIP
10 STYX CRATE (NUMEROUS)
25X1
CHU?CHI
MISSILE LAUNCH COMPLEX
23-54-30N 102-43-40E
25X1
STATUS: UNKNOWN
REMARKS:
ALL FOUR LAUNCH SITES AND MOST SUPPORT
AREAS WERE OBSERVED
25X1
NO MISSILE EQUIPMENT WAS DISCERNIBLE.
CONSTRUCTION WAS
25X1
CONTINUING. PARTICULARLY AT LAUNCH SITE
3 WHERE THE GRADED?
EARTH APRON AROUND THE LAUNCH PAD APPEARED TO BE COMPLETE AND
USEABLE,
25X1
KUN?MING/CHENG...KUNG
SSM HQ GEN 24-55.-24N 102...47-48F
25X1
STATUS: COMPLETE
REMARKS:
CSS-2 PROPELLANT VEHICLES WERE CONFIRMED AT THIS FACILITY FOR
THE FIRST TIME ON FOURTEEN CAB?OVER?ENGINE PROPELLANT
TRUCKS (ONE GROUP OF SIX AND ONE GROUP OF EIGHT). A WARHEAD
VAN. ONE CSS-2 LAUNCH STAND TRANSPORTER. AND ONE CARGO TRUCK
WERE PARKED TOGETHER IN THE EQUIPMENT STORAGE AREA. ALL
ESSENTIAL PIECES OF EQUIPMENT FOR ONE CSS-2 (IBM) LAUNCH UNIT
HAVE BEEN OBSERVED THE THREE
CRYOGEN (OXIDIZER) TRAILERS. PARKED BEHIND THE LARGE/DRIVE?IN
EQUIPMENT STORAGE BUILDINGS HAD
BEEN MOVED TO THE OTHER SIDE OF THE INSTALLATION NEXT TO THE
MOBILE GANTRY CRANE AND TWO DOLLY?TYPE MISSILE TRANSPORTERS.
THE A?FRAME CRANE PRESENT HAD BEEN
REPOSITIONED. THE TWO LARGE CAB?OVER?ENGINE TRUCK PRIME
6
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-9 MISSION 1208-2
11 CHINA. COMMUNIST
DEPLOYED STRATEGIC SSM FACILITIES
MOVERS. PROBABLY ASSOCIATED WITH THE CSS-2 TRANSPORTER AND
TRANSPORTER?ERECTOR OBSERVED WERE
OBSERVED. THE FACILITY WAS PARTLY COVERED BUT THE
EQUIPMENT PARKING AREAS WERE OBSCURED BY CLOUDS.
MISSILF ORDER OF BATTLE:
2 DOLLY?TYPE MSL TRNSPTR
(PROB CSS-1,PRTLY OBSCRD BY
TREES)
ASSOCIATED OBJECTS:
1 A?FRAME RANE
1 MOBILE GANTRY CRANE
14 CSS-2 PROPELLANT TRUCK
(CAB?OVER?ENGINE)
1 WARHEAD VAN
1 CSS-2 LNCH STAND TRNSPTR
8 SMALL PROPELLANT TRUCK
(PROB CSS-1 ASSOC)
3 PROPELLANT HANDLING TRK
(PROB CSS.-1 ASSOC)
2 TRUCK PRIME MOVER
(CAB?OVER?ENGINE)
KUN?MING/CHENG?KUNG SSM LNCH SITE/MRBM
STATUS: COMPLETE
24-52-01N 102-53-47E
REMARKS:
NO MISSILE EQUIPMENT OR OPERATIONAL TRAINING ACTIVITY WAS
OBSERVED. THE LAUNCH PAD WAS COVERED WITH A LAYER OF EARTH.
CONSTRUCTION AT THE HOUSING AREA CONTINUES SLOWLY. CONSTRUCTION
EQUIPMENT WAS PARKED UNDER TREES NEXT TO THE NEW CONSTRUCTION.
LIEN?KENG?WANG MISSILE LNCH CPLX SSM
STATUS: UNDER CONSTRUCTION
30-12-00N 117-43-30E
REMARKS:
WITH THE EXCEPTION OF SITE 10, THE ENTIRE COMPLEX WAS OBSERVED
SITE 10 WAS CLOUD COVERED. TEN
PERMANENT BUILDINGS HAVE BEEN CONSTRUCTED AT THE FIXED FIELD
7
25X1
25X1
25X1
LOA!
25X1
25X1
25X1
25X1
25X1
25X1
25X11
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
. I I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF LAI
25X1
KH-9 MISSION 1208-2
CHINA, COMMUNIST
DEPLOYED STRATEGIC SSM FACILITIES
POSITION. NO MISSILE EQUIPMENT WAS IDENTIFIED AT THE COMPLEX.
LIU?CHING?KOU SSM LAUNCH COMPLEX
STATUS: OCCUPIED
REMARKS:
THE ENTIRE COMPLEX WAS COVERED AND ALL AREAS EXCEPT
LAUNCH SITE 2 AND SUSPECT AREA 5 WERE AT LEAST IDENTIFIABLE ON
1 MAY. AT LAUNCH SITE 1. THE BRIDGE AND ROAD CONNECTING
SEVERAL ADITS OPPOSITE THE LAUNCH AREA WITH THE MAIN ROAD
APPEARED TO BE COMPLETE. AT LAUNCH SITE 3. TWO MAJOR BUILDINGS
HAVE BEEN REMOVED FROM THE HOUSING AND SUPPORT AREA AND ANOTHER
ACCESS ROAD INTO THE LAUNCH AREA WAS UNDER CONSTRUCTION. THIS
ROAD APPROACHES THE LAUNCH AREA FROM THE WEST. AT THE NORTH
AREA OF THE PROBABLE SUPPORT FACILITY, TRENCHES HAVE BEEN DUG
38-08-35N 100-06-25E
25X1
25X1
25X1
IN THE VICINITY OF THE PROBABLE HARDENED ANTENNA. SIMILAR
TRENCHES WERE NOT NEAR THE OTHER PROBABLE HARDENED ANTENNA.
NM TO THE SOUTH.
1
25X1
25X1
25X1
25X1
0?SHAN
TENG?SHA?HO
PoSS SSM LAUNCH SITE 1
STATUS: UNKNOWN
REMARKS:
NO MISSILE EQUIPMENT OR SIGNIFICANT CHANGES
MAY.
24-06-00N 102-30-27
WERE OBSERVED
ON 8
a
SSM SPT FAC
STATUS: OCCUPIED
REMARKS:
39-13-41N 122-03-17E
THE SUPPORT FACILITY AND THE ASSOCIATED AREA WERE BOTH ACTIVE.
8
25X1
TAP CFrPFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
TOP SECRET RUFF
KH-9 MISSION 12082
CHINA' COMMUNIST
DEPLOYED STRATEGIC SSM FACILITIES
AT THE SUPPORT FACILITY, 12 VEHICLES/PIECES OF EQUIPMENT WERE
IN THE MOTOR POOL* AN A....FRAME AND PROBABLY BOTH A CSS-1
TRANSPORTER AND A TRANSPORTER?ERECTOR WERE PROTRUDING FROM THE
STORAGE BUILDING, AT THE ASSOCIATED AREA. AN A....FRAME CRANE AND
TEN VEHICLES/PIECES OF EQUIPMENT WERE OBSERVED*
TIA0...YU...TAI MISSILE LAUNCH COMPLEX
STATUS: UNDER CONSTRUCTION
4P-03-10N 125-57-00E
25X1
25X1
REMARKS:
THE ENTIRE COMPLEX WAS COVERED SITES 2' 5. AND 6 25X1
AND THE CAVE STORAGE AREA WERE COVERED NO 25X1
SIGNIFICANT ACTIVITY OR MISSILE..RELATED EQUIPMENT WAS OBSERVED.
TIEN....WEI MISSILE TEST COMPLEX SSM
STATUS: UNKNOWN
2555...20N 102.?49...28E
25X1
25X1
REMARKS:
THE LAUNCH SITE. ALL FOUR TRACKING FACILITIES, AND MOST SUPPORT
AREAS WERE OBSERVED HE SOUTHERNMOST SUPPORT AREAS 25X1
WERE ALSO OBSERVED NO MISSILE EQUIPMENT 25X1
OR INDICATIONS OF OPERATIONAL ACTIVITY WERE DISCERNIBLE*
TUNG..?HUA SSM COMPLEX
STATUS: OCCUPIED
9
41-28-33N 1P6-08-28E
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
.11 V ! . 1 ..1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
75X1
TOP SFCRFT RUFF 25X1
25X1
REMARKS:
THE COMPLEX WAS COVERED AT LAUNCH SITE 4, THE
FOLLOWING EQUIPMENT WAS SEEN A CSS-1 TRANSPORTER?ERECTOR, A
CSS-1. TRANSPORTER WITH A PROBABLE CANVAS?COVERED MISSILE, A
CRYOGEN TRAILER, A WARHEAD VAN. A TRUCK?MOUNTED CRANE. A
POSSIBLE MOBILE GANTRY CRANE. AND 14 TRUCKS. SIX CRYOGEN
TRAILERS WERE IN THE COMPLEX MISSILE ASSEMBLY AND CHECKOUT
AREA. AT LAUNCH SITE 2. A CSS-2 TRANSPORTER OR
TRANSPORTER?ERECTOR WAS OBSERVED IN THE MOTOR POOL AREA. AT
LAUNCH SITE 1. A WARHEAD VAN AND A PROBABLE CSS-2 LAUNCH STAND
AND LAUNCH STAND TRANSPORTER WERE PRESENT. EIGHT
CAB?OVER?ENGINE PROPELLANT VEHICLES WERE AT THE PROPELLANT
STORAGE AREA.
CHINA. COMMUNIST
208..2 DEPLOYED STRATEGIC SSM FACILITIES
WO..NI..CHAI MISSILE LAUNCH COMPLEX
STATUS: COMPLETE
23-24-40N 102?'47-1OE
REMARKS:
OBSERVED ON AT LAUNCH SITE 1. THE LAUNCH PAD WAS
ALL FOUR LAU C ITES AND MOST OF THE SUPPORT AREAS WERE
PN-171?
GENERALLY CLEAR 0 CAMOUFLAGE MATERIAL, BUT NO EQUIPMENT WAS
OBSERVED. AT LAUNCH SITE 20 20 TRUCKS WERE IN THE LAUNCH AREA.
THE TRUCKS WERE PARKED ON THE EDGES OF THE APRON AND OFF THE
ROADS AND WERE CAMOUFLAGED WITH VEGETATION. NINE OF THE
VEHICLES APPEARED TO BE POSSIBLE PROPELLANT TRUCKS. TWO WERE
POSSIBLE VAN TRUCKS, AND ONE WAS A POSSIBLE LAUNCH STAND
TRANSPORTER. THE LAUNCH PAD AT SITE 2 ALSO WAS CAMOUFLAGED.
THREE CAB?OVER?ENGINE PROPELLANT TRUCKS REPORTED (
WERE STILL AT LAUNCH SITE 5. NO OTHER MISSILE SUPPORT
EQUIPMENT OR SIGNIFICANT CHANGES WERE OBSERVED,
SSM TRAINING POSITION
STATUS: OCCUPIED
37..57..01N 102..40-17E
REMARKS:
NO SSM TRAINING ACTIVITY WAS OBSERVED. TWO CSS-1
TRANSPORTER?ERECTORS, THREE MOBILE GANTRY CRANES, AND ONE TRUCK
WERE OBSERVED IN THE EQUIPMENT MAINTENANCE AND STORAGE AREA ON
10
25X1
25X1
25X1
25X1
- 25X1
25X1
- 25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
KH-9 MISSION 1208-2
11
TOP SECRET RUFF
CHINA. COMMUNIST
DEPLOYED STRATEGIC SSM FACILITIES
OTHER RESULTS?NO APPARENT CHANGE
FU?SUNG FIXED FIELD POSITION 1/MRBM
42-13-05N 127-01-44E
STATUS: UNOCCUPIED
Fu?SUNG FIXED FIELD SITE 2/MRBM
42-09-01N 127-03-46E
STATUS: UNOCCUPIED
11
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in Part
I 1 V .1..,.! .
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF LAI
25X1
11
KH-9 MISSION 1208-2
CHINA, COMMUNIST
MISSILE RANGES
SHUANG?CHENG?TZU
STATUS: OCCUPIED
AIR ORDER OF BATTLE:
SIGNIFICANT RESULTS
AIRFIELD 40....23....5QN 0(19.47.34F
. 25X1
25X1
1 BADGER
2 PROB CRATE
1 BEAGLE 2 COLT
11 FARMER 1 HOUND
9 FAGOT/FRESCO
AIR ORDER OF BATTLE:
25X1
1 BADGER
10 FAGOT/FRESCO
1 BEAGLE 2 CRATE
12 FARMER 1 HOUND
25X1
SHUANG?CHENG?TZU
MISSILE TEST CENTER 41-08-00N 100-15-00E
25X1
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE TEST
CENTER WAS COVERED ON CLEAR PHOTOGRAPHY OF
GOOD
INTERPRETABILITY
THE ONLY SSM ACTIVITY
WAS AT
25X1
COMPLEX Be A CSS?X-4 WAS ERECTED ON THE LAUNCH
STAND
25X1
AT PAD B2 AND THE GANTRY AND EMPTY FIRST? AND SECOND?STAGE
TRANSPORTER WERE
PARKED NEAR THE SW EDGE OF THE LAUNCH PAD. ON
THE FIRST
AND SECOND STAGES OF THE CSS?X-4 WERE IN
25X1
HORIZONTAL POSITIONS
ON THEIR TRANSPORTERS PARKED AT THE SW
EDGE OF THE PAD. THE GANTRY WAS OVER THE LAUNCH STAND. PARKED
ON OR NEAR THE LAUNCH PAD ON BOTH DAYS WAS A SMALL.
APPROXIMATELY 15? BY 10?FOOT. VEHICLE OR PIECE OF EQUIPMENT.
POSSIBLY ASSOCIATED WITH THE MISSILE PAYLOAD.
25X1
25X1
12
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
11 CHINA' COMMUNIST
MISSILE RANGES
SHUANG.-CHENG..TZU MTC SAM LAUNCH CPLX
STATUS: OPERATIONAL
41-04-53N 100-31-05E
REMARKS:
THE COMPLEX WAS COVERED ONLY TWO LAUNCHERS
WERE OBSERVED AT LAUNCH SITE A THE SITE
WAS OCCUPIED BY FIVE LAUNCHERS, A FAN SONG RADAR, AND SEVERAL
ELECTRONICS VANS. AT SITE Bt FIVE LAUNCHERS WERE OBSERVED
AND SIX LAUNCHERS WERE OBSERVED A PROBABLE GIN
SLING AND PROBABLE FAN SONG B/C WERE IN THE GUIDANCE AREA ON
BOTH DAYS.
MISSILE ORDER OF BATTLE:
7 PROB CSA-1 LAUNCHER
1 PROB CSA-1 MISSILE (ON
TRANSPORTER)
MISSILE ORDER OF BATTLE:
11 PROB CSA-1 LAUNCHER
1 PROB CSA-1 MISSILE (ON
TRANSPORTER)
ELECTRONIC
ORDER OF BATTLE:
1 PROB FAN SONG
1 PROB GIN SLING
ELECTRONIC
ORDER OF BATTLE:
2 PROB FAN
1 PROB GIN
ASSOCIATED
SONG B/C
SLING
OBJECTS:
VAN/VEHICLE (NUMEROUS)
15 PROB CSA-1 TRANSPORTER
14 PROB CSA-1 TRANSPORTER
1 PROB KNIFE REST
1 PROB KNIFE REST
13
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
5X1
11 V ,.1 .1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
KH-9 MISSION 1208-.2
WU...CHAI MISSILE TEST COMPLEX
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED ON OBLIQUE PHOTOGRAPHY .
PORTIONS OF THE COMPLEX INCLUDING LAUNCH SITES B AND C
WERE OBSERVED THROUGH HEAVY CLOUDS AND THE ENTIRE
COMPLEX EXCEPT TRACKING FACILITIES 1 AND 5 WAS OBSERVED ON
CLEAR PHOTOGRAPHY
CHINA, COMMUNIST
MISSILE RANGES
111...36..!OE
TRAINING ACTIVITY FIRST OBSERVE WAS
AGAIN OBSERVED AT LAUNCH SITE A AND THE MAIN SUPPORT BASE. AT
LAUNCH SITE A A CSS-2 LAUNCH STAND AND AN EMPTY
LAUNCH STAND TRANSPORTER WERE NEAR THE CENTER OF THE LAUNCH
PAD. A PROBABLE CSS-2 TRANSPORTER?ERECTOR WAS JUST OFF THE
EASTERN EDGE OF THE PAD AND 13 SUPPORT VEHICLES WERE ALIGNED
ALONG THE CABLE SCAR LEADING FROM THE PAD TO THE SITE CONTROL
BUNKER. AT THE KEYHOLE?SHAPED STRUCTURE UNDER CONSTRUCTION IN
AN EXCAVATION SE OF THE LAUNCH PAD. THE CURVED WALL PARTIALLY
ENCIRCLING THE STRUCTURE AND THE TWO WALLS BORDERING THE
COVERED TRENCH LEADING IN A WESTERLY DIRECTION FROM THE
STRUCTURE HAVE BEEN HEIGHTENED.
ACTIVITY WAS OBSERVED AT THE RAIL OFFLOADING POINT 0.5 NM
SOUTH OF LAUNCH SITE A. A MISSILE RAILCAR AND FLAT
CAR COMBINATION WAS ON THE RAIL SIDING BUT WAS NOT PRESENT ON
FOUR PERSONNEL TENTS FIRST OBSERVED WERE
STILL PRESENT. AND THREE PROBABLE PROPELLANT RAILCARS AND FIVE
TRUCKS WERE ALSO OBSERVED.
AT THE MAIN SUPPORT BASE. A TENT ENCAMPMENT AND VEHICLE PARK
WERE ERECTED AT THE NORTHERN EDGE OF THE HOUSING AND SUPPORT
AREA SIMILAR TO THOSE PREVIOUSLY OBSERVED IN CONJUNCTION WITH
TRAINING ACTIVITY AT WU...CHAI. THE VEHICLE PARK
INCLUDED TWO CSS-2 MISSILE TRANSPORTERS AND 15 SUPPORT
VEHICLES. ONLY ONE OF THE TRANSPORTERS WAS PRESENT.
THE ABSENCE OF THE OTHER TRANSPORTER MAY HAVE BEEN RELATED TO
THE PRESENCE OF THE MISSILE RAILCAR COMBINATION AT THE RAIL
OFFLOADING POINT.
A NEW MOBILE INSTRUMENTATION SITE WAS OBSERVED ON A LEVELED
AREA ON THE HILLSIDE SOUTH OF THE MISSILE ASSEMBLY AND CHECKOUT
AREA. TWO VAN TRUCKS PARKED IN TANDEM AND TWO OTHER VANS. ONE
ON EACH SIDE. WERE AT THE SITE FIVE PROBABLE
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified
in Part - Sanitized Copy Approved
for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
25X1
25X1
11
CHINA, COMMUNIST
KH-9 MISSION 1208.,2
MISSILE
RANGES
25X1
GENERATOR TRAILERS
WERE PARKED IN A LINE TO THE REAR.
A TEMPORARY SHELTER HAD BEEN ERECTED WHERE THE PROBABLE 25X1
GENERATOR TRAILERS WERE PREVIOUSLY OBSERVED. THIS ALIGNMENT OF
VEHICLES WAS, SIMILAR TO THAT OF MOBILE ELECTRONICS VANS AND
TRAILERS PARKED ON THE HILLSIDE JUST NORTH OF THE MISSILE
ASSEMBLY AND CHECKOUT AREA WHICH WERE BELIEVED USED TO MONITOR
LAUNCHES FROM LAUNCH SITE A.
CONSTRUCTION WAS CONTINUING AT LAUNCH SITES B AND C. AT
LAUNCH SITE Br THE UNFINISHED PORTION OF THE APRON, FORMERLY
UNDER THE SILO DOOR WHEN IT WAS IN THE OPEN POSITIONS HAS BEEN
PAVED.
15
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
I I V I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
SHAN...TAN SAM TRAINING AREA B
STATUS: OCCUPIED
CHINA, COMMUNIST
AIR DEFENSE MISSILES
38?.56..?57N 101
08.-07E
REMARKS:
CSA-1 TRAINING EXERCISES WERE IN PROGRESS AT TWO OF THE FOUR
LAUNCH SITES (SITES B AND D). CSA'-3. EQUIPMENT WAS
ALSO PARKED IN SITE C. IN THE STORAGE AREA NEAR SITE At AND
NEAR THE HOUSING COMPLEX. EQUIPMENT WITHIN THE
LAUNCH POSITIONS AT SITE B AND IN THE STORAGE AREA NEAR SITE A
HAD BEEN REMOVED. HOWEVER, THE LAUNCH POSITIONS AT SITE D
REMAINED OCCUPIED. MISSILE EQUIPMENT WAS ALSO IN THE HOUSING
AREA. BOGIE WHEELS WERE IN LAUNCH SITE C. THE GUIDANCE AREA
WITHIN SITE B ALSO REMAINED OCCUPIED.
ER OF BATTLE:
6CA1LA NCHER
ELECTRONIC ORDER OF BATTLE:
5 MISSILE TRANSPORTER
1 PROB GIN SLING 1 PROB MODIFIED ODD LOT
1 PROB FAN SONG
ASSOCIATED OBJECTS:
3 CANISTER TRANSPORTER
6 SET OF BOGIE WHEEL
4 PROB CANISTER CRATE
4 PROB WING CRATE
MISSILE ORDER OF BATTLE:
3 CSA-1 LAUNCHER
ELECTRONIC ORDER OF BATTLE:
2 GUIDANCE RADAR
1 PROB MODIFIED ODD LOT
ASSOCIATED OBJECTS:
3 SET OF BOGIE WHEEL
7 TRACKED PRIME MOVER
16
26 ELEC ASSOCIATED VAN
11 TRACKED PRIME MOVER
1 TRUCK..-MOUNTED CRANE
6 TRUCK
18 VEHICLE/PIECE OF EQUIP
7 PROB MISSILE TRANSPORTER
42 POSS ELC ASSOCIATED VAN
29 VEHICLE/PIECE OF EQUIP
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
I.Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
CHINA, COMMUNIST
KH-9 MISSION 1208-2 COMMO/ELEC/RADAR FACILITIES
25X1
25X1
HSIN...HUA
SIGNIFICANT RESULTS
SSM/SPACE TRACKING FACILITY 27-46.-05N 111..-15-35E
25X1
25X1
25X1
25X1
25X1
STATUS: OPERATIONAL
REMARKS:
NO FIRE CAN RADAR OR MOBILE WEATHER STATION WAS OBSERVED. NO
SIGNIFICANT CHANGE WAS OBSERVED AT THE FACILITY.
KUN?MING
LAI?YANG
OPTICAL TRACKING FACILITY
STATUS: OPERATIONAL
REMARKS:
NEITHER A FIRE CAN RADAR NOR A MOBILE
OBSERVED.
24-54-35N 102-48-10E
WEATHER STATION WAS
SPACE TRACKING FACILITY
STATUS: OPERATIONAL
37-03-20N 120-47-00E
REMARKS:
NO FIRE CAN RADAR OR MOBILE WEATHER STATION WAS OBSERVED AT
THIS FACILITY. A NEW SUPPORT_ BUILDING HAS BEEN CONSTRUCTED IN
THE AREA BETWEEN THE OPTICAL TRACKING SECTION AND THE
ADMINISTRATION SECTION. ALSO. THE FOOTINGS FOR TWO ADDITIONAL
suppoRT BUILDINGS WERE OBSERVED IN THE SAME AREA.
18
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
2bAl
25X1
TOP SECRET RUFF
KH.-9 MISSION 1208-2
WU?HU AIRFIELD
SIGNIFICANT RESULTS
CHINA, COMMUNIST
AIR BASE FACILITIES
31-23-28N 118-24-26E
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
10 FISHBED
3 POSS FISHBED
20 POSS FAGOT/FRESCO
25 P055 MAX/MOOSE
19
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-
25X1
25X1
25X1
25X1
? .11 .. .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
25X1
25X1
KH-09 MISSION 1208-2
TOP SECRET RUFF
SIGNIFICANT RESULTS
CHINA, COMMUNIST
NAVAL BASE FACILITIES
CHING-TAO NAVAL BASE
36-05-49N 120-19-22E
25X1
25X1
STATUS: OPERATIONAL
NAVAL ORDER OF BATTLE:
1 PROB FUCHOU ACM
3 ATA
1 YTB
1 OCEAN TANKER
SMALL CRAFT (SEVERAL)
-- AT NVL BASE
3 GORDYY DOGS
1 T-43 MSF
2 US LST-1 LST
2 PROB US LSIL-351 LSIL
13 LCM
1 AKL
NAVAL ORDER OF BATTLE:
- AT SUB BASE
25X1
3 PROS R SS
1 PROB T-43 AGS
6 PROB W SS
2 AGS/AGOR
3 HAINAN PC
1 ANTUNG AK
2 PROB T-43 MSF
1 TUNG-FANG-HUNG AGOR
1 US LST-1 LST
SMALL CRAFT (SEVERAL)
1 US LSM-1 LSM
NAVAL ORDER OF BATTLE:
25X1
-- AT NVL DOCKYARD
1 SS
1 PROB AKL
3 PROB PC
2 PROB AOTL
3 PROB OSA PTFG
1 OCEAN FREIGHTER
1 PROB US LST-1 LST
1 PROB PASSENGER SHIP
1 PROB T-43 AGS
SMALL CRAFT (NUMEROUS)
NAVAL ORDER OF BATTLE:
AT NVL FAC
25X11
6 SHANGHAI-II PGM
5 PROB LCM
. SMALL CRAFT (NUMEROUS)
NAVAL ORDER OF BATTLE:
-- AT NVL BASE
25X1
3
GORDYY DOGS
1
US BITTERBUSH ALB
1
7-43 MSF
1
FUCHOU AOTL
5
POSS MSA
1
PROB LEICHOU AOTL
2
US LST-1 LST
3
ATA
2
US LSIL-351 LSIL
2
OCEAN TANKER
18
LCM
SMALL CRAFT (NUMEROUS)
20
25X1
TAP cFrRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
KH-9 MISSION 1208-2
5 PROB AKL
11
Top SECRET RUFF
NAVAL ORDER OF BATTLE:
__ AT SUB BASE
3 R SS
6 w SS
4 HAINAN PC
1 US LST-1 LST
1 US LSM-1 LSM
NAVAL ORDER OF BATTLE:
-- AT NVL DOCKYARD
1 W SS
2 KRONsHTADT PC
3 OSA pTFG
1 US LST-1 LST
1 T-43 AGS
1 TANLIN AKL
CHINA, COMMUNIST
NAVAL BASE FACILITIES
NAVAL ORDER OF BATTLE:
? AT mTB BASE
1 PROB MIDGET SUBMARINE
11 P-6 PT
2 PROB LIENYUN MSA
NAVAL ORDER OF BATTLE:
.? AT NVL FAC
6 SHANGHAI?II PGM
1 PROB SWATOW PGM
2 PROB LIENYuN MSA
1 T-43 AGS
2 AGS/AGOR
1 ANTUNG AK
1 TUNG?FANG?HUNG AGOR
SMALL CRAFT (SEVERAL)
1 FUCHOU AOTL
1 LEICHOU AOTL
2 ATA
1 OCEAN FREIGHTER
1 PROB PASSENGER SHIP
SMALL CRAFT (NUMEROUS)
2 PROB TINGHAI?TYPE AG
2 PROB VP
SMALL CRAFT (SEVERAL)
7 LCm
SMALL CRAFT (NUMEROUS)
CHING?TAO SUBMARINE BASE
36-05-41N 120-18-46E
STATUS: OPERATIONAL
NAVAL ORDER OF BATTLE:
3
PROB R SS
1
PROB T-43 AGS
6
PROB W SS
2
AGS/AGOR
3
HAINAN PC
1
ANTUNG AK
2
PROB T-43 MSF
1
TUNG?FANG?HUNG AGoR
1
US LST-1 LST
SMALL CRAFT (SEVERAL)
21
25X1
25X1
HX1
25X1
25X1
25X1
25X1
25X1
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part
li ?l , 1.. I ?
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
1 US LSM-1 LSM
NAVAL ORDER OF BATTLE:
3 R SS
6 W SS
4 HAINAN PC
1 US LST-1 LST
1 US LSM-1 LSM
CHINA, COMMUNIST
NAVAL BASE FACILITIES
1 T-43 AGS
2 AGS/AGOR
1 ANTUNG AK
1 TUNG?FANG?HUNG AGOR
SMALL CRAFT (SEVERAL)
HSIAO?PING?TAO SUBMARINE BASE
STATUS: OCCUPIED
3R0.41.9.41UN 11 F
REMARKS:
THE G SSB WAS AT ITS USUAL BERTH. NO MISSILE?ASSOCIATED
EQUIPMENT WAS OBSERVED AND THE TWO FLOATING CRANES REPORTED ON
) WERE NO LONGER PRESENT. THE HAN SSU WAS NOT
PRESENT. HOWEVER, THE LIGHT?TONED HAN SUPPORT TANK REMAINED
WHERE IT WAS
NAVAL ORDER OF BATTLE:
1 G SSB
2 W/R SS
ASSOCIATED OBJECTS:
1 HAN SUPPORT TANK (LIGHT
TONED)
1 POSS SWATOW PGM
HSIN?HSIANG NAVAL BASE
STATUS: OPERATIONAL
30-15-06N 122-18-17E
REMARKS:
CONSTRUCTION CONTINUED ON THE THREE LARGE BUILDINGS (ONE IN
AREA A AND TWO IN AREA 8). THE GRAVING DOCK IN AREA C REMAINED
22
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
2bAl
TOP SECRET RUFF
CHINA, COMMUNIST
KH-9 MISSION 12082 NAVAL BASE FACILITIES
UNCHANGED
NAVAL ORDER OF BATTLE:
12 OSA PTFG
4 SHANGHAI?II PGM (1 IN
GRAVING DOCK, 1 U/WY AT
SEA)
ASSOCIATED OBJECTS:
IN AREA At NEAR ADIT
4 POSS CRATE (SMALL)
1 PROB YP
1 YTL
2 AKL
1 YAG
HU?LU?TAO NVL BASE SHYD 4- PORT FAC
STATUS: OPERATIONAL
40-43...09N 12059?..,39E
REMARKS:
THE HAN SSU, WHICH IS EXTERNALLY COMPLETES WAS OUTBOARD A
SUPPORT PLATFORM AT QUAY 2. THE TWO HAN SUPPORT TANKS REMAINED
AT THEIR LOCATION.
TWO RECENTLY CONSTRUCTED LUTA?TYPE POL BARGES WERE ON THE
TRANSVERSER IN FRONT OF BAYS 4 AND 6. THE EIGHT LIQUID
CARRYING BARGES, LAST OBSERVED ON THE TRANSVERSER
HAD MOVED ONTO THE LAUNCH PLATFORM.
AN R SS REMAINED IN DRYDOCK AND SCAFFOLDING WAS IN PLACE
AROUND THE HULL.
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
AT LEAST 16 UNIDENTIFIED OBJECTS, POSSIBLY JIGS OR OUTER HULL
PLATES, WERE OBSERVED ON THE TRANSVERSER. THESE OBJECTS WERE
NOT PRESENT THE OTHER LARGE?DIAMETER SUBMARINE 9X1
COMPONFN7 REMAINED IN THE SAME APPROXIMATE LOCATION A 25X1
25X1
CONSTRUCTION OF SHIPYARD FACILITIES WAS CONTINUING.
1 HAN S
1 R SS (IN DRYDOCK)
1 POSS HUCHWAN PTH
1 P?..6 PT
OF BATTLE:
23
2 YAGT BARGE
2 SUPPORT PLATFORM
1 WORK BARGE
2 LUTA POL BARGE (ON
TOP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
li ,1 .,
Declassified in Part - Sanitized 'Copy Approved for Release 2014/05/01 : CIA-RDP78T64752A601500010011-9
25X1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
1 SHANTUNG PGH
5 P-6 HULL
2 YULIN YP
1 1-43 MSF (YENHSI AGM
ASSOC)
1 LCM
ricrTPnwrr 7DER OF BATTLE:
3 POSS SHEET NEST (RADAR
REFLECTOR ARRAY)
ASSOCIATED 7JECTS:
2 HAN SUPPORT TANK
CHINA, COMMUNIST
NAVAL BASE FACILITIES
TRANSVERSER)
8 LIQUID CARRYING BARGE (ON
LAUNCH PLATFORM)
1 YT (IN DRYDOCK)
5 SMALL CRAFT
- 25X1
SHANG-HAI NVB AND SHIPYARD HU-TUNG
STATUS: OPERATIONAL
31-16-53N 121.-33-58E
REMARKS:
ONE, POSSIBLY TWO, OSA PTFG WERE LAUNCHED FROM THE WAYS SINCE
I TEN OSA PTFG WERE AT THE DOWNSTREAM
FITTING-OUT AREA AND EIGHT WERE ON THE WAYS. THERE WAS NO
CHANGE IN THE STATUS OF THE KIANGTUNG DE
NAVAL ORDER OF BATTLE:
-- AT UPSTREAM FITTING.-OUT AREA
7 FUCHOU AOTL/AWL 1 PASSENGER/CARGO VESSEL
1 HUTUNG 172 1 BARGE
1 TA CHIH ASL
NAVAL ORDER OF BATTLE:
^ ON WAYS
4 FUCHOU AOTL/AWK (2 EACH
ON WAYS 1 AND 2)
2 PROB YTL (ON WAY 3)
8 OSA PTFG (5 ON WAY 4, 3
ON WAY 5)
NAVAL ORDER OF BATTLE:
? AT DOWNSTREAM FITTING-OUT AREA
1 KIANGTUNG DE 10 OSA PTFG
1 HOLA PTFG
1 BARGE (WAY 6)
1 POSS BARGE (UNDER
CONSTRUCTION ON WAY 6)
1 FUCHOU AOTL/AWK (ON
TRANSVERSER)
24
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TAD crrppT PIMP
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
CHINA. COMMUNIST
NAVAL BASE FACILITIES
SHANG-HAI SHPYD KIANGNAN DOCK CO
STATUS: OPERATIONAL
31-12-06N 121-.28--51E
REMARKS:
AN R SS WAS IN THE MIDSTAGE OF CONSTRUCTION ON WAY 4 AND AN R
SS WAS IN THE LATE STAGE OF CONSTRUCTION ON WAY 5. NO
CONSTRUCTION ACTIVITY WAS OBSERVED ON WAY 3. DISMANTLING/REPAIR
WORK CONTINUED ON THE PORTAL CRANE ON CRANEWAY 6. THE STATUS
OF THE TWO-BAY BUILDING UNDER CONSTRUCTION WAS THE SAME AS
REPORTED
NAVAL ORDER OF BATTLE:
-- AT UPSTREAM FITTING-OUT AREA
YTL
TOW BOAT
FLOATING CRANE
BARGE
2 R SS 1
2 POSS R SS 2
3 OCEAN CARGO VESSEL (3 2
HATCHES FWD, 3 HATCHES AFT) 2
NAVAL ORDER OF BATTLE:
ON WAYS
2 R SS (1 EACH ON WAYS 4
AND 5)
4 TOW BOAT (2 EACH ON WAYS
NAVAL ORDER OF BATTLE:
- IN GRAVING DOCK 1 25X1
1 ATA
1 COASTAL CARGO VESSEL
1 LSM-1 LSM
1 AOTL
6 AND 7)
1 TUG BOAT (WAY 8)
25X1
25X1
25X1
25X1
25X1
NAVAL ORDER OF BATTLE:
- IN GRAVING DOCK 2
1 OCEAN TANKER
NAVAL ORDER OF BATTLE:
-- IN GRAVING DOCK 3
1 KAIBOKEN PC
2 W SS
NAVAL ORDER OF BATTLE:
- AT DOWNSTREAM FITTING-OUT AREA
1 R SS 1 FLOATING CRANE
1 KAIBOKEN AGS 2 COASTAL CARGO VESSEL
1 LARGE SUCTION DREDGE 1 REPAIR BARGE
25X1
25X1
25X1
25X1
25
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 _
.11 V
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
CHINA. COMMUNIST
NAVAL BASE FACILITIES
SHAN?TOU NAVAL BASE
11A..Url..RAF
STATUS: OPERATIONAL
NAVAL nPnFR OF BATTLE:
1 PROB US 173?FT PC
6 SHANGHAI?II PGM
7 LCM
1 PROB TING?HAI AKL
2 POSS AG
MISC SERVICE CRAFT
(SEVERAL)
TA?HSIEH PORT FACS
STATUS: OPERATIONAL
29-53-55N 12i-57-51F
PHYSICAL DESCRIPTION:
21.4 NM EAST OF NING?P0 ON TA?HSIEH TAO (ISLAND).
UPDATED DESCRIPTION. THE FACILITY CONTAINS FOUR MAJOR AREAS
AN ADMINISTRATION/BARRACKS AREA. AN OPERATIONS
SUPPORT/BERTHING AREA. A STORAGE/SUPPORT AREA. AND A POL
STORAGE AREA.
THE ADMINISTRATION/BARRACKS AREA. ON THE NORTH EDGE OF THE
FACILITY. CONTAINS FIVE ADMINISTRATION BUILDINGS. 18 BARRACKS.
TWO MESSHALLS, 28 SUPPORT BUILDINGS. EIGHT STORAGE BUILDINGS.
FOUR ADITS, ONE PARTIALLY UNDERGROUND WATER TANK. ONE
RESERVOIR. TWO SWIMMING POOLS. ONE ATHLETIC/RECREATION AREA.
AND SEVERAL ANIMAL PENS.
BERTHING FACILITIES INCLUDE ONE L?HEAD PIER. TWO 1?HEAD PIERS
(ONE HAS TWO ATTACHED PONTON WHARVES AND ONE IS CRANE SERVED
WITH A SMALL RAIL SYSTEM EXTENDING BACK INTO THE
STORAGE/SUPPORT AREA). SIX FINGER PIERS (TWO HAVE TWO PONTON
WHARV EACH), A 105.e. X 25?FOOT GRAVING DOCK. AND A
GRAVING DOCK WITH A CONNECTING UNDERGROUND SUBMARINE
PEN (POSSIBLY USED FOR MAINTENANCE). OPERATIONS SUPPORT
FACILITIES ARE PARALLEL TO THE BERTHING FACILITIES AND INCLUDE
TWO STORAGE BUILDINGS. NINE SUPPORT BUILDINGS. FOUR SHOP
BUILDINGS. A HEATING PLANT. A COMMUNICATIONS/SIGNAL STATION.
26
25X1
25X1
25X1
25X1
25X1
25X1
2Y1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
KH-9 MISSION 1208-2
25X1
TOP SECRET RUFF
25X1
CHINA. COMMUNIST
NAVAL BASE FACILITIES
FOUR ADITS, AND THREE PARTIALLY UNDERGROUND VERTICAL POL TANKS.
THE STORAGE/SUPPORT AREA IS BETWEEN THE OPERATIONS/BERTHING
AREA AND THE BARRACKS AREA. IT CONTAINS THREE STORAGE
BUILDINGS. SEVEN SUPPORT BUILDINGS, SEVEN SHOPS. AN
ATHLETIC/RECREATION AREA. AND THREE ADITS.
THE POL STORAGE AREA IS AT THE WEST END OF THE BERTHING AREA
AND CONTAINS FOUR HORIZONTAL POL TANKS. A PUMPHOUSE, AND TWO
SUPPORT BUILDINGS.
NAVAL ORDER OF BATTLE:
4 R SS
3 W SS
1 PROB LCM
ASSOCIATED OBJECTS:
4 CRATE
1 YT
3 YAG
27
TAP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
II V
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TnD crrPpT PH=P
CHINA. COMMUNIST
KH-9 MISSION 1208-2 GROUND FORCE FACILITIES
25X1
25X1
SIGNIFICANT RESULTS
CHENG-..KUNG STOR DPO LL 2
STATUS: OPERATIONAL
REMARKS:
24-56...05N 102-47-26E
- 25X1
THE BUILDING U R CONSTRUCTION NEAR THE END OF THE RAIL SPUR
IN MAR 74 IS COMPLETE.
25X1
ASSOCIATED OBJECTS:
25X1
3 PIECE OF ROLLING STOCK
ASSOCIATED OBJECTS:
25X1
12 PIECE OF ROLLING STOCK 1 CARGO
TRUCK
25X1
HENG?YANG AMMO DEPOT LL 1 26-55-30N 112-43...15E
25X1
STATUS:OPERATIONAL
PHYSICAL DESCRIPTION:
6 NM ENE OF HENG?YANG.
UPDATED DESCRIPTION. THE FACILITY. WHICH HAS NOT CHANGED
SINCE SEP 69 IS ROAD AND RAIL SERVED, FENCE SECURED.
AND CONSISTS OF AN AMMUNITION STORAGE AREA (AREA A) AND A
BILLETING/SUPPORT AREA (AREA B).
AREA A CONTAINS 78 UNDERGROUND BUNKERS. 15 REVETTED AMMUNITION
STORAGE BUILDINGS WITH VENTED ROOFS. THREE STORAGE BUILDINGS.
FOUR SUPPORT BUILDINGS, ONE ADMINISTRATION/SUPPORT BUILDING.
AND FIVE GUARD BUILDINGS.
AREA Br ADJACENT TO THE SW EDGE OF AREA Ar CONTAINS TWO
TRANSSHIPMENT BUILDINGS. TEN BARRACKS, ONE ADMINISTRATION
BUILDING. ONE ADMINISTRATION/SUPPORT BUILDING. ONE AUDITORIUM.
ONE MESSHALL. TWO VEHICLE STORAGE BUILDINGS. ONE PROBABLE
VEHICLE STORAGE BUILDING, SIX STORAGE BUILDINGS. SIX SUPPORT
BUILDINGS. AND TWO GUARD BUILDINGS.
28
25X1
25X1
TnP crrprT RUPP"
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
CHINA. COMMUNIST
GROUND FORCE FACILITIES
HENG?YANG AMMO DFPOT LI 4
26-50-30N 112-41-07
STATUS: OCCUPIED
ASSOCIATED OBJECTS:
37 CARGO TRUCK
13 PIECE OF ROLLING STOCK
KUN?MING ARTY DIV HQ A ARMY BKS AL 9
25-00-21N 102-50-00E
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
14 CARGO TRUCK
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
29
ToP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
? II .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
25X1
25X1
CHINA, COMMUNIST
KH-9 MISSION 1208-2
KUN?MING RR STA
LOGISTICS
SIGNIFICANT RESULTS
YDS A SHOPS N 25-03-26N 102-43-13E
25X1
STATUS: OPERATIONAL
ASSOCIATED OBJECTS:
25X1
90 PIECE OF ROLLING
STOCK
25X1
KUN?MING RR TRNSLDG
YDS STN A SHOPS 25-00-40N 102-46-17E
25X1
STATUS: OPERATIONAL
ASSOCIATED OBJECTS:
25X1
350 PIECE OF ROLLING
STOCK
(APPROXIMATELY)
ASSOCIATED OBJECTS:
25X1
150 PIECE OF ROLLING
STOCK
(APPROXIMATELY)
30
25X1
25X1
Tno ccrocT purr
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
218
CHINA, COMMUNIST
INDUSTRY
25X1
25X1
SIGNIFICANT RESULTS
CHENG?TU AIRFRAME PLT 132
STATUS:OPERATIONAL
REMARKS:
30-42-27N 103-57-47E
- 25X1
THE 26 FRESCO OBSERVED AT THE PLANT REPRESENTS
A DECREASE OF
EIGHT FRESCO SINCE THE PLANT WAS LAST
SEEN
25X1
25X1
ASSOCIATED OBJECTS:
-- AT THE PLANT
25X1
11 FISHBED (2 W/O 26 FRESCO
EMPENNAGE) 2 PROS MIDGET
25X1
HSI?AN AIRFRAME PLT YEN?LIANG 172
34-38.-54N 109-13-36E
25X1
STATUS: OPERATIONAL
REMARKS:
THE HSIAN?A WAS OBSERVED AT THE PLANT. A MODIFIED BEAGLES
WITH
AN AFT FUSELAGE EXTENSION, ALSO WAS OBSERVED
AT THE PLANT
25X1
THIS AIRCRAFT WAS FIRST OBSERVED
AT THE PLANT IN DEC
67
25X1
25X1
ASSOCIATED OBJECTS:
-- AT THE PLANT
25X1
4
BADGER (1 W/O VERT +
1
FAGOT/MIDGET
HORIZ STABS)
1
CAT/CUB
1
BEAGLE (MODIFIED)
1
COKE
1
HSIAN A
3
COLT
3
FISHBED
1
CC-6
13
FARMER
6
AA GUN (SMALL)
4
FRESCO
10
PROS AA GUN
2
FAGOT/FRESCO
32
25X1
25X1
TAO ccrocT OHCP
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
KH-9 MISSION 1208-2
TOP SECRET RUFF
11 CHINA, COMMUNIST
INDUSTRY
LU?TA SHIPYARD DAIREN
STATUS: OPERATIONAL
38-55..-53N 121-38-22E
REMARKS:
THREE LUTA DOGS WERE OBSERVED. UNITS 1 AND 2 WERE BERTHED AT
THE SOUTH SIDE OF THE FITTING?OUT MOLE AND UNIT 3 WAS OUTBOARD
A POSSIBLE LSM ACROSS THE END OF THE FITTING?OUT MOLE. THE
130MM MOUNTS HAD NOT BEEN INSTALLED ON UNIT 3.
A GORDYY DD REMAINED IN GRAVING DOCK 1. TWO LARGE HATCH CARGO
SHIPS WERE BERTHED AT THE NORTH SIDE OF THE FITTING?OUT MOLE
AND TA?CHING TANKER WAS IN GRAVING DOCK 2.
THE LARGEST TANKER CONSTRUCTED IN THE PRC. APPROXIMATELY
WAS ACROSS THE ENTRANCE TO THE BUILDINGWAYS. THE
TANKER WAS LAUNCHED FROM BUILDINGWAY 2
A SECOND TANKER WAS IN THE EARLY STAGE OF CONSTRUCTION ON
BUILDINGWAY 1.
EIGHT SHANGHAI PGM WERE OBSERVED. ONE WAS UNDER CONSTRUCTION
ON BUILDINGWAY lr TWO WERE UNDER CONSTRUCTION ON BUILDINGWAY 3r
AND FIVE WERE AT THE NORTH FITTING?OUT AREA.
TWO SMALL CRAFT WERE UNDER CONSTRUCTION ON BUILDINGWAY 1 AND
BUILDINGWAY 2 WAS OPEN.
NAVAL ORDER OF BATTLE:
2 LUTA DOGS
1 GORDYY DD
8 SHANGHAI PGM
1 POSS LSM
1 TA?CHING TANKER (577 FT
LONG)
1 TA?CHING TANKER (537 FT
LONG)
2 CARGO SHIP (LARGE HATCH)
1 TANKER (UCON ON WAY 3)
2 SMALL CRAFT (UCON ON WAY
1)
SMALL HARBOR CRAFT
(NUMEROUS)
33
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
5X1
11 VJ.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-9 MISSION 1208-2
PEI?CHING GM DEVEL PROD CEN CHANG?HSIN
STATUS: OPERATIONAL
CHINA, COMMUNIST
INDUSTRY
39-48-40N 116-08-03E
REMARKS:
TWO STRETCHED STYX?TYPE CRATES WERE IN THE MANUFACTURING AREA
OF THE CENTER,
SHEN?YANG AIRFRAME PLT 112
STATUS: OPERATIONAL
REMARKS:
THE CSS?N-1 SHIPPING CONTAINER COUNT
SINCE THE PLANT WAS LAST SEEN
ASSOCIATED OBJECTS:
.? AT THE PLANT
79 FARMER
18 CSS?N-1 SHP CONTAINER
ASSOCIATED OBJECTS:
12 AA GUN
41-52-13N I23-26-01E
INCREASED
FROM TEN TO 18
425 CSA-1 SHP CONTAINER
(APPROXIMATELY)
WU?HAN SHIPYARD WU?CHANG
STATUS:OPERATIONAL
REMARKS:
THE REAR POSITION OF BUILDINGWAY 4 CONTAINED A POSSIBLE SS
SUBASSEMBLY SECTION. THE FRONT POSITION OF BUILDINGWAY 4 AND
THE FRONT AND REAR POSITIONS OF BUILDINGWAY 3 APPEARED TO BE
OCCUPIED. A CARGO VESSEL WAS BEING LAUNCHED.
NAVAL ORDER OF BATTLE:
-- AT FITTING?OUT BARGE
34
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TAP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
CHINA, COMMUNIST
INDUSTRY
KH-9 MISSION 1208-2
3 R $S
NAVAL ORDER OF BATTLE:
- ON BUILDINGWAY
3
25X1
1 SS
1
PROB R SS
NAVAL ORDER OF BATTLE:
-- ON BUILDINGwAY
4
25X1
1 PROB R SS
1 FOSS SS SUBASSEMBLY
SECTION
NAVAL ORDER OF BATTLE:
ON BUILDINGWAY
1
25X1
2 PROB 7-43 MSF/AGS
NAVAL ORDp OF BATTLE:
25X1
H- ON LAUNCH CRADLE
1 CARGO VESSEL
25X1
WU-HSING MISL PROPULSION R+D CENTER 30-44-50N 120-01-35E
25X1
STATUS: UNDER CONSTRUCTION
REMARKS:
THE ROADS IN THE ROCKET MOTOR PRODUCTION AREA HAVE BEEN
SURFACED, INDICATING THAT THE AREA MAY NOW BE OPERATIONAL.
25X1
WU -KUNG AFL() 34-t6-3FIN I1)8-15-59
25X1
STATUS:OPERATIONAL
REMARKS:
THE MODIFIED BEAGLE HAD BLUNTED CONE-LIKE OBJECTS PROTRUDING
FROM OR ATTACHED TO THE FORWARD END OF EACH ENGINE NACELLE. A
BEAGLE WITH SIMILAR MODIFICATION WAS SEEN
AT THE AIRFIELD IN
25X1
THE 12 BULL REPRESENT THE HIGHEST COUNT OF
THIS AIRCRAFT SEEN
AT THE AIRFIELD TO DATE.
25X1
35
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
11
KH-9 MISSION 1208-2
ASSOCIATED OBJECTS:
? AT THE PLANT
22 BADGER
12 BULL (2 W/TURBOPROPS)
1 BULL AWAC
CHINA* COMMUNIST
INDUSTRY
5 BEAGLE (1 MODIFIED)
2 COLT
36
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
0
V
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
CUBA
KH-9 M S ON 2 8 2 NAVAL BASE FACILITIES
SIGNIFICANT RESULTS
CIENFUEGOS NAVAL BASE
STATUS:OPERATIONAL
22-09-03N 080-27-20W
REMARKS:
THE STATUS OF THE SPECIAL?PURPOSE BARGES REMAINED UNCHANGED.
NAVAL ORDER OF BATTLE:
2
KRONSHTADT PC
2 LCM
1
SO-1 PCS
2 LAUNCH
4
P-6 PT
2 SPECIAL?PURPOSE BARGE
1
POLUCHAT YPT
37
TAD Fri:iiFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
II , . I ,
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF LOA!
25X1
Ll
KH-9 MISSION 1208....2
SIGNIFICANT RESULTS
CIENFUEGOS PORT FACILITIES
STATUS:OPERATIONAL
CUBA
LOGISTICS
22...08...25N 080...27...20W
REMARKS:
THE DREDGING AND LANDFILL OPERATION WAS CONTINUING AT THE MAIN
TRANSSHIPMENT PIER.
NAVAL ORDER OF BATTLE:
4 FREIGHTER
1 COASTAL FREIGHTER
38
- 25X1
25X1
25X1
25X1
rnm 1-,rninc1 mire'
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
.
/
?
.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 225X1
25X1
KH-9 MISSION 1208-2
11 CZECHOSLOVAKIA
LOGISTICS
SIGNIFICANT RESULTS
CIERNA RR TRANSLOADING YARD
STATUS: OPERATIONAL
48-25-11N 022-04-57E
REMARKS:
SEVENTY PERCENT OF THE YARD WAS CLOUD COVERED. NO MILITARY
EQUIPMENT WAS OBSERVED.
39
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
.1
RESULTS
697
UNITED ARAB REPUBLIC
AIR DEFENSE MISSILES
30-12-40N 032-01-25E
KH-9 MISSION 1208-2
SIGNIFICANT
AL ISMAILIYAH SAM SITE C21-6
STATUS: OCCUPIED
AL ISMAILIYAH SAM SITE C22
STATUS: OCCUPIED
695
30-16-15N
032-01-17E
AL ISMAILIYAH SAM SITE C22A-6
STATUS: OCCUPIED
696
30-11-25N
031-56-20E
AL QAHIRAH SAM SITE C04-6
STATUS: OCCUPIED
645
30-19-45N
031-30-30E
AL QAHIRAH SAM SITE C05-6
STATUS: OCCUPIED
646
30-21-00N
031-34-00E
AL QAHIRAH SAM SITE CO6A-6
STATUS: OCCUPIED
648
30-18-20N
031-38-20E
25X1
41
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
11 u
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01
: CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
25X1
25X1
UNITED ARAB
REPUBLIC
KH
-9 MISSION 1208-2
AIR DEFENSE MISSILES
25X1
AL
QAHIRAH SAM SITE C06-6 647
30-20-40N 031-39-30E
. 25X1
STATUS:OCCUPIED
25X1
AL
QAHIRAH SA-6 SAM SITE 782
30-16-09N
031-30-02E
25X1
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
19.5 Nm NE OF AL QAHIRAH
AND 5 NM SW OF INSHAS AIRFIELD (BE
25X1
THE NEWLY IDENTIFIED
SA-6 SAM SITE CONSISTS OF FOUR REVETTED
LAUNCH POSITIONS AND A GUIDANCE AREA WITH THREE REVETMENTS.
TGT DIAM 2.500 FT. ELEV 495 FT.
MISSILE ORDER OF BATTLE:
25X1
4 SA-6 TEL
3 SA-6 TRANSLOADER
ELECTRONIC ORDER OF
BATTLE:
25X1
1 STRAIGHT FLUSH
2 ELECTRONICS VAN
ASSOCIATED OBJECTS:
25X1
ROB DUMMY STRAIGHT
FLUSH
25X1
MAP SOURCE REFERENCE:
250?JOG R. NH 36-6
42
25X1
25X1
TOP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-9 MISSION 1208-2
AS SUWAYS SAM SITE C29-.6
STATUS: OCCUPIED
UNITED ARAB REPUBLIC
AIR DEFENSE MISSILES
698 30-07-.40N 032-00-30E
AS SUWAYS SAM SITE D28A-6
STATUS: OCCUPIED
692 30-01-50N 031.-52-20E
AS SUWAYS SAM SITE D28-6
STATUS: OCCUPIED
691 30-04-00N 031-54-00E
25X1
25X1
25X1
25X1
25X1
25X1
25X1
AS SUWAYS SAM SITE D29A-6
STATUS: OCCUPIED
690 30-04-50N 031-52-10E
AS SUWAYS SA-6 SAM SITE
STATUS: OCCUPIED
781
30-03-41N 031-48-18E
PHYSICAL DESCRIPTION:
38 NM WNW OF AS SUWAYS AND 2 NM WEST OF WADI AL JANDALI
AIRFIELD
THE NEWLY IDENTIFIED SA-6 SAM SITE CONSISTS OF FOUR REVETTED
LAUNCH POSITIONS AND A REVETTED GUIDANCE AREA.
TGT DIAM -- 2'500 FT. ELEV -- 825 FT.
43
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
5X1
Declassified
in Part - Sanitized Copy
Approved
11
for Release 2014/05/01
TOP SECRET RUFF
: CIA-RDP78T04752A001500010011-9
25X1
25X1
UNITED ARAB REPUBLIC
AIR DEFENSE MISSILES
KH-9 MISSION 1208-2
MISSILE ORDER OF BATTLE:
25X1
3 SA-6 TEL
3 SA-6 TRANSLOADER
ELECTRONIC ORDER OF
BATTLE:
25X1
1 STRAIGHT FLUSH
2 ELECTRONICS VAN
25X1
MAP SOURCE REFERENCE:
250?JOG RP NH 36-6
25X1
OTHER RESULTS?NO APPARENT CHANGE
AL OAHIRAH SAM SITE B29A-6
659
30-07-00N 030-56-50E
25X1
STATUS: UNOCCUPIED
25X1
BALTIM SAM SITE A10-2
632
31-33?ooN 031-09-50E
25X1
STATUS: UNOCCUPIED
44
25X1
25X1
TAD crrorT PIMP
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
KH-9 MISSION 1208-2
TOP SECRET RUFF
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
25X1
SIGNIFICANT RESULTS
AL MANSURAH AIRFIELD 30-58-03N
031...25-37E
25X1
STATUS: OPERATIONAL
REMARKS:
CLOUDS PRECLUDED A COMPLETE READOUT OF THE AIRFIELD.
AIR ORDER OF BATTLE:
25X1
3 FISHBED
ASSOCIATED OBJECTS:
25X1
3 PROB DUMMY FRESCO
25X1
AL RAHMANIYAH AIRFIELD
31-02-35N
030-40-00E
25X1
STATUS:OPERATIONAL
REMARKS:
CLOUDS PRECLUDED A COMPLETE READOUT.
AIR ORDER OF BATTLE:
25X1
NONE DISCERNIBLE
ASSOCIATED
r3JECTS:
25X1
6 PROB DUMMY FITTER
25X1
AS SALIHIYAH AIRFIELD
30-47..-55N
032-02-20E
25X1
STATUS: OPERATIONAL
REMARKS:
CONSTRUCTION WAS CONTINUING ON THE HANGARETTES, THE NEW
45
TOP SECRET RUFF
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
I.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
,1
KH-9 MISSION 1208-2
OFYI
TOP SECRET RUFF 25X1
25X1
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
TAXIWAY, AND THE NEW RUNWAY. THE OLD TAXIWAY WAS BEING
RESURFACED.
AIR ORDER OF BATTLE:
5 FRESCO
ASWAN AIRFIELD
STATUS: OPERATIONAL
REMARKS:
RESURFACING OF THE TAXIWAY CONTINUED.
AIR ORDER OF BATTLE:
1 TU-154 CARELESS
1 AN-12 CUB
ASSOCIATED OBJECTS:
2 PROB DERELICT FRESCO
2 AN-24 CRATE
AZ ZAQAZIQ AIRFIELD
STATUS: OPERATIONAL
30-35-38N 031-39-57
REMARKS:
CONSTRUCTION WAS CONTINUING ON THE NEW HANGARETTES.
AIR ORDER OF BATTLE:
3 FISHBED
ASSOCIATED OBJECTS:
6 PROB DUMMY FITTER
1 HOUND
46
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
KH-9 MISSION 1208-2
BENI SUEF AIRFIELD
STATUS: OPERATIONAL
TOP SECRET RUFF
1 UNITED ARAB REPUBLIC
AIR BASE FACILITIES
29-1155N 031-01-00E
REMARKS:
CONSTRUCTION WAS CONTINUING ON THE HANGARETTES. EIGHT DUMMY
FRESCO AND SEVEN DUMMY FISHBED AIRCRAFT WERE PARKED IN A LINE
WING TIP TO WING TIP IN THE AIRCRAFT SALVAGE AREA. THESE
AIRCRAFT WILL NOT BE REPORTED IN THE A0B.
AIR ORDER OF BATTLE:
2 BADGER (1 IN NET-COVERED
SHELTER)
3 CUB
5 HOOK
1 HOUND
BILBAYS AIRFIELD
STATUS: OPERATIONAL
REMARKS:
CONSTRUCTION WAS CONTINUING ON
AIR ORDER OF BATTLE:
6 FITTER (4 IN NET-COVERED
SHELTERS)
6 CRATE
ASSOCIATED OBJECTS:
14 PROB DERELICT FITTER
30-23-42N 031-35-54E
THE NEW HANGARETTES.
2 MAYA
11 SMALL STRAIGHT-WING
BIR JIFJAFAH AIRFIELD
STATUS:OPERATIONAL
47
30-24-,50N 033-09-45E
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
u
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
UNITED ARAB REPUBLIC
KM-9 MISSION 1208-2 AIR BASE FACILITIES
REMARKS:
NO UNUSUAL ACTIVITY WAS OBSERVED. NO PROGRESS WAS NOTED ON THE
HANGARETTES UNDER CONSTRUCTION.
AIR ORDER OF BATTLE:
6 VAUToUR
5 SMALL STRAIGHT?WING
ASSOCIATED OBJECTS:
4 PROB DUMMY MIRAGE
3 UM-1
?
BIRMA AIRFIELD
STATUS: OPERATIONAL
30-50-17N 030-56-10E
REMARKS:
CONSTRUCTION WAS CONTINUING ON THE FOUR HANGARETTES.
AIR ORDER OF BATTLE:
1 FISHBED
ASSOCIATED OBJECTS:
8 PROB DUMMY FRESCO
1 SMALL STRAIGHT?WING
1 DERELICT FITTER
CAIRO AIRFIELD
STATUS: OPERATIONAL
30-08-26N 031-24-20E
REMARKS:
CONSTRUCTION CONTINUED ON THE NEW HANGAR AND BUILDINGS.
AIR ORDER OF BATTLE:
3 707 TYPE
7 TU-154 CARELESS
1 COMET
48
2 DC-6 TYPE
1 LI-2 CAB
2 DHCS BUFFALO
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
t1CV,1
25X1
25X1
1 727 TYPE
1 DASSAULT MYSTERE 20
11 AN-12 CUB
2 IL-18 COOT
1 C-45
3 AN-2 COLT
12 PZL-101
19 SMALL STRAIGHT?WING
ASSOCIATED OBJECTS:
25X1
1 DERELICT FRESCO
1 DERELICT CAB
25X1
CAIRO AIRFIELD WEST
30-06-10N 030-55-40E
25X1
STATUS: OPERATIONAL
REMARKS:
A PROBABLE ASM WAS UNDER THE WING OF TWO BADGER AIRCRAFT.
AIR ORDER OF BATTLE:
25X1
6 BADGER (2 W/PROB ASM)
3 FISHBED
1 BEAGLE
3 CUB
1 FITTER
ASSOCIATED OBJECTS:
25X1
2 PROB ASM (ON 2 BADGER)
2 PROB DUMMY FISHBED
1 DERELICT BADGER
25X1
DARAW AIRFIELD
24-24-.59N 032-57-24E
25X1
STATUS:OPERATIONAL
AIR ORDER OF BATTLE:
25X1
1 CRATE
ASSOCIATED OBJECTS:
25X1
8 PROB DERELICT FRESCO
49
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
11 V . 1 1 ,
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1.1
25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
DUKHAYLAH AIRFIELD
STATUS:OPERATIONAL
11-n7-4AN (12guNtLA-wiF
REMARKS:
FOUR ADDITIONAL COMPONENT CRATES WERE OBSERVED AT THE HANGAR
WITH THE PREVIOUSLY REPORTED SHIPPING AND COMPONENT CRATES.
AIR ORDER OF BATTLE:
9 HIP C
ASSOCIATED OBJECTS:
5 HIP C FUSELAGE CRATE
17 HOUND
9 COMPONENT CRATE
GEBEL EL BASUR AIRFIELD
STATUS: OPERATIONAL
30-32-48N 030-34-55E
REMARKS:
CONSTRUCTION ACTIVITY HAS SLOWED DOWN OR STOPPED ON THE
UNIDENTIFIED FACILITY AT THE NORTH END OF THE NORTH/SOUTH
RUNWAY.
AIR ORDER OF BATTLE:
11 BEAGLE
ASSOCIATED OBJECTS:
4 PROB DUMMY FRESCO
15 FISHBED
50
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
KH.-9 MISSION 1208-2
INSHAS AIRFIELD
STATUS: OPERATIONAL
TOP SECRET RUFF
11 UNITED ARAB REPUBLIC
AIR BASE FACILITIES
30-19-47N 031-27-23E
REMARKS:
SEVEN OF THE EIGHT HANGARETTES REPORTED TO BE UNDER
CONSTRUCTION IN SEP 73 APPEARED TO BE EXTERNALLY
COMPLETE. THE REMAINING HANGARETTE WAS NEARING COMPLETION;
ONLY A SMALL SECTION OF THE ROOF WAS STILL TO BE COVERED WITH
25X1
25X1
25X1
25X1
EARTH.
AIR ORDER OF BATTLE:
25X1
6 FISHBED
ASSOCIATED OBJECTS:
25X1
5 PROB DUMMY FISHBED
25X1
JIYANKLIS AIRFIELD NEW
30-49-30N 030-11-35E
25X1
STATUS: OPERATIONAL
REMARKS:
WORK CONTINUED ON THE WATER TREATMENT FACILITY.
AIR ORDER OF BATTLE:
?1?TeAt4tR?TIN
25X1
NET?COVERED 2 FITTER
SHELTER)
25X1
LUXOR AIRFIELD
25-40-23N
032-42-27E
25X1
STATUS: OPERATIONAL
REMARKS:
CONSTRUCTION CONTINUED ON THE HANGARETTES.
51
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
11 .1.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF 25X1
25X1
11
KH-9 MISSION 1208-2
AIR ORDER OF BATTLE:
1 FISHBED
ASSOCIATFD OBJECTS:
3 PROB DUMMY FISHBED
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
1 HIP C
4 PROB DUMMY FRESCO
QUWAYSINA AIRFIELD
STATUS:OPERATIONAL
30-34-46N 031-07-47
REMARKS:
REPAIR WORK HAS BEEN UNDERWAY ON THE RUNWAY AND PARALLEL
TAXIWAY.
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
OBJECTS:
Y FRESCO (6 NET
COVERED)
WADI ABU RISH AIRFIELD
STATUS:OPERATIONAL
25X1
25X1
25X1
25X1
25X1
25X1
25X1
28-58-45N 031-42-07
25X1
REMARKS:
NO ADDITIONAL WORK APPEARED TO HAVE BEEN DONE ON THE PROTECTIVE
STRUCTURES
AIR ORnFR OF BATTLE:
NONE DISCERNIBLE
52
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF 25X1
25X1
11
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
KH-9 MISSION 1208-2
WADI AL JANDALI AIRFIELD
30-03-10N
031-50-25E
25X1
STATUS: OPERATIONAL
REMARKS:
CONSTRUCTION CONTINUED ON THE HANGARETTES.
AIR ORDER OF BATTLE:
25X1
NONE DISCERNIBLE
AssoCIATED OBJECTS:
25X1
3 PROB DUMMY FISHBED
25X1
53
25X1
TnP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
?1I.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF 2bA1
25X1
11 UNITED ARAB REPUBLIC
KH-9 MISSION 1208-2 NAVAL BASE FACILITIES
SIGNIFICANT RESULTS
AL ISKANDARIYAH NVB + HQ NATIONAL
STATUS: OPERATIONAL
31-11-50N 029-52-00E
REMARKS:
COMBATANTS OBSERVED AT THE PORT INCLUDED FIVE F SS. TEN W/R SS.
SIX OSA PTFG, TWO KOMAR PIG. AND ONE SHERSHEN PTFS. THE
EGYPTIANS APPEARED TO BE WORKING ON SEVERAL COMBATANTS IN BOTH
THE NAVAL BASE AND ARSENAL BASIN. AND FIVE PROBABLE BM.-21
ROCKET LAUNCHERS WERE SEEN LYING ON QUAYS. A SKORYY DD WAS
UNDERWAY 7 NM NW OF THE PORT AND A VYDRA LFS WAS 4 NM EAST OF
ABU QIR PORT TRAVELING SOUTH TOWARDS THE
COAST. WE DID NOT SEE ANY MILITARY CARGO WITHIN THE PORT.
EITHER ON QUAYS OR VESSELS.
NAVAL ORDER OF BATTLE:
-- AT NAVAL BASE
2 W/R SS
1 SKORYY DD
1 HUNT-1 PF
1 OSA PTFG
2 KOMAR PIG (1 ON
REPAIRWAYS)
1 SHERSHEN PTF (W/0 TORPEDO
TUBES)
6 SO-1 PCS
2 P-6 PT
ASSOCIATFD OBJECTS:
-- AT NAVAL BASE
2 PROB BM-21 ROCKET
LAUNCHER
NAVAL ORDER OF BATTLE:
-- AT ARSENAL BASIN
1 N1SR PB (W/0 STACK +
ENGINE COMPARTMENT)
1 YURKA MSF
1 T-43 MSF
1 1-301 MSM
1 MP-,SMB-1 LCU
2 1200 HP YPT
2 P-6 PT HULL (ON QUAY)
1 PATROL CRAFT
2 YAGT (TARGET BARGE)
8 STYX MISSILE CRATE
3
W/R SS
7
VYDRA LFS
1
MIDGET SS (ON QUAY)
1
INTISAR AG
1
SHERSHEN PITS
1
FLOWER PF
3
12.-6 PTFS (1 W/TORPEDO
1
SEKSTAN ADG
TUBES)
1
BANGOR PF
2
SHERSHEN PTF
1
AL HURRIYA AG
1
SO-1 PCS
1
T-43 MSF
2
P-6 PT (W/0 TORPEDO
2
POLUCHAT-1 YP
TUBES)
3
P-6 HULL (ON QUAY)
54
25X1
25X1
25X1
25X1
25X1
25X1
TAO crrorT PIMP
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-9 MISSION 1208-2
1 P-4 PT
1 NISR PB
3 FAIRMILE PB
POLNOCNY LSM
ASSOCIATED OBJECTS:
- AT ARSENAL BASIN
3 PROB BM-21 ROCKET
LAUNCHER (ON QUAY)
NAVAL ORDER OF BATTLE:
-- IN INNER HARBOR
3 W/R SS
4 OSA PTFG
2 SO-1 PCS
1 VYDRA LFS (W/RAMP LOWERED
ONTO COALING QUAY)
ASSOCIATED OBJECTS:
-- IN INNER HARBOR
6 STYX CRATE
NAVAL
ORDER OF BATTLE:
-- AT AL QABBARI SHIPYARD
1 MAYAK AGI
1 NYRYAT-1 YDT
REPAIRWAYS) 1 MUNA AKL
1 AKL
1 FLOATING STORES BARGE
1 FISH FACTORY SHIP (IN
DRYDOCK)
1 YAGT (TARGET BARGE)
UNITED AKAU IEPUBLIC
NAVAL BASE FACILITIES
2 POSS P-6 HULL (ON QUAY)
2 FISH FACTORY SHIP
4 OCEANGOING TUG
2 STYX MISSILE CRATE
2 PATROL CRAFT (SMALL)
1 FLOATING WORKSHOP
5 F SS
1 W/R SS
1 OSA PTFG (ON
1 AMUR AR
1 PRUT ASR
2 YURKA MSF
1 T-43 MSF
1 BOLVA APL
2 OKHTENSKIY ATR
NAVAL ORDER OF BATTLE:
-_ IN OUTER HARBOR
1 W/R SS (IN FLOATING
DRYDOCK)
1 SO-1 PCS (IN FLOATING
DRYDOCK)
NAVAL ORDER OF BATTLE:
- IN MEDITERRANEAN
1 SKORYY DD (7 NM NW OF
ALEXANDRIA PORT)
1 T-43 MSF
1 VYDRA LFS (4 NM EAST OF
ABU QIR PORT)
55
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
II V
v 1 1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TAD crrorT DHCP 25X1
KH-9 MISSION 1208-2
BUR SAID NAVAL BASE
STATUS: OPERATIONAL
UNITED ARAB REPUBLIC
NAVAL BASE FACILITIES
31-15-28N 032-18-18E
REMARKS:
TWO OSA PTFG AND TWO SHERSHEN PTFS WERE BERTHED ALONGSIDE THE
NAVAL BASE HEADQUARTERS, A NUMBER OF VESSELS RELATED TO
MINESWEEPING WERE AT THE PORT. INCLUDING THE ABDIEL MCS. TWO
TON?CLASS MHC. A T-301 MSM. THE EL QUSEIR AG (LOGISTICS SUPPLY
SHIP FROM ALEXANDRIA), AN OKHTENSKIY ATA. AND A NYRYAT-1 YDT
(DIVING TENDER).
TWO US IWO JIMA?CLASS AMPHIBIOUS ASSAULT SHIPS WERE SEEN
ANCHORED APPROXIMATELY 6 NM NORTH OF PORT SAID.
NAVAL ORDER OF BATTLE:
2
OSA PTFG
1
NYRYAT-1 YDT
2
SHERSHEN PTFS
1
EL QUSEIR AG
2
VYDRA LFS
1
P-6 HULL (ON REPAIRWAYS)
1
ABDIEL MCS
7
AWK (WATER TANKER)
2
TON?CLASS MHC
2
IWO JIMA?CLASS LPH (6 NM
1
T-301 MSM
NORTH OF PORT SAID)
1
OKHTENSKIY ATA
56
2bA1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP cFCRFT RUFF
KH-9 MISSION 1208-2
ABU ZABAL STOR AREA
STATUS: OCCUPIED
1 UNITED ARAB REPUBLIC
GROUND FORCE FACILITIES
SIGNIFICANT RESULTS
REMARKS:
NO FROG EQUIPMENT WAS OBSERVED.
GROUND FORCE ORDER OF BATTLE:
3 TRUCK
30-15-20N 031-23
20E
11 VEHICLE/PIECE OF EQUIP
AL QAHIRAH ARMD VEH CONC A NO 1
STATUS: OCCUPIED
30-02-00N 031-25-30E
REMARKS:
CONSTRUCTION WAS CONTINUING ON BOTH OF THE COMMAND/CONTROL
BUNKER COMPLEXES.
GROUND FORCE ORDER OF BATTLE:
49 TANK (10 ON RANGE)
2 PROB 100Mm FIELD GUN
4 FA PIECE (CANVAS COVERED)
VEHICLE/PIECE OF EQUIP
(NUMEROUS)
AL QAHIRAH BKS A ARMY SPLy DPo HULwAN
STATUS: OCCUPIED
29-52-53N C31-18-07E
REMARKS:
THE INSTALLATION CONTINUED TO REFLECT AN OVERALL DECLINE IN
ACTIVITY. Dummy FIELD ARTILLERY REMAINED IN THE FABRICATION
AREA (AREA A).
57
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
I 1 V
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF 2bA1
25X1
UNITED ARAB REPUBLIC
MISSION 1208-2 GROUND FORCE FACILITIES
GROUND FORCE ORDER OF BATTLE:
? AREA A
17 TRUCK
6 LOWBED TRAILER
ASSOCIATED OBJECTS:
? AREA A
50 PIECE OF ROLLING STOCK
GROUND FORCE ORDER OF BATTLE:
-- AREA B
116 TRUCK
5 POWERBOAT
11 TRUCK?MOUNTED CRANE
17 CRANE
GROUND FORCE ORDER OF BATTLE:
AREA C
22 TRUCK
25 CRANE
13 TRUCK?MOUNTED CRANE
20 LOWBED TRAILER
GROUND FORCE ORDER OF BATTLE:
? AREA D
35 TRUCK
GROUNI1 FORCE ORDER OF BATTLE:
-- AREA E
1 MDK-2
1 BAT?M
1 MOTORIZED GRADER
GROUND FORCE ORDER OF BATTLE:
-- AREA F
?14014E?in-b-CERNIBLE
4 CARGO TRAILER
37 LOWBED TRAILER
5 MOTORIZED GRADER
37 VEHICLE/PIECE OF EQUIP
1 MDK-2
2 BAT?M
3 MOTORIZED GRADER
18 VEHICLE/PIECE OF EQUIP
2 TRACTOR
4 TOWED SCRAPER
AL QAHIRAH ORDNANCE STORAGE AREA
STATUS: OCCUPIED
30-07-20N 031-28-49E
REMARKS:
AN INCREASE OF TRUCKS, SUPPORT EQUIPMENT, AND TENTS WAS
OBSERVED THROUGHOUT. THE AREA. AT LEAST 20 FA PIECES WERE
58
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TAP cprin'T SNIFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
KH-9 MISSION 1208-2
11 UNITED ARAB REPUBLIC
GROUND FORCE FACILITIES
PARKED WITHIN THE AREA.
GROUND FORCE ORDER OF BATTLE:
75 TANK
?57 APC
24 OT-64C
36 BMP
20 FA PIECE
487 TRUCK/PIECE OF
EQUIPMENT (AT LEAST)
DAHSHUR BARRACKS AREA
STATUS: OCCUPIED
29-49-05N 031..10-03E
REMARKS:
TWENTY?TWO TANKS WERE IN THE WEST TRAINING AREA' 29 TANKS WERE
ON THE EAST SIDE OF THE AREA NORTH OF THE FAIYUM ROAD. AND 30
TANKS AND 18 BTR-50?TYPE APC WERE SOUTH OF THE FAIYUM ROAD.
NUMEROUS TRUCKS. VEHICLES. AND PIECES OF EQUIPMENT WERE
THROUGHOUT THE AREA.
GROUND FORC ORDER OF BATTLE:
81 TANK
18 BTR-50P TYPE
TRUCK/VEH/PCE OF EQUIP
(NUMEROUS)
HULWAN RIVER CROSSING TNG AREA W
STATUS: OCCUPIED
29-51-30N 031-15-20E
REMARKS:
THE FIVE COMPANIES OF RIVER CROSSING EQUIPMENT REMAINED IN AREA
A. NO ACTIVITY WAS SEEN IN AREA B.
GROUND FORCE ORDER OF BATTLE:
-- AREA A
18 PMP
1 PMP SERVICE TRUCK
25 TMP/TPP
59
9 POWERBOAT
41 TRUCK
1 LOWBED TRAILER
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
UNITED ARAB REPUBLIC
KH-9 MISSION 1208-2 GROUND FORCE FACILITIES
44 PONTON
22 PONTON CARRIER (WITHOUT
PONTON)
ASSOCIATED OBJECTS:
-- AREA A
60 TENT
- 25X1
GROUND FORCE ORDER OF BATTLE:
-- AREA B
NONE DISCERNIBLE
SHALAQAN ENGR TNG CENTER
STATUS: OCCUPIED
In-11?InN nA1?n7??nr
REMARKS:
THE PREVIOUSLY REPORTED SUPPLIES/MATERIALS STACKED IN AREA C
HAVE BEEN COMPLETELY REMOVED. THE AREA WHERE RIVER CROSSING
EQUIPMENT WAS PARKED BEFORE THE OCTOBER 1973 WAR HAS BEEN
COMPLETELY CLEANED UP.
GROUND FORCE ORDER OF BATTLE:
H- AREA A
46 VEHICLE/TRUCK
21 CRANE
GROUND FORCE ORDER OF BATTLE:
H? AREA B
NONE DISCERNIBLE
GROUND FORCE ORDER OF BATTLE:
? AREA C
10 TRUCK
3 VEHICLE/PIECE OF EQUIP
(CANVAS COVERED)
4 VEHICLE/PIECE OF EQUIP
(CANVAS COVERED)
31 SMALL TENT (PERSONNEL
TYPE)
60
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF LAI
25X1
1 UNITED ARAB REPUBLIC
KH-9 MISSION 1208-2 DEPLOYED TACTICAL SSM FACILITIES
SIGNIFICANT RESULTS
AL QAHIRAH TAC SSM STOR FAC
STATUS: OCCUPIED
30-03-00N 031-21-40E
REMARKS:
NO SCUD MISSILES OR PIECES OF ASSOCIATED EQUIPMENT WERE
IDENTIFIED. ONE FROG-7 MISSILE ON A
TRANSPORTER?ERECTOR?LAUNCHER (TEL) WAS IN THE QUARRY IN AREA A.
AN ADDITIONAL CANVAS?COVERED TEL WITHOUT A MISSILE AND A
RESUPPLY VEHICLE WERE SEEN IN AREA A. NO FROG-7 MISSILE. TEL.
OR RESUPPLY VEHICLE WAS OBSERVED IN AREA B.
GROUND FORCE ORDER OF BATTLE:
? IN AREA A 25X1
1 FROG-7 RESUPPLY VEHICLE
1 TRUCK?MOUNTED CRANE
43 TRUCK
25X1
1 FROG-7
1 FROG-7 TEL
1 FROG-7 TEL (CANVAS
COVERED)
AL QAHIRAH TAC SSM TNG AREA WEST
STATUS: UNOCCUPIED
29-58-40N 030-55-50E
REMARKS:
NO TACTICAL SSM?ASSOCIATED EQUIPMENT WAS NOTED IN A DETAILED
SEARCH OF THE TRAINING AREA.
GROUND F017 ORDER OF BATTLE:
NONE DISCERNIBLE
61
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
Declassified in Part
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
25X1
KH-9 MISSION 1208-2
11 UNITED ARAB REPUBLIC
LOGISTICS
SIGNIFICANT RESULTS
AL ISKANDARIYAH PORT FACILITIES
STATUS: OPERATIONAL
A1-11?unm
REMARKS:
ALTHOUGH THE TOTAL NUMBER OF MERCHANT VESSELS HAS REMAINED
APPROXIMATELY THE SAME SINCE FEB 714' THE NUMBER OF TANKERS HAS
CONTINUED TO INCREASE. NINETEEN TANKERS WERE IN THE HARBOR AND
OUTSIDE THE HARBOR IN THE MEDITERRANEAN (AT ANCHOR OR
UNDERWAY). THIS IS THE LARGEST NUMBER OF TANKERS REPORTED AT
ALEXANDRIA SINCE AT LEAST
NAVAL ORDER OF BATTLE:
19 TANKER
3 COASTAL TANKER
71 FREIGHTER
10 COASTAL FREIGHTER
4 PASSENGER SHIP
AS SUWAYS PORT FACS ADABIYAH
STATUS: OPERATIONAL
29-52-38N 032-.28-31E
REMARKS:
A P-6 PT AND A P-6 PTFS WERE OBSERVED BERTHED ALONGSIDE THE
QUAY. A US CH-53 HELICOPTER WAS PARKED IN THE PORT AREA AND
ANOTHER CH-53 WAS IN FLIGHT APPROXIMATELY 2.3 NM EAST OF THE
PORT.
NAVAL ORDER OF BATTLE:
1 P-6 PTFS
1 P-6 PT
1 MEDIUM LANDING SHIP
2 P-6 HULL (ON QUAY. 1
PARTIALLY BURNED)
AIR ORDER OF BATTLE:
2 CH-53 HELICOPTER (1 IN
FLIGHT 2.3 NM EAST OF PORT)
62
2 SMALL SERVICE CRAFT
2 FREIGHTER (1 PARTIALLY
SUNK)
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
KH.-9 MISSION 1208-2
ASSOCIATED OBJECTS:
3 MINE?CLEARING SLED
UNITED ARAB REPUBLIC
LOGISTICS
SUEZ CANAL SEG 1 16 NM
STATUS: UNKNOWN
31-04-50N 032-19-10E
REMARKS:
WITHIN THIS ZONE WERE A TON?CLASS MHC. AN OKHTENSKIY ATA. TWO
SERVICE CRAFT. AND ONE PASSENGER SHIP LYING ON ITS SIDE.
NAVAL ORDER OF BATTLE:
1 TON?CLASS MHC
1 OKHTENSKIY ATA
2 SERVICE CRAFT
1 PASSENGER SHIP (ON ITS
SIDE)
SUEZ CANAL SEG 2 16 NM
STATUS: UNKNOWN
30-48-50N 032-19-55E
REMARKS:
A TANKER WHICH WAS UPRIGHT BUT IMMOBILE AND AN UNIDENTIFIED
VESSEL SUBMERGED ALONG THE BANK WERE WITHIN THIS ZONE.
NAVAL ORDER OF BATTLE:
1 TANKER (UPRIGHT BUT
IMMOBILE)
1 VESSEL (SUBMERGED)
SUEZ CANAL SEG 3 16 NM
STATUS:UNKNOWN
63
30-32-55N 032-21-00E
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF
S ON 1208-2
UNITED ARAB REPUBLIC
LOGISTICS
REMARKS:
ALTHOUGH THERE WAS NO APPARENT MINE?CLEARING ACTIVITY, ONE
TANKER WAS IN LAKE TIMASAH, AND A DREDGE AND MINE?CLEARING SLED
(BEACHED) WERE AT THE NORTH END OF THE LAKE.
NAVAL ORDER OF BATTLE:
1 DREDGE
ASSOCIATED OBJECTS:
1 MINE?CLEARING SLED
1 TANKER
SUEZ CANAL SEG 4 16 NM
STATUS: UNKNOWN
30-19-05N 032-27-35E
REMARKS:
IN THE GREAT BITTER LAKE WERE ONE CH-53 HELICOPTER PULLING A
MINE?CLEARING SLED AND ANOTHER SLED DEAD?IN?THE?WATER AT THE
NORTH END OF THE LAKE.
FLOATING WITHIN THE LAKE WERE 13 FREIGHTERS LASHED TOGETHER IN
GROUPS OF FIVE. FOUR, THREE. AND ONE. IN ADDITION. THERE WAS
ONE DREDGE AND ONE FREIGHTER PARTLY UNDER WATER IN THE LAKE.
NAVAL ORDER OF BATTLE:
1 DREDGE
AIR ORnER F BATTLE:
1 CH-53 HELICOPTER
ASSOCIATED OBJECTS:
2 MINE?CLEARING SLED
14 FREIGHTER (ONE SUNK)
64
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9z5X11
TOP SECRET RUFF
KH-9 MISSION 1208-2
SUEZ CANAL SEG 5 16 NM
STATUS: UNKNOWN
UNITED ARAB REPUBLIC
LOGISTICS
30-05-05N 032.-34-20E
REMARKS:
NO MINE?CLEARING ACTIVITY OR EQUIPMENT WAS OBSERVED.
NAVAL ORDER OF BATTLE:
NONE PRESENT
65
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
R
Next 3 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
?
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP sECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
BUDAPEST AAA BKS STROMFELD AUREL 207
HUNGARY
GROUND FORCE FACILITIES
47-25-27N 019-13-54E
STATUS: OCCUPIED
aRnimn FolICE ORDER OF BATTLE:
28 POSS MAZ-537 (W/LOWBED 121 VEHICLE/PIECE OF EQUIP
SEMITRAILERS)
73
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
R
Next 4 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
,
?
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
11 IRAQ
KH-9 MISSION 1208-2 COMMO/ELEC/RADAR FACILITIES
SIGNIFICANT RESULTS
TALLIL AFLD AW RADAR FAC TALL KING
30-58-50N
046-11-13E
25X1
STATUS: OPERATIONAL
PHYSICAL DESCRIPTION:
9.1 NM NE OF TALLIL AIRFIELD
25X1
THE NEWLY IDENTIFIED TALL KING
B RADAR FACILITY
CONSISTS OF ONE
TALL KING RADAR AND FIVE ASSOCIATED ELECTRONICS VANS. A
PROBABLE CABLE LED FROM THE RADAR TO A REVETTED AREA CONTAINING
THREE OF THE VANS.
TGT DIAM -- 200 FT. ELEV -- 250 FT.
ELECTRONIC ORDER OF BATTLE:
1 TALL KING
MAP SOURCE REFERENCE:
250?JOG A, NH 38-7
5 ELECTRONICS VAN
81
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
LI..,
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A00-1500010011-9 25x1
TOP SECRET RUFF 25X1
IRAQ
KH-9 MISSION 1208-2 AIR BASE FACILITIES
SIGNIFICANT RESULTS
HABBANIYAH PLATEAU AIRFIELD
STATUS: OPERATIONAL
25X1
33-20-25N 043-35-37
25X1
REMARKS:
THE 13 BLINDER WERE IN THE NEW SUPPORT AREA AT THE SE END OF
THE AIR BASE. PROBABLE GROUND SERVICE VEHICLES WERE AROUND FOUR
OF THEM. TWO AREAS OF NEW AIRCRAFT REVETMENT CONSTRUCTION WERE
NOTED ON THE SW SIDE OF THE AIRFIELD.
THE FIRST AREA CONSISTS OF TWO LARGE NEW AIRCRAFT REVETMENTS
AND AN ACCESS TAXIWAY CONNECTED TO THE NW END OF THE NW/SE MAIN
TAXIWAY. BLACKTOPPING OF THE CONNECTING TAXIWAY AND THE
SURFACE OF THE AIRCRAFT REVETMENTS WAS ALMOST COMPLETE. THIS
CONSTRUCTION WAS NOT EVIDENT IN FEB 74
THE SECOND AREA OF NEW CONSTRUCTION IS APPROXIMATELY MIDWAY
BETWEEN THE NW AND SE ENDS OF. THE FIELD AROUND AN ALREADY
EXISTING DISPERSAL TAXIWAY LINKED TO THE MAIN NW/SE TAXIWAY.
THE CONSTRUCTION CONSISTED OF FIVE LARGE AIRCRAFT REVETMENTS,
TWO IN THE LATE STAGE OF CONSTRUCTION, THREE IN THE MIDSTAGE OF
CONSTRUCTION, AND TWO POSSIBLE REVETMENTS IN THE VERY EARLY
STAGE OF CONSTRUCTION. BLACKTOPPING OF THE SERV/CE TAXIWAY AND
THE SURFACE OF TWO OF THE REVETMENTS HAS BEGUN. PROBABLE
INITIAL SCARRING FOR A PORTION OF THIS SECOND AREA OF
CONSTRUCTION WAS NOTED ON PARTIAL COVERAGE OF THE AIRFIELD IN
FEB 74. THE AIRFIELD PERIMETER ROAD WAS BEING EXTENDED TO THE
NEW AREAS OF CONSTRUCTION AND ALONG THE SW SIDE OF THE FIELD TO
THE BLINDER SUPPORT AREA AT THE SE END.
A TALL KING B RADAR WAS IDENTIFIED 2,000 FEET OFF THE END OF
THE NNE RUNWAY WITH FIVE ASSOCIATED ELECTRONICS VANS. A
PROBABLE CABLE SCAR EXTENDED FROM THE RADAR TO A PROBABLE
BUNKER IN THE ADJACENT SAND HILLS. THIS WAS THE SECOND TALL
KING B IDENTIFIED IN IRAQ,
AIR ORDER OF BATTLE:
13 BLINDER
7 BADGER
9 BEAGLE
ASSOCIATED OBJECTS:
82
9 FISHBED
1 STRAIGHT?WING TRAINER
(SMALL)
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
KH-9 MISSION 1208-2
3 DUMMY FISHBED
Top SECRET RUFF
IRAQ
AIR BASE FACILITIES
3 DUMMY HAWKER HUNTER
TALLIL AIRFIELD
STATUS: OPERATIONAL
30-56-13N 046-05-29E
REMARKS:
NO UNUSUAL ACTIVITY WAS OBSERVED AT THE AIRFIELD. THE THIRD
TALL KING B RADAR IDENTIFIED IN IRAQ WAS OBSERVED 9.1 NM NE OF
THE RAIL-TO-ROAD TRANSFER POINT. FIVE ASSOCIATED VANS AND A
PROBABLE CABLE WERE OBSERVED LEADING FROM THE RADAR TO A
REVETTED AREA CONTAINING THREE OF THE VANS.
AIR ORDER OF BATTLE:
6 FISH:3ED
ASSOCIATED OBJECTS:
8 PROB DUMMY FITTER
ELECTRONIC ORDER OF BATTLE:
5 ELECTRONICS VAN
83
Declassified in Part - Sanitized Copy Approved for kele-;s-e--16-1 470E1 : CIA-RDP78T04752A001500010011-9
t1CV,1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
HWANGJU AIRFIELD
SIGNIFICANT RESULTS
KOREA. NORTH
AIR BASE FACILITIES
38-38-58N 125-47-31E
STATUS: OPERATIONAL
ATP APrIFR ifF BATTLE:
5 FISHBED
2 PROB FISHBED
ASSOCIATED OBJECTS:
4 PROB DUMMY/DECOY FISHBED
12 PROB DUMMY/DECOY
FAGOT/FRESCO
2 COLT
KOKSAN AIRFIELD
38-41-25N 126-36-20E
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
23 FRESCO
4 FAGOT
NAMSI AIRFIELD
An-Rc.Am
STATUS: OPERATIONAL
REMARKS:
NINE OF THE FAGOT/FRESCO, THE HOUND HELICOPTER,
FUSELAGE WERE AT NAMSI REPAIR BASE
AIR ORDER OF BATTLE:
38 FAGOT/FRESCO
5 COLT
AND THE HOUND
1 HOUND
1 HOUND FUSELAGE
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
5X1
85
TnP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified
11 V
in Part - Sanitized Copy Approved
. I
for Release 2014/05/01
TOP SECRET RUFF
: CIA-RDP78T04752A001500010011-9
25x1
25X1
25X1
KOREA,
NORTH
KH-9 MISSION 1208-2
AIR BASE FACILITIES
25X1
5 PROB DUMMY/DECOY FISHBED
13 PROB DUMMY/DECOY
FAGOT/FRESCO
25X1
ONCHON?UP
AIRFIELD
38-54-21N 125-14-07E
25X1
STATUS:OPERATIONAL
PHYSICAL DESCRIPTION:
13.2 NM NW OF NAMPO.
UPDATED DESCRIPTION. THE AIRFIELD CONSISTS OF THE FOLLOWING
FLIGHT OPERATIONS AND SUPPORT FACILITIES.
RUNWAY -- THE PRIMARY RUNWAY IS NORTH/SOUTH,
SERVICEABLE, AND CONCRETE. THE SECONDARY RUNWAY, A COMBAT
ALERT STRIP/TAXIWAY LEADING TO TWO AIRCRAFT STORAGE TUNNELS, IS
7,900 X 60 FEET, WNW/ESE, SERVICEABLE, AND CONCRETE.
REFERENCE POINT (RP) -- THE RP IS THE CENTER OF THE PRIMARY
RUNWAY.
PARKING FACILITIES -- PARKING FACILITIES CONSIST OF A PARALLEL
TAXIWAY. A DISPERSAL TAXIWAY EXTENDING 2.4 NM ESE OF THE RP TO
TWO AIRCRAFT STORAGE TUNNELS, THREE DISPERSAL TAXIWAYS SERVING
AIRCRAFT REVETMENTS. TWO END?CONNECTING LINKS, FOUR CROSSOVER
LINKS. FOUR PARKING APRONS, ONE MAINTENANCE APRON, ONE
MAINTENANCE HANGAR. FOUR DOUBLE?BAY HANGARETTES (ONE UNDER
CONSTRUCTION), 18 AIRCRAFT REVETMENTS, AND ONE FIRING?IN BUTT.
SUPPORT FACILITIES -- SUPPORT FACILITIES INCLUDE TWO CONTROL
TOWERS/OPERATIONS BUILDINGS (AT EACH END OF THE PARALLEL
TAXIWAY), ONE AW SITE IN THE AIRCRAFT DISPERSAL AREA SW OF THE
RP, AND 36 SUPPORT BUILDINGS (THREE REVETTED).
ADMINISTRATION AND BARRACKS FACILITIES -- THESE FACILITIES
CONSIST OF TWO ADMINISTRATION BUILDINGS, 24 BARRACKS/QUARTERS,
ONE T?SHAPED MESSHALL, AND THREE VEHICLE SHEDS.
AMMUNITION FACILITIES -- THE AMMUNITION STORAGE AREA, SE OF
THE RP, CONSISTS OF TWO DRIVE?THROUGH STORAGE BUNKERS.
POL FACILITIES -- POL FACILITIES CONSIST OF SEVEN HORIZONTAL
86
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified
in Part - Sanitized Copy Approved
for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP sFCRET RUFF
25X1
25X1
NORTH
KOREA,
AIR BASE FACILITIES
KH-9 MISSION 1208-2
POL STORAGE TANKS. A PUMPHOUSE. AND EIGHT REFUELING POINTS.
AIR ORDER OF BATTLE:
25X1
4 FARMER
ELECTRONIC ORDER OF
BATTLE:
25X1
1 BAR LOCK
1 POSS SPOON REST
ASSOCIATED
rJECTS:
25X1
3 DUMMY/DECOY FISHBED
16 DUMMY/DECOY FAGOT/FRESCO
25X1
PUKCHANG?NI AIRFIELD 39-30-07N 125-58-02E
25X1
STATUS:OPERATIONAL
AIR ORDER OF BATTLE:
25X1
5 PROB FISHBED
ASSOCIATED OBJECTS:
25X1
7 POSS DUMMY/DECOY
AIRCRAFT
25X1
PUNGCHON AIRFIELD
3A-25-24N 125-01-16E
25X1
STATUS:OPERATIONAL
REMARKS:
A POL FACILITY CONSISTING OF EIGHT HORIZONTAL POL TANKS IS
ADJACENT TO THE PARALLEL TAXIWAY. ANOTHER FACILITY. 1.5 NM
SOUTH OF THE RP AT 38-23-48N 125-01-10E. CONSISTED OF 17
HORIZONTAL POL TANKS, TWO TUNNELS IN THE EARLY STAGE OF
CONSTRUCTION, AND AT LEAST 68 CONSTRUCTION SUPPORT BUILDINGS.
THE RELATIONSHIP OF THIS FACILITY TO THE AIRFIELD IS
UNDETERMINED.
87
5X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 7)(1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
AIR ORDER IF BATTLE:
NONE DISCERNIBLE
KOREA, NORTH
AIR BASE FACILITIES
PYONG?NI AIRFIELD
STATUS: OPERATIONAL
39-24-29N 125-53-39F
REMARKS:
CONSTRUCTION APPEARED TO HAVE BEEN STOPPED ON THE DISPERSAL
TAXIWAY WHICH REMAINED 50 PERCENT PAVED. THE PROBABLE
AMMUNITION STORAGE AREA NOW CONSISTS OF FIVE CONCRETE?LINED
BUNKERS IN THE LATE STAGE OF CONSTRUCTION.
AIR oRnER 9F BATTLE:
4 FITTER (2 w/TAIL SCTNS
RMVD)
ASSOCIATED OBJECTS:
13 PROB DUMMY/DECOY FISHBED
7 PROB DUMMY/DECOY
FAGOT/FRESCO
SAAMCHAM AIRFIELD
39-45-00N I25-54-12E
STATUS; OPERATIONAL
AIR ORDER O,F BATTLE:
LL SWEPT?WING
(AT LEAST)
88
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
KH-9 MISSION 1208-2
SUNAN?UP AIRFIELD
STATUS: OPERATIONAL
TOP SECRET RUFF 25X1
11 KOREA, NORTH
AIR BASE FACILITIES
39-12-10N 125-40-23E
REMARKS:
CONSTRUCTION APPEARED To BE COMPLETE ON THE LARGE TERMINAL
BUILDING. CONSTRUCTION WAS CONTINUING ON THE TWO AIRCRAFT
TUNNELS.
AIR ORDER OF BATTLE:
1 COOT
3 COKE
4 CAB
16 COLT
4 HIP C
TAETAN AIRFIELD
STATUS:UNDER CONSTRUCTION
38-07-50N 125-15-10E
REMARKS:
A DOUBLE?BAY HANGARETTE WAS IN THE INITIAL STAGE OF
CONSTRUCTION ADJACENT TO THE WEST END OF THE RUNWAY.
CONSTRUCTION WAS CONTINUING ON THE MODIFIED PARALLEL TAXIWAY.
THE DISPERSAL TAXIWAY. AND THE TUNNELS. THE RUNWAY WAS
COMPLETELY PAVED; HOWEVER, DEPOSITS OF DIRT FROM FRINGE AREA
GRADING ACTIVITY AND CONSTRUCTION VEHICLE TRAFFIC WERE ON
PORTIONS OF THE RUNWAY. THE MODIFIED PARALLEL TAXIWAY WAS
APPROXIMATELY 75 PERCENT PAVED. PAVING HAS JUST BEGUN ON THE
DISPERSAL TAXIWAY,
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
89
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 _
?l
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
11 KOREA. NORTH
KH-9 MISSION 1208-2 NAVAL BASE FACILITIES
SIGNIFICANT RESULTS
PIPA?GOT NAVAL BASE AND SHIP REPAIR YD
STATUS: OPERATIONAL
3R-35-17N 1,4-c(3..17
REMARKS:
THE TWO R SS, 2.1 NM NNE. WERE APPROACHING THE BASE ON A
HEADING OF 220 DEGREES. THESE VESSELS ARE BELIEVED TO BE NEW
ACQUISITIONS AND WOULD BRING THE TOTAL NUMBER OF R SS TO FOUR
IN THE NORTH KOREAN NAVAL INVENTORY.
CONSTRUCTION WAS CONTINUING IN THE ADMINISTRATION/BILLETING
AREA.
NAVAL ORDER OF BATTLE:
? AT FINGER PIER 25X1
2 R SS
25X1
NAVAL ORDER OF BATTLE:
-- UNDERWAY
2 R SS (2.1 NM NNE OF BASE)
NAVAL ORDER OF BATTLE:
? DEAD IN WATER
1 50-1 PCS (1.7 NM NNE OF
BASE)
NAVAL ORDER OF BATTLE:
- ON TRANSVERSER
2 HANCHON LCU
NAVAL ORDER OF BATTLE:
-- BEACHED
1 HANCHON LCU
'RN
NAVAL ORflER OF BATTLE:
-- ON MARINE RAILWAY
M LL AKL
NAVAL ORDER OF BATTLE:
- ADJACENT TO MARINE RAILWAY
1 POSS YP
90
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
KH-9 MISSION 1208-2
KOREA, NORTH
NAVAL BASE FACILITIES
SUNWI?DO NAVAL FAC PUG 37-46-10N 125-20-18E
STATUS:OPERATIONAL
REMARKS:
THIS WAS THE FIRST OBSERVATION OF OSA PTFG AT THIS FACILITY ON
SATELLITE PHOTOGRAPHY.
THE APPROACH BASINS' BOAT TUNNEL ENTRANCES. AND AREAS AROUND
THE TUNNELS APPEARED TO BE COMPLETE AND OPERATIONAL. HOWEVER'
CONSTRUCTION WAS CONTINUING ON THE SUPPORT AREAS ADJACENT TO
THE EAST BASIN AND ON THE RIDGE MIDWAY BETWEEN THE TUNNEL
ENTRANCES.
NAVAL ORDER OF BATTLE:
2 OSA PTFG
25X1
25X1
MOORED TO FLTNG PIER ON OUTER BASIN WALL 25X1
NAVAL ORDER OF BATTLE:
2 P-6 PT
- IN EAST BASIN 25X1
25X1
25X1
NAVAL ORDER OF BATTLE:
? ADJACENT TO EAST BASIN (BARGE?MOUNTED)
1 CRANE
1 BARGE
NAVAL ORDER OF BATTLE:
- IN WEST BASIN
3 CHAHO PTFS (1 PARTIALLY
IN ENTR TO TUNNEL)
NAVAL ORDER OF BATTLE:
-- 2.5 NM SSW IN CHANNEL 25X1
1 PROB HANCHON LCU
(UNDERWAY)
1 P-6 PT (TORPEDO TUBES
REMOVED)
MAVAI IlDrIR OF BATTLE:
-- 4.7 NM SSE
1 PROB INFILTRATION TRAWLER
(UNDERWAY)
91
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
. I .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
KOREA. NORTH
GROUND FORCE FACILITIES
38-39-46N 126-33-02E
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
CHILCHON?DONG ARMY BKS A STORAGE AREA
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
? IN AREA B
25X1
24 TRUCK
25X1
CHONGDAN ORD DPO
38-22.-40N
125-51-50E
25X1
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
3.3 NM SE OF CHOGU?RI.
UPDATED DESCRIPTION. THE FACILITY CONSISTS OF THREE SEPARATE
AREAS.
AREA A. AT 38-22-40N 125-51-50E, CONTAINS TWO ADMINISTRATION
BUILDINGS. 13 BARRACKS, TWO MESSHALLS (ONE L SHAPED)? ONE
AUDITORIUM. ONE MONITOR?ROOFED VEHICLE REPAIR BUILDING. FIVE
PROBABLE MACHINE SHOPS. 54 QUARTERS. TWO VEHICLE SHEDS.
NUMEROUS SUPPORT BUILDINGS. AND SIX BUILDINGS UNDER
CONSTRUCTION.
AREA B. AT 38-22-30N 125-50-50E. CONTAINS 13 STORAGE
BUILDINGS.
AREA CP AT 38-23-50N 125...50-35E, CONTAINS TWO ADMINISTRATION
BUILDINGS (ONE E SHAPED). THREE BARRACKS. ONE MESSHALL. ONE
AUDITORIUM' SIX SUPPORT BUILDINGS, AND GROUND SCARRING FOR
POSSIBLE SMALL?ARMS TARGET RUNS.
GROUND FORCE ORDER OF BATTLE:
- IN AREA A 25X1
103 TRUCK
92
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 5x1
TOP SECRET RUFF 25X1
25X1
1
KH-9 MISSION 1208-2
KUMCHON HQ TK DIV/ARMY BKS/STOR
KOREA, NORTH
GROUND FORCE FACILITIES
39-24-38N 125-44-58E
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
IN AREA A
2 TANK (CANVAS COVERED)
7 BTR-60PB
GROUND FORCE ORDER OF BATTLE:
-- IN AREA B
18 TANK/ASSAULT GUN
(REVETTED)
GROUND FORCE ORDER OF BATTLE:
? IN AREA C 25X1
8 TRUCK
11 TRUCK
25X1
25X1
25X1
GROUND FORCE ORDER OF BATTLE:
IN AREA D 25X1
25 TANK
GROUND FORCE ORDER OF BATTLE:
H IN AREA F
8 PROB M1967 APC
(CHICOm,CANVAs COVERED)
MUNMYONG?NI BKS A STOR AREA
38-12-45N 126-26-50E
STATUS:OCCUPIED
GROUND FORCE ORDER OF BATTLE:
24 PONTON CARRIER (W/PONTON 3 POS5 TRUCK?MOUNTED CRANE
SECTIONS) 35 TRUCK
13 PROB PONToN SECTION (ON
GROUND)
93
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
5X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KOREA, NORTH
GROUND FORCE FACILITIES
38-20-00N 126-42-33E
KH
TOSAN-UP
-9 MISSION 1208-2
ARMOR INSTALLATION N
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
- IN VEHICLE REVETMENTS
25X1
16 TANK
25X1
OTHER RESULTS-NO APPARENT CHANGE
ANHYOP
ARMY BKS A HQ INF DIV A REGT
38-20-21N 126-54.-57E
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
25X1
NONE DISCERNIBLE
25X1
KAESONG
ARMY BKS A HQ INF DIV
38-00-30N
126.-31-23E
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
25X1
NONE DISCERNIBLE
25X1
SINWON-NI
TANK PARK N
38-15-35N 125-42-00E
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
94
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TAP cFrRFT RUFF I 25X1
25X1
KH-9 MISSION 1208-2
NONE DISCERNIBLE
KOREA. NORTH
GROUND FORCE FACILITIES
95
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
.11 II
5X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 9 -
TOP SECRET RUFF 25X1
25X1
KOREA. NORTH
KH-9 MISSION 1208-2 DEPLOYED TACTICAL SSM FACILITIES
SIGNIFICANT RESULTS
TAEPYONG.-NI TAC SSM SPT FAC A BKS NW
STATUS: OCCUPIED
39-00-22N 125-36-33E
PHYSICAL DESCRIPTION:
7.5 NM SW OF PYONGYANG.
UPDATED DESCRIPTION. THE FACILITY CONSISTS OF TWO SEPARATE
AREAS. AREA At AT 39-00-22N 125-36-33E, CONTAINS 14 BARRACKS.
TWO ADMINISTRATION BUILDINGS. TWO MESSHALLS, FOUR VEHICLE
SHEDS. 16 SUPPORT BUILDINGS, FIVE TUNNEL ENTRANCES CIRCLING A
HILL. AND A NEW VEHICLE PARKING AREA UNDER CONSTRUCTION.
AREA Bo AT 39-00-05N 125-.36-00E, CONTAINS ONE BARRACKS. ONE
MESSHALL, THREE VEHICLE SHEDS. 22 QUARTERS, AND FOUR SUPPORT
BUILDINGS.
THIS WAS THE FIRST IDENTIFICATION OF FROG-7 EQUIPMENT IN NORTH
KOREA.
GROUND FORCE ORDER OF BATTLE:
H IN AREA A
3 PROB FROG-7 TEL (CANVAS
COVERED)
GROUND FORCE ORDER OF BATTLE:
IN AREA B
3 PROB TRACKED VEHICLE
19 TRUCK
3 VEHICLE
1 VEHICLE
25X1
25X1
25X1
25X1
96 25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
0
,.
.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
2
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75x1
TOP cFCRET RUFF
25X1
11
KH.-9 MISSION 1208-2
SIGNIFICANT RESULTS
TARABULUS PORT FACILITIES
STATUS:OPERATIONAL
REMARKS:
THE NUMBER OF MERCHANT SHIPS
DECREASED SINCE MAR 74,
NAVAL ORDER OF BATTLE:
1 VOSPER MARK 7 FRIGATE
(OUTSIDE HARBOR)
1 T-43 MSF
1 CORVETTE PG
4 VOSPER 100.-FT PB (2
OUTSIDE HARBOR)
3 BRAVE PTGL (1 IN AGF)
LIBYA
LOGISTICS
32-54.P.08N 013-11-27E
IN AND AROUND TRIPOLI PORT HAS
1 PATROL BOAT (OUTSIDE
HARBOR)
3 PB HULL (2 ON DOCK)
1 ZEILTEN AGF
111 MERCHANT SHIP (62
OUTSIDE HARBOR)
97
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
5X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
?
????
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
25X1
KH-9 MISSION 1208...2
ITU ABA ISLAND
STATUS:OCCUPIED
SIGNIFICANT RESULTS
SPRATLY IS.
MISCELLANEOUS
10-..22..'30N
PHYSICAL DESCRIPTION:
318 NM ESE OF CAM RANH BAY. SOUTH VIETNAM.
INITIAL NPIC DESCRIPTION. THIS SMALL ISLAND IS IN THE CENTRAL
PORTION OF THE SPRATLY ARCHIPELAGO. IT IS APPROXIMATELY 4.615
FEET. VEGETATION CONSISTS MAINLY OF TREES. SCRUB
BRUSH. AND GRASS. THE MILITARY FACILITY ON THE ISLAND CONSISTS
OF THREE ADMINISTRATION BUILDINGS, SIX BARRCKS. ONE PROBABLE
OFFICERS QUARTERS. ONE MESSHALL. ONE LARGE STORAGE BUILDING.
FIVE SMALL STORAGE BUILDINGS. AND EIGHT STORAGE/SUPPORT
BUILDINGS. ONE LONG FINGER PIER IS ON THE SOUTHERN SIDE OF THE
ISLAND AND APPEARED TO EXTEND OUT TO A DREDGED SLIP IN THE
CORAL. A SMALL FINGER PIER IS IMMEDIATELY EAST OF THE LARGE
PIER. ROADS EXTEND THE LENGTH AND WIDTH OF THE ISLAND AND A
MONUMENT HAS BEEN ERECTED AT THE INTERSECTION. NUMEROUS TRAILS
RUN THROUGHOUT THE ISLAND. PERSONNEL TRENCHES AND FOXHOLES
EXTEND AROUND THE PERIMETER OF THE ISLAND. AT LEAST SIX
REVETTED GUN POSITIONS WERE ALONG THE BEACH IN THE VICINITY OF
THE FINGER PIERS.
TGT DIAM 4.600 FT. ELEV 15 FT.
NAVAL ORDER OF BATTLE:
2 EX US BOSTWICK...CLASS DE 1 LST..-1 CLASS
(LYING OFF SOUTHERN SIDE OF 3 SPEED BOAT (SMALL.
ISLAND) BEACHED)
1 EX US BOSTWICK...CLASS DE 3 PROB SHIPS BOAT (SMALL)
(UNDERWAY 1.5 NM SE OF ITU
ABA)
_ATinEltini_cnRICE ORDER OF BATTLE:
6 CARGO TRUCK
2 PROB GUN (IN REVETTED
PSNS, UNID CALIBRE)
99
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TAO ccrocT PlI 25)(1
25X1
KH-9 MISSION 1208-2
MAP SOURCE REFERENCE:
PC K-10C
SPRATLY IS.
MISCELLANEOUS
LOAITA ISLAND
STATUS: OCCUPIED
10-40-07N 114-25-20E
PHYSICAL DESCRIPTION:
318 NM ESE OF CAM RANH BAY' SOUTH VIETNAM,
INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL
PORTION OF THE SPRATLY ARCHIPELAGO, IT IS APPROXIMATELY
I VEGETATION CONSISTS MAINLY OF SCRUB TREES AND
25X1
25X1
25X1
GRASS. THE FACILITY ON THE ISLAND
AND TWO SMALL SHEDS. ONE ROAD
AND NUMEROUS TRAILS EXTEND FROM
THE LARGE SHED.
TGT DIAM 1500 FT. ELEV --
NAVAL ORDER OF BATTLE:
CONSISTS OF ONE LARGE
EXTENDS THE LENGTH OF THE
THE BEACH TO THE VICINITY
10 FT.
SHED
ISLAND
OF
25X1
NONE OBSERVED
25X1
MAP SOURCE REFERENCE:
PC K-10C
- 25X1
NAMYIT ISLAND 10-12-00N 114-21-30E
25X1
STATUS: OCCUPIED
NAVAL ORDER OF BATTLE:
25X1
1 EX US CA CO?CLASS WHEC
100
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
25X1
SPRATLY IS.
KH MISCELLANEOUS
NORTHEAST CAY
STATUS: OCCUPIED
11...2630N
PHYSICAL DESCRIPTION:
299 NM EAST OF CAM RANH BAY. SOUTH VIETNAM.
INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL
PORTION OF THE SPRATLY ARCHIPELAGO. IT IS APPROXIMATELY 25X1
VEGETATION CONSISTS MAINLY OF TREES. SCRUB BRUSH. 25X1
AND GRASS. THE FACILITY ON THE ISLAND CONSISTS OF ONE
25X1
ADMINISTRATION BUILDING. ONE LARGE BARRACKS. TWO SUPPORT
BUILDINGS. AND ONE OBSERVATION TOWER. TWO ALL?WEATHER ROADS
RUNNING THE LENGTH AND WIDTH OF THE ISLAND INTERSECT AT THE
ADMINISTRATION BUILDING.
TGT DIAM 2.400 FT. ELEV 15 FT.
NAVAL ORDER OF BATTLE:
NONE OBSERVED
MAP SOURCE REFERENCE:
PC K-10C
SAND CAY
STATUS: OCCUPIED
25X1
25X1
25X1
?Ifl223fiNt14-28-45E
25X1
PHYSICAL DESCRIPTION:
319 NM ESE OF CAM RANH BAY. SOUTH VIETNAM. AND 1 NM EAST OF ITU
ABA ISLAND.
INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL
HE SPRATLY ARCHIPELAGO. IT IS APPROXIMATELY 25X1
VEGETATION CONSISTS MAINLY OF SCRUB BRUSH A 2bAl
ERMENANT FACILITY WAS OBSERVED ON THE ISLAND.
TGT DIAM 1.300 FT. ELEV 10 FT.
5X1
101
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
i , I
Declassified
in Part - Sanitized Copy
Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
SPRATLY
IS.
KH-9 MISSION 1208-2
MISCELLANEOUS
NAVAL ORDER OF BATTLE:
25X1
6 PROB SMALL LANDING
CRAFT
25X1
MAP SOURCE REFERENCE:
PC K-10C
25X1
SIN COWE ISLAND
09-53-15N
114-19-42E
25X1
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
330 NM ESE OF CAM RANH BAY. SOUTH
INITIAL NPIC DESCRIPTION, THIS
PORTION OF THE SPRATLY ARCHIPELAGO.
VIETNAM.
SMALL
IT
ISLAND IS IN THE CENTRAL
7X1
IS APPROXIMATELY
VEGETATION CONSISTS
MAINLY
OF GRASS AND LOW BRUSH.
25X1
THE FACILITIES ON THE ISLAND
CONSIST OF TWO LARGE
BARRACKS?TYPE BUILDINGS. TWO SMALL PROBABLE SUPPORT BUILDINGS.
FOUR PROBABLE SHEDS/TENTS, AND ONE OBSERVATION TOWER.
TGT DIAM -- 1.050 FT. ELEV 10 FY.
NAVAL ORDER OF BATTLE:
25X1
2 PROB SMALL LANDING CRAFT
25X1
MAP SOURCE REFERENCE:
PC K-10C
25X1
SOUTHWEST CAY
11-26-31N 114-20-30E
25X1
STATUS: OCCUPIED
102
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF
KH-9 MISSION 1208..?2
1 SPRATLY IS.
MISCELLANEOUS
PHYSICAL DESCRIPTION:
298 NM EAST OF CAM RANH BAY. SOUTH VIETNAM.
INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL
PORTION OF THE SPRATLY ARCHIPELAGO* IT IS APPROXIMATELY
VEGETATION CONSISTS MAINLY OF GRASS WITH A FEW
SCRUB TREES AROUND THE PERIMETER OF THE ISLAND. THE FACILITY
ON THE ISLAND CONSISTS OF ONE PROBABLE BARRACKS. FOUR
STORAGE/SUPPORT BUILDINGS, ONE FOOTING FOR A PROBABLE BARRACKS,
ONE FOOTING FOR A PROBABLE STORAGE/SUPPORT BUILDING. ONE
OBSERVATION TOWER. AND ONE TOWER/MAST.
TGT DIAM 2.900 FT. ELEV 15 FT.
NAVAL ORDER OF BATTLE:
8 PROB SMALL LANDING CRAFT
MAP SOURCE REFERENCE:
PC K.?'10C
THITU ISLAND
STATUS: OCCUPIED
11-03-15N 11L11659E
25X1
25X1
25X1
25X1
25X1
25X1
25X1
PHYSICAL DESCRIPTION:
300 NM EAST OF CAM RANH BAY. SOUTH VIETNAM.
INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL
PORTION OF THE SPRATLY ARCHIPELAGO. IT IS ROUGHLY TRIANGULAR
AND IS APPROXIMATELY VEGETATION CONSISTS 25X1
MAINLY OF SCRUB TREES AND GRASS AND A FEW LARGER TREES. THE
VEGETATION APPEARED TO BE RATHER THICK ON THITU. THE MILITARY
FACILITY ON THE ISLAND IS PRIMARILY IN A LARGE CLEARED AREA ON
THE SW CORNER OF THE ISLAND. IT CONSISTS OF ONE ADMINISTRATION
BUILDING. THREE BARRACKS. ONE MESSHALL. TWO STORAGE BUILDINGS.
AND THREE SUPPORT BUILDINGS. TWO ROADS EXTEND FROM THE LARGE
CLEARING TO THE FAR SIDE OF THE ISLAND AND A THIRD ROAD EXTENDS
FROM THE MAIN COMPLEX TO A SMALL CLEARING WHERE THE TWO STORAGE
BUILDINGS ARE SITUATED.
TGT DIAM 2.600 FT. ELEV 15 FT.
103
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUH- 25X1
25X1
KH-9 MISSION 1208-2
NAVAI npnFR OF BATTLE:
2 PATROL. CRAFT (UNDERWAY 2
NM ESE OF THITu)
MAP SOURCE REFERENCE:
PC K-10C
SPRATLY IS.
MISCELLANEOUS
104
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
???
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
1
KH-9 MISSION 1208-2
TOP SECRET RUFF 25X1
PAKISTAN
AIR BASE FACILITIES
25X1
HYDERABAD AIRFIELD
SIGNIFICANT RESULTS
NEW 25-19.-20N 068-21-50E
25X1
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
25X1
1 L-19
ASSOCIATED OBJECTS:
25X1
1 POSS POL TRUCK
25X1
MONTGOMERY AIRFIELD EAST
30-44-28N
073-21-17E
25X1
STATUS: OPERATIONAL
PHYSICAL DESCRIPTION:
13.6 NM ENE OF MONTGOMERY.
THE NEWLY IDENTIFIED AIRFIELD CONSISTS
OF A 9.050? X
75?FOOT
SERVICEABLE NNW/SSE ASPHALT RUNWAY WITH
A _ _
ASPHALT
25X1
AND EARTH OVERRUN AT THE SSE END AND A 1.365?FOOT ASPHALT
OVERRUN AT THE NNW END. FACILITIES INCLUDE EIGHT HANGARETTES
(FOUR AT EACH END OF THE RUNWAY) AND TEN AIRCRAFT PARKING BAYS
PROTECTED BY CONCRETE BLAST WALLS (FIVE AT EACH END OF THE
RUNWAY).
TGT DIAM -- 18.000 FT. ELEV -- 600 FT.
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
MAP SOURCE REFERENCE:
250?JOG?R. NH 43-5
25X1
25X1
25X1
105
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
25X1
25X1
TOP SECRET RUFF
KH-..9 MISSION 1208-2
SIGNIFICANT RESULTS
MONTGOMERY MIL CANTONMET AREA
STATUS: OCCUPIED
PAKISTAN
GROUND FORCE FACILITIES
30-44-24N 073-20-57E
PHYSICAL DESCRIPTION:
12.5 NM ENE OF MONTGOMERY.
THE NEWLY IDENTIFIED MILITARY CANTONMENT AREA CONSISTS OF 37
BARRACKS. 31 ADMINISTRATION BUILDINGS (ONE E SHAPED AND SEVEN U
SHAPED). 16 MESSHALLS. 20 STORAGE BUILDINGS, 26 VEHICLE
MAINTENANCE/STORAGE BUILDINGS, 17 REVETTED EXPLOSIVES STORAGE
BUILDINGS. 157 APARTMENT-TYPE FAMILY QUARTERS' 92 SMALL
STORAGE/SUPPORT BUILDINGS, AND 30 BUILDINGS IN VARIOUS STAGES
OF CONSTRUCTION. OTHER FACILITIES INCLUDE SEVEN
PARADE/ATHLETIC FIELDS, THREE PISTOL RANGES. SEVEN ELEVATED
WATER TANKS. AND 32 GREASE RACKS (LOCATED IN THE MOTOR POOLS).
THE INSTALLATION IS ROAD SERVED.
TGT DIAM -- 18,000 FT. ELEV -- 600 FT.
GROUND FORCE ORDER OF BATTLE:
3 FA PIECE
2
LOWBOY TRAILER
123 CARGO TRUCK
1
TANK TRNSPRTR TRAILER
100
UTILITY TRUCK
1
TRUCK.-MOUNTED CRANE
146
SINGLE-AXLE TRAILER
2
MOBILE CRANE
MAP SOURCE REFERENCE:
250-JOG-R. NH 43-5
107
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
11 V ?I . .1 ,
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
KH-9 MISSION 1208-2
TOP SECRET RUFF
11
SIGNIFICANT RESULTS
WROCLAW ARMY BARRACKS 203 KARLOWICE
POLAND
GROUND FORCE FACILITIES
51-08-34N 017-04-06E
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
21 PROB 0T-64
3 PROB TRACKED VEHICLE
63 TRUCK
22 TRAILER
7 PROB UAZ-69
17 VEHICLE/PIECE OF EQUIP
109
L,JZX I
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
r
r
?
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
KH-9 MISSION 1208?.2
1 SOMALIA
AIR DEFENSE MISSILES
SIGNIFICANT RESULTS
MOGADISCIO SA-2 SAM SITE 2
STATUS: OCCUPIED
02...0741N 045.46..?37E
PHYSICAL DESCRIPTION:
7 NM NW OF MOGADISCIO?
THE NEWLY IDENTIFIED SAM SITE CONSISTS OF A CIRCULAR ROAD. SIX
LAUNCH POSITIONS. AND A GUIDANCE AREA. AN ONSITE SUPPORT
FACILITY WITH AT LEAST NINE BUILDINGS IS JUST WEST OF THE SITE,
TOT DIAM 6.000 FT. ELEV 450 FT.
2 Sk...2 TRANSPORTER
6 PROB ELECTRONICS VAN
MISSILE ORDER OF BATTLE:
6 PROB SA-2 LAUNCHER
ELECTRONIC ORDER OF BATTLE:
1 PROB FAN SONG
GROUND FORCE ORDER OF BATTLE:
2 VEHICLE/IECE OF EQUIP
MISSILE ORDER OF BATTLE:
3 SA-2 LAUNCHER
3 POSS SA-2 LAUNCHER
ELECTRONIC ORDER OF BATTLE:
1 FAN SONG
1 POSS ACQUISITION RADAR
GROUND FORCE ORDER OF BATTLE:
4 VEHICLE/PIECE OF EQUIP
3 SA-2 TRANSPORTER
9 PROB ELECTRONICS VAN
MAP SOURCE REFERENCE:
250...JOG(A). NA38..-7
111
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-
,?.
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
I in
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 nav4
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SOMALIA
AIR DEFENSE MISSILES
MOGADISCIO SA-2 SAM SITE 3
STATUS: OCCUPIED
02-0536N 045..21-09E
PHYSICAL DESCRIPTION:
3.5 NM NORTH OF MOGADISCIO.
THE NEWLY IDENTIFIED SAM SITE CONSISTS OF A CIRCULAR ROAD' SIX
LAUNCH POSITIONS, AND A GUIDANCE AREA. AN ONSITE SUPPORT
FACILITY WITH TEN BUILDINGS IS ADJACENT TO THE SITE.
TGT ELEV -- 250 FT.
mTccur 70ER OF BATTLE:
NONE DISCERNIBLE
MISSILE ORDER OF BATTLE:
5 PROB SA-2 LAUNCHER
3 SA-2 TRANSPORTER (CANVAS
COVERED)
ELECTR(INIC_ORDER OF BATTLE:
1 FAN SONG
GROUND FORCE ORDER OF BATTLE:
3 VEHICLE/PIECE OF EQUIP
6 PROB ELECTRONICS VAN
MAP SOURCE REFERENCE:
250?JOG(A), NA38-7
112
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
11 SOMALIA
AIR BASE FACILITIES
SIGNIFICANT RESULTS
BELEDAI AMIN AIRFIELD
STATUS: UNDER CONSTRUCTION
(12-39-05N 044-47-25E
REMARKS:
CONSTRUCTION WAS CONTINUING ON THE RUNWAY.
AIR ORDER OF BATTLE:
NONE PRESENT
C T OBJECTS:
20 VEHXCLEJIECE OF EQUIP
(AT LEAST)
CHISIMAIO AIRFIELD SOUTHWEST
STATUS: OPERATIONAL
00-23-0/S 042-27-0/E
REMARKS:
SURFACING OF THE RUNWAY APPEARED TO BE COMPLETE. CONSTRUCTION
WAS CONTINUING ON THE LARGE TERMINAL PARKING APRON AND THE
SECOND LINK TAXIWAY.
AIR ORDER OF BATTLE:
NONE PRESENT
ASSOCIATED OBJECTS:
28 VEHICLE/PIECE OF EQUIP
(AT LEAST)
113
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
MOGADISCIO INTERNATIONAL AIRFIELD
STATUS:OPERATIONAL
SOMALIA
AIR BASE FACILITIES
02-00-48N 045-18-48E
REMARKS:
THIS WAS THE FIRST IDENTIFICATION OF A FISHBED IN SOMALIA.
GROUND WAS BEING CLEARED FOR ENLARGEMENT OF A COMMERCIAL
PARKING APRON.
AIR ORDER OF BATTLE:
4
BEAGLE
2
CREEK
1
FISHBED
2
HIP C
7
FAGOT/FRESCO
2
HOUND
1
PROB BOEING 720
5
SMALL STRAIGHT?WING
5
CAB (1 DERELICT)
1
AIRCRAFT (TAIL PROTRUDING
2
COKE
FROM HANGAR)
2
COLT
ASSOCIATED OBJECTS:
CRAFTFUS SHP CNTNR
(AT LEAST)
114
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 7cY1
TOP SECRET RUFF 25X1
25X1
11 SOMALIA
NAVAL BASE FACILITIES
SIGNIFICANT RESULTS
BERBERA PORT FACILITIES
STATUS: OPERATIONAL
REMARKS:
10-26-30N 045..00-30E
25X1
TWO TO SIX SOVIET NAVAL SHIPS ARE NORMALLY SEEN AT THIS PORT.
AsIVIAL?WWYLOF BATTLE:
25X1
2 POLUCHAT-1 PB
1 VYN?CLASS BARRACKS SHIP
1 PROB MAYAK AFL
3 OCEANGOING FREIGHTER
25X1
CHISIMAIO PORT FACILITIES
00-22-14S 042-33-13E
25X1
STATUS:OPERATIONAL
NAVAL ORDER OF BATTLE:
2 POLUCHAT-1 PB
25X1
Pb Fl
1 PROB P-6 PT (ON MARINE
1 OCEANGOING FREIGHTER
RAILWAY)
25X1
&I
115
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
2
5X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
Top SECRET RUFF 25X1
25X1
1 SOMALIA
KH-9 MISSION 1208-2 GROUND FORCE FACILITIES
BERBERA BH2
OTHER RESULTS?NO APPARENT CHANGE
10-35.10N 045-13-40E
STATUS: UNOCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE PRESENT
25X1
25X1
25X1
116 25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TAP cFCRFT RUFF LAI
25X1
KH-9 MISSION 1208.-2
1 SYRIA
AIR DEFENSE MISSILES
SIGNIFICANT RESULTS
AL QUNAYTIRAH HAWK SITE
STATUS: OCCUPIED
33-11...00N 035-47-45E
PHYSICAL DESCRIPTION:
4 NM NNW OF AL QUNAYTIRAH IN ISRAELI?OCCUPIED SYRIA.
THE NEWLY IDENTIFIED HAWK SITE IS THE SECOND OCCUPIED HAWK SITE
IN ISRAELI?OCCUPIED SYRIA. THE OTHER IS AT UYUN HADID (BE
THE SITE CONSISTS OF SIX OCCUPIED HAWK LAUNCHERS
WITH THREE MISSILES ON EACH LAUNCHER PLUS ONE LAUNCHER IN THE
SUPPORT AREA AND ANOTHER ON THE APPROACH ROAD. A CENTRAL
BATTERY CONTROL CENTER IN AN EXCAVATION, FOUR PROBABLE RADARS,
THREE COMMUNICATIONS VANS, A THREE?GUN LIGHT AAA BATTERY. AT
LEAST 17 TRUCKS, AND NUMEROUS OBJECTS/PIECES OF EQUIPMENT.
TGT DIAM -- 1,000 FT. ELEV 3,970 FT.
MISSILE ORDER OF BATTLE:
24 HAWK MISSILE (3 IN
SUPPORT AREA + 3 ON
APPROACH ROAD)
FLFCTRONIC ORDER OF BATTLE:
8 HAWK LAUNCHER (1 IN
SUPPORT AREA + 1 ON
APPROACH ROAD)
1 BATTERY CONTROL CENTER 3 COMMUNICATION VAN
4 PROB RADAR
ORCE ORDER OF BATTLE:
1 LIGHT AAA BATTERY (3 17 TRUCK (AT LEAST)
GUNS)
OBJECTS:
OBJECT/PIECE OF EQUIP
(NUMEROUS)
MAP SOURCE REFERENCE:
250?JOG (R) NI 36-12
117
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
SYRIA
KH-9 MISSION 1208-2 GROUND FORCE FACILITIES
SIGNIFICANT RESULTS
DIMASHQ ORD DPO A BKS NNE
STATUS: OCCUPIED
036.-20-09E
PHYSICAL DESCRIPTION:
ON THE NNE EDGE OF DIMASHQ.
THE NEWLY IDENTIFIED FACILITY CONSISTS OF ONE ADMINISTRATION
BUILDING/BARRACKS, ONE LARGE MAINTENANCE BUILDING. 12 SUPPORT
BUILDINGS. AND 12 VEHICLE SHEDS. THIS FACILITY IS FENCED EXCEPT
FOR THE FRONT OF THE ADMINISTRATION BUILDING WHICH FACES THE
STREET ON THE NORTH SIDE. THE SOUTH END OF THE INSTALLATION
WHICH FACES A DITCH. AND THE SOUTH THIRD OF THE WEST SIDE OF
THE FACILITY. ENTRANCE TO THE FACILITY IS FROM A DIRT ROAD
WHICH PARALLELS THE FENCE ON THE WEST SIDE AND ALSO THROUGH THE
OPEN AREA ON THE WEST SIDE WHICH HAS NO FENCE.
A LARGE MAINTENANCE BUILDING IS IN THE CENTER OF THE FACILITY
AND IS CONNECTED TO TWO SUPPORT BUILDINGS BY VEHICLE SHEDS. A
15?SPACE PARKING AREA IS SOUTH OF THE LARGE MAINTENANCE
BUILDING. THIS AREA IS FENCED ON THREE SIDES WITH COLUMNS
ALONG THE FRONT. EACH SPACE HAS WHAT APPEARED TO BE AN OPEN
GREASE PIT. TO THE REAR OF THE FENCED AREA ARE SIX VEHICLE
PARKING REVETMENTS. FACING THE FRONT OF THE 15?SPACE PARKING
AREA NEXT TO THE WEST FENCE IS A VEHICLE SHED FOR APPROXIMATELY
TEN VEHICLES. MOST OF THE TANKS AND APC WERE IN THE NE CORNER
OF THE FACILITY. A NUMBER OF UNDEFINED OBJECTS WERE IN THIS
SAME AREA AND APPEARED TO BE JUNK OR VEHICLE PARTS. IN AN AREA
WEST OF THE FACILITY, NUMEROUS VEHICLES, COMPRISED OF TRUCKS.
BUSES. AND FLATBED TRAILERS. WERE OBSERVED.
TGT DIAM 1,640 FT. ELEV -- 710 FT.
?"' ''? ORDER OF BATTLE:
15 TANK 30 TRUCK
10 POSS APC (MAY BE TANKS 8 TRAILER
W/TURRET OFF) 3 BUS
4 POSS FA PIECE (MAY BE GUN 3 FLATBED TRAILER
FROM TANK)
119
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
1
KH-9 MISSION 1208-2
MAP SOURCE REFERENCE:
250-40G RP NI 37-9
SYRIA
GROUND FORCE FACILITIES
120
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
R
Next 5 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
AL LADHIOIYAH PORT FACILITIES
STATUS: OPERATIONAL
PFMARKC?
SYRIA
LOGISTICS
35-30-47N 035-45-52E
25X1
25X1
FIVE MORE 25X1
WERE ON A MERCHANT SHIP ANCHORED OFF THE PORT. ALSO ON THE
THE RAILROAD 25X1
UNDER CONSTRUCTION HAD ALMOST REACHED THE WAREHOUSE BUILDINGS
AT THE WATERS EDGE. RAILCARS WERE PRESENT AT THE TERMINAL IN
LATAKIA.
NAVAL ORDER OF BATTLE:
11 LARGE MERCHANT SHIP
4
OSA pTFG
3
KOMAR PTG
30 SMALL MERCHANT SHIP
4
P-4 PT
1 OIL TANKER
1
FISHING VESSEL (145 FT)
ASSOCIATED OBJECTS:
10 FISHBED FUSELAGE CRATE
127
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
5X1
II u I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
SOVIET UNION
KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
SIGNIFICANT RESULTS
ALEYSK ICBM COMPLEX
STATUS: OPERATIONAL
52-28-45N 083-05-20E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
ALUKSNE MRBM COMPLEX
STATUS: OPERATIONAL
57-18-59N 026-44-00E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE SEEN
r:THREEi SILO DOORS WERE OPEN AT LAUNCH SITE 3 ON BOTH
NEW HORIZONTAL DIPOLE ANTENNAS ARE IN A CLEARED
RECTANGULAR CLEARING TO THE NORTH OF THE SILOS. AN EXERCISE
WAS IN PROGRESS ON FOUR PADS AT LAUNCH SITE 1 AND ON ONE PAD
LAUNCH SITE 2
:OVERAGE.
THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN
THE OAK SUPPLEMENT FOR EACH TARGET.
AT
BELOKOROVICHI mRBm COMPLEX
STATUS: OPERATIONAL
51-01-35N 027-55-24E
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. A MISSILE EXERCISE WITH AN
ERECTED MISSILE WAS IN PROGRESS AT TWO LAUNCH PADS AT LAUNCH
SITE 1. AT LAUNCH SITE 2. AN SS-4 MISSILE ON TRANSPORTER WAS
129
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
J. I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
Top SECRET RUFF 25X1
25X1
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
IN FRONT OF ONE OF THE MISSILE?READY BUILDINGS. AT LAUNCH SITE
3. FOUR CANVAS?COVERED MISSILE TRANSPORTERS WERE NEAR THE
SILOS. A CLEARING FOR A DIPOLE ANTENNA WAS NEWLY IDENTIFIED
ADJACENT TO AND ON THE NE SIDE OF THE LAUNCH SITE. THIS
CLEARING WAS NOT PRESENT IN AUG 73 TWO ERECTORS AND
ONE EMPTY MISSILE TRANSPORTER WERE Al THE. sspi TRAINING
POSITION.
BORSHCHEv mRBm COMPLEX
STATUS:OPERATIoNAL
48-46-38N 026-08-57
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE lr THREE AND
POSSIBLY FOUR Ss-4 MISSILES ON TRANSPORTERS WERE NEAR THE
MISSILE-READY BUILDINGS. AT LAUNCH SITE 2. Two SS-4 MISSILES
WERE NEAR THE MISSILE?READY BUILDINGS.
THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN
THE OAK SUPPLEMENT FOR EACH TARGET.
BREST mRBm COMPLEX
STATUS: UNKNOWN
REMARKS:
ONLY FIXED FIELD SITE 1 WAS OBSERVED.
BRODY MRBm COMPLEX
STATU5:UNKNOwN
50-12-49N 025-05-23E
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
130
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
KH-.9 MISSION 1208-2
SOV/ET UNION
DEPLOYED STRATEGIC SSM FACILITIES
DERA2HNYA SSM COMPLEX
STATUS: OPERATIONAL
49-12-54N 027-08-18E
REMARKS:
THE ENTIRE COMPLEX AND SEARCH AREA WERE OBSERVED. SILO
CONVERSION ACTIVITY CONTINUED IN LAUNCH GROUPS A AND C. IN
LAUNCH GROUP A. A TYPE up HEADWORKS ASSEMBLY WAS INSTALLED IN
THE SILO AT LAUNCH SITES 10A. 11A, AND 12A. THE 40?FOOT?SQUARE
PLATFORM HAD BEEN REMOVED FROM THESE SITES AND FROM SITES 8A
AND 9A. AT SITE 9Ar A CYLINDRICAL RETAINING WALL.
WAS UNDER CONSTRUCTION ON TOP OF THE SILO WALL. IN
LAUNCH GROUP Cr A 40...FOOT...SQUARE PLATFORM WAS PLACED OVER EACH
SILO. AND PROBABLE SILO DEEPENING WAS TAKING PLACE AT FIVE
SITES. HOUSETRAILERS AND VEHICLES WERE NEAR THE SUPPORT
BUILDINGS AT LAUNCH GROUP CONTROL SITE 49F. ACTIVITY RESEMBLING
PERIODIC MAINTENANCE WAS IN PROGRESS AT LAUNCH SITES 48F AND
50F.
TYPE IIIX LAUNCH SITE 76H WAS THE LAST SITE COMPLETED IN
LAUNCH GROUPS G. Ho AND I. AT TYPE IIIX LAUNCH SITES 99 AND
101, THE SILO DOOR HAS BEEN INSTALLED. AND CONSTRUCTION
CONTINUED ON THE CANTED BUILDING BESIDE THE APRON AT BOTH
SITES.
A PROBABLE CAPSULE FOR A TYPE IIIX SILO WAS ON A
THREE?CAR?TRAIN IN THE RAIL?TO?ROAD TRANSFER POINT. IN THE
COMPLEX SUPPORT FACILITY RAIL. A NEW STORAGE AREA CONTAINING
SOME UNIDENTIFIED MATERIAL WAS NEAR THE NORTH END OF THE
STORAGE AREA ASSOCIATED WITH THE LARGE GANTRY CRANE.
DISNA MRBM COMPLEX
STATUS:OPERATIONAL
55-.48...09N 028.-21.-30E
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AN EXERCISE WAS SEEN ON THE
LAUNCH PADS AT LAUNCH SITES 1, 2. AND 3. TWO MISSILES WERE
OBSERVED ON TRANSPORTERS AT LAUNCH SITE 1. A PROBABLE MISSILE
RAILCAR WAS AT THE RAIL?TO?ROAD TRANSFER POINT.
131
25X1
25X1
25X1
25X1
25X1
TAP CFCPFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
Declassified
11 V .
in Part - Sanitized Copy Approved
?I . . 1 .
for Release 2014/05/01
TOP SECRET RUFF
: CIA-RDP78T04752A001500010011-9
25X1
25X1
SOVIET
UNION
KH
-9 MISSION 1208-2
DEPLOYED STRATEGIC SSM FACILITIES
25X1
DOMBAROVSKIY
ICBM COMPLEX
51-07-46N 060-09-57E
25X1
STATUS:OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
AT
IIIX
25X1
SITE 75e A CAP/CAN SILO LOADER WAS POSITIONED
IN FRONT OF
THE
SILO. A PROBABLE HARDENED DOME ANTENNA AND A PROBABLE HARDENED
HOOK ANTENNA WERE IDENTIFIED FOR THE FIRST TIME AT IIIF LAUNCH
SITES 2A AND 72.
A PROBABLE
IIIX SILO WAS OBSERVED UNDER CONSTRUCTION
25X1
AT LAUNCH GROUP CONTROL
SITE 98 AND UNIDENTIFIED ACTIVITY WAS
AGAIN OBSERVED OUTSIDE THE SECURITY FENCE AT LAUNCH SITE 12B.
A PROBABLE HARDENED HOOK ANTENNA AND A PROBABLE HARDENED DOME
ANTENNA WERE IDENTIFIED FOR THE FIRST TIME AT IIIF LAUNCH SITE
74, A PROBABLE HARDENED HOOK ANTENNA WAS ALSO IDENTIFIED AT
IIIF LAUNCH SITE 73. A PROBABLE HARDENED
DOME ANTENNA WAS
IDENTIFIED AT THIS LAUNCH SITE IN OCT 73
A TOTAL OF 12 MULTISYSTEM PROPELLANT TRANSPORTERS, ONE CAP/CAN
SILO LOADER. AND ONE CAP/CAN TRANSPORTER WERE IN THE
RAIL?To-ROAD TRANSFER POINT. THE AMOUNT OF IIIF SILO
CONSTRUCTION MATERIAL IN THE RECEIVING AREA APPEARED To BE
UNCHANGED. AT LEAST FIVE INF SILO DOORS AND PARTS OF AT LEAST
FIVE INF SILO HEADWORKS WERE IDENTIFIED. THE UNIDENTIFIED
ACTIVITY CONTINUED AT LAUNCH SITE 12B.
DROGOBYCH MRBM COMPLEX
STATUS: UNKNOWN
49-22-24N 023-29-47E
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
132
25X1
25X1
25X1
25X1
TAP cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
KH-9 MISSION 1208...2
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
DYATLOVO MRBM COMPLEX
STATUS: OPERATIONAL
53...3237N 025..20...27E
REMARKS:
THE ENTIRE COMPLEX, EXCEPT FIXED FIELD SITES 1 AND 2. WAS
OBSERVED. AT LAUNCH SITE 1. A PROBABLE SS-4 MISSILE ON A
TRANSPORTER WAS ALIGNED WITH THE ERECTOR AT THE SOUTH LAUNCH
PAD. AT LAUNCH SITE 2. A PROBABLE SS...4 MISSILE ON A
TRANSPORTER WAS ALIGNED TO THE ERECTOR AT THE MIDDLE NORTH
LAUNCH PAD.
GOMEL MRBM COMPLEX
STATUS; OPERATIONAL
52..-21u..30N 03044s.56E
REMARKS:
THE RAIL?TO?ROAD TRANSFER POINT, FIXED FIELD SITE 1, PARTS OF
LAUNCH SITES 1 AND 2. AND FIXED FIELD SITE 2 WERE OBSERVED. TWO
FUEL TRANSPORTERS AND ONE OXIDIZER TRANSPORTER WERE OBSERVED ON
ONE LAUNCH PAD AT LAUNCH SITE 1.
GRANOV IRBM COMPLEX
STATUS:OPERATIONAL
48...54...47N
4,11\1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. AT EACH OF THE
THREE LAUNCH SITES. A CLEARING FOR A FREQUENCY DIVERSE PAIR OF
HORIZONTAL DIPOLE ANTENNAS WAS OBSERVED. THESE AREAS WERE
FIRST VISIBLE IN JAN 74 WHEN CLEARING WAS UNDERWAY. 25X1
THE CLEARINGS WERE NOT PRESENT IN AUG 73 AT LAUNCH 25X1
SITE 1. FIVE SS-5 MISSILES ON TRANSPORTERS WERE AT THE LAUNCH
SITE. AT LAUNCH SITE 2. TWO SS..-5 TRANSPORTERS AND ONE SILO
LOADER WERE IN THE RIM AREA. TEN HOLLOW RECTANGULAR CONCRETE
FORMS WERE ON THE GROUND NEAR THE NORTHERN SILO. AT LAUNCH
133
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
11 V I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF 25X1
25X1
11
SOVIET UNION
KH..?44 MISSION 1206...2 DEPLOYED STRATEGIC SSM FACILITIES
SITE 3, TWO SS-5 MISSILES ON TRANSPORTERS WERE IN THE RIM AREA..
A NEW RAIL SPUR WAS UNDER CONSTRUCTION AT THE RAIL?TO-ROAD
TRANSFER POINT AND PROBABLE CONSTRUCTION MATERIALS WERE IN THE
LOOP ROAD AREA.
- 25X1
25X1
GRESK MRBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH
MISSILE WAS ERECTED ON THE WEST LAUNCH
53..420..31N
027...4447
SITE 30
PAD.
AN SS-4
25X1
GUSEV MRBM COMPLEXX
STATUS: OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
54?..39..?35N
02208?..18E
25X1
25X1
GVARDEYSK MRBM COMPLEX 54*..44...59N
25X1
STATUS: OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. A LAUNCH STAND
WAS ON THE NE PAD AT LAUNCH SITE 14,
134
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
1 SOVIET UNION
KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
IMENI GASTELLO ICBM COMPLEX
STATUS:OPERATIONAL
51-16-41N 065-55-50E
25X1
REMARKS:
ALL COMPONENTS OF THE COMPLEX EXCEPT TYPE IIF LAUNCH SITES 57
AND 58 WERE OBSERVED ON EITHER NO CONSTRUCTION 25X1
PROGRESS WAS SEEN AT THE IIIF LAUNCH SITES. PROBABLE PERIODIC
MAINTENANCE WAS IN PROGRESS AT TYPE IIIC LAUNCH SITES 45H AND
48H.
JELGAVA MRBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED AT
LAUNCH SITE 3. THE CLEARING EAST OF THE SILOS HAD BEEN
ENLARGED. PROBABLY FOR HORIZONTAL DIPOLE ANTENNAS. AT LAUNCH
SITE 2. AN EXERCISE WAS IN PROGRESS ON THE NORTH LAUNCH PAD. ON
A MISSILE TRANSPORTER WAS ON THE NW LAUNCH PAD AT
LAUNCH SITE 2.
56-38-40N 024-06-09E
JONAVA MRBM COMPLEX
STATUS:OPERATIONAL
55-00.-05N 024-12-53E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NETTING WAS AT
TWO LAUNCH PADS AT LAUNCH SITE 1 AND AT FOUR LAUNCH PADS AT
LAUNCH SITE 2. TWO MISSILES ON TRANSPORTERS WERE SEEN AT
135
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
11
SOVIET UNION
KH-9 MISSION 12082 DEPLOYED STRATEGIC SSM FACILITIES
LAUNCH SITE 1. A TRAINING MISSILE WAS ERECTED NEAR ONE OF THE
LAUNCH PADS AT LAUNCH SITE 1. AND ACTIVITY WAS SEEN ON ONE OF
THE LAUNCH PADS. STACKS OF MATERIEL WERE AT THE RAIL?TO?ROAD
TRANSFER POINT.
THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN
THE OAK SUPPLEMENT FOR EACH TARGET.
KARTALY ICBM COMPLEX
STATUS: OPERATIONAL
52...5311N 060...347E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. CONSTRUCTION
ACTIVITY WAS AGAIN OBSERVED AT IIIF LAUNCH SITE 54
THE ENVIRONMENTAL COVER HAD BEEN REMOVED FROM THE SILO
plEkCAV.i4TION AND A CRANE WAS NEXT TO THE SILO
AT LAUNCH SITE 56 ON ALL THREE DAYS. SIX SILO LINER
SEGMENTS WERE ON THE SILO APRON. NO CHANGE WAS OBSERVED IN THE
AMOUNT OF IIIF CONSTRUCTION MATERIAL IN .THE RECEIVING AREA.
PROBABLE PREPARATIONS FOR LAUNCH SITE CONVERSION WERE
CONTINUING IN THE A GROUP. CONSTRUCTION WAS CONTINUING ON THE
BUILDING OBSERVED AT LAUNCH SITE 1 AT LAUNCH SITE 2
THE SMALL BUILDING REPORTED WAS COMPLETE
AND A NEW LARGER BUILDING, SIMILAR TO THAT AT LAUNCH SITE 1.
WAS UNDER CONSTRUCTION. NEW TEMPORARY SUPPORT AREAS
WITH HOUSETRAILERS WERE OBSERVED IN THE TREES NEAR LAUNCH SITES
1 AND 3 AND, AT LAUNCH SITE 6. UNIDENTIFIED MATERIAL WAS LYING
ON PORTIONS OF THE APRON AND THE LOOP ROAD. PROBABLE PERIODIC
MAINTENANCE ACTIVITY WAS IN PROGRESS AT THE TRAINING SITE
NO CHANGE WAS OBSERVED IN THE AMOUNT OF I/IF CONSTRUCTION
MATERIEL IN THE RECEIVING AREA. HOWEVER. SOME IIIF MATERIEL
OBSERVED IN THE OLD IIIC 7CEIVING AREA
WAS NOT PRESENT
136
25X1
25X1
25X1
')cY1
25X1
25X1
25X1
25X1
25X1
2bA1
25X1
25X1
25X1
25X1
Tnp cFCRFT RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KN.-9 MISSION 1208-2
KIVERTSY MRBM COMPLEX
STATUS: UNKNOWN
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
50-54-14N 025-29-46E
KONKOVICHI MRBM COMPLEX
STATUS:OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 1, 25X1
FOUR ERECTORS WERE OBSERVED ON ONE LAUNCH PAD AND LAUNCH STANDS
WERE OBSERVED ON THE OTHER THREE LAUNCH PADS. A 25X1
PROBABLE ERECTOR WAS ON EACH OF THE FOUR LAUNCH PADS.
52-18-14N 028-38-50E
25X1
25X1
25X1
AT LAUNCH SITE 2' AN ERECTOR WAS AT EACH OF THE FOUR LAUNCH
PADS ON BOTH DAYS.
KOROSTEN MRBM COMPLEX
STATUS: OPERATIONAL
50-.51...56N 028.-15-22E
REMARKS:
THE ENTIRE COMPLEX AND SEARCH AREA WERE SEEN. AN SS-4 ERECTOR
WAS ON EACH LAUNCH PAD AT LAUNCH SITE 1. AN SS-4 MISSILE ON A
TRANSPORTER WAS AT EACH OF TWO MISSILE?READY BUILDINGS AT
LAUNCH SITE 1.
AN 55-4 ERECTOR WAS ON THREE OF THE FOUR LAUNCH PADS AT LAUNCH
SITE 2. AN SS-4 MISSILE ON A TRANSPORTER WAS ALIGNED WITH AN
ERECTOR AT THE SE LAUNCH PAD.
RECTANGULAR REVETMENTS WERE UNDER CONSTRUCTION OFF THE ACCESS
137
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
H u
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1.
25X1
1
KH-9 MISSION 1208-2
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
ROAD IN FRONT OF THREE OF THE FOUR LAUNCH PADS AT LAUNCH SITE 1
AND IN FRONT OF EACH OF THE LAUNCH PADS AT LAUNCH SITE 2. ONE
OF THESE REVETMENTS AT LAUNCH SITE 2 WAS NET COVERED.
KOZELSK ICBM COMPLEX
STATUS: OPERATIONAL
RU?n7.10A1 n?c.9Q-22r
REMARKS:
THIRTY OF THE 110 SS-11 LAUNCH SITES, TWO SS-8 LAUNCH SITES.
25X1
25X1
AND PARTS
SUPPORT
UNIDENTIFIED
ONE OF
SUPPORT
OF THE RAIL?TO?ROAD TRANSFER
FACILITY WERE OBSERVED.
MATERIALS WERE OBSERVED
THE RAIL SPURS IN THE SOUTHERN
FACILITY. NEITHER THE
POINT AND COMPLEX
A NEW CLEARING AND
FOR THE FIRST TIME NEAR
PART OF THE COMPLEX
CLEARING NOR MATERIALS WERE
PRESENT
25X1
25X1
KOZHANOVICHI MRBM COMPLEX
52-12...58N 027-52-51E
25X1
STATUS :OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. A MISSILE?READY TENT WAS NEXT
TO EACH OF THE TWO MISSILE?READY BUILDINGS AT LAUNCH SITE 2. A
MISSILE TRANSPORTER WAS IN FRONT
OF ONE OF THE MISSILE?READY
BUILDINGS AT BOTH LAUNCH SITES
1 AND 2
25X1
25X1
KRASNOZNAMENSK MRBM COMPLEX
STATUS:OPERATIONAL
55-01.-10N 022-23-07E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED EXCEPT THE
RAIL?TO?ROAD TRANSFER POINT WHICH WAS PARTIALLY CLOUD COVERED.
138
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
SOVIET UNION
KH-9 MISSION 1208-2 DEPLOYED
AN SS-4 MISSILE ON A TRANSPORTER WAS ON
SITES 1 AND 2. NETTING OR CANVAS PANELS
LAUNCH PADS AT LAUNCH SITE 1 AND ON THREE
SITE 2. APPROXIMATELY 25 VEHICLES WERE
OF LAUNCH SITE 2.
STRATEGIC SSM FACILITIES
ONE PAD AT BOTH LAUNCH
WERE SEEN ON ALL FOUR
OF THE PADS AT LAUNCH
IN A CLEARED AREA WEST
25X1
KROLEVETS IRBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
ONLY LAUNCH SITE 3 WAS PARTIALLY OBSERVED.
51-37-17N
033-32-27
25X1
25X1
25X1
25X1
25X1
LIDA MRBM COMPLEX
STATUS:OPERATIONAL
REMARKS:
LAUNCH SITES 1 AND 2 WERE OBSERVED.
LUTSK MRBM COMPLEX
STATUS: UNKNOWN
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
50-48-00N
024...54-00E
25X1
MOLOSKOVITSY MRBM COMPLEX 59-33-15N
028-57-16E
25X1
STATUS: OPERATIONAL
139
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified
11 V
in Part - Sanitized Copy
.1 ,
Approved for Release 2014/05/01
TOP SECRET RUFF
: CIA-RDP78T04752A001500010011-9
25X1
25X1
SOVIET
UNION
KH-9 MISSION 1208,...2
DEPLOYED STRATEGIC SSM FACILITIES
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
A
25X1
MISSILE EXERCISE WAS IN PROGRESS ON ONE PAD
AND UNIDENTIFIED
ACTIVITY WAS ON ANOTHER
AT LAUNCH SITE 2. AN EXERCISE WAS
IN
PROGRESS ON ONE PAD
AT LAUNCH SITE 1, TWO MISSILES
25X1
ON TRANSPORTERS WERE
IN FRONT OF MISSILE-READY BUILDINGS
AT
LAUNCH SITE 2' AND ONE POSSIBLE MISSILE ON A TRANSPORTER WAS BY
A MISSILE-.READY BUILDING AT LAUNCH SITE 1.
FOUR PROBABL
TRANSFER POINT
25X1
RAILCARS WERE AT THE RAIL-TO-ROAD
rIllISSLE
FOUR MISSILES
ON TRANSPORTERS WERE AT LAUNCH SITE
3 ON
25X1
BOTH DATES.
25X1
NADVORNAYA MRBM COMPLEX
48-41...23N 024.-46-03E
25X1
STATUS: UNKNOWN
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
25X1
NIGRANDE IRBM COMPLEX
56-35...32N 021.-55-44E
25X1
STATUS: OPERATIONAL
REMARKS:
ONLY LAUNCH SITES 1 AND 3 WERE OBSERVED. MISSILE ERECTORS WERE
ON ALL FOUR LAUNCH PADS AT LAUNCH SITE 1 AND A CLEARING FOR A
PROBABLE NEW ANTENNA INSTALLATION WAS NEAR THE REGIMENTAL
COMMAND BUNKER.
140
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
25X1
SOVIET UNION
STRATEGIC SSM FACILITIES
55-17-11N 083-06-02E
KH-9 MISSION 1208-2 DEPLOYED
NOVOSIBIRSK ICBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED.
25X1
OMSK ICBM COMPLEX
55-04-19N 073-36-02E
25X1
STATUS: UNKNOWN
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
25X1
OSTROG MRBM COMPLEX
50-15-24N OP6-49-50F
25X1
STATUS:OPERATIONAL
REMARKS:
AN SS-4 MISSILE
THE ENTIRE COMPLEX WAS OBSERVED.
25X1
WAS ERECTED ON THE SW LAUNCH PAD.
A SECOND 55-4 MISSILE WAS AT
THE NORTH?CENTRAL MISSILE?READY BUILDING. AT LAUNCH SITE 2r
TWO SS-4 MISSILES WERE PRESENT AND THE ERECTOR BED WAS RAISED
ON THE SOUTH?CENTRAL LAUNCH PAD.
25X1
OSTROV MRBM COMPLEX
57-29-22N 028-19-02E
25X1
STATUS:OPERATIONAL
141
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 -
11 V ,..4.1 I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF 25X1
25X1
SOVIET UNION
KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. ALL
FOUR SILO DOORS WERE OPEN AT LAUNCH SITE 3 AND AN AREA FOR A
HORIZONTAL DIPOLE ANTENNA WAS BEING CLEARED, TWO RAILCARS WERE
IN THE RAIL-40.-ROAD TRANSFER POINT. AN EXERCISE WAS IN
PROGRESS ON TWO PADS AT LAUNCH SITE 1.
THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN
THE OAK SUPPLEMENT FOR EACH TARGET.
PERM ICBM COMPLEX
STATUS: OPERATIONAL
57e-35...58N 056-15.41E
REMARKS:
ALL ELEMENTS OF THE LAUNCH COMPLEX WERE AT LEAST PARTIALLY
OBSERVED ON
25X1
25X1
25X1
25X1
SS-7 LAUNCH SITES 1 AND 2 REMAINED IN A REDUCED STATE OF
READINESS. AT LAUNCH SITE 4 ONE SILO DOOR WAS OPEN. 25X1
TWO SS-.7 MISSILES WERE PRESENT ON BOTH A 25X1
MISSILE EXERCISE WITH TWO ERECTED MISSILES WAS IN PROGRESS AT
LAUNCH SITE 3 AT LAUNCH SITE 5, TWO SS-.7 MISSILES 25X1
ON TRANSPORTERS WERE OBSERVED ON THE NORTH LAUNCH PAD ON BOTH
DATES.
SS,-11 SITE MODERNIZATION WAS IN PROCESS AT ALL SITES IN THE H
AND I GROUPS. NO EVIDENCE OF A LINEAR EXCAVATION WAS OBSERVED
AT ANY OF THE SITES. NO EVIDENCE OF INTRA-SITE CABLING WAS
OBSERVED.
AN SS-11 MISSILE TRANSPORTER AND SILO LOADER WERE OBSERVED AT
LAUNCH SITE 81 AND AT 29H AND 30H TWO
PROPELLANT TRANSPORTERS WERE ALSO AT 29H AND 30H.
A NEW BUILDING WAS UNDER CONSTRUCTION AT GROUP CONTROL SITES
13G 29Hr AND 101.
EIGHT SS.-11 CANISTERS WERE IN REVETMENTS IN THE ADMINISTRATION
AND HOUSING AREA OF THE CSI AND FIVE MORE WERE AT THE RTP
(THREE ON THE TRAINING SITE APRON AND TWO IN THE PROPELLANT
HANDLING AREA). THE RTP ALSO CONTAINED SEVEN MISSILE RAILCARS.
A PROBABLE SECURITY RAILCAR. AND 11 PROPELLANT RAILCARS.
142
25X11
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
PERVOMAYSK SSM COMPLEX
STATUS: COMPLETE
48?I2.-24N 030e.54.-17
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. CONSTRUCTION WAS CONTINUING
ON THE TYPE IIIX SILOS AT FIVE OF THE SIX TYPE IIID LAUNCH
GROUP CONTROL SITES. AT THE SIXTH TYPE IIID LAUNCH GROUP
CONTROL SITE. 41E, 14 HOUSETRAILERS AND NUMEROUS VEHICLES WERE
VISIBLE THROUGHOUT THE SITE. VEHICLES WERE ALSO OBSERVED AT
FIVE OTHER LAUNCH SITES IN THIS GROUP. POSSIBLY PREPARATORY TO
SITE CONVERSION. HEADWORKS WERE ASSEMBLED ON THE APRONS OF ALL
THE TYPE IIID SITES IN THE A GROUP. AT LAUNCH SITE 14A, IN
ADDITION TO THE HEADWORKS, A PARTIALLY ASSEMBLED PROBABLE SILO
WALL SEGMENT WAS VISIBLE ON THE APRON.
IN THE C GROUP, ASSEMBLED HEADWORKS WERE ON THE APRON OF FOUR
OF THE TEN LAUNCH SITES. AT LAUNCH SITE 22C. A PROBABLE SILO
WALL SEGMENT
25X1
25X1
25X1
WAS ON THE APRON NEAR 25X1
THE SILO. AND TWO PILES OF UNIDENTIFIED MATERIALS WERE STACKED
TO ONE SIDE OF THE APRON. AT THE OTHER SIX LAUNCH SITES IN C
GROUP. THE SILO DOORS HAD BEEN REMOVED.
PINSK MRBM COMPLEX
STATUS:OPERATIONAL
52...11...4AN 0PS...43..09F
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 3.. AN SS-4
MISSILE ON A TRANSPORTER WAS ALIGNED WITH EACH OF THREE
ERECTORS. AT LAUNCH SITE 2. AN SS-4 MISSILE ON A TRANSPORTER
WAS ALIGNED WITH AN ERECTOR.
143
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
h V
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF LOA1
25X1
SOVIET UNION
KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
POLOTSK MRBM COMPLEX
STATUS: OPERATIONAL
55-18-07N 028-19-29E
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AN EXERCISE WAS IN PROGRESS
ON ALL FOUR PADS AT LAUNCH SITE 1 AND ON THREE PADS AT LAUNCH
SITE 2.
POSTAVY MRBM COMPLEX
STATUS:OPERATIONAL
55-17-07N 026-49-43E
REMARKS:
ONLY LAUNCH SITE 2 WAS OBSERVED. AN EXERCISE WAS IN PROGRESS
ON TWO LAUNCH PADS AT LAUNCH SITE 2. LAUNCH SITE 1 AND THE
RAIL?TO-ROAD TRANSFER POINT WERE IDENTIFIABLE ONLY.
PRUZHANY MRBM COMPLEX
STATUS:OPERATIONAL
52-28-56N 024-02-48E
REMARKS:
LAUNCH SITES 1 AND 2 WERE OBSERVED, AT LAUNCH SITE 2. A
MISSILE ON A TRANSPORTER WAS IN FRONT OF A MISSILE?READY
BUILDING. ERECTORS WERE AT THEIR NORMAL POSITIONS.
RAKVERE MRBM COMPLEX
STATUS: UNKNOWN
59-09-51N 026-17-50E
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
144
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Top SECRET RUFF
Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified
in Part - Sanitized Copy Approved
for Release 2014/05/01 :
TOP SECRET RUFF
CIA-RDP78T04752A001500010011-9
25x1
LOA!
25X1
SOVIET
UNION
DEPLOYED STRATEGIC SSM FACILITIES
KH-9 MISSION 1208u-2
25X1
RISTI MRBM COMPLEX
59-415.-3SN OP4..05-18
25X1
STATUS: OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
THE
25X1
ERECTOR BED WAS RAISED ON THE NW LAUNCH
PAD AT LAUNCH SITE 1.
AN SS-N.4 MISSILE WAS ERECTED ON THE NE LAUNCH PAD AT LAUNCH SITE
2.
25X1
RUZHANY MRBM COMPLEX
52-51...42N 024-35-35E
25X1
STATUS: UNKNOWN
REMARKS:
THE compLEx WAS NOT OBSERVED.
25X1
SARY?OZEK IRBM COMPLEX
44-32-16N 077-46-06E
25X1
STATUS:OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 3. TWO SILO
DOORS WERE OPEN. THE WORK PLATFORMS HAD BEEN REMOVED AND NO
MISSILES WERE VISIBLE IN THE SILOS. CONSTRUCTION WAS
CONTINUING ON THE APRON BETWEEN THE TWO SOUTHERN SILOS AND ON
THE HORIZONTAL DIPOLE ANTENNAS SOUTH OF THE SILOS. AT LAUNCH
SITE 2, THE NORTH SILO DOOR WAS OPEN. AT LAUNCH SITE 1. A
MISSILE WAS ALIGNED WITH THE ERECTOR ON TWO LAUNCH PADS AND
145
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified
11 II
in Part - Sanitized Copy Approved
?I .1 ,
for Release 2014/05/01
TOP SECRET RUFF
: CIA-RDP78T04752A001500010011-9
25X1
LAI
25X1
SOVIET
UNION
KH-9 MISSION 1208-2
DEPLOYED STRATEGIC SSM FACILITIES
THREE OTHER MISSILES ON TRANSPORTERS WERE AT THE SITE.
25X1
SATEIKIAI MRBM COMPLEX
56-01-08N 021-46-23E
25X1
STATUS:OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
AN
25X1
EXERCISE WAS IN PROGRESS ON ALL FOUR LAUNCH
PADS AT LAUNCH
SITE
1. AT LAUNCH SITE 2. TWO OXIDIZER TRANSPORTERS AND ONE FUEL
TRANSPORTER WERE ON EACH LAUNCH PAD NEXT TO THE ERECTOR. AT
LAUNCH SITE 3. CLEARING FOR A NEW PROBABLE ANTENNA FACILITY WAS
VISIBLE WEST OF THE SILOS.
25X1
SHADRINSK ICBM COMPLEX
56-08-09N 063-49-46E
25X1
STATUS: UNKNOWN
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
25X1
SLONIM MRBM COMPLEX
O-17-
8E
25X1
STATUS:OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 2. AN SS-4
MISSILE ON A TRANSPORTER WAS ALIGNED TO THE ERECTOR AT THE
NORTH LAUNCH PAD.
146
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
SOVIET UNION
KH-..9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
SMORGON IRBM COMPLEX
STATUS: OPERATIONAL
54-31-.07N 026..48.-07E
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 2. AN SS-5
MISSILE WAS ERECTED AT EACH OF TWO LAUNCH PADS. HORIZONTAL
DIPOLE ANTENNAS WERE IN A CLEARING SOUTH OF THE CONTROL BUNKER
SOUTH OF THE ACCESS ROAD TO THE LAUNCH PADS. A CLEARING.
POSSIBLY FOR HORIZONTAL DIPOLE ANTENNAS, WAS SE OF THE SILOS AT
LAUNCH SITE 3.
G.J/V I
25X1
25X1
25X1
25X1
25X1
25X1
SOKAL MRBM COMPLEX
STATUS: UNKNOWN
REMARKS:
THE COMPLEX WAS NOT OBSERVED.
50-23-53N 024...21.-51E
021-34-08E
SOVETSK MRBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED.
COVERED ONE LAUNCH PAD AT LAUNCH SITE
AT ONE OTHER LAUNCH PAD. UNIDENTIFIED
WAS SEEN AT LAUNCH SITE 2. NORTH OF THE
WARHEAD STORAGE AREA, A SMALL SQUARE
PARTIAL EXCAVATION FOR A BUILDING WAS
55-09.-22N
NETTING PARTIALLY
1. AND ACTIVITY WAS SEEN
CONSTRUCTION ACTIVITY
LAUNCH PADS NEAR THE
AREA WAS GRADED AND A
SEEN.
147
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
I I V . I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF 25X1
25X1
SOV/ET UNION
KH-9 MISSION 1208...2 DEPLOYED STRATEGIC SSM FACILITIES
TATISHCHEVO ICBM COMPLEX
STATUS: OPERATIONAL
51-50...42N 045...40-42E
REMARKS:
ONE HUNDRED AND ONE TYPE IIID LAUNCH SITES, THE COMPLEX SUPPORT
FACILITIES (CSF). AND THE RAIL-TO?ROAD TRANSFER POINT (RIP)
WERE OBSERVED. THE PROBABLE TYPE IIIX SITE (154) WAS NOT
OBSERVED. A TEMPORARY SUPPORT CAMP WAS NEXT TO LAUNCH SITES
94H AND 127H. THE TEMPORARY SUPPORT CAMPS WERE PRESENT
TAURAGE MRBM COMPLEX
STATUS:OPERATIONAL
55-14-..07N 022-25...39E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. THE BED ON ONE
ERECTOR WAS RAISED AT LAUNCH SITE 1. A MISSILE ON A
TRANSPORTER WAS OBSERVED AT LAUNCH SITES 1 AND 2.
TAYBOLA IRBM COMPLEX
STATUS: OPERATIONAL
68-25-27N 033...21.48E
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. NORMAL ACTIVITY AND LEVELS OF
EQUIPMENT WERE VISIBLE AT BOTH LAUNCH SITES.
148
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 2bAl
25X1
KH-9 MISSION 1208-2
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
TEYKOVO ICBM COMPLEX
STATUS: OPERATIONAL
56..44?05N 040.?40..-54E
REMARKS:
THE SIX SS-7 LAUNCH SITES. 55 OF THE 80 SS-11 LAUNCH SITES. THE
TRAINING SITE, THE RAIL?TO?ROAD TRANSFER POINT. THE COMPLEX
SUPPORT FACILITY ADMINISTRATION' AND THE COMPLEX SUPPORT
FACILITY RAIL WERE OBSERVED.
PROBABLE LAUNCH SITE MODERNIZATION ACTIVITY WAS VISIBLE AT ALL
TEN SITES IN LAUNCH GROUP A. THE SILO DOOR WAS OPEN AT THREE
AND PROBABLY FOUR SITES AND THE SILO WAS CANVAS COVERED AT
FOUR' AND PROBABLY FIVE SITES. NO INDICATIONS OF MODERNIZATION
WERE VISIBLE IN LAUNCH GROUPS B' CP Et AND G. OR IN THE VISIBLE
PORTIONS OF LAUNCH GROUPS D AND F. LAUNCH GROUP H WAS NOT
IMAGED.
SS-7 LAUNCH SITES 2 AND 3 REMAINED IN A REDUCED STATE OF
READINESS. THE SS?X-18 MISSILE CANISTER WAS STILL PRESENT IN
THE RIP.
TORVA MRBM COMPLEX
STATUS: OPERATIONAL
57-58.?44N
REMARKS:
ALL COMPLEX COMPONENTS WERE OBSERVED. AN EXERCISE WAS IN
PROGRESS ON ONE PAD AT LAUNCH SITE 1 AND AN SS-4 WAS ON ONE PAD
AT LAUNCH SITE 2.
THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE
OAK SUPPLEMENT FOR EACH TARGET.
149
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
25X1
25X1
25X1
25X1
25X1
25X1
UNION
SOVIET
DEPLOYED STRATEGIC SSM FACILITIES
KN....9 MISSION 1208...2
TYUMEN ICBM COMPLEX
STATUS:OPERATIONAL
REMARKS:
ALL COMPONENTS OF THE COMPLEX
AND TWO LOX CARS WERE IN THE
WERE OBSERVED*
RTP.
56...52e.09N 065e.39^.24E
A MISSILE RAILCAR
UKMERGE MRBM COMPLEX
STATUS:OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX EXCEPT FIXED FIELD
024..40...44E
SITE 1 WAS OBSERVED*
USOVO MRBM COMPLEX
51...15."11N
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS SEEN* AN SS...4 ERECTOR WAS ON EACH
LAUNCH PAD AT EACH OF THE THREE LAUNCH SITES* ONE MISSILE ON A
TRANSPORTER IN FRONT OF A READY BUILDING WAS OBSERVED AT EACH
OF THE LAUNCH SITES. A RECTANGULAR REVETMENT WAS OFF THE
ACCESS ROAD IN FRONT OF THREE OF THE LAUNCH PADS AT LAUNCH SITE
2 AND A RECTANGULAR REVETMENT WAS UNDER CONSTRUCTION IN FRONT
OF A LAUNCH PAD AT LAUNCH SITE 3,
VERKHNYAYA SALDA ICBM COMPLEX
STATUS:OPERATIONAL
150
58..08 18N 060..33...36E
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP cFCRFT RUFF
25X1
11
KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
SOVIET UNION
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NORMAL SS-7
ACTIVITY WAS VISIBLE AT ALL NINE LAUNCH SITES. A MISSILE ON A
TRANSPORTER WAS SEEN AT LAUNCH SITES 7 AND 9.
voRu mR8m COMPLEX
STATUS:OPERATIoNAL
REMARKS:
57-47-23N 026-48-51E
ALL COMPONENTS OF THE COMPLEX WERE OBSERVF11.
AN
FYFRCTSF
WAS
IN PROGRESS ON TWO PADS AT LAUNCH SITE 1
AND
ON ONE PAD AT LAUNCH SITE 2
THE NIIRS RATING FOR INDIVIDUAL TARGETS
WILL
BE
INCLUDED
IN
THE OAK SUPPLEMENT FOR EACH TARGET.
VSELYUB MRBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED.
53-47-16N 025-44-49E
YEDROVO ICBM COMPLEX
STATUS: OPERATIONAL
57-46-40N 033-13-15E
REMARKS:
THIRTY?SEVEN SS-11 LAUNCH SITES AND THE TRAINING SITE WERE
OBSERVED. SIX OTHER SS-11 LAUNCH SITES. TWO SS-7 LAUNCH SITES.
THE RAIL?TO?ROAD TRANSFER POINT'
151
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
u?.i..I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF LOA!
25X1
SOVIET UNION
KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES
FACILITY WERE PARTIALLY OBSERVED.
A PROBABLE TYPE IIIX SILO UNDER CONSTRUCTION WAS IDENTIFIED AT
LAUNCH GROUP CONTROL SITE 111. THE SILO IS IN THE WOODED AREA
ABOUT 400 FEET WEST OF TH 111 SILO APROk A 1 AS kO PRESENT
UNIDENTIFIED ACTIVITY WAS SEEN AT THREE SITES IN LAUNCH GROUP
0. A TEMPORARY SUPPORT AREA. CONSISTING OF APPROXIMATELY 18
HOUSETRAILERS AND NUMEOUS VEHICLES. WAS VISIBLE AT THE LAUNCH
GROUP CONTROL SITE. . AT TWO OTHER SITES IN THE GROUP. THE SILO
DOOR WAS OPEN AND AT LEAST TEN VEHICLES, INCLUDING A
TRUCK?MOUNTED CRANE. WERE ON THE SILO APRON AND TURNAROUND.
YELSK MRBM COMPLEX
STATUS: OPERATIONAL
51...46s.45N 029..-16-26E
REMARKS:
THE ENTIRE COMPLEX WAS SEEN. AT LAUNCH SITE 1. ONLY LAUNCH
STANDS WERE PRESENT AT EACH LAUNCH PAD. AN ERECTOR WAS ON EACH
OF THE FOUR LAUNCH PADS AT LAUNCH SITE 2.
YOSHKARs.OLA ICBM COMPLEX
STATUS: OPERATIONAL
56-47...40N 048...30.-58F
REMARKS:
FORTY-.FIVE OF THE SS-13 SITES. FOUR OF THE SS-7 SITES. AND FOUR
LAUNCH CONTROL FACILITIES WERE AT LEAST PARTIALLY SEEN. LAUNCH
SITE 2 REMAINED IN A REDUCED STATE OF READINESS AND LAUNCH SITE
1 WAS NOT SEEN, THE ROOF WAS REMOVED FROM ONE OF THE
PROPELLANT SHEDS SOUTH OF THE LOOP ROAD AT LAUNCH SITE 2. THE
SHED NORTH OF THE LOOP ROAD HAD BEEN ENTIRELY REMOVED. ONE
PROPELLANT TANK WAS ON THE APRON IN FRONT OF THE SHED WITH THE
152
25X1
25X1
25X1
25X1
- 25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Top SECRET RUFF
KH-9 MISSION 1208-2
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
ROOF REMOVED. ONE SS-7 MISSILE ON A TRANSPORTER WAS IN FRONT
OF THE EAST MISSILE?READY BUILDING AT SITE 6.
YURYA ICBM COMPLEX
STATUS: OPERATIONAL
sQ-13-10N 049-35-07
25X1
25X1
25X1
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NORMAL SS-7
ACTIVITY WAS VISIBLE AT ALL 11 LAUNCH SITES. A 25X1
MISSILE ON A TRANSPORTER WAS SEEN AT LAUNCH SITES 7, 8. AND 10,
AND A MISSILE WAS ERECTED ON THE WEST PAD AT LAUNCH SITE 1.
ZAGARE MRBM COMPLEX
STATUS:OPERATIONAL
REMARKS:
ALL OF THE COMPLEX COMPONENTS WERE OBSERVED. A
MISSILE ON A TRANSPORTER WAS ALIGNED WITH THE ERECTOR ON THE SW
LAUNCH PAD AT LAUNCH SITE 2. A MISSILE ON A
TRANSPORTER WAS ALIGNED WITH THE ERECTOR ON THE NW LAUNCH PAD
AT lAHNCH STTF 2.
56-31.-50N 023...19-48E
ZHANGIZTOBE Icpm compLEx
STATUS: OPERATIONAL
153
49-17..59N 081.49-44E
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
. 1 I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 2)(1
TOP cFCRFT RUFF 25X1
25X1
1
KH-9 MISSION 1208...2
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NO CONSTRUCTON
ACTIVITY OR CHANGE WAS SEEN AT THE IIIF LAUNCH SITES.
ZHITOMIR MRBM COMPLEX
STATUS: OPERATIONAL
REMARKS:
THE ENTIRE COMPLEX AND SEARCH AREA WERE OBSERVED. AT
LAUNCH SITE 2, THREE SS...4 MISSILES ON TRANSPORTERS WERE
PRESENT. A DRIVE?IN REVETMENT WAS BEYOND THE CONNECTING ROAD
IN FRONT OF EACH LAUNCH PAD. AN ERECTOR WAS IN EACH OF TWO
REVETMENTS AND AN EMPTY SS...4 MISSILE TRANSPORTER WAS IN EACH OF
THE TWO REMAINING REVETMENTS ? THESE TWO ERECTORS WERE /N
ADDITION TO THE FOUR ON THE LAUNCH PADS.
028...14..-49E
AT LAUNCH SITE 3, FOUR 5S...4 MISSILES WERE PRESENT. A DRIVE?IN
REVETMENT WAS BEYOND THE CONNECTING ROAD IN FRONT OF EACH
LAUNCH PAD. AN EMPTY SS...4 MISSILE TRANSPORTER WAS IN THE WEST
REVETMENT.
AT THE INACTIVE LAUNCH SITE 1, TWO STRUCTURES. APPROXIMATELY
100 FEET LONG, WERE ON THE EAST?CENTRAL LAUNCH PAD AND PIECES
OF EQUIPMENT WERE AT THE ROAD INTERSECTION NEAR THE PAD. FIVE
PIECES OF PROBABLE GROUND FORCE?ASSOCIATED EQUIPMENT WERE IN
THE PROPELLANT STORAGE AREA.
THREE MISSILE RAILCARS WERE IN THE RAIL?TO?ROAD TRANSFER POINT.
ZHMERINKA MRBM COMPLEX
STATUS:OPERATIONAL
02801...34E
REMARKS:
THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 1, ONE SS-4
MISSILE ON A TRANSPORTER AND ONE EMPTY TRANSPORTER WERE
PRESENT. AT LAUNCH SITE 2. AN SS.-.4 MISSILE ON A TRANSPORTER
154
25X1
- 25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 )1(1
.1
KH-9 MISSION 12082
TOP SECRET RUFF
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES
WAS ALIGNED WITH THE ERECTOR AT THREE LAUNCH PADS. AN ERECTOR
WAS ON THE FOURTH LAUNCH PAD AND AN SS?L# MISSILE WAS NEAR THE
PAD. AT LAUNCH SITE 3, A CLEARING WAS BEING PREPARED FOR A
HORIZONTAL DIPOLE ANTENNA ON THE WEST SIDE OF THE SITE.
THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN
THE OAK SUPPLEMENT FOR EACH TARGET.
ZNAMENSK MRBM COMPLEX
STATUS:OPERATIONAL
021..05.?.13E
REMARKS:
ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. ONE MISSILE ON A
TRANSPORTER WAS SEEN AT BOTH SITES.
OTHER RESULTS?NO APPARENT CHANGE
UMAN MRBM COMPLEX
STATUS:NOT OPERATIONAL
4852e?OON 030?.4223E
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
155
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 -
?h .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
AKHTUBINSK FLIGHT TEST CENTER
STATUS: OPERATIONAL
SOVIET UNION
MISSILE RANGES
48-17-53N 046-11-22E
REMARKS:
THREE RAM?G (ONE WITH AN EXTENDED FUSELAGE) WERE OBSERVED ON
THE PARKING APRON AND FOUR FENCER A WERE OBSERVED IN THE AAM
SUPPORT FACILITY. THIS WAS THE LARGEST NUMBER OF FENCER EVER
OBSERVED IN THE AAM SUPPORT FACILITY. NO BACKFIRE WERE
OBSERVED.
AIR ORDER OF BATTLE:
-- AT MAIN AIRFIELD
3 RAM?G (1 W/EXTENDED
FUSELAGE)
8 BLINDER
10 BADGER
1 BEAGLE
3 FOXBAT
3 FIDDLER
4 FLOGGER
2 FLAGON A
1 FLAGON D
6 FITTER
26 FISHBED
AIR ORnER OF BATTLE:
-- AT AREA AIRFIELD
1 BEAR
7 BADGER
9 BEAGLE
4 FLOGGER
AIR ORDER OF BATTLE:
-- IN ASM SPT CPLX
1 BLINDER
1 FOXBAT
1 FITTER B
AIR ORDER OF BATTLE:
-- IN AAM SPT CPLX 25X1
1 FLAGON A
1 FISHPOT
6 FITTER
1 FOXBAT
4 FENCER A
5 FLOGGER
9 FIREBAR/BREWER
1 FAGOT/MIDGET
1 CRUSTY
1 COOKER (W/POINTED NOSE)
2 CAMEL (1 W/POINTED NOSE)
4 CUB
1 CAMP
7 COKE
4 CRATE
2 HIND?A
10 HIP C (1 W/0 ROTOR)
1 PROB LA-17 DRONE
5 FARMER
23 FAGOT/FRESCO
1 COOKPOT
3 FITTER
2 FISHBED
25X1
25X1
25X1
25X1
156
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
LOA!
25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
ASSOCIATED OBJECTS:
-- IN AAM ASM STOR AREA
85 ASM SHIPPING CRATE
SOVIET UNION
MISSILE RANGES
EMBA MISSILE TEST CENTER
STATUS: OPERATIONAL
48-38-00N 0580330E
REMARKS:
THE ENTIRE EMBA MISSILE TEST CENTER WITH THE EXCEPTION OF THE
SA-1 LAUNCH FACILITY WAS COVERED
AN SA-8 FIELD EXERCISE WAS IDENTIFIED FOR THE FIRST TIME.
TWENTY-ONE SA-8 VEHICLES WERE IDENTIFIED IN OR AROUND A BIVOUAC
AREA, APPROXIMATELY 7 NM SW OF THE OPERATIONAL SUPPORT AREA. A
PROBABLE MISSILE CHECKOUT AREA WAS NEARBY. A LONG PROBABLE
CHECKOUT TENT AND SEVERAL PROBABLE SA-8 CANISTERS' SOME ON THE
BACK OF A FLATBED TRUCK. WERE IDENTIFIED IN THE CHECKOUT AREA.
ASSOCIATED EQUIPMENT IDENTIFIED NEAR THE SA-.8 FIELD EXERCISE
INCLUDED AT LEAST ONE PROBABLE LONG TRACK. TWO PROBABLE THIN
SKIN. AND AT LEAST EIGHT POSSIBLE BTR.-60.
SIX ADDITIONAL SA-8 VEHICLES WERE IDENTIFIED AT OR NEAR LAUNCH
AREA B. (SEE EMBA MISSILE TEST CENTER LAUNCH COMPLEX.
FOR READOUT.) FOUR OTHER SA-8 VEHICLES WERE SEEN
IN THE OPERATIONAL SUPPORT AREA. ONLY THREE OF THE 31 SA-8
VEHICLES OBSERVED WERE OF THE CONFIGURATION PREVIOUSLY
IDENTIFIED AS THE SA-8 TRANSPORTER/LAUNCHER. ONE OF THE SA-8
VEHICLES WAS OF A UNIQUE CONFIGURATION, WITH AN A-FRAME-SHAPED
DEVICE MOUNTED ON IT. THIS VEHICLE WAS IN THE OPERATIONAL
SUPPORT AREA. WHERE IT HAS BEEN SINCE SEP 72 WHEN IT WAS FIRST
OBSERVED* THE REMAINDER OF THE SA-8 VEHICLES IDENTIFIED WERE OF
THE CONFIGURATION CALLED A PROBABLE RADAR VEHICLE. THE TOTAL OF
31 SA-8 VEHICLES WAS THE LARGEST NUMBER SEEN IN THE USSR TO
DATE.
AT THE OPERATIONAL SUPPORT AREA. A SELF-SUPPORTING TOWER WAS
NEWLY IDENTIFIED IN FRONT OF THE MISSILE ASSEMBLY AND CHECKOUT
BUILDING ADJACENT TO THE U.-SHAPED REVETMENT. THIS AREA HAS
BEEN ASSOCIATED WITH THE SA-8 SYSTEM FOR MORE THAN THREE YEARS
AND THE TOWER MAY BE FOR SOME TYPE OF CALIBRATION OR CHECKOUT.
TWO SA-..8 VEHICLES WERE IDENTIFIED BESIDE THE U-SHAPED REVETMENT
157
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
Kl+..9 MISSION 1208?..2
SOVIET UNION
MISSILE RANGES
AN APARTMENT BUILDING WAS UNDER CONSTRUCTION AT THE BASE
SUPPORT COMPLEX,
A BUNKERED BUILDING WAS OBSERVED UNDER CONSTRUCTION
APPROXIMATELY 1 NM WEST OF TRACKING FACILITY 2.
NO SIGNIFICANT CHANGES WERE OBSERVED AT OTHER FACILITIES.
EMBA MSL TEST CENTER LAUNCH COMPLEX
STATUS: OPERATIONAL
05803...32E
REMARKS:
SIX SA.-8 VEHICLES WERE IDENTIFIED AT OR NEAR LAUNCH AREA B ON
ALL SIX WERE OF THE TYPE PREVIOUSLY IDENTIFIED AS A
PROBABLE RADAR VEHICLE. A PROBABLE. PAT HAND IN TRAVEL
CONFIGURATION WAS AT POSITION Cl OF NEW LAUNCH AREA Ce FOUR
PROBABLE INSTRUMENTATION POINTS' POSSIBLY CAMERA POSITIONS,
WERE OBSERVED AROUND POSITION C2o OTHER PROBABLE
INSTRUMENTATION POINTS WERE BEING PREPARED AROUND POSITION Cl.
DISCOLORING WAS OBSERVED IN THE CONCRETE PAD AT POSITION C2e
NO SIGNIFICANT CHANGE IN FACILITIES WAS IDENTIFIED AT LAUNCH
AREAS A AND B.
MISSILE 07ER OF BATTLE:
5 PROB SA-6 TEL
ELECTRONIC ORDER OF BATTLE:
2 POSS STRAIGHT FLUSH
2 PROB PAT HAND
ASSOCIATED OBJECTS:
VANS AND EQUIPMENT
(NUMEROUS)
6 PROB SA-8 RADAR VEHICLE
158
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
SOVIET UNION
MISSILE RANGES
25X1
KAPUSTIN YAR ELECTRONICS RELATED FAC
STATUS: UNDER CONSTRUCTION
REMARKS:
48-50-08N 045-39-11E
25X1
THE ENTIRE FACILITY WAS COVERED ON PHOTOGRAPHY OF FAIR
INTERPRETABILITY. AT AREA At ALL SIX RADAR POSITIONS WERE
OCCUPIED. NO SIGNIFICANT ACTIVITY WAS
DISCERNIBLE AT
AREA B. A
POSSIBLE RADAR VAN WAS POSITIONED ATOP
THE
GUYED
25X1
TOWER.
ELECTRONIC
ORDER OF BATTLE:
--
AREA A
25X1
3 PROB RANGE/AZIMUTH
RADAR 1 TALL KING
2 PROB ODD PAIR ELECTRONICS VAN (NUMEROUS)
ELECTRONIC
ORDER OF BATTLE:
--
AREA B
25X1
7 PROB ELECTRONICS
VAN
25X1
KAPUSTIN YAR MSL/SPACE TEST CENTER SSM
48-41-07N
045-58-53E
25X1
STATUS:OPERATIONAL
REMARKS:
PHOTOGRAPHY
PROVIDED COMPLETE COVERAGE OF THE
25X1
CENTER.
CONSTRUCTION ACTIVITY TO MODIFY LAUNCH
PAD 1C-3 AT SITE 1C WAS
CONTINUING.
MOST OF THE TRENCHING REPORTED
25X1
HAS BEEN
BACKFILLED.
SHALLOW EXCAVATING
WAS OBSERVED AT
25X1
THE PAD ON
? THREE MISSILES
ON TRANSPORTERS WERE
25X1
OBSERVED NEAR
THE HIGH?BAY
RECEIVING AND CHECKOUT BUILDING
AT
THF MISSILERECEIVING/CHECKOUT FACILITY ON BOTH DAYS.
AT SITE 3Ct AN 55-4 MISSILE ON A TRANSPORTER WAS OBSERVED
ON PAD 3C-2.
MODIFICATIONS TO THE RANGEHEAD TRACKING FACILITY HAVE STARTED.
THE MODIFICATIONS APPEARED TO BE IDENTICAL TO THOSE MADE TO
THE VT-3 INTERFEROMETER (BOW AND ARROW) AT THE TYURATAM
MISSILE/SPACE TEST CENTER AND THE PLESETSK MISSILE/SPACE TEST
159
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
u . .1 .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF LOA!
25X1
KH-9 MISSION 1208-2
SOV/ET UNION
MISSILE RANGES
CENTER* THE MODIFICATIONS INCLUDE EXTENDING ONE BASE LEG DUE
NORTH APPROXIMATELY 19.650 FEET TO AN END TERMINAL BUILDING
UNDER CONSTRUCTION AND A SECOND LEG DUE EAST APPROXIMATELY
TO AN END TERMINAL BUILDING UNDER CONSTRUCTION.
FOOTINGS FOR A SMALL SQUARE BUILDING IMMEDIATELY SOUTH OF THE
MAIN CONTROL BUILDING WERE INSTALLED.
TWO OF THE THREE SRBM TRAINING EXERCISES SEEN IN THE BIVOUAC
AREAS SW_OF_THIE_SR8M SUPPORT FACILITY WERE NOT
PRESENT , ANOTHER SRBM TRAINING EXERCISE WAS UNDERWAY
IN A BIVOUAC AREA SW OF SITE B
KAPUSTIN YAR SAM FIRING RANGE
STATUS: OPERATIONAL
48-48.-28N 045.-43-43E
REMARKS:
MAJOR PORTIONS OF THE RANGE WERE COVERED ON PHOTOGRAPHY OF FAIR
INTERPRETABILITY, NO ADDITIONAL DETAILS OF THE PROBABLE NEW
RADAR AT LAUNCH SITE Fr R AND D LAUNCH AREA. WERE DISCERNIBLE.
THE FOUR PROBABLE SA-1 TRANSPORTER...ERECTOR...LAUNCHERS WERE NO
LONGER PRESENT IN THE MISSILE?ASSOCIATED HANDLING AREA AT THE
REAR OF THE SA-2 LAUNCH AREA* NO OTHER SIGNIFICANT ACTIVITY
WAS OBSERVED.
NENOKSA NAVAL MISSILE TEST CENTER
STATUS: OPERATIONAL
64-38...58N 039-11-25E
REMARKS:
TWO SS'-N-8?SIZE PROBABLE MISSILE MOCKUPS WERE AT THE TEST
CENTER. ONE IN LAUNCH FACILITY B AND THE OTHER AT THE
ASSEMBLY/CHECKOUT AREA. ON 25 APR. ONLY THE MOCKUP AT FACILITY
B WAS OBSERVED. TWO SS?N...8 TRANSPORTERS WERE ALSO PRESENT. ONE
ON THE APRON EAST OF LAUNCH FACILITY B AND THE OTHER IN THE
LIQUID PROPELLANT HANDLING AREA. THE TOP SECTION OF THE
GOOSENECK CRANE IN LAUNCH FACILITY B APPEARED TO HAVE BEEN
LENGTHENED. A PIECE OF PROBABLE ELECTRONICS EQUIPMENT WAS ON
160
25X1
OFYI
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
KH-"'9 MISSION 12082
SOVIET UNION
MISSILE RANGES
THE THREE INSTRUMENTATION PEDESTALS PREVIOUSLY SEEN UNDER
CONSTRUCTION.
A NEW CONSTRUCTION AREA BETWEEN LAUNCH FACILITIES A AND B
CONSISTED OF ONE LARGE BUILDING BASE OR FOUNDATION.
APPROXIMATELY 50 X 180 FEET WITH A POSSIBLE RAMP. ONE SMALL
COMPLETED BUILDING. AND STACKS OF BUILDING MATERIAL. THE
ALIGNMENT OF THE ROAD SOUTH OF THE AREA HAD BEEN ALTERED
SLIGHTLY DUE TO THE CONSTRUCTION ACTIVITY. IN LAUNCH FACILITY
Ar AN EXCAVATION WAS OBSERVED BETWEEN THE EASTERN AND CENTRAL
LAUNCHERS' THE LAUNCH TUBE OF THE CENTRAL LAUNCHER WAS ORIENTED
NW. AND THE BLAST DEFLECTOR WAS ON THE GROUND BEHIND THE
LAUNCHER.
MISSILE ORDER OF BATTLE:
ORDER OF BATTLE:
25X1
25X1
2 TRANSPORTER
GROUND FORCE
4 PROB TRUCK
TRACTOR 1 POWER SHOVEL
2 MOBILE CRANE 3 VEHICLE/PIECE OF EQUIP
ASSOCIATED
OBJECTS:
25X1
2 PROB MISSILE
MOCKUP 15 RAILCAR
(SS....N.?.8 SIZE) 2 PROB SS...W..8 DOLLY
2 SS?N--3?TYPE CRATE 2 POSS MISSILE DOLLY
1 UNIDENTIFIED CRATE
25X1
PLESETSK MISSILE/SPACE TEST CENTER SSM
62?-57-.46N 040=,2346E
25X1
STATUS; PERATIONAL
REMARKS:
PHOTOGRAPHY
PROVIDED TOTAL COVERAGE OF
25X1
THE CENTER.
AT LAUNCH SITE 21' THE TENT?LIKE FRAMEWORK AT THE
25X1
EAST LAUNCH
PAD HAD BEEN RECOVERED WITH CANVAS. THE FRAMEWORK
WAS LAST SEEN
UNCOVERED ? THREE
25X1
IRREGULARLY SHAPED OBJECTS WERE ON THE WEST LAUNCH PAD. THE
161
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part
- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF LOAI
25X1
KH-9 MISSION 1208-2
SOVIET UNION
MISSILE RANGES
TENT/NETTING THAT HAD BEEN REMOVED FROM OVER THE PARKING AP
IMMEDIATELY OUTSIDE_THE_MAIN ENTRANCE TO THE SITE
BEEN REPLACED
SILO W
ON
HAD 25X1
2bAl
AT LAUNCH SITE 11. THE SILO DOOR AT THE SOUTH
S OPEN. THIS SILO DOOR WAS ALSO OPEN
WHEN IT WAS LAST SEEN. AND AN ENVIRONMENTAL COVER WAS
OVER THE SILO OPENING. AN UNIDENTIFIED PIECE OF EQUIPMENT
REMAINED ON THE LOADING APRON AT THE NORTH SILO.
ACTIVITY AT THE OTHER SS-13 LAUNCH SITES INCLUDED AT LEAST
EHICLES/PIECES OF, EQUIPMENT AT LAUNCH SITE 22
AND A CRANE WORKING OVER THE OPEN SILO AT LAUNCH SITE' 24
A VAN TRUCK WAS ALSO PARKED ON THE SILO APRON. TWO
VEHICLES/PIECES OF EQUIPMENT WERE DISCERNIBLE AT LAUNCH SITE 24
AT LAUNCH SITE 5. THE THREE TENTS SEFN NEXT TO THF WFcTFRN
LAUNCH PAD HAD BEEN REMOVEDI A
VEHICLE/PIECE OF EQUIPMENT WAS PARKED ON THE PAVED ACCESS ROAD
LEADING INTO THE NEW CLERESTORY BUILDING IN THE SITE SUPPORT
FACILITY. CONSTRUCTION CONTINUED IN THE INTER?PAD AREA AT THE
LAUNCH SITE.
AT LAUNCH SITE 7. AN SS-8 SOFT SITE. FOUR CIRCULAR AND FOUR
LINEAR EXCAVATIONS HAVE BEEN DUG IN THE TOP OF THE
EARTH?COVERED NORTH MISSILE?READY BUNKER, THE CANVAS?COVERED
STRUCTURE OVER THE RAIL AT THE NORTH LAUNCH PAD. FIRST SEEN ON
WAS STILL PRESENT.
NO ACTIVITY WAS SEEN AT LAUNCH SITE 16.
PLESETSK SPACE LAUNCH SITE 27
STATUS: UNDER CONSTRUCTION
REMARKS:
CONSTRUCTION CONTINUED AT THE SITE.
HAVE OCCURRED
62-54-23N 040-47-15E
NO SIGNIFICANT CHANGES
162
25X1
')cY1
25X1
OFYI
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-9 MISSION 12082
SOVIET UNION
MISSILE RANGES
SARYSHAGAN MISSILE TEST CENTER
STATUS: OPERATIONAL
4611...05N 072?.41...30E
REMARKS:
ALL FACILITIES AT THE SARY...SHAGAN MISSILE TEST CENTER EXCEPT
THE ASAT/SPACE TRACKING RADAR FACILITY, SAM SITE E06....20 AND
TRACKING FACILITIES 6 THROUGH 16 WERE COVERED ON STEREO
PHOTOGRAPHY OF GOOD INTERPRETABILITY PHOTOGRAPHY OF 25X1
COVERED ONLY A PORTION OF LAUNCH COMPLEX E AND WAS OF 25X1
POOR INTERPRETABILITY DUE TO OBLIQUITY AND SCALE. DOWNRANGE
TRACKING FACILITIES 14 AND 15 WERE COVERED ON PHOTOGRAPHY OF
GOOD INTERPRETABILITY 25X1
HX1
25X1
25X1
25X1
AT LAUNCH COMPLEX B TWO GALOSH CANISTERS WERE OBSERVED
ONE WAS ENGAGED HORIZONTALLY IN THE LAUNCHER AT POSITION
Cl AND THE SECOND WAS ERECTED IN THE LAUNCHER AT POSITION C20
AT LAUNCH COMPLEX p" A LARGE APRON WAS UNDER CONSTRUCTION TO
THE REAR (SE) OF MODIFIED TRY ADD BUILDING A. NO ABM CANISTERS
WERE OBSERVED AT COMPLEX Do
25X1
25X1
AT LAUNCH COMPLEX Et AN UNOCCUPIED SA-3 TRAINING SITE WAS
NEWLY SEEN THE SITE WAS UNDER CONSTRUCTION 8.5 NM 25X1
NNE OF TRACKING FACILITY 3 AT 45-..46?..04N 072-.39-34E. IT
CONSISTS OF FOUR EARTH-GRADED REVETTED LAUNCH POSITIONS AND A
REVETTED GUIDANCE AREA IN THE CENTER OF THE SITE. THIS IS THE
FOURTH SA..-3 SITE TO BE CONSTRUCTED AT LAUNCH COMPLEX E. AT SAM
TRAINING SITE D193' ALL FOUR LAUNCH POSITIONS WERE OCCUPIED BY
A FOUR-RAIL SA-3 LAUNCHER.
AT LAUNCH COMPLEX F, ONE OF THE TWO MOBILE POWER UNITS FOR THE
PLANAR APERTURE RADAR AT THE LAUNCH SITE 2 RADAR APRON WAS NOT
PRESENT NO MISSILES OR MISSILE CANISTERS WERE
OBSERVED AT COMPLEX F.
25X1
AT LAUNCH COMPLEX G, PADS G2 AND G3 WERE OCCUPIED BY AN
UNIDENTIFIED PIECE OF EQUIPMENT. ON PAD G2, THE PIECE OF
EQUIPMENT APPEARED TO BE CONNECTED BY CABLE TO A VAN ON PAD G2
AND POSSIBLY TO SEVERAL VANS PARKED ALONG THE EDGE OF PAD G3. A
SIMILAR CABLE CONNECTION DID NOT APPEAR TO EXIST FOR THE
UNIDENTIFIED PIECE OF EQUIPMENT ON PAD G3. THIS PIECE OF
EQUIPMENT WAS SIMILAR' IF NOT IDENTICAL' TO THE ONE REPORTED ON
PAD G3 A GENERALLY CIRCULAR 25X1
163
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
.1 .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
25X1
SOVIET UNION
KH-9 MISSION 1208-2. MISSILE RANGES
EXCAVATION WAS NEWLY OBSERVED NEAR THE WESTERN END OF COMPLEX G
A RECTANGULAR FOUNDATION WAS _UNDER CONSTRUCTION AT
THE BOTTOM OF THE EXCAVATION.
AT THE OPERATIONAL SUPPORT BASE. ALL EIGHT LAUNCH POSITIONS AT
THE DRONE LAUNCH AREA WERE OCCUPIED BY LA-17 ON LAUNCHERS.
SEVENTEEN ABM CANISTERS WAS OBSERVED AT THE OPERATIONAL
SUPPORT BASE , AT LEAST FIVE OF .THE 17 WERE GALOSH
CANISTERS.
MISSILE ORDER OF BATTLE:
LAUNCH COMPLEX B
2 GALOSH CANISTERS
MISSILE ORDER OF BATTLE:
OPERATIONAL SUPPORT BASE
17 ABM CANISTER (INCLDNG AT
LST 5 GALOSH CNSTRS)
TYURATAM MISSILE/SPACE TEST CENTER SSM
STATUS: OPERATIONAL
REMARKS:
THE TEST CENTER WAS PARTIALLY OBSERVED ON CLOUDY PHOTOGRAPHY OF
AND TOTALLY OBSERVED ON CLEAR COVERAGE
45-56...37N 0A3.27-55F
THE TOP OF A LAUNCH VEHICLE. NOT PRESENT ON
THE SERVICE GANTRY AT SPACE LAUNCH SITE Al
WAS SEEN IN
THE APRON AREA AROUND THE LAUNCH POINT AT SITE GlA
APPEARED TO BE STAINED OR SCORCHED BUT NOT AT SITE G1B. TWO
MISSILE TRANSPORTERS AND THEIR POWER UNITS WERE ON THE G1B SIDE
OF THE SITE. THIS ACTIVITY WAS PROBABLY RELATED TO THE TWO
REPORTED SL-11 LAUNCHES
AT LAUNCH PAD G4, THE REFURBISHMENT ACTIVITY PREVIOUSLY
REPORTED APPEARED TO HAVE BEEN COMPLETED THE GANTRY
FOR THIS PAD HAD BEEN MOVED FROM THE STOWED POSITION
TO THE LAUNCH PAD
164
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KW-9 MISSION 1208-2
SOVIET UNION
MISSILE RANGES
AT SITE Ll. THE DIRT USED AS A DOOR STOP FOR THE TYPE IIID DOOR
HAD BEEN REMOVED AND THE SILO DOOR HAD BEEN MOVED TO THE END OF
THE DOOR RAILS. THIS MOUND OF DIRT WAS REMOVED
25X1
25X1
25X1
25X1
THE SILO DOOR MOUND HAS ALSO BEEN REMOVED AT LAUNCH SITE N2 BUT
EXTENSIONS HAVE BEEN ADDED TO THE EXISTING RAILS. ALLOWING THE
SILO DOOR TO BE OPENED BEYOND ITS NORMAL STOPPING POINT. THE
MOUND WAS REMOVE6 AN OBJECT RESEMBLING 25X1
A TYPE IIID DOOR SHELL HAS NOW BEEN PLACED ON THE RAILS BETWEEN
THE OPEN SILO AND THE N2 SILO DOOR. THE PURPOSE OF THIS
ACTIVITY AT SITES Ll AND N2 IS UNCLEAR AT THIS TIME.
TWO PROPELLANT TRANSPORTERS OF THE NEW TYPE PREVIOUSLY
ASSOCIATED WITH THE SS?X-17 AND SS?X-18 MISSILE SYSTEMS WERE
IDENTIFIED ON THE APRON AT SS.-X-19 LAUNCH SITE S2I 25X1
BECAUSE THESE TRANSPORTERS HAVE NOW BEEN SEEN WITH ALL THREE
NEW SYSTEMS (SS?X-47/18/19)r NPIC WILL REFER TO THEM AS MSP
(MULTISYSTEM PROPELLANT) TRANSPORTERS. ALSO AT SITE 52. THE
LIGHT?TONED TOP OF A CANISTER WAS OBSERVED IN THE SILO.
A SILO LOADING OPERATION WAS OBSERVED AT SS?X-19 LAUNCH SITE S3
A CANISTER.
WAS ON AN SS-11 TYPE SILO LOADER WHICH WAS BEING POSITIONED AT
THE OPEN SILO. THIS CANISTER SECTION IS CONSIDERED TO BE THE
LOWER PORTION OF THE APPROXIMATELY 80?FOOT?LONG SS?X-19
CANISTER. A CANVAS?COVERED SS.-11 TRANSPORTER WAS ALSO IN THE
APRON.
25X1
LAUNCH SITE S8 IS CONSIDERED TO BE COMPLETE THIS 25X1
SITE IS SIMILAR TO PREVIOUSLY COMPLETED SITES S6 AND 57. BOTH
REPORTED AS MODIFIED TYPE IIID SITES. BASED ON THEIR DIFFERENT
SITE SIGNATURE, INCLUDING THE SHAPE AND SIZE OF THE SILO DOOR
FROM THAT SEEN AT TYPE IIID SITES. THESE THREE SITES WILL NOW
BE DESIGNATED BY NPIC AS TYPE IIIH SITES AND ARE DESIGNATED AS
LAUNCH SITES V1 (S6),V2 (S7). AND V3 (58).
AT TEST SUPPORT FACILITY 1, A PROBABLE WARHEAD?ASSOCIATED
VEHICLE WAS IN THE MISSILE ASSEMBLY AND CHECKOUT FACILITY 2 ON
THIS VEHICLE. IS OF
THE SAME CONFIGURATION AS THE ONES SEEN AT THE ALEYSK ICBM
COMPLEX
165
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
5X1
.IL ..,...
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF 2bA1
25X1
KW-9 MISSION 1208-2
SOV/ET UNION
MISSILE RANGES
CONSTRUCTION WAS CONTINUING IN THE AREA OF UNIDENTIFIED
ACTIVITY MIDWAY BETWEEN THE MAIN SUPPORT BASE AND LAUNCH
COMPLEX A. THE SEVEN LARGE PAVED RECTANGULAR AREAS WERE BEING
CONNECTED BY A SINGLE ROW OF PAVING BLOCKSI AN OPEN
DITCH EXTENDED FROM THIS AREA TO THE MAIN NORTH?SOUTH ROAD.
166
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
ALMA?ATA SAM COMPLEX B35-5
STATUS: OPERATIONAL
SOVIET UNION
AIR DEFENSE MISSILES
43-26-55N 076-50-55E
REMARKS:
LAUNCH SITE A CONTAINED FOUR MISSILES ON LAUNCHERS AND SITE B
CONTAINED TWO MISSILES ON LAUNCHERS. A TALL KING RADAR HAD
BEEN ERECTED IN THE WESTERN PORTION OF THE TRACKING AND
GUIDANCE FACILITY. ARCHED SECTIONS WERE OBSERVED IN THE
MISSILE?HANDLING AREA. CONSTRUCTION WAS CONTINUING AT BOTH THE
MISSILE?HANDLING AND SUPPORT AREAS.
MISSILE ORDER OF BATTLE:
25X1
25X1
LAUNCHER
6 SA-5 MISSILE 12 SA-5
16 PROB SA-5 TRANSPORTER
ELECTRONIC ORDER OF BATTLE:
25X1
2 SQUARE PAIR 1 TALL KING
25X1
MOSKVA ABM LAUNCH COMPLEX E31
56-08-05N 036-29-37E
25X1
STATUS:OPERATIONAL
REMARKS:
FOURTEEN GALOSH CANISTERS WERE OBSERVED IN LAUNCHERS.
MISSILF ORDER OF BATTLE:
25X1
14 GALOSH CANISTER
25X1
MOSKVA ABM LAUNCH COMPLEX E33 --_56_211A_ON_113
25X1
STATUS: OPERATIONAL
167
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF
KH-9 MISSION 1208-2
SOVIET UNION
AIR DEFENSE MISSILES
REMARKS:
THE COMPLEX WAS PARTIALLY COVERED ON MONOSCOPIC PHOTOGRAPHY.
SIX GALOSH CANISTERS WERE ENGAGED IN LAUNCHERS. THREE GALOSH
CANISTERS WERE PROBABLY ENGAGED IN LAUNCHERS IN THE PARTIALLY
OBSCURED SECTIONS OF THE COMPLEX.
MISSILE ORDER OF BATTLE:
6 GALOSH CANISTER
3 PROB GALOSH CANISTER
168
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75X1
TAP cFrprT oucr 25X1
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
CHERNYAKHOVSK AIRFIELD
STATUS: OPERATIONAL
SOVIET UNION
AIR BASE FACILITIES
54-36-07N 0,1-46-56E
REMARKS:
THIS WAS THE FIRST IDENTIFICATION OF FLOGGER AT THIS
THE FLOGGER WERE NOT SEEN ON SUBSEQUENT COVERAGE
AIR ORDER OF BATTLE:
57 PRO8 BREWER
5 BEAGLE
2 FLOGGER (1 LANDING)
1 COKE
1 CAB
1 CLOD
1 COLT
1 HIP C
AIRFIELD.
SIAULIAI AIRFIELD
55-53-3QN
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
25 FLOGGER
27 FITTER
2 FISHBED
40 CUB
8 MOSS
VITEBSK AIRFIELD NORTHEAST
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
4 NM NE OF VITEBSK.
UPDATED DESCRIPTION. THE AIRFIELD CONSISTS
ENE/WSW SERVICEABLE CONCRETE RUNWAY, A PARALLEL SOD
LANDING STRIP, A PARALLEL TAXIWAY, TWO END?CONNECTING LINKS.
55-15..-24N 030-1_9?n3F
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
169
TOP SECRET RUFF
nAciassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
11 11 .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25)S11
KH-9 MISSION 1208-2
1 SOVIET UNION
AIR BASE FACILITIES
ONE CROSSOVER LINK. TWO CONCRETE PARKING APRONS. THREE SERVICE
APRONS. AND FIVE REVETMENTS.
SUPPORT FACILITIES INCLUDE AN OPERATIONS BUILDING. A CONTROL
TOWER. A HANGAR, THREE MOTOR POOLS. A STEAMPLANT, AND 32
STORAGE/SUPPORT BUILDINGS.
A RAIL-SERVED POL STORAGE AREA SOUTH OF THE AIRFIELD INCLUDES
THREE PARTIALLY UNDERGROUND VERTICAL STORAGE TANKS.
APPROXIMATELY 150 HORIZONTAL STORAGE TANKS, AND SIX
STORAGE/SUPPORT BUILDINGS.
THE AIRFIELD HAS ILS AND GCA.
AIR ORDER OF BATTLE:
17 CUB
1 CRATE
170
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
GUBA LITSA SUB BASE SE
STATUS: OPERATIONAL
SOVIET UNION
NAVAL BASE FACILITIES
69-25-45N 032-22-40E
REMARKS:
CONSTRUCTION WAS CONTINUING ON TWO PROBABLE BARRACKS IN THE
SUPPORT AREA.
NAVAL ORDER OF RATTLE:
b E-II SSGN
2 BOLVA APL
2 KHERSON A APL
NAVAL ORDER OF BATTLE:
1 SPECIAL PURPOSE BARGE
6 MISCELLANEOUS VESSEL (5
5 POSS SUBMARINE
2 POSS BOLVA APL
GUBA LITSA SUBMARINE BASE SOUTH
STATUS:OPERATIONAL
69-26-20N 03P-2S-26r
REMARKS:
THE LONG VARIANT C SSGN WAS IDENTIFIED AT THIS FACILITY FOR THE
FIRST TIME ON A FLOATING CRANE WAS ON THE
OPPOSITE SIDE OF THE PIER FROM THIS SUBMARINE. THE CRANE BOOM
WAS OVER THE BOW OF THE SUBMARINE, BUT IT WAS NOT POSSIBLE TO
IDENTIFY ITS ACTIVITY.
25X1
25X1
25X1
25X1
25X1
25X1
25X1
NAVAL ORDER OF ATTL
25X1
1 LONG VARIANT C SSGN
1 P-6 PT
4 C SSGN
2 BOLVA APL
1 E-II SSGN
2 SPECIAL PURPOSE BARGE
4 V SSN
1 OSS
7 MISCELLANEMIS VESSEL (5
25X1
171
25X1
TOP SECRET RUFF
npriaccifipri in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
L I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
KH-9 MISSION 1208-2
NAVAL ORDER OF BATTLE:
1 U SSN
NAVAL ORDER OF BATTLE:
5 POSS SUBMARINE
SOVIET UNION
NAVAL BASE FACILITIES
2 POSS BOLVA APL
OLENYA GUBA SUBMARINE BASE
STATUS: OPERATIONAL
69-12-51N 033-22-32E
REMARKS:
A Y SSEIN WAS MOORED AT THE WEST PIERS. A V SSN WAS SEEN AT THE
25X1
25X1
25X1
25X1
25X1
REPAIR FACILITY ALONGSIDE A RECTANGULAR
SUPPORT
OF THE
BARGE
25X1
25X1
THE MAJOR REPAIR OR OVERHAUL
G?CLASS SSB WAS
CONTINUING AT THE REPAIR FACILITY.
MOST OF THE SUBMARINES DECK
PLATING HAD BEEN REMOVED AND EXTENSIVE REPAIR WORK WAS GOING ON
ON THE SAIL AND MISSILE AREA. CONSTRUCTION WAS CONTINUING ON
THE ADDITIONS TO THE REPAIR FACILITY
AREA. AN F SS WAS
APPARENTLY DEAD IN THE WATER IN
THE BAY HEAVY CLOUD
25X1
COVER OBSCURED THE NAVAL BASE
25X1
NAVAL ORDER OF BATTLE:
1 ATREK ASL (AT REPAIR
25X1
1 Y SS8N (AT WEST PIERS)
1 POSS G?II SSB FACILITY)
3 G?I SSB 1 LIBAU AGRL
1 G SSB (AT REPAIR 1 BOLVA APL (AT REPAIR
FACILITY) FACILITY)
1 V SSN (AT REPAIR 1 RECTANGULAR SPT BARGE
FACILITY) I YR
1 OSS 4 MISCELLANEOUS CRAFT
NAVAL ORDER OF BATTLE:
- PARTIAL COVERAGE
1 G SSB (AT REPAIR 1
FACILITY)
1 V SSN (AT REPAIR
172
ATREK ASL (AT REPAIR
FACILITY)
1 BOLVA APL (AT REPAIR
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
TOP SECRET RUFF
KH-9 MISSION 12082
FACILITY)
1 F SS (DEAD IN WATER IN
BAY)
SOVIET UNION
NAVAL BASE FACILITIES
FACILITY)
1 RECTANGULAR SPT BARGE (AT
REPAIR FACILITY)
PALA GUBA NVB A SHP RPR YO
STATUS: OPERATIONAL
REMARKS:
TWO Y..CLASS SSBN WERE AT THE SHIPYARD
SECOND Y SSBN ARRIVED AT THE SHIPYARD BETWEEN
THE SUBMARINE WAS MOORED ALONGSIDE A FINGER PIER AND HAD TWO
ACCESS SHEDS PLACED OVER THE REACTOR AREA. THE FIRST Y SSBN
REMAINED IN THE ARD-D. REACTOR MAINTENANCE WORK CONTINUED ON
TH C S N. THE LONG VARIANT C SSGN HAD DEPARTED THE YARD BY
03325..24F
THE
NAVAL ORDER OF BATTLE:
2 Y SSBN (1 IN ARD-D)
2 C SSGN (1 IN ARD...0)
4 SSGN
1 N SSN
1 F SS (IN ARD-T)
1 F/Z SS (IN BAY)
1 DNEPR AR
1 202A AR
1 112B YRSN
2 ROSTA.?A YRSN
NAVAL ORDER OF BATTLE:
PARTIAL COVERAGE
2 V SSBN (1 IN ARD-0)
2 C SSGN (1 IN ARD-D)
3 SSGN
1 DNEPR AR
1 202A AR
1 YR
1 ROSTA..B YRSN
1 ZEYA YRSN
2 PM-12L YRSN
1 DVINA YR
2 YR
1 DUNA YFP
2 BOLVA APL
3 ARD (D)
1 ARD (T)
7 MISCELLANEOUS VESSEL
1 112B YRSN
2 ROSTA...A YRSN
2 PM...124 YRSN
1 ZEYA YRSN
2 BOLVA APL
2 ARD...D
173
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/.01 : CIA-RDP78T04752A001500010011-9
KH-9 MISSION 1208-2
Top SECRET RUFF 25X1
SOVIET UNION
NAVAL BASE FACILITIES
POLYARNYY SUBMARINE BASE
STATUS: OPERATIONAL
69-12-09N 033-27-58E
REMARKS:
A T-58 MSF WAS IN AN ARD(D) ACROSS THE BAY FROM THE BASE.
CONSTRUCTION CONTINUED ON THE APARTMENT BUILDINGS.
NAVAL ORDER OF BATTLE:
8 F SS
3
VANYA MSC
6
POSS F SS
2
YEVGENYA MSI
2
F/Z SS
11
MSD
3
MEDIUM SS
1
DON AS
1
OSS
1
OSKOL AR
3
PETYA-I DE
2
POLUCHAT YPT
1
PETYA DE
1
P-6 HULL
2
GRISHA PCEP
1
BOLVA APL
2
NATYA MSR
1
PSKL-16 YFMB
2
YURKA MSR
17
MISCELLANEOUS VESSEL
1
T-58 MSR (IN ARD-D)
ROSTA NAVAL BASE A SHPRPR YD SEVMORPUT
STATUS: OPERATIONAL
69-01.-47N 033-04-00E
REMARKS:
A G-I SSB AND A G-II SSB WERE IN THE SMALL GRAVING DOCK. A
KRESTA-II CLGM WAS IN THE LARGE GRAVING DOCK WITH A PETYA-II DE
AND A F/Z SS. THE DON AS HAD A VEE CONE ANTENNA INSTALLED ON
THE AFTER RADAR MAST.
NAVAL ORDER OF BATTLE:
2 G-II SSB (1 IN GRAVING
DOCK)
1 G-I SSB (IN GRAVING DOCK)
6 J SSG
3 F/Z SS (1 IN ARD-D)
1 W/R SS (IN ARD-D)
174
1 KAZBEK AO
1 KOLA AG
2 NEPTUN ALBD
1 SURA ALBD
1 KRASIN AGB
1 KLASMA ARC
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
2bAl
TOP SECRET RUFF
25X1
UNION
SOVIET
NAVAL BASE FACILITIES
POLNOCHY LSM
BORIS CHILIKIN AOR
KH-9 MISSION 1208-2
1 MEDIUM SS
2 KRESTA-II CLGM (1
1
IN 1
GRAVING DOCK)
1
CHAPAYEV HULL
1
KOTLIN DD
1
AO
1
SKORYY DD
3
DVINA YR
1
PETYA.-II DE (IN GRAVING 2
YR
DOCK)
1
ARD (D)
1
RIGA DE
4
YGTN (LONG TYPE)
1
OSA-I PTFG
3
YGTN
2
UGRA AS
38
MISCELLANEOUS CRAFT
1
DON AS
(SMALL)
SAYDA GUBA SUBMARINE BASE
STATUS: OPERATIONAL
REMARKS:
AN UGRA AS WITH A SMALL UNIDE
PLATFORM WAS SEEN AT THE BASE
MOST OF THE FACILITY
69-15-32N 033-19-51E
NAMALaRnER OF BATTLE:
L3 SSBN
8 Y SSBN
5 H-II SSBN (1 IN
DEGAUSSING AREA)
1 OSS
1 UGRA AS
2 AMUR AR
NAVAL ORDER OF BATTLE:
-- PARTIAL COVERAGE
1 POSS D SSBN
6 Y SSBN
3 POSS Y SSBN
4 H-II SSBN (1 IN
DEGAUSSING AREA)
25X1
25X1
CT ON ITS HELICOPTER
25X1
HEAVY CLOUDS COVERED
1 DNEPR AR
5 BOLVA APL
1 DVINA YR
1 PSKL-16 YFMB
1 MISCELLANEOUS YR
3 POLUCHAT-1 YPT
9 MISCELLANEOUS CRAFT
1 OSS
2 BOLVA APL
175
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
11
. I.
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
TOP SECRET RUFF
KH MI S 0
SEVERODVINSK NAVAL BASE WEST
STATUS: OPERATIONAL
25X1
SOVIET
UNION
NAVAL BASE FACILITIES
25X1
64...34..46N 039..45..51E
25X1
REMARKS:
THE DISMANTLED DUMMY SSB WAS NOT OBSERVED AT THE BASE.
SNOW HAS MELTED FROM THE HELIPAD AND A POSSIBLE SIEMAN STAR WAS
OBSERVED. A N SSN WAS ALONGSIDE THE Z/V SSB AT A PIER.
NAVAL ORDER OF BATTLE:
T...4 LCM
1
Z/V SSB
1
1
N SSN
1
P...6 HULL
5
W SS
5
PO...2 PGM
2
RIGA DE
1
IRTYSH ASL
1
T...58 MSF
1
YDT
2
T-43 MSF
6
SPECIAL PURPOSE BARGE
2
K.-8 MSB
7
YGTN (2 LONG TYPE)
1
MP-8 LSM
2
BARGE (WITH PILINGS)
1
MP...4 LSV
16
MISCELLANEOUS VESSEL
DEFENSES SECURITY:
THE DISMANTLED DUMMY SSB WAS NOT OBSERVED AT THE BASE. A
POSSIBLE SIEMAN STAR WAS ON THE HELIPAD?
SEVEROMORSK NAVAL BASE
STATUS: OPERATIONAL
033..25...57E
REMARKS:
CONSTRUCTION WAS CONTINUING ON THE NEW BARRACKS AND THE LARGE
PIER.
25X1
25X1
25X1
176 25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Top SECRET RUFF
25X1
25X1
SOVIET
UNION
KH-9 MISSION 1208-2
NAVAL BASE FACILITIES
mAvai mulFR BATTLE:
ifF
25X1
1 POSS MINOR COMBATANT
2 POS KRtrA?II CLGM
2 SVERDLOV CL
1 PROB UGRA AS
1 PROB KRIVAK DDGSP
11 MISCELLANEOUS VESSEL
5 PROB MAJOR COMBATANT
NAVAL ORDER F BATTLE:
25X1
1
F SS
1
PETYA?II DE
2
KRESTA?II CLGM
1
RIGA DE
2
SVERDLOV CL
2
ALLIGATOR LST
2
KANIN DDG
1
LAMA AEM
1
KASHIN DLG
1
UGRA AS
1
KRIVAK DDGSP
1
NEPA ASR
1
KOTLIN DDG
1
PASSENGER HYDROFOIL
1
MOD KOTLIN DD
26
MISCELLANEOUS VESSEL
2
SKORYY DD
URA GUBA SUBMARINE BASE
STATUS: OPERATIONAL
REMARKS:
ONE BUILDING WAS IN THE MIDSTAGE OF CONSTRUCTION ONE
J SSG HAD A DECKHOUSE ENCLOSURE IN THE AREA OF THE AFT MISSILE
TUBES. THREE W/R SS WERE CANVAS COVERED
THIS WAS THE FIRST TIME THAT CANVAS?COVERED SUBMARINES HAVE
BEEN OBSERVED AT URA GUBA. THE ARD (T) HELD A W/R SS
11A2..61....ngE
NAVAL ORDER OF BATTLE:
7
J SSG
1
ATREK ASL
1
B SS
1
LIBAU AGF
6
W/R SS (1 IN ARD (T))
1
SUPPORT YR
3
W/R SS (CANVAS COVERED)
1
REPAIR BARGE
1
0 SS
1
ARD (T)
1
WILHELM BAUER AS
8
MISCELLANEOUS VESSEL
NAVAL ORDER OF BATTLE:
25X1
25X1
25X1
25X1
25X1
25X1
177
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
II
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : 6AIRDP7e-f04i52A001500010011-9 25X1
TOP SFCRFT RUFF 25X1
25X1
SOVIET UNION
KH-9 MISSION 1208-2 NAVAL BASE FACILITIES
6
J SSG
1
ATREK ASL
1
B SS
1
LIBAU AGF
5
W/R SS
1
SUPPORT YR
3
W/R (CANVAS COVERED)
1
REPAIR BARGE
1
OSS
1
ARD (T)
1
WILHELM BAUER AS
10
MISCELLANEOUS VESSEL
DEFENSES SECURITY;
THREE CANVAS?COVERED W/R SS WERE OBSERVED,
178
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
SIGNIFICANT RESULTS
BELAYA TSERKOV ARMY BKS ROSS AL 1
SOVIET UNION
GROUND FORCE FACILITIES
49-48-43N 030-05-47
25X1
STATUS: OCCUPIED
REMARKS:
OBLIQUITY PRECLUDED A READOUT OF THE EQUIPMENT.
BOBRUYSK ARMY B c F AL
STATUS: OCCUPIED
RA...fliAwRM flil..14..Urt
GROUND FORCE ORDER OF BATTLE:
-- IN VEHICLE PARK A
2 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
-- IN VEHICLE PARK B
40 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
IN VEHICLE PARK C
45 VEHICLE/PIECE OF EQUIP
40 TRUCK
GROUND FORCE ORDER OF BATTLE:
? IN VEHICLE PARK D
32 PMP BRIDGE BAY 2 TRUCK?MOUNTED CRANE
3 PROB PMP RAMP BAY 7 TRUCK
1 PROB PMP SERVICE TRUCK
GROUND FORCE ORDER OF BATTLE:
-- IN VEHICLE PARK E
21 NEW?TYPE ENGINEER EQUIP 1 TRUCK?MOUNTED CRANE
1 PROB ARMD ENGR TRACTOR 17 TRUCK
M1972 26 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
-- IN VEHICLE PARK F
12 VEHICLE/PIECE OF EQUIP
2 TRUCK
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
179
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy
1
OF
Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP cFrRFT RUFF
25X1
SOVIET UNION
GROUND FORCE FACILITIES
BATTLE:
KH-9 MISSION 1208-2
GROUND FORCE ORDER
- IN VEHICLE
PARK G
25X1
9 VEHICLE/PIECE OF
EQUIP
25X1
CHERNOVISY ARMY BKS SOUTHEAST AL 1
48-17-30N 025-57-49E
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER
OF BATTLE:
25X1
70 VEHICLE/PIECE OF
EQUIP
(AT LEAST)
25X1
KALININGRAD ARMY BKS LUGOVOyE AL 15
54-40-32N
020-38-24E
25X1
STATUS: OCCUPIED
REMARKS:
THE COUNT OF MAZ-537 AND 60-TON
TRAILERS HAS RETURNED TO NORMAL
25X1
GROUND FORCE ORDER
OF BATTLE:
25X1
302 MAZ-537
8 POL TRUCK
405 60-TON TRAILER 10 VEHICLE/PIECE OF EQUIP
25X1
KOROSTEN ARMY BARRACKS LUGINY AL 3
51-05-31N 028-22-51E
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
20 MEDIUM TANK
1 T-55 MTU
1 BAT-'M
180
115 VEHICLE/PIECE OF EQUIP
(AT LEAST)
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25)(1
TOP SECRET RUFF 25X1
25X1
KH-09 MISSION 1208-2
SOVIET UNION
GROUND FORCE FACILITIES
KRIVOY ROG ARMY BARRACKS AL 2
STATUS; OCCUPIED
47-53-00N 013.14.7
REMARKS:
CONSTRUCTION CONTINUED ON VEHICLE STORAGE BUILDINGS IN VEHICLE
PARKS C AND E. TRAINING WAS IN PROGRESS IN THE TANK FIRING
RANGE' WITH SIX TANKS ON THE FIRING LOOPS AND NUMEROUS TARGETS
SET UP DOWNRANGE.
GROUND FORC
? ?
BATTLE:
NOVOGRAD.-VOLYNSKIY ARMY BARRACKS AL 2 50-35-29N 027..39-04F
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
ON THE EASTERN EDGE OF NOVOGRAD-VOLYNSKIY.
UPDATED DESCRIPTION. THE ARMY BARRACKS CONTAINS FIVE BARRACKS
AND ADMINISTRATION AREAS, 13 VEHICLE PARKS. TWO AMMUNITION
STORAGE AREAS. A GENERAL STORAGE AREA. THREE SMALL-ARMS FIRING
RANGES. AND A DRIVER-TRAINING COURSE.
BARRACKS ADMINISTRATION AREA 1 CONTAINS ONE MULTISTORY
HEADQUARTERS BUILDING. SIX SINGLE-STORY ADMINISTRATION
BUILDINGS' AND THREE MULTISTORY AND NINE SINGLE-STORY BARRACKS.
BARRACKS AND ADMINISTRATION AREA 2 IS SE OF BARRACKS AND
ADMINISTRATION AREA 1. IT CONTAINS A MULTISTORY HEADQUARTERS
BUILDING. TWO MULTISTORY AND ONE SINGLE-STORY ADMINISTRATION
BUILDINGS' 12 MULTISTORY BARRACKS (ONE IN THE EARLY STAGES OF
CONSTRUCTION), SIX QUARTERS, AND 15 SUPPORT BUILDINGS.
BARRACKS AND ADMINISTRATION AREA 3 IS EAST OF BARRACKS AND
ADMINISTRATION AREA 2. IT CONTAINS TWO MULTISTORY
ADMINISTRATION BUILDINGS. THREE MULTISTORY BARRACKS. AND THREE
SUPPORT BUILDINGS.
25X1
25X1
25X1
25X1
25X1
BARRACKS AND ADMINISTRATION AREA 4 IS NORTH OF BARRACKS AND
181
TOP SECRET RUFF
n.rincQifipri in Part - Sanitized Coov Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RD
KH.-9 MISSION 1208-2
TAO crroFT RUFF
P78T0452.A001500010011-9
SOVIET UNION
GROUND FORCE FACILITIES
ADMINISTRATION AREA 3 AND CONTAINS THREE MULTISTORY AND THREE
SINGLE-STORY ADMINISTRATION BUILDINGS. EIGHT MULTISTORY
BARRACKS. AND FIVE SUPPORT BUILDINGS.
BARRACKS AND ADMINISTRATION AREA 5 IS EAST OF BARRACKS AND
ADMINISTRATION AREA 3. IT CONTAINS TWO MULTISTORY
ADMINISTRATION BUILDINGS. THREE MULTISTORY BARRACKS. AND A
SUPPORT BUILDING.
VEHICLE PARK A IS ON THE EASTERN EDGE OF THE BARRACKS. NORTH OF
BARRACKS AND ADMINISTRATION AREA 4, AND CONTAINS THREE SUPPORT
BUILDINGS.
VEHICLE PARK B IS IMMEDIATEY NORTH OF VEHICLE PARK A AND
CONTAINS A LARGE VEHICLE MAINTENANCE BUILDING AND FOUR SUPPORT
BUILDINGS,
VEHICLE PARK C IS IMMEDIATELY WEST OF VEHICLE PARK A. IT
CONTAINS TWO VEHICLE STORAGE BUILDINGS (ONE SINGLE WIDTH AND
ONE DOUBLE WIDTH).
VEHICLE PARK D IS IMMEDIATELY NORTH OF VEHICLE PARK C AND
CONTAINS SEVEN VEHICLE STORAGE BUILDINGS (ONE SINGLE WIDTH AND
SIX DOUBLE WIDTH).
VEHICLE PARK E IS IMMEDIATELY WEST OF VEHICLE PARK D AND
CONTAINS FIVE DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS.
VEHICLE PARK F IS NORTH OF VEHICLE PARK E AND CONTAINS THREE
SINGLE.-WIDTH VEHICLE STORAGE BUILDINGS.
VEHICLE PARK G IS IMMEDIATELY WEST OF VEHICLE PARK E. IT
CONTAINS THREE DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS AND TWO
SUPPORT BUILDINGS,
VEHICLE PARK H 15 IMMEDIATLY WEST OF VEHICLE PARK G. IT
CONTAINS TWO DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS (ONE UNDER
CONSTRUCTION). AND A VEHICLE MAINTENANCE BUILDING.
VEHICLE PARK J IS A SEPARATELY SECURED VEHICLE PARK WITHIN
VEHICLE PARK H. IT CONTAINS TWO DOUBLE-WIDTH VEHICLE STORAGE
BUILDINGS.
VEHICLE PARK K IS SOUTH OF BARRACKS AND ADMINISTRATION AREA 3.
IT CONTAINS 22 DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS (FIVE
UNDER CONSTRUCTION). TWO SINGLE-.WIDTH VEHICLE STORAGE
BUILDINGS. A VEHICLE MAINTENANCE BUILDING. AND THREE SUPPORT
BUILDINGS.
182
Top SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A0015onni nnil_a
225X1
25X1
???
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
SOVIET UNION
S ON 1208*.2 GROUND FORCE FACILITIES
VEHCLE PARK L IS IMMEDIATELY SOUTH OF VEHICLE PARK K. IT
CONTAINS A SINGLE?WIDTH VEHICLE STORAGE BUILDING AND A
DOUBLE?WIDTH VEHICLE STORAGE BUILDING,
VEHICLE PARK M IS IMMEDIATELY EAST OF VEHICLE PARK Le IT
CONTAINS A DOUBLE?WIDTH VEHICLE STORAGE BUILDING, A SMALL
SINGLE?WIDTH VEHICLE STORAGE BUILDING, AND A SUPPORT BUILDING.
VEHICLE PARK N IS IMMEDIATELY EAST OF VEHICLE PARK Me IT
CONTAINS THREE DOUBLE?WIDTH VEHICLE STORAGE BUILDINGS AND A
SUPPORT BUILDING.
THE GENERAL STORAGE AREA IS SW OF BARRACKS AND ADM/NISTATION
AREA 5. IT CONTAINS AN ADMINISTRATION BUILDING. SIX STORAGE
BUILDINGS' AND A SUPPORT BUILDING.
AMMUNITION STORAGE AREA 1 IS NORTH OF BARRACKS AND
ADMINISTRATION AREA 1 AND CONTAINS FOUR AMMUNITION STORAGE
BUILDINGS. AMMUNITION STORAGE AREA 2 IS EAST OF BARRACKS AND
ADMINISTRATION AREA 5 AND CONTAINS ONE AMMUNITION STORAGE
BUILDING.
THE DRIVER?TRAINING COURSE AND THE SMALL?ARMS FIRING RANGES ARE
EAST AND NORTH OF BARRACKS AND ADMINISTRATION AREA 5.
RESPECTIVELY.
AN UNIDENTIFIED SECURED AREA WAS UNDER CONSTRUCTION SE OF
VEHICLE PARK A. NO BUILDINGS OR PIECES OF EQUIPMENT WERE SEEN
IN THIS AREA.
THE VEHICLES AND PIECES OF EQUIPMENT INDICATED THE POSSIBLE
PRESENCE OF ELEMENTS OF THE FOLLOWING UNITS:
VEHICLE PARK A UNIDENTIFIED ENGINEER UNIT
VEHICLE PARK B ENGINEER TECH COMPANY
VEHICLE PARK C ASSAULT CROSSING PLATOON AND PONTON BRIDGE
COMPANY
VEHICLE PARK E ARTILLERY REGIMENT
VEHICLE PARK G HEAVY EQUIPMENT TRANSPORT REGIMENT
VEHICLE PARK K MEDIUM TANK REGIMENT
VEHICLE PARKS Dr Ft Hr Jo Lo Me N UNIDENTIFIED UNITS
GROUND FORCE ORDER OF BATTLE:
? VEHICLE PARK A
PROB K-?61 TRACKED 16 PROB CRANE SHOVEL
AMPHIBIAN 9 BULLDOZER
10 PROB KMM 2 GRADER
10 KMS SET 2 PROB SAWMILL
183
TOP SECRET RUFF
IThnnlaccifiari in Part - Sanitized Coov Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
KH-.9 MISSION 1208-2
11 PROB PMR-60
2 MDK-2
13 BTM
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK B
8 TMM
10 KMM
4 PROB BAT?M
1 CRANE SHOVEL
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK C
2 PROB PTS
11 K-61 TRACKED AMPHIBIAN
4 BMK-150
6 GSP
9 PMP
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK
20 CARGO TRUCK
2 TRUCK TRACTOR
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK E
8 FA PIECE
GROUND FORCE ORDER OF BATTLE:
H VEHICLE PARK F
NONE DISCERNIBLE
GROUND FORCE ORDER OF BATTLE:
h- VEHICLE PARK G
144 MAZ-537
263 LOWBED TRAILER
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK H
3 MEDIUM TANK
6 CARGO TRUCK
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK J
7 MEDIUM TANK
3 PROB PMR-60
SOVIET UNION
GROUND FORCE FACILITIES
30 CARGO TRUCK
13 TRUCK TRACTOR
10 VEHICLE/PIECE OF EQUIP
1 UAZ-69
35 CARGO TRUCK
15 VEHICLE/PIECE OF EQUIP
2 POSS TMM
1 MDK.-2
6 BAT
4 VEHICLE/PIECE OF EQUIP
25X1
25X1
25X1
25X1
3 LOWBED TRAILER 25X1
15 VEHICLE/PIECE OF EQUIP
80 CARGO TRUCK
1 POL TRUCK
6 VEHICLE/PIECE OF EQUIP
3 POSS BACKHOE
12 VEHICLE/PIECE OF EQUIP
25X1
25X1
25X1
25X1
25X1
2
184 5X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A00150001nn11_a
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF 25X1
2bAl
SOVIET UNION
MISSION 1208-2 GROUND FORCE FACILITIES
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK K
45 MEDIUM TANK
1 BAT
GROUND FORCE ORDER OF BATTLE:
H- VEHICLE PARK L
6 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
-- VEHICLE PARK M
4 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
h? VEHICLE PARK N
2 PT-76
1 PROB BRDM
25 CARGO TRUCK
20 CARGO TRUCK
6 VEHICLE/PIECE OF EQUIP
SLAVUTA ARMY BARRACKS AL 1
STATUS; OCCUPIED
REMARKS:
ADDITIONAL VEHICLES AND PIECES OF EQUIPMENT INDICATE THE
PRESENCE OF ELEMENTS OF A MULTIPLE ROCKET LAUNCHER BATTALION.
25X1
25X1
25X1
25X1
25X1
25X1
FROG EQUIPMENT WAS NOT OBSERVED.
GROUND FORCE ORDER OF BATTLE:
25X1
44 POSS AT?L
1 POSS ARMD ENGR TRACTOR
19
70
MEDIUM TANK
FA PIECE
12
BM-14/24
M-1972
3
BM-13
2
CRANE SHOVEL
4
PUAZO-6
2
TRUCK?MOUNTED CRANE
3
POSS PTS
24
CARGO TRAILER
14
K-61 TRACKED AMPHIBIAN
290 CARGO TRUCK
4
TMM
175 VEHICLE/PIECE OF EQUIP
2
ARMORED TRKD MINELAYER
(AT LEAST)
ELECTRONIC ORDER OF BATTLE:
1 PROB FIRE CAN
1 POSS BREAD BIN
185
TOP SECRET RUFF
nariaccifipn in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 IGV4
TOP SECRET RUFF
25X1
25X1
SOVIET
UNION
GROUND FORCE FACILITIES
KH-9 MISSION leuo-4
25X1
URECHYE ARMY BK5--cE_M--1___
R2-56-26N 027-54-22E
25X1
STATUS;OCCUPIED
GROUND FORCE ORDER OF
BATTLE:
H.- VEHICLE
PARK A
25X1
29 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF
BATTLE:
VEHICLE
PARK B
33 MEDIUM TANK
22 VEHICLE/PIECE OF EQUIP
25X1
1 PT-76
MISSILE ORDER OF BATTLE:
-- VEHICLE
PARK C
2 FROG-7 TEL
1 POSS UAZ-452 COMPUTER VAN
25X1
I PROB FROG-7 TRANSPORTER
GROUND FORCE ORDER OF
BATTLE:
-- VEHICLE
PARK C
7 VEHICLE/PIECE OF EQUIP
25X1
GROUND FORCE ORDER OF
BATTLE:
- VEHICLE
PARK D
10 MEDIUM TANK
1 PROB ARV
25X1
3 PROB ASSAULT GUN 10 TRUCK
I PROB T54 MTU 24 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF
BATTLE:
VEH MA TNT
AREA
I TRUCK-MOUNTED CRANE
3 VEHICLE/PIECE OF EQUIP
25X1
I 40-ToN TRAILER
GROUND FORCE ORDER OF
BATTLE:
-- IN BKS/ADMIN
AREA
EQUIP
25X1
10 VEHI(A.E/PIECE OF
25X1
186 25X1
TOP SECRET RUF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500nirmi1_q
Declassified in Part- Sanitized Copy Approved forRelease2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF
25X1
S ON 1208-2
VOLNOYE ARMY BKS SAMARA RIVER E AL 1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK A
214 MA2-537
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK B
31 TANK (CANVAS COVERED)
3 POSS GSP
4 K-61 TRACKED AMPHIBIAN
GROUND FORCE ORDER OF BATTLE:
- IN VEH PARK C
1 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK D
21 TANK (CANVAS COVERED)
10 TRACKED VEHICLE
GROUND FORCE ORDER OF BATTLE:
H? IN VEH PARK E
30 TANK (CANVAS COVERED)
43 VEHICLE/PIECE OF EQUIP
(8 CANVAS COVERED)
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK F
315 TANK/ASSAULT GUN
15 PMP (2 END SECTIONS)
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK G
4 BAT?m (CANVAS COVERED)
32 CARGO TRUCK
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK H
8 TANK
SOVIET UNION
GROUND FORCE FACILITIES
48-42?49N 035-23-05E
25X1
227 60?TON TRAILER
25X1
25X1
1 BAT?M (CANVAS COVERED)
18 VEHICLE/PIECE OF EQUIP
25X1
25X1
11 CARGO TRUCK
26 VEHICLE/PIECE OF EQUIP
25X1
25X1
13 VEHICLE/PIECE OF EQUIP
25X1
28 VEHICLE/PIECE OF EQUIP
25X1
11 CARGO TRUCK
25X1
187
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - -
KH-..9 MISSION 1208-2
TOP cFCRFT RUFF 25X1
25X1
VOLNOYE ARMY BKS SAMARA RIVER N AL 2
SOVIET UNION
GROUND FORCE FACILITIES
48-44...22N 035...19-30E
STATUS:OCCUPIED
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK A
35 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK B
7 VEHICLE/PIECE OF EQUIP
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK C
94 TANK
39 CARGO TRUCK
GROUND FORCE ORDER OF BATTLE:
? IN VEH PARK 0
37 CARGO TRUCK
GROUND FORCE ORDER OF BATTLE:
? IN VEH PARK E 25X1
7 K-61 TRACKED AMPHIBIAN
26 VEHICLE/PIECE OF EQUIP
11 TANK
3 GSP
17 VEHICLE/PIECE OF EQUIP
13 VEHICLE/PIECE OF EQUIP
25X1
25X1
25X1
25X1
25X1
GROUND FORCE ORDER OF BATTLE:
-- IN VEH PARK F
51 VEHICLE/PIECE OF EQUIP
zHiTomIR ARMY BA RACKS WFST AL 3
50-14-43N 028-37-38E
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
1 POSS MEDUM TANK
4 PT-.76
11 PROB SU-100
35 CARGO TRAILER
25 CARGO TRUCK
10 VEHICLE/PIECE OF EQUIP
(AT LEAST)
25X1
25X1
25X1
25X1
188 25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF
HX1
25X1
UNION
25X1
SOVIET
GROUND FORCE FACILITIES
KH
KAUNAS
-9 MISSION 1208-2
OTHER RESULTS?NO APFARENT CHANGE
ARMY BKS SE AL 2 54-51-35N
023-57-37
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
25X1
-17E
KRIVOY
PERECHIN
VOLKA
ROG ARMY BARRACKS AL 1
47-53-32N
013-1Q
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
25X1
ARMY BKS AL1
48-44-15N
022-29-05E
25X1
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
25X1
ARMY BARRACKS AL 1
52-47-40N
025-39-47E
25X1
STATUS: OCCUPIED
nRnumn Fnprr nPrIpP OF
BATTLE:
25X1
189
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 -
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
OFYI
TOP SECRET RUFF 25X1
25X1
SOVIET UNION
KH-9 MISSION 12082
SIGNIFICANT RESULTS
BREST RR TRANSLOADING YARD SEVERNYY
LOGISTICS
5206...59N
25X1
25X1
25X1
25X1
25X1
25X1
STATUS: OPERATIONAL
REMARKS:
THE YARD WAS APPROXIMATELY 50 PERCENT FILLED* NO MILITARY
EQUIPMENT WAS OBSERVED.
BREST RR TRANSLOADING YARD TSENTRALNYY
STATUS: OPERATIONAL
REMARKS:
THE YARD WAS APPROXIMATELY 30 PERCENT
EQUIPMENT WAS OBSERVED*
5206...04N 023..^41.47E
FILLED* NO MILITARY
CHERNYAKHOVSK TRANSLOADING YD SW
STATUS: OPERATIONAL
REMARKS:
THE YARD WAS FILLED TO APPROXIMATELY 25
NO MILITARY EQUIPMENT WAS SEEN.
54?..37...22N 021?..46...08E
PERCENT OF CAPACITY*
GRODNO RR STATION YARDS A SHOPS
STATUS: OPERATIONAL
534120N 023..?51?42E
25X1
REMARKS:
THE YARD WAS APPROXIMATELY 25 PERCENT FILLED* NO MILITARY
EQUIPMENT WAS OBSERVED*
191
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
SOVIET UNION
LOGISTICS
KALININGRAD
25X1
25X1
25X1
25X1
25X1
25X1
RR TRANSLOADING YARD
STATUS: OPERATIONAL
REMARKS:
THE YARD WAS APPROXIMATEY 10 PERCENT FILLED.
EQUIPMENT WAS OBSERVED.
54-39-46N 020-31-57E
NO MILITARY
MOSTISKA
RR TRANSLOADING YARD 2
STATUS: OCCUPIED
REMARKS:
THE YARD WAS FILLED TO APPROXIMATELY
GROUND FORCE ORDER OF BATTLE:
50
49-48-57N 023-01-41E
PERCENT OF CAPACITY.
NONE DISCERNIBLE
192 25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
R
Next 7 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
Kft..9 MISSION 1208...2
SIGNIFICANT RESULTS
BRYANSK GUIDED MISSILE SPT EQUIP P II
SOVIET UNION
INDUSTRY
STATUS: OPERATIONAL
ASSOCIATED OBJECTS:
18 PROB SS..4/5 ERECTOR
2 POSS SSL/5 ERECTOR
75 SUPPORT VEHICLE (AT
LEAST)
CHALMPUSHKA SHIP REPAIR YARD
STATUS: OPERATIONAL
E
033...13...43E
REMARKS:
A 0?CLASS SSBN WAS IN THE ARD (D). THE SHIP DID NOT APPEAR TO
BE UNDERGOING MAJOR REPAIRS, FLOATING SCREENS WERE POSITIONED
AFT OF THE ARD (D).
NAVAL ORDER OF BATTLE:
1 POSS LARGE SUBMARINE (IN 1 POSS BOLVA APL
ARD?D)
NAVAL ORDER OF BATTLE:
1 D SSBN (IN ARD?D)
1 PETYA?qI DE
1 PETYA...4 DE
1 GRISHA PCEP
3 POTI PCE
10 VESSEL (AT LEAST)
1 T...43 AGSC
2 LIBAU AG
2 BOLVA APL
18 MISCELLANEOUS VESSEL
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
201
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
11 V .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TOP SECRET RUFF 25X1
KH-..9 MISSION 1208-2
DNEPROPETROVSK MISL DEVEL PROD CENTER
STATUS:OPERATIONAL
SOVIET UNION
INDUSTRY
48-26-03N 034-58.-21E
REMARKS:
ROCKET ENGINE TEST FACILITY -- MODIFICATIONS THROUGHOUT THE
TEST FACILITY WERE CONTINUING. A NEW EXCAVATION WAS OBSERVED
APPROXIMATELY 400 FEET SOUTH OF TEST STAND NO 1. THE EXCAVATION
IS APPROXIMATELY 110 FEET SQUARE AND 35 FEET DEEP. THE
MODIFICATIONS TO TEST STAND NO 1 FIRST OBSERVED IN FEB 74 WERE
STILL IN PROGRESS. A CRANE WAS POSITIONED IN THE FLAME BUCKET
AND SEVERAL RING-LIKE OBJECTS WERE NEARBY. AN UNIDENTIFIED
BUILDING WAS UNDER CONSTRUCTION OUTSIDE THE SECURITY FENCES TO
THE WEST OF THE TEST FACILITY.
KAZAN AIRFRAME PLANT GORBUNOV 22
55-5138N 049--0655E
STATUS:OPERATIONAL
ASSOCIATED OBJECTS:
7 BACKFIRE B
1 BACKFIRE A
5 BLINDER
3 BADGER
2 FITTER
2 FAGOT/FRESCO
1 CLASSIC
1 CAT
1 CAMP
7 CAB (3 W/0 WING PANEL)
2 COLT
1 SAILPLANE
3 POSS KITCHEN
LENINGRAD GUIDED MISSILE PROD PLT 458
STATUS:OPERATIONAL
59-59.-31N 030-17-44E
REMARKS:
AT LEAST 119 SA...-5 SHIPPING CONTAINERS, 22 LONG FIN BOXES, AND
22 SHORT FIN BOXES WERE IN THE OPEN STORAGE AREAS. IN THE
NORTH-CENTRAL SECTION OF THE FACILITY, TEN CYLINDRICAL OBJECTS'
202
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
I
1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 7 -5X1
TOP SECRET RUFF 25X1
25X1
1208-2
ASSOCIATED OBJECTS:
119 SA-5 SHIPPING CONTAINER 22 SHORT FIN BOX
22 LONG FIN BOX
10 CYLINDRICAL OBJECT
SOVIET UNION
INDUSTRY
LENINGRAD SHIPYARD ADMIRALTY 194
STATUS: OPERATIONAL
REMARKS:
59-55-09N 030-16-27E
25X1
25X1
25X1
25X1
TWO AGBL WERE STILL FITTING OUT
NO 4, PREVIOUSLY MOORED ALONGSIDE
FITTING?OUT BASIN IS NOW AT SVDOMEKH
975?CLASS YRSN AND 925.'-CLASS YRSN
OTHER AT THE FITTING?OUT QUAY.
NAVAL ORDER OF BATTLE:
ON BUILDINGWAY 50$ THE ARD (T)
THE QUAY IN THE MERSHIP
SHIPYARD 196. THE
WERE MOORED ALONGSIDE EACH
25X1
1 975 YRSN
9 MISCELLANEOUS VESSEL
(2
1 925 YRSN
ON WAYS)
1 ARD (0)
2 AGBL (UNDER CONSTRUCTION
ON WAYS)
25X1
LENINGRAD SHIPYARD SUDOMEKH 196
59-55..45N
030.-16...46E
25X1
STATUS: OPERATIONAL
REMARKS:
THE BOW HALF OF THE A SSN REMAINED IN THE 26 TRANSPORTER DOCK
ALONGSIDE THE QUAY. THE F SS ALONGSIDE THE QUAY WAS PROTECTED
BY SECURITY SCREENS OUTBOARD. THE W SS WITH AN UNIDENTIFIED
TUBULAR OBJECT ON THE BOW REMAINED ALONGSIDE THE BOLVA APL. A
POSSIBLE SUBASSEMBLY REMAINED ON THE INCLINED RAIL ALONGSIDE
TH ? ? NINE SUBMARINE HULL SECTIONS MEASURING
WERE ON THE QUAY IN THE PRODUCTION AND
ASSEMBLY AREA. THREE HULL SECTIONS MEASURING 28 FEET IN
DIAMETER WERE INSIDE THE ARD (D)r WHICH WAS MOORED ALONGSIDE
203
TOP SECRET RUFF
narinQcifipn in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
I
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TciPsECREF
2SX1
25X1
1
KH-9 MISSION 12082
THE QUAY.
NAVAL ORDER OF BATTLE:
1 F SS (ALONGSIDE QUAY)
1 A SSN BOW SECTION (IN 2B
ARD?T)
1 W SS (ACROSS RIVER)
1 W/R SS (IN RIVER)
1 KIROV CA (IN RIVER)
2 RIGA DE (IN RIVER)
1 T...43 MSF (IN RIVER)
ASSOCIATED OBJECTS:
12 SUB HULL SECTION (3 IN
ARD?D)
SOVIET UNION
INDUSTRY
1 1.?..58 MSF (IN RIVER)
1 PROB SONYA MSF (IN RIVER)
1 BOLVA APL (ACROSS RIVER)
1 28 ARD (T)
1 ARD (T) NO. 4
1 ARD (D)
9 MISCELLANEOUS VESSEL
LENINGRAD SHIPYARD ZHDANOV 190
STATUS:OPERATIONAL
03013...59E
REMARKS:
VDS CONVERSION CONTINUED ON THE KASHIN DLG ON WAY 64C.
CONSTRUCTION ON THE NEW LAUNCH WAY WAS CONTINUING.
NAVAL ORDER OF BATTLE:
2 KRESTA 11 (.1-GM
1KRESTA I CLGM
2 KASHIN DLG (1 ON WAY 64C)
1 BOLVA APL
1 ARD (D)
6 MISCELLANEOUS VESSEL
NIKOLAYEV SHPYD NORTHERN 61 KOMMUNA445
STATUS: OPERATIONAL
03200....19E
REMARKS:
HEAVY CLOUDS AND HAZE PRECLUDED A DETAILED INTERPRETATION OF
204
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001sonninni1_cv
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
THE SHIPYARD.
NAVAL ORDER OF BATTLE:
2 POSS KARA CLGMP
1 POSS KASHIN DLG
1 POSS MED COMBATANT
NOVOSIBIRSK AIRFRAME PLT CHKALOV 153
STATUS: OPERATIONAL
SOVIET UNION
INDUSTRY
55-04-01N 082-59-10E
REMARKS:
FIVE FENCER A WERE OBSERVED AT THE PLANT THIS IS A
REDUCTION OF NINE FENCER A FROM A HIGH COUNT OF 14 WHICH WERE
AT THE PLANT ON NO NEW CONSTRUCTION WAS
OBSERVED IN THE PLANT AREA.
ASSOCIATFD OBJECTS:
AT THE PLANT
5 FENCER A (1 W/1 POSS
MISSILE)
13 FLAGON D/E (1 W/2
MISSILES)
3 FLAGON C
3 CUB
1 CAT
1 CAMP
1 CRATE
1 COLT
2 CREEK
2 MIDGET
2 HOUND
1 CAB FUSELAGE
PERM AC ENGINE PLANT STALIN 19
STATUS: OPERATIONAL
_7-58-_,4?N 056I5-1k
REMARKS:
THERE WAS NO CHANGE IN THE STATUS OF THE CONSTRUCTION ACTIVITY
FROM THAT OBSERVED IN APR 74 NO OTHER
CONSTRUCTION ACTIVITY WAS OBSERVED. NUMEROUS ENGINE SHIPPING
CONTAINERS WERE AT THE PLANT. MOST IN THE VICINITY OF THE
TRANSSHIPMENT FACILITIES.
205
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
II V
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
Top SECRET RUFF
KH -9 M
SEVERODVINSK NAVAL MISSILE SUPPORT FAC
STATUS: OPERATIONAL
SOVIET UNION
INDUSTRY
64-33-45N 039-46-30E
REMARKS:
A CIRCULAR BUILDING WAS UNDER CONSTRUCTION IMMEDIATELY NORTH OF
THE FACILITY, A LONG VEHICLE STORAGE SHED HAS ALSO BEEN ADDED
TO THIS AREA. FENCE LINES WERE EVIDENT AROUND THE NEW AREA. A
CYLINDRICAL OBJECT APPROXIMATELY 42 FEET LONG WAS OBSERVED
ADJACENT TO THE SS-N-8 DOLLIES IN FRONT OF THE HIGH-BAY
BUILDING.
MISSILE ORDER OF BATTLE:
2 SS-N-6 TRANSPORTER
ASSOCIATED OBJECTS:
L. SS-N-3 TRANSPORTER
1
SS-N-3 CANISTER
1
CYLINDRICAL OBJ
2
FUEL TRANSPORTER
42
SS-N-3 TYPE CRATE
8
SS-N-8 DOLLY
9
PROB SS-N-9 CRATE
3
PROS SS-N-3 DOLLY
4
PoSS SS-N-7 CRATE
3
SS-N-6 CANISTER
9
SA-N-1 CANISTER
2
SS-N-5 CANISTER
10
$A-N-3 CANISTER
GROUND FORCE ORDER OF BATTLE:
35 TRUCK
2 TRUCK-MOUNTED CRANE
1 RAIL-MOUNTED CRANE
60 VEHICLE/PIECE OF EQUIP
SEVERODVINSK NUC SUB SPECIAL SPT FAC
STATUS: OPERATIONAL
64-34-55N 039-46-36E
REMARKS:
THE Y SSBN REMAINED IN OVERHAUL AT POSITION III. THE E-II SSGN
REMAINED AT POSITION II AND WAS SCAFFOLDED ABOUT THE SAIL AND
206
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRET RUFF 25X1
25X1
KH-9 MISSION 12082
SOVIET UNION
INDUSTRY
HULL. THE V SSN WAS STILL UNDERGOING DECONTAMINATION AND
DEFUELING WITH A ZEYA YRSN OUTBOARD.
NAVAL ORDER OF BATTLE:
1 Y SSBN
1
1 SSGN
1
1 V SSN
2
ASSOCIATED OBJECTS:
1 SS.41...6 MSL TUBE
16
ZEYA YRSN
YR
RECTANGULAR SPT BARGE
SS.??11..?6 BALLAST CAN
SEVERODVINSK SHIPYARD YAGRY ISLAND
STATUS:OPERATIONAL
6435.".11N 039...48 52
REMARKS:
THE Y SSBN ON THE SOUTH SHELF REMAINED IN OVERHAUL WITH NO
APPARENT CHANGE. THE 402M SSB REMAINED AT THE MAIN QUAY WITH
ALL MISSING TUBE DOORS OPEN. SIX SS?N-8 BALLAST CANS WERE ON
THE QUAY NEAR THE SUBMARINE. SCAFFOLDING WAS STILL EVIDENT
ABOUT THE HULL AND SAIL. THE 402K SSB REMAINED AT THE MAIN
QUAY. THE E?'?II SSGN WAS STILL HEAVILY SCAFFOLDED ON THE NORTH
SHELF, A MISSILE LOADING TRAY WAS SEEN IN FRONT OF
THE PORT SIDE FORWARD MISSILE TUBE OF THE SSGN AT THE WEST
QUAY. THE SAIL OF THE N SSN REMAINED CANVAS COVERED. SOME DECK
PLATING MAY HAVE BEEN REMOVED, THE STERN HALF OF THE A SSN
REMAINED AFLOAT AT POSITION II MAIN QUAY. THE STABILIZERS
REMAINED ON THE QUAY,
THE PROBABLE MISSILE TEST PLATFORM/402K AMIDSHIPS SECTION
REMAINED AT POSITION It MAIN QUAY. THE BARGE UNDER
CONSTRUCTION ON THE NORTH SHELF APPEARS TO BE REPAIR RELATED.
FOOTINGS WERE BEING EMPLACED AS CONSTRUCTION CONTINUED ON THE
NEW REPAIRWAYS ADJACENT TO THE TRANSVERSER.
NAVAL ORDER OF RATTIP.
1 Y SSBN
1 A SSN STERN HALF
25X1
25X1
25X1
25X1
25X1
207
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SECRET RUFF
KH-9 MISSION 1208...2
SOVIET UNION
INDUSTRY
1
402M
SSB
1
ZEYA YRSN
1
402K
SSB
5
RECTANGULAR SPT BARGE
2
E...II
SSGN
1
FERRY
1
N SSN
1
PROB REPAIR BARGE
1
W SS
2
MISCELLANEOUS VESSEL
ASSOCIATED OBJECTS:
1 PROB MSL TST P M
MIDSEC
SEVERODVINSK SHIPYARD 402
STATUS:OPERATIONAL
64...34..?42N 039...49.49E
REMARKS:
POST LAUNCH DEBRIS ALONG RAIL C CONFIRMED THE LAUNCH OF THE
SSBN UNIT 8 FLOTATION DEVICE SUPPORTS, AND TRANSFER DOLLIES
WERE IN POSITION WHERE THE UNIDENTIFIED LINEAR
OBJECT WAS SEEN I UNIT 8 WAS FITTING OUT
AT POSITION IV. MAIN QUAY. D SSBN UNITS 6 AND 7 WERE FITTING
OUT AT POSITIONS II AND III. PREPARATIONS FOR THE LAUNCH OF D
SSBN UNIT 9 WERE OBSERVED WHEN SNOW REMOVAL
OPERATIONS WERE UNDERWAY ALONG LAUNCH RAIL A. THE
BASIN WAS PARTIALLY FLOODED AND FLOTATION DEVICES WERE BEING
AFFIXED TO AN E-4I SSGN ALREADY INSIDE THE BASIN. THIS SHIP
WOULD HAVE TO BE MOVED TO THE SHALLOW END OF THE BASIN AND THE
BASIN ITSELF DRAINED BEFORE THE LAUNCH OF D SSBN UNIT 9 COULD
BE ACCOMPLISHED.
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
THE Y SSBN REMAINED IN OVERHAUL AT THE DEGAUSSING/CALIBRATION
QUAY. WORK HAD BEGUN AROUND THE REACTOR AREA OF THE
LIGHT?TONED V SSBN AT POSITION I. SCAFFOLDING WAS BEING PLACED
AROUND THE HULL.
THE ARD(D) WITH THE W.III SSBN WAS MOVED FROM THE CALIBRATION
25)S11
25X1
25X1
PIER
TO THE EAST QUAY AND FINALLY TO
POSITION
WITH MOST
REMOVED.
VI
THE SHIP REMAINED
HEAVILY SCAFFOLDED
SAIL PLATING
V AND WAS OUTBOARD
OF THE DECK AND NEARLY ALL OF THE
THE P SSGN REMAINED AT POSITION
208
TOP SECRET RUFF
Declassified
in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1
TOP SFCRFT RUFF
25X1
SOVIET UNION
KH-9 MISSION 1208-2 INDUSTRY
THE H?III PORTIONS OF ITS SAIL HAD BEEN REMOVED. 25X1
THE E?II SSGN AT POSITION II WAS THE VESSEL IN 25X1
THE BASIN ON ? THE C SSGN REMAINED IN OVERHAUL IN THE 25X1
ARD(D) AT THE EAST QUAY. THE 402H CATAMARAN WAS IN THE LAUNCH
BASIN.
MISSILE BAY PRESSURE HULL SECTION WAS JUST
OUTSIDE THE MAIN CONSTRUCTION HALL. NO SECTION WAS
PRESENT. SEVEN ADDITIONAL PRESSURE HULL SECTIONS. A BOW
SUBASSEMBLY, AND A STERN SECTION WERE ALSO IN THE STAGING AREA.
A POSSIBLE HULI SFCT ION
WAS ON A HOLDING TRACK OUTSIDE
THE NO 2 CONSTRUCTION HALL. THIS POSSIBLE SECTION WAS CRATED
SO MORE ACCURATE MEASUREMNT WAS IMPOSSIBLE. THREE SS?N-8
BALLAST CANS WERE NEAR THE WEST END OF THE NO 2 HALL.
APPROXIMATELY 85 PERCENT OF THE PANELS HAD BEEN INSTALLED ON
THE NEW CONSTRUCTION/REPAIR HALL. THE REAR OF THE NEW HALL WAS
STILL OPEN. THE TRANSVERSER IN THE PRESSURE HULL STAGING AREA
HAD BEEN MODIFIED TO ACCEPT SECTIONS GOING INTO AND OUT OF THE
SUBASSEMBLY BUILDING SIMULTANEOUSLY. THE TRANSVERSER AND FENCE
OUTSIDE HALL NO 2 WERE COMPLETE.
NAVAL ORDER OF BATTLE:
925 YRSN
D S5BN
1
2
Y SSBN
1
402C YRSN
1
H?III SSEIN
1
402F YRSN
1
P SSGN
1
402H CATAMARAN
1
C SSGN
3
YR
1
E?II SSGN
5
RECTANGULAR SPT BARGE
2
POLUCHAT PGM
5
BARGE
1
POLUCHAT YPT
2
ARD(D)
1
975 YRSN
15
MISCELLANEOUS VESSEL
ASSOCIATED OBJECTS:
8 PRESSURE HULL SECTION
1 STERN SECTION
1 BOW SUBASSEMBLY SECTION
1 POSS HULL SECTION
3 SS?N-8 BALLAST CAN (NEAR
NO 2 SHED)
209
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
9Y1
25X1
25X1
25X1
25X1
25X1
11 ,
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Top SECRET RUFF 25X1
25X1
KH-9 MISSION 1208-2
OTHER RESULTS-NO APPARENT CHANGE
BIYSK ROCKET MOTOR TEST FACILITY
STATUS:OPERATIONAL
SOVIET UNION
INDUSTRY
52-29-00N 085-07-00E
BIYSK SOLID MOTOR PRODUCTION PLANT
52-29-24N 085-05-34E
STATUS: OPERATIONAL
BRYANSK ROAD MACH__A_GJLLL
STATUS: OPERATIONAL
53-14-49N 034-22-54E
KURUMOCH ROCKET 7INE TEST FACILITY
STATUS: OPERATIONAL
53-32-18N 049-51-33E
KUYBYSHEV AEROSPACE PRODUCTION PLT 1
STATUS:OPERATIONAL
53-13-15N 050-18-04E
210
TOP SECRET RUFF
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
225X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
0
ii,
t
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75X1
TOP SECRET RUFF LOA!
25X1
KH-9 MISSION 1208-2
SIGNIFICANT RESULTS
HA NOI SAM SITE A17-3 45
STATUS: UNOCCUPIED
REMARKS:
THE AREA IS NO LONGER BEING USED AS AN SA-3 SITE.
VIETNAM p NORTH
AIR DEFENSE MISSILES
20-52-37N 105-54-23E
PA LAY SA-3 SAM SUPPORT FAC
STATUS: ABANDONED
21-57-00N 106.21-1Ar
REMARKS:
NO MISSILE?RELATED EQUIPMENT WAS OBSERVED. THE SITE IS
PROBABLY NO LONGER USED AS A MISSILE STORAGE/SUPPORT AREA.
PHUC YEN SA-3 SAM SUPPORT FACILITY
STATUS: OCCUPIED
24 VEHICLE
21-17-25N 105-50-08E
211
TOP SECRET RUFF
25X1
25X1
25X1
25X1
npriacsified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
25X1
25X1
25X1
25X1
25X1
11 .
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9
TnO CPCPFT RUFF 25X1
25X1
KH-9 MISSION 120
DONG SUONG AIRFIELD
STATUS:OPERATIONAL
SIGNIFICANT RESULTS
VIETNAM. NORTH
AIR BASE FACILITIES
REMARKS:
APPROXIMATELY 95 PERCENT OF THE AIRFIELD WAS VISIBLE. NO
AIRCRAFT WERE DISCERNIBLE.
AIR ORDER OF BATTLE:
---NONE?DTsCERNIBLE
HA NOI/GIA LAM AIRFIELD
STATUS: OPERATIONAL
...1,,..2nN 105-53-26E
REMARKS:
APPROXIMATELY BO PERCENT OF THE AIRFIELD WAS VISIBLE THROUGH
SCATTERED CLOUDS AND HAZE.
AIR.QRnEROF BATTLE:
25X1
25X1
25X1
25X1
9 COLT (AT LEAST)
25X1
2 BEAGLE
2 COOT
2 HIP C (AT LEAST)
5 COKE
1 HOOK
6 CRATE
3 HOUND
15 CAB
25X1
HOA LAC AIRFIELD
21-01-51N
105-30-06E
25X1
STATUS: UNKNOWN
REMARKS:
APPROXIMATELY 40 PERCENT OF THE AIRFIELD WAS VISIBLE THROUGH
HEAVY CLOUDS.
25X1
212
Top SECRET RUFF
Declassified in Part- Sanitized Copy Approved forRelease2014/05/01 : CIA-RDP78T04752A0015000inni1A
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1
TOP SECRFT RUFF 25X1
LOKI
NORTH
25X1
25X1
VIETNAM,
AIR BASE
FACILITIES
10615....54E
KH-9 MISSION 1208-...2
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
KEP AIRFIELD
2123...36N
25X1
STATUS :OPERATIONAL
AIR ORDER OF BATTLE:
2 HOUND (W/0 ROTOR)
25X1
25X1
21 FISHBED
36 FAGOT/FRESCO
PHUC
YEN AIRFIELD
STATUS: OPERATIONAL
2113...15N 1054837
25X1
REMARKS:
ALTHOUGH CLOUDS PRECLUDED A TOTAL ASSESSMENT OF THE AIRFIELD,
REPAIRS ON THE CENTER PORTION OF THE RUNWAY APPEARED TO BE
COMPLETE. THE AIRFIELD IS PROBABLY OPERATIONAL.
AIR ORDER OF BATTLE:
1 BEAGLE
36 FISHBED
ASSOCIATED BJECTS:
L T BEAGLE
9 DERELICT FISHBED
7 MAYA
2 DERELICT FAGOT/FRESCO
QUANG TE AIRFIELD
105?.31....35F
STATUS:NOT OPERATIONAL
213
TOP SECRET RUFF
25X1
25X1
25X1
25X1
25X1
nprdaccifien in Part - Sanitized Copy Approved for Release 2014/05/01 CIA-RDP78T04752A001500010011-9
11 V -- I? I
Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - -
25X1
TAD