OAK KH-9 MISSION 1208-2 25 APRIL - 22 MAY 1974

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04752A001500010011-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
222
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 1, 2014
Sequence Number: 
11
Case Number: 
Publication Date: 
June 1, 1974
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04752A001500010011-9.pdf6.85 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ? NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 25X1 OAK KH-9 MISSION 1208-2 25 APRIL - 22 MAY 1974 25X1 -111P-STeRfT 25X1 JUNE 1974 COPY NO. 97 228 PAGES (1208) IPIR 11/74 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 .1. 11.......I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 WARNING This document contains information affecting the national security of the United States within the meaning of the espionage lows U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT-KEYHOLE Control System. TARGET CATEGORIES AND ASSOCIATED NTP FUNCTIONAL AREAS (CODES) 1. STRATEGIC SSM Deployed Strategic SSM Facilities (A) 2. MISSILE RANGES Missile Ranges: Strategic SSM/Space Facilities (PI Missile Ranges: Air- Launched Missile Facilities (0) Missile Ranges: Naval -Launched Missile Facilities (R) Missile Ranges: Tactical SSM Facilities (S) Missile Ranges: SAM/AMM Facilities (T) 3. AIR DEFENSE MISSILES Deployed AMM Facilities (B) Deployed SAM Facilities (D) 4. ELECTRONICS/COMMUNICATIONS Deployed Communication/Electronic/Radar Facilities (C) 5. AIR Air Base Facilities (E) 6. NAVAL Naval Base Facilities (F) 7. GROUND Ground Force Facilities (6) 8. TACTICAL SSM Deployed Tactical SSM Facilities (H) 9. LOGISTICS Military Logistics Facilities (K) 10. NUCLEAR ENERGY Atomic Energy Facilities (0) 11. CBR CBR Facilities (V) 12. INDUSTRY Strategic Weapons Industrial Facilities (.1) General Purpose Weapons Industrial Facilities (L) Non -Military Industrial Facilities (N) Communication/Electronic/Radar R&D Facilities (U) 13. MISCELLANEOUS Non-Military Logistics Facilities (M) Miscellaneous/Unidentified Facilities (Z) These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional association (i.e., missile range tracking facilities are reported under "MISSILE RANGES: fly-away airfields at aircraft plants are reported under "INDUSTRY: airfield nuclear weapons storage facilities are reported under "AIR: etc.). WARNING NOTICE Sensitive Intelligence Sources and Methods Involved. Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SFCRFT RUFF 25X1 11 KH-9 MISSION 1208-2 TABLE OF CONTENTS PAGE PREFACE 1 ALGERIA AIR BASE FACILITIES 3 CHINA' COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES 5 MISSILE RANGES 12 AIR DEFENSE MISSILES 16 COMMO/ELEC/RADAR FACILITIES 18 AIR BASE FACILITIES 19 NAVAL BASE FACILITIES 20 GROUND FORCE FACILITIES 28 LOGISTICS 30 NUCLEAR ENERGY 31 INDUSTRY 32 CUBA NAVAL BASE FACILITIES 37 LOGISTICS 38 CZECHOSLOVAKIA LOGISTICS -39 UNITED ARAB REPUBLIC AIR DEFENSE MISSILES 41 AIR BASE FACILITIES 45 NAVAL BASE FACILITIES 54 GROUND FORCE FACILITIES 57 DEPLOYED TACTICAL SSM FACILITIES 61 LOGISTICS 62 HUNGARY GROUND FORCE FACILITIES 73 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - ? 11 V . 1..v..1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 KH-9 MISSION 1208-2 25X1 TOP SECRET RUFF --RELEASABLE TO UKr CA. AS, AND NZ ONLY IN ACCORDANCE WITH AGENCY OR DEPT. DIRECTIVES PAGE IRAQ COMMO/ELEC/RADAR FACILITIES AIR BASE FACILITIES KOREA. NORTH AIR BASE FACILITIES NAVAL BASE FACILITIES GROUND FORCE FACILITIES DEPLOYED TACTICAL SSM FACILITIES LIBYA LOGISTICS SPRATLY IS. MISCELLANEOUS 81 82 85 90 92 96 97 99 PAKISTAN AIR BASE FACILITIES 105 GROUND FORCE FACILITIES 107 POLAND GROUND FORCE FACILITIES 109 NUCLEAR ENERGY 110 SOMALIA AIR DEFENSE MISSILES AIR BASE FACILITIES NAVAL BASE FACILITIES GROUND FORCE FACILITIES 111 113 115 116 SYRIA AIR DEFENSE MISSILES 117 GROUND FORCE FACILITIES 119 LOGISTICS 127 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES 129 MISSILE RANGES 156 AIR DEFENSE MISSILES 167 AIR BASE FACILITIES 169 NAVAL BASE FACILITIES 171 II 25X1 25X1 TOP cECRET RUFF Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 225X1 1 KH-9 MISSION 1208-2 PAGE GROUND FORCE FACILITIES 179 LOGISTICS 191 NUCLEAR ENERGY 193 INDUSTRY 201 VIETNAM' NORTH AIR DEFENSE MISSILES 211 AIR BASE FACILITIES 212 GROUND FORCE FACILITIES 215 LOGISTICS 219 SOUTHERN YEMEN AIR BASE FACILITIES 225 III 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 _ Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP cFCRFT RUFF 2oA1 25X1 KH-9 MISSION 1208-2 11 PREFACE PREFACE THIS OAK REPORT ON MISSION 1208..2 PROVIDES INFORMATION ON THE A AND B PRIORITY COMIREX TARGETS OBSERVED ON PHOTOGRAPHY. TARGETS IN THIS REPORT ARE SEQUENCED ALPHABETICALLY WITHIN THE 13 TARGET CATEGORIES ESTABLISHED BY COMIREX. A LISTING OF THE TARGET CATEGORIES APPEARS ON THE INSIDE FRONT COVER OF THIS REPORT. TARGETS ARE FURTHER SEQUENCED BY COUNTRY AND DIVIDED INTO TWO SECTIONS -- SIGNIFICANT RESULTS AND OTHER RESULTS. THE SIGNIFICANT RESULTS SECTIONS INCLUDE NEW TARGETS' PERISHABLE ITEMS, AND TARGETS WHICH REFLECT CHANGE AND/OR ORDER OF BATTLE. ALL REMAINING TARGETS ARE INCLUDED IN THE OTHER RESULTS SECTION. A CUMULATIVE INDEX WILL BE PUBLISHED AT THE CONCLUSION OF EACH OAK REPORTING PHASE. AN INDEX WILL BE INCLUDED WITH EACH OAK SUPPLEMENT. FOR EXPLANATION OF PREFIXES AND CODES USED IN THIS REPORT, SEE THE NATIONAL STANDARD MESSAGE FORMAT FOR ELECTRICAL TRANSMISSION OF FIRST? AND SECOND?PHASE _EXPLOITATION (COMIREX.-D-31.2/11, 1ST REVISION, JANUARY 1969 AND JUNE 1968' THE SUPPLEMENT_ TO COMIREX?D-31.2/11). THE ORDER OF BATTLE REPORTED IS CONFIRMED UNLESS OTHERWISE QUALIFIED AS PROBABLE (PROB) OR POSSIBLE (POSS). RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF PHOTOGRAPHY IS ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEMERIS DATA. CONSEQUENTLY, FUTURE ANALYSIS MAY RESULT IN ADDITIONAL INFORMATION, MOREOVER, RECIPIENTS ARE CAUTIONED THAT THE IDENTIFICATION OF TARGETS IS BASED PRIMARILY ON PHOTOGRAPHY AND DOES NOT CONSTITUTE A FINISHED INTELLIGENCE JUDGMENT. 1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 11 V . , Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Top SECRET RUFF KH-9 MISSION 1208-2 1 ALGERIA AIR BASE FACILITIES SIGNIFICANT RESULTS LA REGHAIA/ALMA AIRFIELD STATUS: NOT OPERATIONAL 36-45--17 003-23-24E REMARKS: Two SA-2 SITES WERE OBSERVED COMPLETE WITH MISSILES ON LAUNCHERS AT THIS NON?OPERATIONAL AIRFIELD ON OBLIQUE COVERAGE THE SITES WERE SET UP IN A PROBABLE TRAINING MODE. ALTHOUGH SA-2 EQUIPMENT WAS INITIALLY IDENTIFIED IN THE COUNTRY IN OCT 72' THIS IS THE FIRST INDICATION OF TRAINING WITH ANY OF THE EQUIPMENT. THERE HAVE BEEN NO SAM SITES IDENTIFIED OR OBSERVED UNDER CONSTRUCTION IN ALGERIA TO DATE. MicSilF ORDER OF BATTLE: 12 SA-2 MISSILE (CANVAS 14 SA-2 TRANSPORTER COVERED) 12 SA-2 LAUNCHER GROUND FORCE ORDER OF BATTLE: 25 pROB PRIME MOVER TRANSPORTER) ELECTRONIC ORDER OF BATTLE: 2 FAN SONG 6 FAN SONG RADAR VAN 12 ELECTRONICS VAN 3 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 I I I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-9 MISSION 1208-2 CHINA. COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES r)av 25X1 25X1 CHING?YU SIGNIFICANT RESULTS MISSILE TEST COMPLEX SSM STATUS:OPERATIONAL REMARKS: 42-17.-05N 126-53-20E 25X1 THE COMPLEX WAS COVERED THE SILO DOOR WAS 25X1 CLOSED ON BOTH DAYS. THE PREVIOUSLY OBSERVED PROBABLE CSS-2 TRANSPORTER WAS STILL IN THE SITE SUPPORT AREA. NO SIGNIFICANT ACTIVITY WAS OBSERVED. 25X1 CHIN?HSI SSM R+D TEST COMPLEX 40-41-26N 120-53-09E 25X1 STATUS: OPERATIONAL REMARKS: A POSSIBLE STRUCTURAL TEST VEHICLE (STV), REPORTED 25X1 AS A POSSIBLE FULLY ASSEMBLED INERT SLBM, PROBABLY 25X1 REMAINED AT ITS LOCATION. (POSITIVE IDENTIFICATION WAS 25X1 NOT POSSIBLE BECAUSE OF THE INTERPRETABILITY OF THE PHOTOGRAPHY.) AN OBJECT/PIECE OF EQUIPMENT WAS ADJACENT TO THE POSSIBLE STV, A POSSIBLE PARTIALLY ASSEMBLED STV. REPORTED ON AS A POSSIBLE PARTIALLY INERT SLBM, WAS NOT AT ITS 25X1 LOCATION AND COULD NOT BE IDENTIFIED IN THE COMPLEX. TWO 25X1 POSSIBLE SLBM?ASSOCIATED TRAILERS WERE IN THE LOGISTICS SUPPORT AREA* THE THREE DUMMY SLBM REPORTED REMAINED AT THE 25X1 SAME LOCATION. NUMEROUS VEHICLES/PILCES OF EQUIPMENT WERE OBSERVED THROUGHOUT THE COMPLEX' BUT THE INTERPRETABILITY OF THE PHOTOGRAPHY PRECLUDED THEIR IDENTIFICATION. THE NEW BUILDING UNDER CONSTRUCTION ADJACENT TO THE ENGINE TEST CELL HAS 7T CHANGFD IN APPEARANCE SINCE ITS INITIAL IDENTIFICATION 25X1 ALL OF THE PREVIOUSLY REPORTED SAMLET CRATES AND SOME OF THE STYX CRATES WERE BEING USED AS SUPPORT BUILDINGS. THESE CRATES WILL NO LONGER BE REPORTED IN THE ORDER OF BATTLE LIST. THE NAVAL GUN POSITIONS AND ASSOCIATED INSTRUMENTATION SITE 5 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 2bAl 25X1 CHINA. COMMUNIST KH-9 MISSION 1208...2 DEPLOYED STRATEGIC SSM FACILITIES WERE OCCUPIED. BUT THE EQUIPMENT COULD NOT BE IDENTIFIED. THE STYX LAUNCH FACILITY AND ASSOCIATED ELECTRONICS AREA REMAINED UNOCCUPIED. ASSOCIATED OBJECTS: 25X1 1 POSS STV 3 DUMMY SLBM 2 POSS FLATBED TRAILER 2 LONG RAILCAR (SLBM ASSOCIATED) VEHICLE/PIECE OF EQUIP 10 STYX CRATE (NUMEROUS) 25X1 CHU?CHI MISSILE LAUNCH COMPLEX 23-54-30N 102-43-40E 25X1 STATUS: UNKNOWN REMARKS: ALL FOUR LAUNCH SITES AND MOST SUPPORT AREAS WERE OBSERVED 25X1 NO MISSILE EQUIPMENT WAS DISCERNIBLE. CONSTRUCTION WAS 25X1 CONTINUING. PARTICULARLY AT LAUNCH SITE 3 WHERE THE GRADED? EARTH APRON AROUND THE LAUNCH PAD APPEARED TO BE COMPLETE AND USEABLE, 25X1 KUN?MING/CHENG...KUNG SSM HQ GEN 24-55.-24N 102...47-48F 25X1 STATUS: COMPLETE REMARKS: CSS-2 PROPELLANT VEHICLES WERE CONFIRMED AT THIS FACILITY FOR THE FIRST TIME ON FOURTEEN CAB?OVER?ENGINE PROPELLANT TRUCKS (ONE GROUP OF SIX AND ONE GROUP OF EIGHT). A WARHEAD VAN. ONE CSS-2 LAUNCH STAND TRANSPORTER. AND ONE CARGO TRUCK WERE PARKED TOGETHER IN THE EQUIPMENT STORAGE AREA. ALL ESSENTIAL PIECES OF EQUIPMENT FOR ONE CSS-2 (IBM) LAUNCH UNIT HAVE BEEN OBSERVED THE THREE CRYOGEN (OXIDIZER) TRAILERS. PARKED BEHIND THE LARGE/DRIVE?IN EQUIPMENT STORAGE BUILDINGS HAD BEEN MOVED TO THE OTHER SIDE OF THE INSTALLATION NEXT TO THE MOBILE GANTRY CRANE AND TWO DOLLY?TYPE MISSILE TRANSPORTERS. THE A?FRAME CRANE PRESENT HAD BEEN REPOSITIONED. THE TWO LARGE CAB?OVER?ENGINE TRUCK PRIME 6 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-9 MISSION 1208-2 11 CHINA. COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES MOVERS. PROBABLY ASSOCIATED WITH THE CSS-2 TRANSPORTER AND TRANSPORTER?ERECTOR OBSERVED WERE OBSERVED. THE FACILITY WAS PARTLY COVERED BUT THE EQUIPMENT PARKING AREAS WERE OBSCURED BY CLOUDS. MISSILF ORDER OF BATTLE: 2 DOLLY?TYPE MSL TRNSPTR (PROB CSS-1,PRTLY OBSCRD BY TREES) ASSOCIATED OBJECTS: 1 A?FRAME RANE 1 MOBILE GANTRY CRANE 14 CSS-2 PROPELLANT TRUCK (CAB?OVER?ENGINE) 1 WARHEAD VAN 1 CSS-2 LNCH STAND TRNSPTR 8 SMALL PROPELLANT TRUCK (PROB CSS-1 ASSOC) 3 PROPELLANT HANDLING TRK (PROB CSS.-1 ASSOC) 2 TRUCK PRIME MOVER (CAB?OVER?ENGINE) KUN?MING/CHENG?KUNG SSM LNCH SITE/MRBM STATUS: COMPLETE 24-52-01N 102-53-47E REMARKS: NO MISSILE EQUIPMENT OR OPERATIONAL TRAINING ACTIVITY WAS OBSERVED. THE LAUNCH PAD WAS COVERED WITH A LAYER OF EARTH. CONSTRUCTION AT THE HOUSING AREA CONTINUES SLOWLY. CONSTRUCTION EQUIPMENT WAS PARKED UNDER TREES NEXT TO THE NEW CONSTRUCTION. LIEN?KENG?WANG MISSILE LNCH CPLX SSM STATUS: UNDER CONSTRUCTION 30-12-00N 117-43-30E REMARKS: WITH THE EXCEPTION OF SITE 10, THE ENTIRE COMPLEX WAS OBSERVED SITE 10 WAS CLOUD COVERED. TEN PERMANENT BUILDINGS HAVE BEEN CONSTRUCTED AT THE FIXED FIELD 7 25X1 25X1 25X1 LOA! 25X1 25X1 25X1 25X1 25X1 25X1 25X11 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 . I I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LAI 25X1 KH-9 MISSION 1208-2 CHINA, COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES POSITION. NO MISSILE EQUIPMENT WAS IDENTIFIED AT THE COMPLEX. LIU?CHING?KOU SSM LAUNCH COMPLEX STATUS: OCCUPIED REMARKS: THE ENTIRE COMPLEX WAS COVERED AND ALL AREAS EXCEPT LAUNCH SITE 2 AND SUSPECT AREA 5 WERE AT LEAST IDENTIFIABLE ON 1 MAY. AT LAUNCH SITE 1. THE BRIDGE AND ROAD CONNECTING SEVERAL ADITS OPPOSITE THE LAUNCH AREA WITH THE MAIN ROAD APPEARED TO BE COMPLETE. AT LAUNCH SITE 3. TWO MAJOR BUILDINGS HAVE BEEN REMOVED FROM THE HOUSING AND SUPPORT AREA AND ANOTHER ACCESS ROAD INTO THE LAUNCH AREA WAS UNDER CONSTRUCTION. THIS ROAD APPROACHES THE LAUNCH AREA FROM THE WEST. AT THE NORTH AREA OF THE PROBABLE SUPPORT FACILITY, TRENCHES HAVE BEEN DUG 38-08-35N 100-06-25E 25X1 25X1 25X1 IN THE VICINITY OF THE PROBABLE HARDENED ANTENNA. SIMILAR TRENCHES WERE NOT NEAR THE OTHER PROBABLE HARDENED ANTENNA. NM TO THE SOUTH. 1 25X1 25X1 25X1 25X1 0?SHAN TENG?SHA?HO PoSS SSM LAUNCH SITE 1 STATUS: UNKNOWN REMARKS: NO MISSILE EQUIPMENT OR SIGNIFICANT CHANGES MAY. 24-06-00N 102-30-27 WERE OBSERVED ON 8 a SSM SPT FAC STATUS: OCCUPIED REMARKS: 39-13-41N 122-03-17E THE SUPPORT FACILITY AND THE ASSOCIATED AREA WERE BOTH ACTIVE. 8 25X1 TAP CFrPFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 TOP SECRET RUFF KH-9 MISSION 12082 CHINA' COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES AT THE SUPPORT FACILITY, 12 VEHICLES/PIECES OF EQUIPMENT WERE IN THE MOTOR POOL* AN A....FRAME AND PROBABLY BOTH A CSS-1 TRANSPORTER AND A TRANSPORTER?ERECTOR WERE PROTRUDING FROM THE STORAGE BUILDING, AT THE ASSOCIATED AREA. AN A....FRAME CRANE AND TEN VEHICLES/PIECES OF EQUIPMENT WERE OBSERVED* TIA0...YU...TAI MISSILE LAUNCH COMPLEX STATUS: UNDER CONSTRUCTION 4P-03-10N 125-57-00E 25X1 25X1 REMARKS: THE ENTIRE COMPLEX WAS COVERED SITES 2' 5. AND 6 25X1 AND THE CAVE STORAGE AREA WERE COVERED NO 25X1 SIGNIFICANT ACTIVITY OR MISSILE..RELATED EQUIPMENT WAS OBSERVED. TIEN....WEI MISSILE TEST COMPLEX SSM STATUS: UNKNOWN 2555...20N 102.?49...28E 25X1 25X1 REMARKS: THE LAUNCH SITE. ALL FOUR TRACKING FACILITIES, AND MOST SUPPORT AREAS WERE OBSERVED HE SOUTHERNMOST SUPPORT AREAS 25X1 WERE ALSO OBSERVED NO MISSILE EQUIPMENT 25X1 OR INDICATIONS OF OPERATIONAL ACTIVITY WERE DISCERNIBLE* TUNG..?HUA SSM COMPLEX STATUS: OCCUPIED 9 41-28-33N 1P6-08-28E TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 .11 V ! . 1 ..1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75X1 TOP SFCRFT RUFF 25X1 25X1 REMARKS: THE COMPLEX WAS COVERED AT LAUNCH SITE 4, THE FOLLOWING EQUIPMENT WAS SEEN A CSS-1 TRANSPORTER?ERECTOR, A CSS-1. TRANSPORTER WITH A PROBABLE CANVAS?COVERED MISSILE, A CRYOGEN TRAILER, A WARHEAD VAN. A TRUCK?MOUNTED CRANE. A POSSIBLE MOBILE GANTRY CRANE. AND 14 TRUCKS. SIX CRYOGEN TRAILERS WERE IN THE COMPLEX MISSILE ASSEMBLY AND CHECKOUT AREA. AT LAUNCH SITE 2. A CSS-2 TRANSPORTER OR TRANSPORTER?ERECTOR WAS OBSERVED IN THE MOTOR POOL AREA. AT LAUNCH SITE 1. A WARHEAD VAN AND A PROBABLE CSS-2 LAUNCH STAND AND LAUNCH STAND TRANSPORTER WERE PRESENT. EIGHT CAB?OVER?ENGINE PROPELLANT VEHICLES WERE AT THE PROPELLANT STORAGE AREA. CHINA. COMMUNIST 208..2 DEPLOYED STRATEGIC SSM FACILITIES WO..NI..CHAI MISSILE LAUNCH COMPLEX STATUS: COMPLETE 23-24-40N 102?'47-1OE REMARKS: OBSERVED ON AT LAUNCH SITE 1. THE LAUNCH PAD WAS ALL FOUR LAU C ITES AND MOST OF THE SUPPORT AREAS WERE PN-171? GENERALLY CLEAR 0 CAMOUFLAGE MATERIAL, BUT NO EQUIPMENT WAS OBSERVED. AT LAUNCH SITE 20 20 TRUCKS WERE IN THE LAUNCH AREA. THE TRUCKS WERE PARKED ON THE EDGES OF THE APRON AND OFF THE ROADS AND WERE CAMOUFLAGED WITH VEGETATION. NINE OF THE VEHICLES APPEARED TO BE POSSIBLE PROPELLANT TRUCKS. TWO WERE POSSIBLE VAN TRUCKS, AND ONE WAS A POSSIBLE LAUNCH STAND TRANSPORTER. THE LAUNCH PAD AT SITE 2 ALSO WAS CAMOUFLAGED. THREE CAB?OVER?ENGINE PROPELLANT TRUCKS REPORTED ( WERE STILL AT LAUNCH SITE 5. NO OTHER MISSILE SUPPORT EQUIPMENT OR SIGNIFICANT CHANGES WERE OBSERVED, SSM TRAINING POSITION STATUS: OCCUPIED 37..57..01N 102..40-17E REMARKS: NO SSM TRAINING ACTIVITY WAS OBSERVED. TWO CSS-1 TRANSPORTER?ERECTORS, THREE MOBILE GANTRY CRANES, AND ONE TRUCK WERE OBSERVED IN THE EQUIPMENT MAINTENANCE AND STORAGE AREA ON 10 25X1 25X1 25X1 25X1 - 25X1 25X1 - 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 KH-9 MISSION 1208-2 11 TOP SECRET RUFF CHINA. COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES OTHER RESULTS?NO APPARENT CHANGE FU?SUNG FIXED FIELD POSITION 1/MRBM 42-13-05N 127-01-44E STATUS: UNOCCUPIED Fu?SUNG FIXED FIELD SITE 2/MRBM 42-09-01N 127-03-46E STATUS: UNOCCUPIED 11 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011- 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part I 1 V .1..,.! . - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LAI 25X1 11 KH-9 MISSION 1208-2 CHINA, COMMUNIST MISSILE RANGES SHUANG?CHENG?TZU STATUS: OCCUPIED AIR ORDER OF BATTLE: SIGNIFICANT RESULTS AIRFIELD 40....23....5QN 0(19.47.34F . 25X1 25X1 1 BADGER 2 PROB CRATE 1 BEAGLE 2 COLT 11 FARMER 1 HOUND 9 FAGOT/FRESCO AIR ORDER OF BATTLE: 25X1 1 BADGER 10 FAGOT/FRESCO 1 BEAGLE 2 CRATE 12 FARMER 1 HOUND 25X1 SHUANG?CHENG?TZU MISSILE TEST CENTER 41-08-00N 100-15-00E 25X1 STATUS: OPERATIONAL REMARKS: THE ENTIRE TEST CENTER WAS COVERED ON CLEAR PHOTOGRAPHY OF GOOD INTERPRETABILITY THE ONLY SSM ACTIVITY WAS AT 25X1 COMPLEX Be A CSS?X-4 WAS ERECTED ON THE LAUNCH STAND 25X1 AT PAD B2 AND THE GANTRY AND EMPTY FIRST? AND SECOND?STAGE TRANSPORTER WERE PARKED NEAR THE SW EDGE OF THE LAUNCH PAD. ON THE FIRST AND SECOND STAGES OF THE CSS?X-4 WERE IN 25X1 HORIZONTAL POSITIONS ON THEIR TRANSPORTERS PARKED AT THE SW EDGE OF THE PAD. THE GANTRY WAS OVER THE LAUNCH STAND. PARKED ON OR NEAR THE LAUNCH PAD ON BOTH DAYS WAS A SMALL. APPROXIMATELY 15? BY 10?FOOT. VEHICLE OR PIECE OF EQUIPMENT. POSSIBLY ASSOCIATED WITH THE MISSILE PAYLOAD. 25X1 25X1 12 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 11 CHINA' COMMUNIST MISSILE RANGES SHUANG.-CHENG..TZU MTC SAM LAUNCH CPLX STATUS: OPERATIONAL 41-04-53N 100-31-05E REMARKS: THE COMPLEX WAS COVERED ONLY TWO LAUNCHERS WERE OBSERVED AT LAUNCH SITE A THE SITE WAS OCCUPIED BY FIVE LAUNCHERS, A FAN SONG RADAR, AND SEVERAL ELECTRONICS VANS. AT SITE Bt FIVE LAUNCHERS WERE OBSERVED AND SIX LAUNCHERS WERE OBSERVED A PROBABLE GIN SLING AND PROBABLE FAN SONG B/C WERE IN THE GUIDANCE AREA ON BOTH DAYS. MISSILE ORDER OF BATTLE: 7 PROB CSA-1 LAUNCHER 1 PROB CSA-1 MISSILE (ON TRANSPORTER) MISSILE ORDER OF BATTLE: 11 PROB CSA-1 LAUNCHER 1 PROB CSA-1 MISSILE (ON TRANSPORTER) ELECTRONIC ORDER OF BATTLE: 1 PROB FAN SONG 1 PROB GIN SLING ELECTRONIC ORDER OF BATTLE: 2 PROB FAN 1 PROB GIN ASSOCIATED SONG B/C SLING OBJECTS: VAN/VEHICLE (NUMEROUS) 15 PROB CSA-1 TRANSPORTER 14 PROB CSA-1 TRANSPORTER 1 PROB KNIFE REST 1 PROB KNIFE REST 13 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 5X1 11 V ,.1 .1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 KH-9 MISSION 1208-.2 WU...CHAI MISSILE TEST COMPLEX STATUS: OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED ON OBLIQUE PHOTOGRAPHY . PORTIONS OF THE COMPLEX INCLUDING LAUNCH SITES B AND C WERE OBSERVED THROUGH HEAVY CLOUDS AND THE ENTIRE COMPLEX EXCEPT TRACKING FACILITIES 1 AND 5 WAS OBSERVED ON CLEAR PHOTOGRAPHY CHINA, COMMUNIST MISSILE RANGES 111...36..!OE TRAINING ACTIVITY FIRST OBSERVE WAS AGAIN OBSERVED AT LAUNCH SITE A AND THE MAIN SUPPORT BASE. AT LAUNCH SITE A A CSS-2 LAUNCH STAND AND AN EMPTY LAUNCH STAND TRANSPORTER WERE NEAR THE CENTER OF THE LAUNCH PAD. A PROBABLE CSS-2 TRANSPORTER?ERECTOR WAS JUST OFF THE EASTERN EDGE OF THE PAD AND 13 SUPPORT VEHICLES WERE ALIGNED ALONG THE CABLE SCAR LEADING FROM THE PAD TO THE SITE CONTROL BUNKER. AT THE KEYHOLE?SHAPED STRUCTURE UNDER CONSTRUCTION IN AN EXCAVATION SE OF THE LAUNCH PAD. THE CURVED WALL PARTIALLY ENCIRCLING THE STRUCTURE AND THE TWO WALLS BORDERING THE COVERED TRENCH LEADING IN A WESTERLY DIRECTION FROM THE STRUCTURE HAVE BEEN HEIGHTENED. ACTIVITY WAS OBSERVED AT THE RAIL OFFLOADING POINT 0.5 NM SOUTH OF LAUNCH SITE A. A MISSILE RAILCAR AND FLAT CAR COMBINATION WAS ON THE RAIL SIDING BUT WAS NOT PRESENT ON FOUR PERSONNEL TENTS FIRST OBSERVED WERE STILL PRESENT. AND THREE PROBABLE PROPELLANT RAILCARS AND FIVE TRUCKS WERE ALSO OBSERVED. AT THE MAIN SUPPORT BASE. A TENT ENCAMPMENT AND VEHICLE PARK WERE ERECTED AT THE NORTHERN EDGE OF THE HOUSING AND SUPPORT AREA SIMILAR TO THOSE PREVIOUSLY OBSERVED IN CONJUNCTION WITH TRAINING ACTIVITY AT WU...CHAI. THE VEHICLE PARK INCLUDED TWO CSS-2 MISSILE TRANSPORTERS AND 15 SUPPORT VEHICLES. ONLY ONE OF THE TRANSPORTERS WAS PRESENT. THE ABSENCE OF THE OTHER TRANSPORTER MAY HAVE BEEN RELATED TO THE PRESENCE OF THE MISSILE RAILCAR COMBINATION AT THE RAIL OFFLOADING POINT. A NEW MOBILE INSTRUMENTATION SITE WAS OBSERVED ON A LEVELED AREA ON THE HILLSIDE SOUTH OF THE MISSILE ASSEMBLY AND CHECKOUT AREA. TWO VAN TRUCKS PARKED IN TANDEM AND TWO OTHER VANS. ONE ON EACH SIDE. WERE AT THE SITE FIVE PROBABLE 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 11 CHINA, COMMUNIST KH-9 MISSION 1208.,2 MISSILE RANGES 25X1 GENERATOR TRAILERS WERE PARKED IN A LINE TO THE REAR. A TEMPORARY SHELTER HAD BEEN ERECTED WHERE THE PROBABLE 25X1 GENERATOR TRAILERS WERE PREVIOUSLY OBSERVED. THIS ALIGNMENT OF VEHICLES WAS, SIMILAR TO THAT OF MOBILE ELECTRONICS VANS AND TRAILERS PARKED ON THE HILLSIDE JUST NORTH OF THE MISSILE ASSEMBLY AND CHECKOUT AREA WHICH WERE BELIEVED USED TO MONITOR LAUNCHES FROM LAUNCH SITE A. CONSTRUCTION WAS CONTINUING AT LAUNCH SITES B AND C. AT LAUNCH SITE Br THE UNFINISHED PORTION OF THE APRON, FORMERLY UNDER THE SILO DOOR WHEN IT WAS IN THE OPEN POSITIONS HAS BEEN PAVED. 15 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 I I V I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS SHAN...TAN SAM TRAINING AREA B STATUS: OCCUPIED CHINA, COMMUNIST AIR DEFENSE MISSILES 38?.56..?57N 101 08.-07E REMARKS: CSA-1 TRAINING EXERCISES WERE IN PROGRESS AT TWO OF THE FOUR LAUNCH SITES (SITES B AND D). CSA'-3. EQUIPMENT WAS ALSO PARKED IN SITE C. IN THE STORAGE AREA NEAR SITE At AND NEAR THE HOUSING COMPLEX. EQUIPMENT WITHIN THE LAUNCH POSITIONS AT SITE B AND IN THE STORAGE AREA NEAR SITE A HAD BEEN REMOVED. HOWEVER, THE LAUNCH POSITIONS AT SITE D REMAINED OCCUPIED. MISSILE EQUIPMENT WAS ALSO IN THE HOUSING AREA. BOGIE WHEELS WERE IN LAUNCH SITE C. THE GUIDANCE AREA WITHIN SITE B ALSO REMAINED OCCUPIED. ER OF BATTLE: 6CA1LA NCHER ELECTRONIC ORDER OF BATTLE: 5 MISSILE TRANSPORTER 1 PROB GIN SLING 1 PROB MODIFIED ODD LOT 1 PROB FAN SONG ASSOCIATED OBJECTS: 3 CANISTER TRANSPORTER 6 SET OF BOGIE WHEEL 4 PROB CANISTER CRATE 4 PROB WING CRATE MISSILE ORDER OF BATTLE: 3 CSA-1 LAUNCHER ELECTRONIC ORDER OF BATTLE: 2 GUIDANCE RADAR 1 PROB MODIFIED ODD LOT ASSOCIATED OBJECTS: 3 SET OF BOGIE WHEEL 7 TRACKED PRIME MOVER 16 26 ELEC ASSOCIATED VAN 11 TRACKED PRIME MOVER 1 TRUCK..-MOUNTED CRANE 6 TRUCK 18 VEHICLE/PIECE OF EQUIP 7 PROB MISSILE TRANSPORTER 42 POSS ELC ASSOCIATED VAN 29 VEHICLE/PIECE OF EQUIP 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 I.Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF CHINA, COMMUNIST KH-9 MISSION 1208-2 COMMO/ELEC/RADAR FACILITIES 25X1 25X1 HSIN...HUA SIGNIFICANT RESULTS SSM/SPACE TRACKING FACILITY 27-46.-05N 111..-15-35E 25X1 25X1 25X1 25X1 25X1 STATUS: OPERATIONAL REMARKS: NO FIRE CAN RADAR OR MOBILE WEATHER STATION WAS OBSERVED. NO SIGNIFICANT CHANGE WAS OBSERVED AT THE FACILITY. KUN?MING LAI?YANG OPTICAL TRACKING FACILITY STATUS: OPERATIONAL REMARKS: NEITHER A FIRE CAN RADAR NOR A MOBILE OBSERVED. 24-54-35N 102-48-10E WEATHER STATION WAS SPACE TRACKING FACILITY STATUS: OPERATIONAL 37-03-20N 120-47-00E REMARKS: NO FIRE CAN RADAR OR MOBILE WEATHER STATION WAS OBSERVED AT THIS FACILITY. A NEW SUPPORT_ BUILDING HAS BEEN CONSTRUCTED IN THE AREA BETWEEN THE OPTICAL TRACKING SECTION AND THE ADMINISTRATION SECTION. ALSO. THE FOOTINGS FOR TWO ADDITIONAL suppoRT BUILDINGS WERE OBSERVED IN THE SAME AREA. 18 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 2bAl 25X1 TOP SECRET RUFF KH.-9 MISSION 1208-2 WU?HU AIRFIELD SIGNIFICANT RESULTS CHINA, COMMUNIST AIR BASE FACILITIES 31-23-28N 118-24-26E STATUS: OPERATIONAL AIR ORDER OF BATTLE: 10 FISHBED 3 POSS FISHBED 20 POSS FAGOT/FRESCO 25 P055 MAX/MOOSE 19 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011- 25X1 25X1 25X1 25X1 ? .11 .. . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 25X1 25X1 KH-09 MISSION 1208-2 TOP SECRET RUFF SIGNIFICANT RESULTS CHINA, COMMUNIST NAVAL BASE FACILITIES CHING-TAO NAVAL BASE 36-05-49N 120-19-22E 25X1 25X1 STATUS: OPERATIONAL NAVAL ORDER OF BATTLE: 1 PROB FUCHOU ACM 3 ATA 1 YTB 1 OCEAN TANKER SMALL CRAFT (SEVERAL) -- AT NVL BASE 3 GORDYY DOGS 1 T-43 MSF 2 US LST-1 LST 2 PROB US LSIL-351 LSIL 13 LCM 1 AKL NAVAL ORDER OF BATTLE: - AT SUB BASE 25X1 3 PROS R SS 1 PROB T-43 AGS 6 PROB W SS 2 AGS/AGOR 3 HAINAN PC 1 ANTUNG AK 2 PROB T-43 MSF 1 TUNG-FANG-HUNG AGOR 1 US LST-1 LST SMALL CRAFT (SEVERAL) 1 US LSM-1 LSM NAVAL ORDER OF BATTLE: 25X1 -- AT NVL DOCKYARD 1 SS 1 PROB AKL 3 PROB PC 2 PROB AOTL 3 PROB OSA PTFG 1 OCEAN FREIGHTER 1 PROB US LST-1 LST 1 PROB PASSENGER SHIP 1 PROB T-43 AGS SMALL CRAFT (NUMEROUS) NAVAL ORDER OF BATTLE: AT NVL FAC 25X11 6 SHANGHAI-II PGM 5 PROB LCM . SMALL CRAFT (NUMEROUS) NAVAL ORDER OF BATTLE: -- AT NVL BASE 25X1 3 GORDYY DOGS 1 US BITTERBUSH ALB 1 7-43 MSF 1 FUCHOU AOTL 5 POSS MSA 1 PROB LEICHOU AOTL 2 US LST-1 LST 3 ATA 2 US LSIL-351 LSIL 2 OCEAN TANKER 18 LCM SMALL CRAFT (NUMEROUS) 20 25X1 TAP cFrRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 KH-9 MISSION 1208-2 5 PROB AKL 11 Top SECRET RUFF NAVAL ORDER OF BATTLE: __ AT SUB BASE 3 R SS 6 w SS 4 HAINAN PC 1 US LST-1 LST 1 US LSM-1 LSM NAVAL ORDER OF BATTLE: -- AT NVL DOCKYARD 1 W SS 2 KRONsHTADT PC 3 OSA pTFG 1 US LST-1 LST 1 T-43 AGS 1 TANLIN AKL CHINA, COMMUNIST NAVAL BASE FACILITIES NAVAL ORDER OF BATTLE: ? AT mTB BASE 1 PROB MIDGET SUBMARINE 11 P-6 PT 2 PROB LIENYUN MSA NAVAL ORDER OF BATTLE: .? AT NVL FAC 6 SHANGHAI?II PGM 1 PROB SWATOW PGM 2 PROB LIENYuN MSA 1 T-43 AGS 2 AGS/AGOR 1 ANTUNG AK 1 TUNG?FANG?HUNG AGOR SMALL CRAFT (SEVERAL) 1 FUCHOU AOTL 1 LEICHOU AOTL 2 ATA 1 OCEAN FREIGHTER 1 PROB PASSENGER SHIP SMALL CRAFT (NUMEROUS) 2 PROB TINGHAI?TYPE AG 2 PROB VP SMALL CRAFT (SEVERAL) 7 LCm SMALL CRAFT (NUMEROUS) CHING?TAO SUBMARINE BASE 36-05-41N 120-18-46E STATUS: OPERATIONAL NAVAL ORDER OF BATTLE: 3 PROB R SS 1 PROB T-43 AGS 6 PROB W SS 2 AGS/AGOR 3 HAINAN PC 1 ANTUNG AK 2 PROB T-43 MSF 1 TUNG?FANG?HUNG AGoR 1 US LST-1 LST SMALL CRAFT (SEVERAL) 21 25X1 25X1 HX1 25X1 25X1 25X1 25X1 25X1 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part li ?l , 1.. I ? - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 1 US LSM-1 LSM NAVAL ORDER OF BATTLE: 3 R SS 6 W SS 4 HAINAN PC 1 US LST-1 LST 1 US LSM-1 LSM CHINA, COMMUNIST NAVAL BASE FACILITIES 1 T-43 AGS 2 AGS/AGOR 1 ANTUNG AK 1 TUNG?FANG?HUNG AGOR SMALL CRAFT (SEVERAL) HSIAO?PING?TAO SUBMARINE BASE STATUS: OCCUPIED 3R0.41.9.41UN 11 F REMARKS: THE G SSB WAS AT ITS USUAL BERTH. NO MISSILE?ASSOCIATED EQUIPMENT WAS OBSERVED AND THE TWO FLOATING CRANES REPORTED ON ) WERE NO LONGER PRESENT. THE HAN SSU WAS NOT PRESENT. HOWEVER, THE LIGHT?TONED HAN SUPPORT TANK REMAINED WHERE IT WAS NAVAL ORDER OF BATTLE: 1 G SSB 2 W/R SS ASSOCIATED OBJECTS: 1 HAN SUPPORT TANK (LIGHT TONED) 1 POSS SWATOW PGM HSIN?HSIANG NAVAL BASE STATUS: OPERATIONAL 30-15-06N 122-18-17E REMARKS: CONSTRUCTION CONTINUED ON THE THREE LARGE BUILDINGS (ONE IN AREA A AND TWO IN AREA 8). THE GRAVING DOCK IN AREA C REMAINED 22 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 2bAl TOP SECRET RUFF CHINA, COMMUNIST KH-9 MISSION 12082 NAVAL BASE FACILITIES UNCHANGED NAVAL ORDER OF BATTLE: 12 OSA PTFG 4 SHANGHAI?II PGM (1 IN GRAVING DOCK, 1 U/WY AT SEA) ASSOCIATED OBJECTS: IN AREA At NEAR ADIT 4 POSS CRATE (SMALL) 1 PROB YP 1 YTL 2 AKL 1 YAG HU?LU?TAO NVL BASE SHYD 4- PORT FAC STATUS: OPERATIONAL 40-43...09N 12059?..,39E REMARKS: THE HAN SSU, WHICH IS EXTERNALLY COMPLETES WAS OUTBOARD A SUPPORT PLATFORM AT QUAY 2. THE TWO HAN SUPPORT TANKS REMAINED AT THEIR LOCATION. TWO RECENTLY CONSTRUCTED LUTA?TYPE POL BARGES WERE ON THE TRANSVERSER IN FRONT OF BAYS 4 AND 6. THE EIGHT LIQUID CARRYING BARGES, LAST OBSERVED ON THE TRANSVERSER HAD MOVED ONTO THE LAUNCH PLATFORM. AN R SS REMAINED IN DRYDOCK AND SCAFFOLDING WAS IN PLACE AROUND THE HULL. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 AT LEAST 16 UNIDENTIFIED OBJECTS, POSSIBLY JIGS OR OUTER HULL PLATES, WERE OBSERVED ON THE TRANSVERSER. THESE OBJECTS WERE NOT PRESENT THE OTHER LARGE?DIAMETER SUBMARINE 9X1 COMPONFN7 REMAINED IN THE SAME APPROXIMATE LOCATION A 25X1 25X1 CONSTRUCTION OF SHIPYARD FACILITIES WAS CONTINUING. 1 HAN S 1 R SS (IN DRYDOCK) 1 POSS HUCHWAN PTH 1 P?..6 PT OF BATTLE: 23 2 YAGT BARGE 2 SUPPORT PLATFORM 1 WORK BARGE 2 LUTA POL BARGE (ON TOP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 li ,1 ., Declassified in Part - Sanitized 'Copy Approved for Release 2014/05/01 : CIA-RDP78T64752A601500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 1 SHANTUNG PGH 5 P-6 HULL 2 YULIN YP 1 1-43 MSF (YENHSI AGM ASSOC) 1 LCM ricrTPnwrr 7DER OF BATTLE: 3 POSS SHEET NEST (RADAR REFLECTOR ARRAY) ASSOCIATED 7JECTS: 2 HAN SUPPORT TANK CHINA, COMMUNIST NAVAL BASE FACILITIES TRANSVERSER) 8 LIQUID CARRYING BARGE (ON LAUNCH PLATFORM) 1 YT (IN DRYDOCK) 5 SMALL CRAFT - 25X1 SHANG-HAI NVB AND SHIPYARD HU-TUNG STATUS: OPERATIONAL 31-16-53N 121.-33-58E REMARKS: ONE, POSSIBLY TWO, OSA PTFG WERE LAUNCHED FROM THE WAYS SINCE I TEN OSA PTFG WERE AT THE DOWNSTREAM FITTING-OUT AREA AND EIGHT WERE ON THE WAYS. THERE WAS NO CHANGE IN THE STATUS OF THE KIANGTUNG DE NAVAL ORDER OF BATTLE: -- AT UPSTREAM FITTING.-OUT AREA 7 FUCHOU AOTL/AWL 1 PASSENGER/CARGO VESSEL 1 HUTUNG 172 1 BARGE 1 TA CHIH ASL NAVAL ORDER OF BATTLE: ^ ON WAYS 4 FUCHOU AOTL/AWK (2 EACH ON WAYS 1 AND 2) 2 PROB YTL (ON WAY 3) 8 OSA PTFG (5 ON WAY 4, 3 ON WAY 5) NAVAL ORDER OF BATTLE: ? AT DOWNSTREAM FITTING-OUT AREA 1 KIANGTUNG DE 10 OSA PTFG 1 HOLA PTFG 1 BARGE (WAY 6) 1 POSS BARGE (UNDER CONSTRUCTION ON WAY 6) 1 FUCHOU AOTL/AWK (ON TRANSVERSER) 24 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TAD crrppT PIMP Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 CHINA. COMMUNIST NAVAL BASE FACILITIES SHANG-HAI SHPYD KIANGNAN DOCK CO STATUS: OPERATIONAL 31-12-06N 121-.28--51E REMARKS: AN R SS WAS IN THE MIDSTAGE OF CONSTRUCTION ON WAY 4 AND AN R SS WAS IN THE LATE STAGE OF CONSTRUCTION ON WAY 5. NO CONSTRUCTION ACTIVITY WAS OBSERVED ON WAY 3. DISMANTLING/REPAIR WORK CONTINUED ON THE PORTAL CRANE ON CRANEWAY 6. THE STATUS OF THE TWO-BAY BUILDING UNDER CONSTRUCTION WAS THE SAME AS REPORTED NAVAL ORDER OF BATTLE: -- AT UPSTREAM FITTING-OUT AREA YTL TOW BOAT FLOATING CRANE BARGE 2 R SS 1 2 POSS R SS 2 3 OCEAN CARGO VESSEL (3 2 HATCHES FWD, 3 HATCHES AFT) 2 NAVAL ORDER OF BATTLE: ON WAYS 2 R SS (1 EACH ON WAYS 4 AND 5) 4 TOW BOAT (2 EACH ON WAYS NAVAL ORDER OF BATTLE: - IN GRAVING DOCK 1 25X1 1 ATA 1 COASTAL CARGO VESSEL 1 LSM-1 LSM 1 AOTL 6 AND 7) 1 TUG BOAT (WAY 8) 25X1 25X1 25X1 25X1 25X1 NAVAL ORDER OF BATTLE: - IN GRAVING DOCK 2 1 OCEAN TANKER NAVAL ORDER OF BATTLE: -- IN GRAVING DOCK 3 1 KAIBOKEN PC 2 W SS NAVAL ORDER OF BATTLE: - AT DOWNSTREAM FITTING-OUT AREA 1 R SS 1 FLOATING CRANE 1 KAIBOKEN AGS 2 COASTAL CARGO VESSEL 1 LARGE SUCTION DREDGE 1 REPAIR BARGE 25X1 25X1 25X1 25X1 25 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 _ .11 V Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 CHINA. COMMUNIST NAVAL BASE FACILITIES SHAN?TOU NAVAL BASE 11A..Url..RAF STATUS: OPERATIONAL NAVAL nPnFR OF BATTLE: 1 PROB US 173?FT PC 6 SHANGHAI?II PGM 7 LCM 1 PROB TING?HAI AKL 2 POSS AG MISC SERVICE CRAFT (SEVERAL) TA?HSIEH PORT FACS STATUS: OPERATIONAL 29-53-55N 12i-57-51F PHYSICAL DESCRIPTION: 21.4 NM EAST OF NING?P0 ON TA?HSIEH TAO (ISLAND). UPDATED DESCRIPTION. THE FACILITY CONTAINS FOUR MAJOR AREAS AN ADMINISTRATION/BARRACKS AREA. AN OPERATIONS SUPPORT/BERTHING AREA. A STORAGE/SUPPORT AREA. AND A POL STORAGE AREA. THE ADMINISTRATION/BARRACKS AREA. ON THE NORTH EDGE OF THE FACILITY. CONTAINS FIVE ADMINISTRATION BUILDINGS. 18 BARRACKS. TWO MESSHALLS, 28 SUPPORT BUILDINGS. EIGHT STORAGE BUILDINGS. FOUR ADITS, ONE PARTIALLY UNDERGROUND WATER TANK. ONE RESERVOIR. TWO SWIMMING POOLS. ONE ATHLETIC/RECREATION AREA. AND SEVERAL ANIMAL PENS. BERTHING FACILITIES INCLUDE ONE L?HEAD PIER. TWO 1?HEAD PIERS (ONE HAS TWO ATTACHED PONTON WHARVES AND ONE IS CRANE SERVED WITH A SMALL RAIL SYSTEM EXTENDING BACK INTO THE STORAGE/SUPPORT AREA). SIX FINGER PIERS (TWO HAVE TWO PONTON WHARV EACH), A 105.e. X 25?FOOT GRAVING DOCK. AND A GRAVING DOCK WITH A CONNECTING UNDERGROUND SUBMARINE PEN (POSSIBLY USED FOR MAINTENANCE). OPERATIONS SUPPORT FACILITIES ARE PARALLEL TO THE BERTHING FACILITIES AND INCLUDE TWO STORAGE BUILDINGS. NINE SUPPORT BUILDINGS. FOUR SHOP BUILDINGS. A HEATING PLANT. A COMMUNICATIONS/SIGNAL STATION. 26 25X1 25X1 25X1 25X1 25X1 25X1 2Y1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 KH-9 MISSION 1208-2 25X1 TOP SECRET RUFF 25X1 CHINA. COMMUNIST NAVAL BASE FACILITIES FOUR ADITS, AND THREE PARTIALLY UNDERGROUND VERTICAL POL TANKS. THE STORAGE/SUPPORT AREA IS BETWEEN THE OPERATIONS/BERTHING AREA AND THE BARRACKS AREA. IT CONTAINS THREE STORAGE BUILDINGS. SEVEN SUPPORT BUILDINGS, SEVEN SHOPS. AN ATHLETIC/RECREATION AREA. AND THREE ADITS. THE POL STORAGE AREA IS AT THE WEST END OF THE BERTHING AREA AND CONTAINS FOUR HORIZONTAL POL TANKS. A PUMPHOUSE, AND TWO SUPPORT BUILDINGS. NAVAL ORDER OF BATTLE: 4 R SS 3 W SS 1 PROB LCM ASSOCIATED OBJECTS: 4 CRATE 1 YT 3 YAG 27 TAP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 II V Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TnD crrPpT PH=P CHINA. COMMUNIST KH-9 MISSION 1208-2 GROUND FORCE FACILITIES 25X1 25X1 SIGNIFICANT RESULTS CHENG-..KUNG STOR DPO LL 2 STATUS: OPERATIONAL REMARKS: 24-56...05N 102-47-26E - 25X1 THE BUILDING U R CONSTRUCTION NEAR THE END OF THE RAIL SPUR IN MAR 74 IS COMPLETE. 25X1 ASSOCIATED OBJECTS: 25X1 3 PIECE OF ROLLING STOCK ASSOCIATED OBJECTS: 25X1 12 PIECE OF ROLLING STOCK 1 CARGO TRUCK 25X1 HENG?YANG AMMO DEPOT LL 1 26-55-30N 112-43...15E 25X1 STATUS:OPERATIONAL PHYSICAL DESCRIPTION: 6 NM ENE OF HENG?YANG. UPDATED DESCRIPTION. THE FACILITY. WHICH HAS NOT CHANGED SINCE SEP 69 IS ROAD AND RAIL SERVED, FENCE SECURED. AND CONSISTS OF AN AMMUNITION STORAGE AREA (AREA A) AND A BILLETING/SUPPORT AREA (AREA B). AREA A CONTAINS 78 UNDERGROUND BUNKERS. 15 REVETTED AMMUNITION STORAGE BUILDINGS WITH VENTED ROOFS. THREE STORAGE BUILDINGS. FOUR SUPPORT BUILDINGS, ONE ADMINISTRATION/SUPPORT BUILDING. AND FIVE GUARD BUILDINGS. AREA Br ADJACENT TO THE SW EDGE OF AREA Ar CONTAINS TWO TRANSSHIPMENT BUILDINGS. TEN BARRACKS, ONE ADMINISTRATION BUILDING. ONE ADMINISTRATION/SUPPORT BUILDING. ONE AUDITORIUM. ONE MESSHALL. TWO VEHICLE STORAGE BUILDINGS. ONE PROBABLE VEHICLE STORAGE BUILDING, SIX STORAGE BUILDINGS. SIX SUPPORT BUILDINGS. AND TWO GUARD BUILDINGS. 28 25X1 25X1 TnP crrprT RUPP" Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE CHINA. COMMUNIST GROUND FORCE FACILITIES HENG?YANG AMMO DFPOT LI 4 26-50-30N 112-41-07 STATUS: OCCUPIED ASSOCIATED OBJECTS: 37 CARGO TRUCK 13 PIECE OF ROLLING STOCK KUN?MING ARTY DIV HQ A ARMY BKS AL 9 25-00-21N 102-50-00E STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 14 CARGO TRUCK 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 29 ToP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ? II . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 CHINA, COMMUNIST KH-9 MISSION 1208-2 KUN?MING RR STA LOGISTICS SIGNIFICANT RESULTS YDS A SHOPS N 25-03-26N 102-43-13E 25X1 STATUS: OPERATIONAL ASSOCIATED OBJECTS: 25X1 90 PIECE OF ROLLING STOCK 25X1 KUN?MING RR TRNSLDG YDS STN A SHOPS 25-00-40N 102-46-17E 25X1 STATUS: OPERATIONAL ASSOCIATED OBJECTS: 25X1 350 PIECE OF ROLLING STOCK (APPROXIMATELY) ASSOCIATED OBJECTS: 25X1 150 PIECE OF ROLLING STOCK (APPROXIMATELY) 30 25X1 25X1 Tno ccrocT purr Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 218 CHINA, COMMUNIST INDUSTRY 25X1 25X1 SIGNIFICANT RESULTS CHENG?TU AIRFRAME PLT 132 STATUS:OPERATIONAL REMARKS: 30-42-27N 103-57-47E - 25X1 THE 26 FRESCO OBSERVED AT THE PLANT REPRESENTS A DECREASE OF EIGHT FRESCO SINCE THE PLANT WAS LAST SEEN 25X1 25X1 ASSOCIATED OBJECTS: -- AT THE PLANT 25X1 11 FISHBED (2 W/O 26 FRESCO EMPENNAGE) 2 PROS MIDGET 25X1 HSI?AN AIRFRAME PLT YEN?LIANG 172 34-38.-54N 109-13-36E 25X1 STATUS: OPERATIONAL REMARKS: THE HSIAN?A WAS OBSERVED AT THE PLANT. A MODIFIED BEAGLES WITH AN AFT FUSELAGE EXTENSION, ALSO WAS OBSERVED AT THE PLANT 25X1 THIS AIRCRAFT WAS FIRST OBSERVED AT THE PLANT IN DEC 67 25X1 25X1 ASSOCIATED OBJECTS: -- AT THE PLANT 25X1 4 BADGER (1 W/O VERT + 1 FAGOT/MIDGET HORIZ STABS) 1 CAT/CUB 1 BEAGLE (MODIFIED) 1 COKE 1 HSIAN A 3 COLT 3 FISHBED 1 CC-6 13 FARMER 6 AA GUN (SMALL) 4 FRESCO 10 PROS AA GUN 2 FAGOT/FRESCO 32 25X1 25X1 TAO ccrocT OHCP Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 KH-9 MISSION 1208-2 TOP SECRET RUFF 11 CHINA, COMMUNIST INDUSTRY LU?TA SHIPYARD DAIREN STATUS: OPERATIONAL 38-55..-53N 121-38-22E REMARKS: THREE LUTA DOGS WERE OBSERVED. UNITS 1 AND 2 WERE BERTHED AT THE SOUTH SIDE OF THE FITTING?OUT MOLE AND UNIT 3 WAS OUTBOARD A POSSIBLE LSM ACROSS THE END OF THE FITTING?OUT MOLE. THE 130MM MOUNTS HAD NOT BEEN INSTALLED ON UNIT 3. A GORDYY DD REMAINED IN GRAVING DOCK 1. TWO LARGE HATCH CARGO SHIPS WERE BERTHED AT THE NORTH SIDE OF THE FITTING?OUT MOLE AND TA?CHING TANKER WAS IN GRAVING DOCK 2. THE LARGEST TANKER CONSTRUCTED IN THE PRC. APPROXIMATELY WAS ACROSS THE ENTRANCE TO THE BUILDINGWAYS. THE TANKER WAS LAUNCHED FROM BUILDINGWAY 2 A SECOND TANKER WAS IN THE EARLY STAGE OF CONSTRUCTION ON BUILDINGWAY 1. EIGHT SHANGHAI PGM WERE OBSERVED. ONE WAS UNDER CONSTRUCTION ON BUILDINGWAY lr TWO WERE UNDER CONSTRUCTION ON BUILDINGWAY 3r AND FIVE WERE AT THE NORTH FITTING?OUT AREA. TWO SMALL CRAFT WERE UNDER CONSTRUCTION ON BUILDINGWAY 1 AND BUILDINGWAY 2 WAS OPEN. NAVAL ORDER OF BATTLE: 2 LUTA DOGS 1 GORDYY DD 8 SHANGHAI PGM 1 POSS LSM 1 TA?CHING TANKER (577 FT LONG) 1 TA?CHING TANKER (537 FT LONG) 2 CARGO SHIP (LARGE HATCH) 1 TANKER (UCON ON WAY 3) 2 SMALL CRAFT (UCON ON WAY 1) SMALL HARBOR CRAFT (NUMEROUS) 33 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 5X1 11 VJ. Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-9 MISSION 1208-2 PEI?CHING GM DEVEL PROD CEN CHANG?HSIN STATUS: OPERATIONAL CHINA, COMMUNIST INDUSTRY 39-48-40N 116-08-03E REMARKS: TWO STRETCHED STYX?TYPE CRATES WERE IN THE MANUFACTURING AREA OF THE CENTER, SHEN?YANG AIRFRAME PLT 112 STATUS: OPERATIONAL REMARKS: THE CSS?N-1 SHIPPING CONTAINER COUNT SINCE THE PLANT WAS LAST SEEN ASSOCIATED OBJECTS: .? AT THE PLANT 79 FARMER 18 CSS?N-1 SHP CONTAINER ASSOCIATED OBJECTS: 12 AA GUN 41-52-13N I23-26-01E INCREASED FROM TEN TO 18 425 CSA-1 SHP CONTAINER (APPROXIMATELY) WU?HAN SHIPYARD WU?CHANG STATUS:OPERATIONAL REMARKS: THE REAR POSITION OF BUILDINGWAY 4 CONTAINED A POSSIBLE SS SUBASSEMBLY SECTION. THE FRONT POSITION OF BUILDINGWAY 4 AND THE FRONT AND REAR POSITIONS OF BUILDINGWAY 3 APPEARED TO BE OCCUPIED. A CARGO VESSEL WAS BEING LAUNCHED. NAVAL ORDER OF BATTLE: -- AT FITTING?OUT BARGE 34 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TAP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 CHINA, COMMUNIST INDUSTRY KH-9 MISSION 1208-2 3 R $S NAVAL ORDER OF BATTLE: - ON BUILDINGWAY 3 25X1 1 SS 1 PROB R SS NAVAL ORDER OF BATTLE: -- ON BUILDINGwAY 4 25X1 1 PROB R SS 1 FOSS SS SUBASSEMBLY SECTION NAVAL ORDER OF BATTLE: ON BUILDINGWAY 1 25X1 2 PROB 7-43 MSF/AGS NAVAL ORDp OF BATTLE: 25X1 H- ON LAUNCH CRADLE 1 CARGO VESSEL 25X1 WU-HSING MISL PROPULSION R+D CENTER 30-44-50N 120-01-35E 25X1 STATUS: UNDER CONSTRUCTION REMARKS: THE ROADS IN THE ROCKET MOTOR PRODUCTION AREA HAVE BEEN SURFACED, INDICATING THAT THE AREA MAY NOW BE OPERATIONAL. 25X1 WU -KUNG AFL() 34-t6-3FIN I1)8-15-59 25X1 STATUS:OPERATIONAL REMARKS: THE MODIFIED BEAGLE HAD BLUNTED CONE-LIKE OBJECTS PROTRUDING FROM OR ATTACHED TO THE FORWARD END OF EACH ENGINE NACELLE. A BEAGLE WITH SIMILAR MODIFICATION WAS SEEN AT THE AIRFIELD IN 25X1 THE 12 BULL REPRESENT THE HIGHEST COUNT OF THIS AIRCRAFT SEEN AT THE AIRFIELD TO DATE. 25X1 35 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 11 KH-9 MISSION 1208-2 ASSOCIATED OBJECTS: ? AT THE PLANT 22 BADGER 12 BULL (2 W/TURBOPROPS) 1 BULL AWAC CHINA* COMMUNIST INDUSTRY 5 BEAGLE (1 MODIFIED) 2 COLT 36 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 0 V Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF CUBA KH-9 M S ON 2 8 2 NAVAL BASE FACILITIES SIGNIFICANT RESULTS CIENFUEGOS NAVAL BASE STATUS:OPERATIONAL 22-09-03N 080-27-20W REMARKS: THE STATUS OF THE SPECIAL?PURPOSE BARGES REMAINED UNCHANGED. NAVAL ORDER OF BATTLE: 2 KRONSHTADT PC 2 LCM 1 SO-1 PCS 2 LAUNCH 4 P-6 PT 2 SPECIAL?PURPOSE BARGE 1 POLUCHAT YPT 37 TAD Fri:iiFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 II , . I , Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LOA! 25X1 Ll KH-9 MISSION 1208....2 SIGNIFICANT RESULTS CIENFUEGOS PORT FACILITIES STATUS:OPERATIONAL CUBA LOGISTICS 22...08...25N 080...27...20W REMARKS: THE DREDGING AND LANDFILL OPERATION WAS CONTINUING AT THE MAIN TRANSSHIPMENT PIER. NAVAL ORDER OF BATTLE: 4 FREIGHTER 1 COASTAL FREIGHTER 38 - 25X1 25X1 25X1 25X1 rnm 1-,rninc1 mire' Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 . / ? . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 225X1 25X1 KH-9 MISSION 1208-2 11 CZECHOSLOVAKIA LOGISTICS SIGNIFICANT RESULTS CIERNA RR TRANSLOADING YARD STATUS: OPERATIONAL 48-25-11N 022-04-57E REMARKS: SEVENTY PERCENT OF THE YARD WAS CLOUD COVERED. NO MILITARY EQUIPMENT WAS OBSERVED. 39 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 .1 RESULTS 697 UNITED ARAB REPUBLIC AIR DEFENSE MISSILES 30-12-40N 032-01-25E KH-9 MISSION 1208-2 SIGNIFICANT AL ISMAILIYAH SAM SITE C21-6 STATUS: OCCUPIED AL ISMAILIYAH SAM SITE C22 STATUS: OCCUPIED 695 30-16-15N 032-01-17E AL ISMAILIYAH SAM SITE C22A-6 STATUS: OCCUPIED 696 30-11-25N 031-56-20E AL QAHIRAH SAM SITE C04-6 STATUS: OCCUPIED 645 30-19-45N 031-30-30E AL QAHIRAH SAM SITE C05-6 STATUS: OCCUPIED 646 30-21-00N 031-34-00E AL QAHIRAH SAM SITE CO6A-6 STATUS: OCCUPIED 648 30-18-20N 031-38-20E 25X1 41 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 11 u Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 UNITED ARAB REPUBLIC KH -9 MISSION 1208-2 AIR DEFENSE MISSILES 25X1 AL QAHIRAH SAM SITE C06-6 647 30-20-40N 031-39-30E . 25X1 STATUS:OCCUPIED 25X1 AL QAHIRAH SA-6 SAM SITE 782 30-16-09N 031-30-02E 25X1 STATUS: OCCUPIED PHYSICAL DESCRIPTION: 19.5 Nm NE OF AL QAHIRAH AND 5 NM SW OF INSHAS AIRFIELD (BE 25X1 THE NEWLY IDENTIFIED SA-6 SAM SITE CONSISTS OF FOUR REVETTED LAUNCH POSITIONS AND A GUIDANCE AREA WITH THREE REVETMENTS. TGT DIAM 2.500 FT. ELEV 495 FT. MISSILE ORDER OF BATTLE: 25X1 4 SA-6 TEL 3 SA-6 TRANSLOADER ELECTRONIC ORDER OF BATTLE: 25X1 1 STRAIGHT FLUSH 2 ELECTRONICS VAN ASSOCIATED OBJECTS: 25X1 ROB DUMMY STRAIGHT FLUSH 25X1 MAP SOURCE REFERENCE: 250?JOG R. NH 36-6 42 25X1 25X1 TOP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-9 MISSION 1208-2 AS SUWAYS SAM SITE C29-.6 STATUS: OCCUPIED UNITED ARAB REPUBLIC AIR DEFENSE MISSILES 698 30-07-.40N 032-00-30E AS SUWAYS SAM SITE D28A-6 STATUS: OCCUPIED 692 30-01-50N 031.-52-20E AS SUWAYS SAM SITE D28-6 STATUS: OCCUPIED 691 30-04-00N 031-54-00E 25X1 25X1 25X1 25X1 25X1 25X1 25X1 AS SUWAYS SAM SITE D29A-6 STATUS: OCCUPIED 690 30-04-50N 031-52-10E AS SUWAYS SA-6 SAM SITE STATUS: OCCUPIED 781 30-03-41N 031-48-18E PHYSICAL DESCRIPTION: 38 NM WNW OF AS SUWAYS AND 2 NM WEST OF WADI AL JANDALI AIRFIELD THE NEWLY IDENTIFIED SA-6 SAM SITE CONSISTS OF FOUR REVETTED LAUNCH POSITIONS AND A REVETTED GUIDANCE AREA. TGT DIAM -- 2'500 FT. ELEV -- 825 FT. 43 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 5X1 Declassified in Part - Sanitized Copy Approved 11 for Release 2014/05/01 TOP SECRET RUFF : CIA-RDP78T04752A001500010011-9 25X1 25X1 UNITED ARAB REPUBLIC AIR DEFENSE MISSILES KH-9 MISSION 1208-2 MISSILE ORDER OF BATTLE: 25X1 3 SA-6 TEL 3 SA-6 TRANSLOADER ELECTRONIC ORDER OF BATTLE: 25X1 1 STRAIGHT FLUSH 2 ELECTRONICS VAN 25X1 MAP SOURCE REFERENCE: 250?JOG RP NH 36-6 25X1 OTHER RESULTS?NO APPARENT CHANGE AL OAHIRAH SAM SITE B29A-6 659 30-07-00N 030-56-50E 25X1 STATUS: UNOCCUPIED 25X1 BALTIM SAM SITE A10-2 632 31-33?ooN 031-09-50E 25X1 STATUS: UNOCCUPIED 44 25X1 25X1 TAD crrorT PIMP Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 KH-9 MISSION 1208-2 TOP SECRET RUFF UNITED ARAB REPUBLIC AIR BASE FACILITIES 25X1 SIGNIFICANT RESULTS AL MANSURAH AIRFIELD 30-58-03N 031...25-37E 25X1 STATUS: OPERATIONAL REMARKS: CLOUDS PRECLUDED A COMPLETE READOUT OF THE AIRFIELD. AIR ORDER OF BATTLE: 25X1 3 FISHBED ASSOCIATED OBJECTS: 25X1 3 PROB DUMMY FRESCO 25X1 AL RAHMANIYAH AIRFIELD 31-02-35N 030-40-00E 25X1 STATUS:OPERATIONAL REMARKS: CLOUDS PRECLUDED A COMPLETE READOUT. AIR ORDER OF BATTLE: 25X1 NONE DISCERNIBLE ASSOCIATED r3JECTS: 25X1 6 PROB DUMMY FITTER 25X1 AS SALIHIYAH AIRFIELD 30-47..-55N 032-02-20E 25X1 STATUS: OPERATIONAL REMARKS: CONSTRUCTION WAS CONTINUING ON THE HANGARETTES, THE NEW 45 TOP SECRET RUFF 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 I. Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ,1 KH-9 MISSION 1208-2 OFYI TOP SECRET RUFF 25X1 25X1 UNITED ARAB REPUBLIC AIR BASE FACILITIES TAXIWAY, AND THE NEW RUNWAY. THE OLD TAXIWAY WAS BEING RESURFACED. AIR ORDER OF BATTLE: 5 FRESCO ASWAN AIRFIELD STATUS: OPERATIONAL REMARKS: RESURFACING OF THE TAXIWAY CONTINUED. AIR ORDER OF BATTLE: 1 TU-154 CARELESS 1 AN-12 CUB ASSOCIATED OBJECTS: 2 PROB DERELICT FRESCO 2 AN-24 CRATE AZ ZAQAZIQ AIRFIELD STATUS: OPERATIONAL 30-35-38N 031-39-57 REMARKS: CONSTRUCTION WAS CONTINUING ON THE NEW HANGARETTES. AIR ORDER OF BATTLE: 3 FISHBED ASSOCIATED OBJECTS: 6 PROB DUMMY FITTER 1 HOUND 46 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 KH-9 MISSION 1208-2 BENI SUEF AIRFIELD STATUS: OPERATIONAL TOP SECRET RUFF 1 UNITED ARAB REPUBLIC AIR BASE FACILITIES 29-1155N 031-01-00E REMARKS: CONSTRUCTION WAS CONTINUING ON THE HANGARETTES. EIGHT DUMMY FRESCO AND SEVEN DUMMY FISHBED AIRCRAFT WERE PARKED IN A LINE WING TIP TO WING TIP IN THE AIRCRAFT SALVAGE AREA. THESE AIRCRAFT WILL NOT BE REPORTED IN THE A0B. AIR ORDER OF BATTLE: 2 BADGER (1 IN NET-COVERED SHELTER) 3 CUB 5 HOOK 1 HOUND BILBAYS AIRFIELD STATUS: OPERATIONAL REMARKS: CONSTRUCTION WAS CONTINUING ON AIR ORDER OF BATTLE: 6 FITTER (4 IN NET-COVERED SHELTERS) 6 CRATE ASSOCIATED OBJECTS: 14 PROB DERELICT FITTER 30-23-42N 031-35-54E THE NEW HANGARETTES. 2 MAYA 11 SMALL STRAIGHT-WING BIR JIFJAFAH AIRFIELD STATUS:OPERATIONAL 47 30-24-,50N 033-09-45E 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 u Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 UNITED ARAB REPUBLIC KM-9 MISSION 1208-2 AIR BASE FACILITIES REMARKS: NO UNUSUAL ACTIVITY WAS OBSERVED. NO PROGRESS WAS NOTED ON THE HANGARETTES UNDER CONSTRUCTION. AIR ORDER OF BATTLE: 6 VAUToUR 5 SMALL STRAIGHT?WING ASSOCIATED OBJECTS: 4 PROB DUMMY MIRAGE 3 UM-1 ? BIRMA AIRFIELD STATUS: OPERATIONAL 30-50-17N 030-56-10E REMARKS: CONSTRUCTION WAS CONTINUING ON THE FOUR HANGARETTES. AIR ORDER OF BATTLE: 1 FISHBED ASSOCIATED OBJECTS: 8 PROB DUMMY FRESCO 1 SMALL STRAIGHT?WING 1 DERELICT FITTER CAIRO AIRFIELD STATUS: OPERATIONAL 30-08-26N 031-24-20E REMARKS: CONSTRUCTION CONTINUED ON THE NEW HANGAR AND BUILDINGS. AIR ORDER OF BATTLE: 3 707 TYPE 7 TU-154 CARELESS 1 COMET 48 2 DC-6 TYPE 1 LI-2 CAB 2 DHCS BUFFALO 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF UNITED ARAB REPUBLIC AIR BASE FACILITIES t1CV,1 25X1 25X1 1 727 TYPE 1 DASSAULT MYSTERE 20 11 AN-12 CUB 2 IL-18 COOT 1 C-45 3 AN-2 COLT 12 PZL-101 19 SMALL STRAIGHT?WING ASSOCIATED OBJECTS: 25X1 1 DERELICT FRESCO 1 DERELICT CAB 25X1 CAIRO AIRFIELD WEST 30-06-10N 030-55-40E 25X1 STATUS: OPERATIONAL REMARKS: A PROBABLE ASM WAS UNDER THE WING OF TWO BADGER AIRCRAFT. AIR ORDER OF BATTLE: 25X1 6 BADGER (2 W/PROB ASM) 3 FISHBED 1 BEAGLE 3 CUB 1 FITTER ASSOCIATED OBJECTS: 25X1 2 PROB ASM (ON 2 BADGER) 2 PROB DUMMY FISHBED 1 DERELICT BADGER 25X1 DARAW AIRFIELD 24-24-.59N 032-57-24E 25X1 STATUS:OPERATIONAL AIR ORDER OF BATTLE: 25X1 1 CRATE ASSOCIATED OBJECTS: 25X1 8 PROB DERELICT FRESCO 49 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 11 V . 1 1 , Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1.1 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 UNITED ARAB REPUBLIC AIR BASE FACILITIES DUKHAYLAH AIRFIELD STATUS:OPERATIONAL 11-n7-4AN (12guNtLA-wiF REMARKS: FOUR ADDITIONAL COMPONENT CRATES WERE OBSERVED AT THE HANGAR WITH THE PREVIOUSLY REPORTED SHIPPING AND COMPONENT CRATES. AIR ORDER OF BATTLE: 9 HIP C ASSOCIATED OBJECTS: 5 HIP C FUSELAGE CRATE 17 HOUND 9 COMPONENT CRATE GEBEL EL BASUR AIRFIELD STATUS: OPERATIONAL 30-32-48N 030-34-55E REMARKS: CONSTRUCTION ACTIVITY HAS SLOWED DOWN OR STOPPED ON THE UNIDENTIFIED FACILITY AT THE NORTH END OF THE NORTH/SOUTH RUNWAY. AIR ORDER OF BATTLE: 11 BEAGLE ASSOCIATED OBJECTS: 4 PROB DUMMY FRESCO 15 FISHBED 50 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 KH.-9 MISSION 1208-2 INSHAS AIRFIELD STATUS: OPERATIONAL TOP SECRET RUFF 11 UNITED ARAB REPUBLIC AIR BASE FACILITIES 30-19-47N 031-27-23E REMARKS: SEVEN OF THE EIGHT HANGARETTES REPORTED TO BE UNDER CONSTRUCTION IN SEP 73 APPEARED TO BE EXTERNALLY COMPLETE. THE REMAINING HANGARETTE WAS NEARING COMPLETION; ONLY A SMALL SECTION OF THE ROOF WAS STILL TO BE COVERED WITH 25X1 25X1 25X1 25X1 EARTH. AIR ORDER OF BATTLE: 25X1 6 FISHBED ASSOCIATED OBJECTS: 25X1 5 PROB DUMMY FISHBED 25X1 JIYANKLIS AIRFIELD NEW 30-49-30N 030-11-35E 25X1 STATUS: OPERATIONAL REMARKS: WORK CONTINUED ON THE WATER TREATMENT FACILITY. AIR ORDER OF BATTLE: ?1?TeAt4tR?TIN 25X1 NET?COVERED 2 FITTER SHELTER) 25X1 LUXOR AIRFIELD 25-40-23N 032-42-27E 25X1 STATUS: OPERATIONAL REMARKS: CONSTRUCTION CONTINUED ON THE HANGARETTES. 51 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 11 .1. Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 11 KH-9 MISSION 1208-2 AIR ORDER OF BATTLE: 1 FISHBED ASSOCIATFD OBJECTS: 3 PROB DUMMY FISHBED UNITED ARAB REPUBLIC AIR BASE FACILITIES 1 HIP C 4 PROB DUMMY FRESCO QUWAYSINA AIRFIELD STATUS:OPERATIONAL 30-34-46N 031-07-47 REMARKS: REPAIR WORK HAS BEEN UNDERWAY ON THE RUNWAY AND PARALLEL TAXIWAY. AIR ORDER OF BATTLE: NONE DISCERNIBLE OBJECTS: Y FRESCO (6 NET COVERED) WADI ABU RISH AIRFIELD STATUS:OPERATIONAL 25X1 25X1 25X1 25X1 25X1 25X1 25X1 28-58-45N 031-42-07 25X1 REMARKS: NO ADDITIONAL WORK APPEARED TO HAVE BEEN DONE ON THE PROTECTIVE STRUCTURES AIR ORnFR OF BATTLE: NONE DISCERNIBLE 52 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 11 UNITED ARAB REPUBLIC AIR BASE FACILITIES KH-9 MISSION 1208-2 WADI AL JANDALI AIRFIELD 30-03-10N 031-50-25E 25X1 STATUS: OPERATIONAL REMARKS: CONSTRUCTION CONTINUED ON THE HANGARETTES. AIR ORDER OF BATTLE: 25X1 NONE DISCERNIBLE AssoCIATED OBJECTS: 25X1 3 PROB DUMMY FISHBED 25X1 53 25X1 TnP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ?1I. Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 2bA1 25X1 11 UNITED ARAB REPUBLIC KH-9 MISSION 1208-2 NAVAL BASE FACILITIES SIGNIFICANT RESULTS AL ISKANDARIYAH NVB + HQ NATIONAL STATUS: OPERATIONAL 31-11-50N 029-52-00E REMARKS: COMBATANTS OBSERVED AT THE PORT INCLUDED FIVE F SS. TEN W/R SS. SIX OSA PTFG, TWO KOMAR PIG. AND ONE SHERSHEN PTFS. THE EGYPTIANS APPEARED TO BE WORKING ON SEVERAL COMBATANTS IN BOTH THE NAVAL BASE AND ARSENAL BASIN. AND FIVE PROBABLE BM.-21 ROCKET LAUNCHERS WERE SEEN LYING ON QUAYS. A SKORYY DD WAS UNDERWAY 7 NM NW OF THE PORT AND A VYDRA LFS WAS 4 NM EAST OF ABU QIR PORT TRAVELING SOUTH TOWARDS THE COAST. WE DID NOT SEE ANY MILITARY CARGO WITHIN THE PORT. EITHER ON QUAYS OR VESSELS. NAVAL ORDER OF BATTLE: -- AT NAVAL BASE 2 W/R SS 1 SKORYY DD 1 HUNT-1 PF 1 OSA PTFG 2 KOMAR PIG (1 ON REPAIRWAYS) 1 SHERSHEN PTF (W/0 TORPEDO TUBES) 6 SO-1 PCS 2 P-6 PT ASSOCIATFD OBJECTS: -- AT NAVAL BASE 2 PROB BM-21 ROCKET LAUNCHER NAVAL ORDER OF BATTLE: -- AT ARSENAL BASIN 1 N1SR PB (W/0 STACK + ENGINE COMPARTMENT) 1 YURKA MSF 1 T-43 MSF 1 1-301 MSM 1 MP-,SMB-1 LCU 2 1200 HP YPT 2 P-6 PT HULL (ON QUAY) 1 PATROL CRAFT 2 YAGT (TARGET BARGE) 8 STYX MISSILE CRATE 3 W/R SS 7 VYDRA LFS 1 MIDGET SS (ON QUAY) 1 INTISAR AG 1 SHERSHEN PITS 1 FLOWER PF 3 12.-6 PTFS (1 W/TORPEDO 1 SEKSTAN ADG TUBES) 1 BANGOR PF 2 SHERSHEN PTF 1 AL HURRIYA AG 1 SO-1 PCS 1 T-43 MSF 2 P-6 PT (W/0 TORPEDO 2 POLUCHAT-1 YP TUBES) 3 P-6 HULL (ON QUAY) 54 25X1 25X1 25X1 25X1 25X1 25X1 TAO crrorT PIMP Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-9 MISSION 1208-2 1 P-4 PT 1 NISR PB 3 FAIRMILE PB POLNOCNY LSM ASSOCIATED OBJECTS: - AT ARSENAL BASIN 3 PROB BM-21 ROCKET LAUNCHER (ON QUAY) NAVAL ORDER OF BATTLE: -- IN INNER HARBOR 3 W/R SS 4 OSA PTFG 2 SO-1 PCS 1 VYDRA LFS (W/RAMP LOWERED ONTO COALING QUAY) ASSOCIATED OBJECTS: -- IN INNER HARBOR 6 STYX CRATE NAVAL ORDER OF BATTLE: -- AT AL QABBARI SHIPYARD 1 MAYAK AGI 1 NYRYAT-1 YDT REPAIRWAYS) 1 MUNA AKL 1 AKL 1 FLOATING STORES BARGE 1 FISH FACTORY SHIP (IN DRYDOCK) 1 YAGT (TARGET BARGE) UNITED AKAU IEPUBLIC NAVAL BASE FACILITIES 2 POSS P-6 HULL (ON QUAY) 2 FISH FACTORY SHIP 4 OCEANGOING TUG 2 STYX MISSILE CRATE 2 PATROL CRAFT (SMALL) 1 FLOATING WORKSHOP 5 F SS 1 W/R SS 1 OSA PTFG (ON 1 AMUR AR 1 PRUT ASR 2 YURKA MSF 1 T-43 MSF 1 BOLVA APL 2 OKHTENSKIY ATR NAVAL ORDER OF BATTLE: -_ IN OUTER HARBOR 1 W/R SS (IN FLOATING DRYDOCK) 1 SO-1 PCS (IN FLOATING DRYDOCK) NAVAL ORDER OF BATTLE: - IN MEDITERRANEAN 1 SKORYY DD (7 NM NW OF ALEXANDRIA PORT) 1 T-43 MSF 1 VYDRA LFS (4 NM EAST OF ABU QIR PORT) 55 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 II V v 1 1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TAD crrorT DHCP 25X1 KH-9 MISSION 1208-2 BUR SAID NAVAL BASE STATUS: OPERATIONAL UNITED ARAB REPUBLIC NAVAL BASE FACILITIES 31-15-28N 032-18-18E REMARKS: TWO OSA PTFG AND TWO SHERSHEN PTFS WERE BERTHED ALONGSIDE THE NAVAL BASE HEADQUARTERS, A NUMBER OF VESSELS RELATED TO MINESWEEPING WERE AT THE PORT. INCLUDING THE ABDIEL MCS. TWO TON?CLASS MHC. A T-301 MSM. THE EL QUSEIR AG (LOGISTICS SUPPLY SHIP FROM ALEXANDRIA), AN OKHTENSKIY ATA. AND A NYRYAT-1 YDT (DIVING TENDER). TWO US IWO JIMA?CLASS AMPHIBIOUS ASSAULT SHIPS WERE SEEN ANCHORED APPROXIMATELY 6 NM NORTH OF PORT SAID. NAVAL ORDER OF BATTLE: 2 OSA PTFG 1 NYRYAT-1 YDT 2 SHERSHEN PTFS 1 EL QUSEIR AG 2 VYDRA LFS 1 P-6 HULL (ON REPAIRWAYS) 1 ABDIEL MCS 7 AWK (WATER TANKER) 2 TON?CLASS MHC 2 IWO JIMA?CLASS LPH (6 NM 1 T-301 MSM NORTH OF PORT SAID) 1 OKHTENSKIY ATA 56 2bA1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP cFCRFT RUFF KH-9 MISSION 1208-2 ABU ZABAL STOR AREA STATUS: OCCUPIED 1 UNITED ARAB REPUBLIC GROUND FORCE FACILITIES SIGNIFICANT RESULTS REMARKS: NO FROG EQUIPMENT WAS OBSERVED. GROUND FORCE ORDER OF BATTLE: 3 TRUCK 30-15-20N 031-23 20E 11 VEHICLE/PIECE OF EQUIP AL QAHIRAH ARMD VEH CONC A NO 1 STATUS: OCCUPIED 30-02-00N 031-25-30E REMARKS: CONSTRUCTION WAS CONTINUING ON BOTH OF THE COMMAND/CONTROL BUNKER COMPLEXES. GROUND FORCE ORDER OF BATTLE: 49 TANK (10 ON RANGE) 2 PROB 100Mm FIELD GUN 4 FA PIECE (CANVAS COVERED) VEHICLE/PIECE OF EQUIP (NUMEROUS) AL QAHIRAH BKS A ARMY SPLy DPo HULwAN STATUS: OCCUPIED 29-52-53N C31-18-07E REMARKS: THE INSTALLATION CONTINUED TO REFLECT AN OVERALL DECLINE IN ACTIVITY. Dummy FIELD ARTILLERY REMAINED IN THE FABRICATION AREA (AREA A). 57 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 I 1 V Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 2bA1 25X1 UNITED ARAB REPUBLIC MISSION 1208-2 GROUND FORCE FACILITIES GROUND FORCE ORDER OF BATTLE: ? AREA A 17 TRUCK 6 LOWBED TRAILER ASSOCIATED OBJECTS: ? AREA A 50 PIECE OF ROLLING STOCK GROUND FORCE ORDER OF BATTLE: -- AREA B 116 TRUCK 5 POWERBOAT 11 TRUCK?MOUNTED CRANE 17 CRANE GROUND FORCE ORDER OF BATTLE: AREA C 22 TRUCK 25 CRANE 13 TRUCK?MOUNTED CRANE 20 LOWBED TRAILER GROUND FORCE ORDER OF BATTLE: ? AREA D 35 TRUCK GROUNI1 FORCE ORDER OF BATTLE: -- AREA E 1 MDK-2 1 BAT?M 1 MOTORIZED GRADER GROUND FORCE ORDER OF BATTLE: -- AREA F ?14014E?in-b-CERNIBLE 4 CARGO TRAILER 37 LOWBED TRAILER 5 MOTORIZED GRADER 37 VEHICLE/PIECE OF EQUIP 1 MDK-2 2 BAT?M 3 MOTORIZED GRADER 18 VEHICLE/PIECE OF EQUIP 2 TRACTOR 4 TOWED SCRAPER AL QAHIRAH ORDNANCE STORAGE AREA STATUS: OCCUPIED 30-07-20N 031-28-49E REMARKS: AN INCREASE OF TRUCKS, SUPPORT EQUIPMENT, AND TENTS WAS OBSERVED THROUGHOUT. THE AREA. AT LEAST 20 FA PIECES WERE 58 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TAP cprin'T SNIFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 KH-9 MISSION 1208-2 11 UNITED ARAB REPUBLIC GROUND FORCE FACILITIES PARKED WITHIN THE AREA. GROUND FORCE ORDER OF BATTLE: 75 TANK ?57 APC 24 OT-64C 36 BMP 20 FA PIECE 487 TRUCK/PIECE OF EQUIPMENT (AT LEAST) DAHSHUR BARRACKS AREA STATUS: OCCUPIED 29-49-05N 031..10-03E REMARKS: TWENTY?TWO TANKS WERE IN THE WEST TRAINING AREA' 29 TANKS WERE ON THE EAST SIDE OF THE AREA NORTH OF THE FAIYUM ROAD. AND 30 TANKS AND 18 BTR-50?TYPE APC WERE SOUTH OF THE FAIYUM ROAD. NUMEROUS TRUCKS. VEHICLES. AND PIECES OF EQUIPMENT WERE THROUGHOUT THE AREA. GROUND FORC ORDER OF BATTLE: 81 TANK 18 BTR-50P TYPE TRUCK/VEH/PCE OF EQUIP (NUMEROUS) HULWAN RIVER CROSSING TNG AREA W STATUS: OCCUPIED 29-51-30N 031-15-20E REMARKS: THE FIVE COMPANIES OF RIVER CROSSING EQUIPMENT REMAINED IN AREA A. NO ACTIVITY WAS SEEN IN AREA B. GROUND FORCE ORDER OF BATTLE: -- AREA A 18 PMP 1 PMP SERVICE TRUCK 25 TMP/TPP 59 9 POWERBOAT 41 TRUCK 1 LOWBED TRAILER 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 UNITED ARAB REPUBLIC KH-9 MISSION 1208-2 GROUND FORCE FACILITIES 44 PONTON 22 PONTON CARRIER (WITHOUT PONTON) ASSOCIATED OBJECTS: -- AREA A 60 TENT - 25X1 GROUND FORCE ORDER OF BATTLE: -- AREA B NONE DISCERNIBLE SHALAQAN ENGR TNG CENTER STATUS: OCCUPIED In-11?InN nA1?n7??nr REMARKS: THE PREVIOUSLY REPORTED SUPPLIES/MATERIALS STACKED IN AREA C HAVE BEEN COMPLETELY REMOVED. THE AREA WHERE RIVER CROSSING EQUIPMENT WAS PARKED BEFORE THE OCTOBER 1973 WAR HAS BEEN COMPLETELY CLEANED UP. GROUND FORCE ORDER OF BATTLE: H- AREA A 46 VEHICLE/TRUCK 21 CRANE GROUND FORCE ORDER OF BATTLE: H? AREA B NONE DISCERNIBLE GROUND FORCE ORDER OF BATTLE: ? AREA C 10 TRUCK 3 VEHICLE/PIECE OF EQUIP (CANVAS COVERED) 4 VEHICLE/PIECE OF EQUIP (CANVAS COVERED) 31 SMALL TENT (PERSONNEL TYPE) 60 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LAI 25X1 1 UNITED ARAB REPUBLIC KH-9 MISSION 1208-2 DEPLOYED TACTICAL SSM FACILITIES SIGNIFICANT RESULTS AL QAHIRAH TAC SSM STOR FAC STATUS: OCCUPIED 30-03-00N 031-21-40E REMARKS: NO SCUD MISSILES OR PIECES OF ASSOCIATED EQUIPMENT WERE IDENTIFIED. ONE FROG-7 MISSILE ON A TRANSPORTER?ERECTOR?LAUNCHER (TEL) WAS IN THE QUARRY IN AREA A. AN ADDITIONAL CANVAS?COVERED TEL WITHOUT A MISSILE AND A RESUPPLY VEHICLE WERE SEEN IN AREA A. NO FROG-7 MISSILE. TEL. OR RESUPPLY VEHICLE WAS OBSERVED IN AREA B. GROUND FORCE ORDER OF BATTLE: ? IN AREA A 25X1 1 FROG-7 RESUPPLY VEHICLE 1 TRUCK?MOUNTED CRANE 43 TRUCK 25X1 1 FROG-7 1 FROG-7 TEL 1 FROG-7 TEL (CANVAS COVERED) AL QAHIRAH TAC SSM TNG AREA WEST STATUS: UNOCCUPIED 29-58-40N 030-55-50E REMARKS: NO TACTICAL SSM?ASSOCIATED EQUIPMENT WAS NOTED IN A DETAILED SEARCH OF THE TRAINING AREA. GROUND F017 ORDER OF BATTLE: NONE DISCERNIBLE 61 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 KH-9 MISSION 1208-2 11 UNITED ARAB REPUBLIC LOGISTICS SIGNIFICANT RESULTS AL ISKANDARIYAH PORT FACILITIES STATUS: OPERATIONAL A1-11?unm REMARKS: ALTHOUGH THE TOTAL NUMBER OF MERCHANT VESSELS HAS REMAINED APPROXIMATELY THE SAME SINCE FEB 714' THE NUMBER OF TANKERS HAS CONTINUED TO INCREASE. NINETEEN TANKERS WERE IN THE HARBOR AND OUTSIDE THE HARBOR IN THE MEDITERRANEAN (AT ANCHOR OR UNDERWAY). THIS IS THE LARGEST NUMBER OF TANKERS REPORTED AT ALEXANDRIA SINCE AT LEAST NAVAL ORDER OF BATTLE: 19 TANKER 3 COASTAL TANKER 71 FREIGHTER 10 COASTAL FREIGHTER 4 PASSENGER SHIP AS SUWAYS PORT FACS ADABIYAH STATUS: OPERATIONAL 29-52-38N 032-.28-31E REMARKS: A P-6 PT AND A P-6 PTFS WERE OBSERVED BERTHED ALONGSIDE THE QUAY. A US CH-53 HELICOPTER WAS PARKED IN THE PORT AREA AND ANOTHER CH-53 WAS IN FLIGHT APPROXIMATELY 2.3 NM EAST OF THE PORT. NAVAL ORDER OF BATTLE: 1 P-6 PTFS 1 P-6 PT 1 MEDIUM LANDING SHIP 2 P-6 HULL (ON QUAY. 1 PARTIALLY BURNED) AIR ORDER OF BATTLE: 2 CH-53 HELICOPTER (1 IN FLIGHT 2.3 NM EAST OF PORT) 62 2 SMALL SERVICE CRAFT 2 FREIGHTER (1 PARTIALLY SUNK) 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 KH.-9 MISSION 1208-2 ASSOCIATED OBJECTS: 3 MINE?CLEARING SLED UNITED ARAB REPUBLIC LOGISTICS SUEZ CANAL SEG 1 16 NM STATUS: UNKNOWN 31-04-50N 032-19-10E REMARKS: WITHIN THIS ZONE WERE A TON?CLASS MHC. AN OKHTENSKIY ATA. TWO SERVICE CRAFT. AND ONE PASSENGER SHIP LYING ON ITS SIDE. NAVAL ORDER OF BATTLE: 1 TON?CLASS MHC 1 OKHTENSKIY ATA 2 SERVICE CRAFT 1 PASSENGER SHIP (ON ITS SIDE) SUEZ CANAL SEG 2 16 NM STATUS: UNKNOWN 30-48-50N 032-19-55E REMARKS: A TANKER WHICH WAS UPRIGHT BUT IMMOBILE AND AN UNIDENTIFIED VESSEL SUBMERGED ALONG THE BANK WERE WITHIN THIS ZONE. NAVAL ORDER OF BATTLE: 1 TANKER (UPRIGHT BUT IMMOBILE) 1 VESSEL (SUBMERGED) SUEZ CANAL SEG 3 16 NM STATUS:UNKNOWN 63 30-32-55N 032-21-00E 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF S ON 1208-2 UNITED ARAB REPUBLIC LOGISTICS REMARKS: ALTHOUGH THERE WAS NO APPARENT MINE?CLEARING ACTIVITY, ONE TANKER WAS IN LAKE TIMASAH, AND A DREDGE AND MINE?CLEARING SLED (BEACHED) WERE AT THE NORTH END OF THE LAKE. NAVAL ORDER OF BATTLE: 1 DREDGE ASSOCIATED OBJECTS: 1 MINE?CLEARING SLED 1 TANKER SUEZ CANAL SEG 4 16 NM STATUS: UNKNOWN 30-19-05N 032-27-35E REMARKS: IN THE GREAT BITTER LAKE WERE ONE CH-53 HELICOPTER PULLING A MINE?CLEARING SLED AND ANOTHER SLED DEAD?IN?THE?WATER AT THE NORTH END OF THE LAKE. FLOATING WITHIN THE LAKE WERE 13 FREIGHTERS LASHED TOGETHER IN GROUPS OF FIVE. FOUR, THREE. AND ONE. IN ADDITION. THERE WAS ONE DREDGE AND ONE FREIGHTER PARTLY UNDER WATER IN THE LAKE. NAVAL ORDER OF BATTLE: 1 DREDGE AIR ORnER F BATTLE: 1 CH-53 HELICOPTER ASSOCIATED OBJECTS: 2 MINE?CLEARING SLED 14 FREIGHTER (ONE SUNK) 64 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9z5X11 TOP SECRET RUFF KH-9 MISSION 1208-2 SUEZ CANAL SEG 5 16 NM STATUS: UNKNOWN UNITED ARAB REPUBLIC LOGISTICS 30-05-05N 032.-34-20E REMARKS: NO MINE?CLEARING ACTIVITY OR EQUIPMENT WAS OBSERVED. NAVAL ORDER OF BATTLE: NONE PRESENT 65 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 R Next 3 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ? Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP sECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS BUDAPEST AAA BKS STROMFELD AUREL 207 HUNGARY GROUND FORCE FACILITIES 47-25-27N 019-13-54E STATUS: OCCUPIED aRnimn FolICE ORDER OF BATTLE: 28 POSS MAZ-537 (W/LOWBED 121 VEHICLE/PIECE OF EQUIP SEMITRAILERS) 73 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 R Next 4 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 , ? Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 11 IRAQ KH-9 MISSION 1208-2 COMMO/ELEC/RADAR FACILITIES SIGNIFICANT RESULTS TALLIL AFLD AW RADAR FAC TALL KING 30-58-50N 046-11-13E 25X1 STATUS: OPERATIONAL PHYSICAL DESCRIPTION: 9.1 NM NE OF TALLIL AIRFIELD 25X1 THE NEWLY IDENTIFIED TALL KING B RADAR FACILITY CONSISTS OF ONE TALL KING RADAR AND FIVE ASSOCIATED ELECTRONICS VANS. A PROBABLE CABLE LED FROM THE RADAR TO A REVETTED AREA CONTAINING THREE OF THE VANS. TGT DIAM -- 200 FT. ELEV -- 250 FT. ELECTRONIC ORDER OF BATTLE: 1 TALL KING MAP SOURCE REFERENCE: 250?JOG A, NH 38-7 5 ELECTRONICS VAN 81 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 LI.., Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A00-1500010011-9 25x1 TOP SECRET RUFF 25X1 IRAQ KH-9 MISSION 1208-2 AIR BASE FACILITIES SIGNIFICANT RESULTS HABBANIYAH PLATEAU AIRFIELD STATUS: OPERATIONAL 25X1 33-20-25N 043-35-37 25X1 REMARKS: THE 13 BLINDER WERE IN THE NEW SUPPORT AREA AT THE SE END OF THE AIR BASE. PROBABLE GROUND SERVICE VEHICLES WERE AROUND FOUR OF THEM. TWO AREAS OF NEW AIRCRAFT REVETMENT CONSTRUCTION WERE NOTED ON THE SW SIDE OF THE AIRFIELD. THE FIRST AREA CONSISTS OF TWO LARGE NEW AIRCRAFT REVETMENTS AND AN ACCESS TAXIWAY CONNECTED TO THE NW END OF THE NW/SE MAIN TAXIWAY. BLACKTOPPING OF THE CONNECTING TAXIWAY AND THE SURFACE OF THE AIRCRAFT REVETMENTS WAS ALMOST COMPLETE. THIS CONSTRUCTION WAS NOT EVIDENT IN FEB 74 THE SECOND AREA OF NEW CONSTRUCTION IS APPROXIMATELY MIDWAY BETWEEN THE NW AND SE ENDS OF. THE FIELD AROUND AN ALREADY EXISTING DISPERSAL TAXIWAY LINKED TO THE MAIN NW/SE TAXIWAY. THE CONSTRUCTION CONSISTED OF FIVE LARGE AIRCRAFT REVETMENTS, TWO IN THE LATE STAGE OF CONSTRUCTION, THREE IN THE MIDSTAGE OF CONSTRUCTION, AND TWO POSSIBLE REVETMENTS IN THE VERY EARLY STAGE OF CONSTRUCTION. BLACKTOPPING OF THE SERV/CE TAXIWAY AND THE SURFACE OF TWO OF THE REVETMENTS HAS BEGUN. PROBABLE INITIAL SCARRING FOR A PORTION OF THIS SECOND AREA OF CONSTRUCTION WAS NOTED ON PARTIAL COVERAGE OF THE AIRFIELD IN FEB 74. THE AIRFIELD PERIMETER ROAD WAS BEING EXTENDED TO THE NEW AREAS OF CONSTRUCTION AND ALONG THE SW SIDE OF THE FIELD TO THE BLINDER SUPPORT AREA AT THE SE END. A TALL KING B RADAR WAS IDENTIFIED 2,000 FEET OFF THE END OF THE NNE RUNWAY WITH FIVE ASSOCIATED ELECTRONICS VANS. A PROBABLE CABLE SCAR EXTENDED FROM THE RADAR TO A PROBABLE BUNKER IN THE ADJACENT SAND HILLS. THIS WAS THE SECOND TALL KING B IDENTIFIED IN IRAQ, AIR ORDER OF BATTLE: 13 BLINDER 7 BADGER 9 BEAGLE ASSOCIATED OBJECTS: 82 9 FISHBED 1 STRAIGHT?WING TRAINER (SMALL) 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 KH-9 MISSION 1208-2 3 DUMMY FISHBED Top SECRET RUFF IRAQ AIR BASE FACILITIES 3 DUMMY HAWKER HUNTER TALLIL AIRFIELD STATUS: OPERATIONAL 30-56-13N 046-05-29E REMARKS: NO UNUSUAL ACTIVITY WAS OBSERVED AT THE AIRFIELD. THE THIRD TALL KING B RADAR IDENTIFIED IN IRAQ WAS OBSERVED 9.1 NM NE OF THE RAIL-TO-ROAD TRANSFER POINT. FIVE ASSOCIATED VANS AND A PROBABLE CABLE WERE OBSERVED LEADING FROM THE RADAR TO A REVETTED AREA CONTAINING THREE OF THE VANS. AIR ORDER OF BATTLE: 6 FISH:3ED ASSOCIATED OBJECTS: 8 PROB DUMMY FITTER ELECTRONIC ORDER OF BATTLE: 5 ELECTRONICS VAN 83 Declassified in Part - Sanitized Copy Approved for kele-;s-e--16-1 470E1 : CIA-RDP78T04752A001500010011-9 t1CV,1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 HWANGJU AIRFIELD SIGNIFICANT RESULTS KOREA. NORTH AIR BASE FACILITIES 38-38-58N 125-47-31E STATUS: OPERATIONAL ATP APrIFR ifF BATTLE: 5 FISHBED 2 PROB FISHBED ASSOCIATED OBJECTS: 4 PROB DUMMY/DECOY FISHBED 12 PROB DUMMY/DECOY FAGOT/FRESCO 2 COLT KOKSAN AIRFIELD 38-41-25N 126-36-20E STATUS: OPERATIONAL AIR ORDER OF BATTLE: 23 FRESCO 4 FAGOT NAMSI AIRFIELD An-Rc.Am STATUS: OPERATIONAL REMARKS: NINE OF THE FAGOT/FRESCO, THE HOUND HELICOPTER, FUSELAGE WERE AT NAMSI REPAIR BASE AIR ORDER OF BATTLE: 38 FAGOT/FRESCO 5 COLT AND THE HOUND 1 HOUND 1 HOUND FUSELAGE 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 5X1 85 TnP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified 11 V in Part - Sanitized Copy Approved . I for Release 2014/05/01 TOP SECRET RUFF : CIA-RDP78T04752A001500010011-9 25x1 25X1 25X1 KOREA, NORTH KH-9 MISSION 1208-2 AIR BASE FACILITIES 25X1 5 PROB DUMMY/DECOY FISHBED 13 PROB DUMMY/DECOY FAGOT/FRESCO 25X1 ONCHON?UP AIRFIELD 38-54-21N 125-14-07E 25X1 STATUS:OPERATIONAL PHYSICAL DESCRIPTION: 13.2 NM NW OF NAMPO. UPDATED DESCRIPTION. THE AIRFIELD CONSISTS OF THE FOLLOWING FLIGHT OPERATIONS AND SUPPORT FACILITIES. RUNWAY -- THE PRIMARY RUNWAY IS NORTH/SOUTH, SERVICEABLE, AND CONCRETE. THE SECONDARY RUNWAY, A COMBAT ALERT STRIP/TAXIWAY LEADING TO TWO AIRCRAFT STORAGE TUNNELS, IS 7,900 X 60 FEET, WNW/ESE, SERVICEABLE, AND CONCRETE. REFERENCE POINT (RP) -- THE RP IS THE CENTER OF THE PRIMARY RUNWAY. PARKING FACILITIES -- PARKING FACILITIES CONSIST OF A PARALLEL TAXIWAY. A DISPERSAL TAXIWAY EXTENDING 2.4 NM ESE OF THE RP TO TWO AIRCRAFT STORAGE TUNNELS, THREE DISPERSAL TAXIWAYS SERVING AIRCRAFT REVETMENTS. TWO END?CONNECTING LINKS, FOUR CROSSOVER LINKS. FOUR PARKING APRONS, ONE MAINTENANCE APRON, ONE MAINTENANCE HANGAR. FOUR DOUBLE?BAY HANGARETTES (ONE UNDER CONSTRUCTION), 18 AIRCRAFT REVETMENTS, AND ONE FIRING?IN BUTT. SUPPORT FACILITIES -- SUPPORT FACILITIES INCLUDE TWO CONTROL TOWERS/OPERATIONS BUILDINGS (AT EACH END OF THE PARALLEL TAXIWAY), ONE AW SITE IN THE AIRCRAFT DISPERSAL AREA SW OF THE RP, AND 36 SUPPORT BUILDINGS (THREE REVETTED). ADMINISTRATION AND BARRACKS FACILITIES -- THESE FACILITIES CONSIST OF TWO ADMINISTRATION BUILDINGS, 24 BARRACKS/QUARTERS, ONE T?SHAPED MESSHALL, AND THREE VEHICLE SHEDS. AMMUNITION FACILITIES -- THE AMMUNITION STORAGE AREA, SE OF THE RP, CONSISTS OF TWO DRIVE?THROUGH STORAGE BUNKERS. POL FACILITIES -- POL FACILITIES CONSIST OF SEVEN HORIZONTAL 86 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP sFCRET RUFF 25X1 25X1 NORTH KOREA, AIR BASE FACILITIES KH-9 MISSION 1208-2 POL STORAGE TANKS. A PUMPHOUSE. AND EIGHT REFUELING POINTS. AIR ORDER OF BATTLE: 25X1 4 FARMER ELECTRONIC ORDER OF BATTLE: 25X1 1 BAR LOCK 1 POSS SPOON REST ASSOCIATED rJECTS: 25X1 3 DUMMY/DECOY FISHBED 16 DUMMY/DECOY FAGOT/FRESCO 25X1 PUKCHANG?NI AIRFIELD 39-30-07N 125-58-02E 25X1 STATUS:OPERATIONAL AIR ORDER OF BATTLE: 25X1 5 PROB FISHBED ASSOCIATED OBJECTS: 25X1 7 POSS DUMMY/DECOY AIRCRAFT 25X1 PUNGCHON AIRFIELD 3A-25-24N 125-01-16E 25X1 STATUS:OPERATIONAL REMARKS: A POL FACILITY CONSISTING OF EIGHT HORIZONTAL POL TANKS IS ADJACENT TO THE PARALLEL TAXIWAY. ANOTHER FACILITY. 1.5 NM SOUTH OF THE RP AT 38-23-48N 125-01-10E. CONSISTED OF 17 HORIZONTAL POL TANKS, TWO TUNNELS IN THE EARLY STAGE OF CONSTRUCTION, AND AT LEAST 68 CONSTRUCTION SUPPORT BUILDINGS. THE RELATIONSHIP OF THIS FACILITY TO THE AIRFIELD IS UNDETERMINED. 87 5X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 7)(1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 AIR ORDER IF BATTLE: NONE DISCERNIBLE KOREA, NORTH AIR BASE FACILITIES PYONG?NI AIRFIELD STATUS: OPERATIONAL 39-24-29N 125-53-39F REMARKS: CONSTRUCTION APPEARED TO HAVE BEEN STOPPED ON THE DISPERSAL TAXIWAY WHICH REMAINED 50 PERCENT PAVED. THE PROBABLE AMMUNITION STORAGE AREA NOW CONSISTS OF FIVE CONCRETE?LINED BUNKERS IN THE LATE STAGE OF CONSTRUCTION. AIR oRnER 9F BATTLE: 4 FITTER (2 w/TAIL SCTNS RMVD) ASSOCIATED OBJECTS: 13 PROB DUMMY/DECOY FISHBED 7 PROB DUMMY/DECOY FAGOT/FRESCO SAAMCHAM AIRFIELD 39-45-00N I25-54-12E STATUS; OPERATIONAL AIR ORDER O,F BATTLE: LL SWEPT?WING (AT LEAST) 88 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 KH-9 MISSION 1208-2 SUNAN?UP AIRFIELD STATUS: OPERATIONAL TOP SECRET RUFF 25X1 11 KOREA, NORTH AIR BASE FACILITIES 39-12-10N 125-40-23E REMARKS: CONSTRUCTION APPEARED To BE COMPLETE ON THE LARGE TERMINAL BUILDING. CONSTRUCTION WAS CONTINUING ON THE TWO AIRCRAFT TUNNELS. AIR ORDER OF BATTLE: 1 COOT 3 COKE 4 CAB 16 COLT 4 HIP C TAETAN AIRFIELD STATUS:UNDER CONSTRUCTION 38-07-50N 125-15-10E REMARKS: A DOUBLE?BAY HANGARETTE WAS IN THE INITIAL STAGE OF CONSTRUCTION ADJACENT TO THE WEST END OF THE RUNWAY. CONSTRUCTION WAS CONTINUING ON THE MODIFIED PARALLEL TAXIWAY. THE DISPERSAL TAXIWAY. AND THE TUNNELS. THE RUNWAY WAS COMPLETELY PAVED; HOWEVER, DEPOSITS OF DIRT FROM FRINGE AREA GRADING ACTIVITY AND CONSTRUCTION VEHICLE TRAFFIC WERE ON PORTIONS OF THE RUNWAY. THE MODIFIED PARALLEL TAXIWAY WAS APPROXIMATELY 75 PERCENT PAVED. PAVING HAS JUST BEGUN ON THE DISPERSAL TAXIWAY, AIR ORDER OF BATTLE: NONE DISCERNIBLE 89 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 _ ?l Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 11 KOREA. NORTH KH-9 MISSION 1208-2 NAVAL BASE FACILITIES SIGNIFICANT RESULTS PIPA?GOT NAVAL BASE AND SHIP REPAIR YD STATUS: OPERATIONAL 3R-35-17N 1,4-c(3..17 REMARKS: THE TWO R SS, 2.1 NM NNE. WERE APPROACHING THE BASE ON A HEADING OF 220 DEGREES. THESE VESSELS ARE BELIEVED TO BE NEW ACQUISITIONS AND WOULD BRING THE TOTAL NUMBER OF R SS TO FOUR IN THE NORTH KOREAN NAVAL INVENTORY. CONSTRUCTION WAS CONTINUING IN THE ADMINISTRATION/BILLETING AREA. NAVAL ORDER OF BATTLE: ? AT FINGER PIER 25X1 2 R SS 25X1 NAVAL ORDER OF BATTLE: -- UNDERWAY 2 R SS (2.1 NM NNE OF BASE) NAVAL ORDER OF BATTLE: ? DEAD IN WATER 1 50-1 PCS (1.7 NM NNE OF BASE) NAVAL ORDER OF BATTLE: - ON TRANSVERSER 2 HANCHON LCU NAVAL ORDER OF BATTLE: -- BEACHED 1 HANCHON LCU 'RN NAVAL ORflER OF BATTLE: -- ON MARINE RAILWAY M LL AKL NAVAL ORDER OF BATTLE: - ADJACENT TO MARINE RAILWAY 1 POSS YP 90 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF KH-9 MISSION 1208-2 KOREA, NORTH NAVAL BASE FACILITIES SUNWI?DO NAVAL FAC PUG 37-46-10N 125-20-18E STATUS:OPERATIONAL REMARKS: THIS WAS THE FIRST OBSERVATION OF OSA PTFG AT THIS FACILITY ON SATELLITE PHOTOGRAPHY. THE APPROACH BASINS' BOAT TUNNEL ENTRANCES. AND AREAS AROUND THE TUNNELS APPEARED TO BE COMPLETE AND OPERATIONAL. HOWEVER' CONSTRUCTION WAS CONTINUING ON THE SUPPORT AREAS ADJACENT TO THE EAST BASIN AND ON THE RIDGE MIDWAY BETWEEN THE TUNNEL ENTRANCES. NAVAL ORDER OF BATTLE: 2 OSA PTFG 25X1 25X1 MOORED TO FLTNG PIER ON OUTER BASIN WALL 25X1 NAVAL ORDER OF BATTLE: 2 P-6 PT - IN EAST BASIN 25X1 25X1 25X1 NAVAL ORDER OF BATTLE: ? ADJACENT TO EAST BASIN (BARGE?MOUNTED) 1 CRANE 1 BARGE NAVAL ORDER OF BATTLE: - IN WEST BASIN 3 CHAHO PTFS (1 PARTIALLY IN ENTR TO TUNNEL) NAVAL ORDER OF BATTLE: -- 2.5 NM SSW IN CHANNEL 25X1 1 PROB HANCHON LCU (UNDERWAY) 1 P-6 PT (TORPEDO TUBES REMOVED) MAVAI IlDrIR OF BATTLE: -- 4.7 NM SSE 1 PROB INFILTRATION TRAWLER (UNDERWAY) 91 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 . I . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KOREA. NORTH GROUND FORCE FACILITIES 38-39-46N 126-33-02E KH-9 MISSION 1208-2 SIGNIFICANT RESULTS CHILCHON?DONG ARMY BKS A STORAGE AREA 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: ? IN AREA B 25X1 24 TRUCK 25X1 CHONGDAN ORD DPO 38-22.-40N 125-51-50E 25X1 STATUS: OCCUPIED PHYSICAL DESCRIPTION: 3.3 NM SE OF CHOGU?RI. UPDATED DESCRIPTION. THE FACILITY CONSISTS OF THREE SEPARATE AREAS. AREA A. AT 38-22-40N 125-51-50E, CONTAINS TWO ADMINISTRATION BUILDINGS. 13 BARRACKS, TWO MESSHALLS (ONE L SHAPED)? ONE AUDITORIUM. ONE MONITOR?ROOFED VEHICLE REPAIR BUILDING. FIVE PROBABLE MACHINE SHOPS. 54 QUARTERS. TWO VEHICLE SHEDS. NUMEROUS SUPPORT BUILDINGS. AND SIX BUILDINGS UNDER CONSTRUCTION. AREA B. AT 38-22-30N 125-50-50E. CONTAINS 13 STORAGE BUILDINGS. AREA CP AT 38-23-50N 125...50-35E, CONTAINS TWO ADMINISTRATION BUILDINGS (ONE E SHAPED). THREE BARRACKS. ONE MESSHALL. ONE AUDITORIUM' SIX SUPPORT BUILDINGS, AND GROUND SCARRING FOR POSSIBLE SMALL?ARMS TARGET RUNS. GROUND FORCE ORDER OF BATTLE: - IN AREA A 25X1 103 TRUCK 92 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 5x1 TOP SECRET RUFF 25X1 25X1 1 KH-9 MISSION 1208-2 KUMCHON HQ TK DIV/ARMY BKS/STOR KOREA, NORTH GROUND FORCE FACILITIES 39-24-38N 125-44-58E STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: IN AREA A 2 TANK (CANVAS COVERED) 7 BTR-60PB GROUND FORCE ORDER OF BATTLE: -- IN AREA B 18 TANK/ASSAULT GUN (REVETTED) GROUND FORCE ORDER OF BATTLE: ? IN AREA C 25X1 8 TRUCK 11 TRUCK 25X1 25X1 25X1 GROUND FORCE ORDER OF BATTLE: IN AREA D 25X1 25 TANK GROUND FORCE ORDER OF BATTLE: H IN AREA F 8 PROB M1967 APC (CHICOm,CANVAs COVERED) MUNMYONG?NI BKS A STOR AREA 38-12-45N 126-26-50E STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: 24 PONTON CARRIER (W/PONTON 3 POS5 TRUCK?MOUNTED CRANE SECTIONS) 35 TRUCK 13 PROB PONToN SECTION (ON GROUND) 93 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 5X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KOREA, NORTH GROUND FORCE FACILITIES 38-20-00N 126-42-33E KH TOSAN-UP -9 MISSION 1208-2 ARMOR INSTALLATION N 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: - IN VEHICLE REVETMENTS 25X1 16 TANK 25X1 OTHER RESULTS-NO APPARENT CHANGE ANHYOP ARMY BKS A HQ INF DIV A REGT 38-20-21N 126-54.-57E 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 25X1 NONE DISCERNIBLE 25X1 KAESONG ARMY BKS A HQ INF DIV 38-00-30N 126.-31-23E 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 25X1 NONE DISCERNIBLE 25X1 SINWON-NI TANK PARK N 38-15-35N 125-42-00E 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 94 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TAP cFrRFT RUFF I 25X1 25X1 KH-9 MISSION 1208-2 NONE DISCERNIBLE KOREA. NORTH GROUND FORCE FACILITIES 95 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 .11 II 5X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 9 - TOP SECRET RUFF 25X1 25X1 KOREA. NORTH KH-9 MISSION 1208-2 DEPLOYED TACTICAL SSM FACILITIES SIGNIFICANT RESULTS TAEPYONG.-NI TAC SSM SPT FAC A BKS NW STATUS: OCCUPIED 39-00-22N 125-36-33E PHYSICAL DESCRIPTION: 7.5 NM SW OF PYONGYANG. UPDATED DESCRIPTION. THE FACILITY CONSISTS OF TWO SEPARATE AREAS. AREA At AT 39-00-22N 125-36-33E, CONTAINS 14 BARRACKS. TWO ADMINISTRATION BUILDINGS. TWO MESSHALLS, FOUR VEHICLE SHEDS. 16 SUPPORT BUILDINGS, FIVE TUNNEL ENTRANCES CIRCLING A HILL. AND A NEW VEHICLE PARKING AREA UNDER CONSTRUCTION. AREA Bo AT 39-00-05N 125-.36-00E, CONTAINS ONE BARRACKS. ONE MESSHALL, THREE VEHICLE SHEDS. 22 QUARTERS, AND FOUR SUPPORT BUILDINGS. THIS WAS THE FIRST IDENTIFICATION OF FROG-7 EQUIPMENT IN NORTH KOREA. GROUND FORCE ORDER OF BATTLE: H IN AREA A 3 PROB FROG-7 TEL (CANVAS COVERED) GROUND FORCE ORDER OF BATTLE: IN AREA B 3 PROB TRACKED VEHICLE 19 TRUCK 3 VEHICLE 1 VEHICLE 25X1 25X1 25X1 25X1 96 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 0 ,. . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 2 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75x1 TOP cFCRET RUFF 25X1 11 KH.-9 MISSION 1208-2 SIGNIFICANT RESULTS TARABULUS PORT FACILITIES STATUS:OPERATIONAL REMARKS: THE NUMBER OF MERCHANT SHIPS DECREASED SINCE MAR 74, NAVAL ORDER OF BATTLE: 1 VOSPER MARK 7 FRIGATE (OUTSIDE HARBOR) 1 T-43 MSF 1 CORVETTE PG 4 VOSPER 100.-FT PB (2 OUTSIDE HARBOR) 3 BRAVE PTGL (1 IN AGF) LIBYA LOGISTICS 32-54.P.08N 013-11-27E IN AND AROUND TRIPOLI PORT HAS 1 PATROL BOAT (OUTSIDE HARBOR) 3 PB HULL (2 ON DOCK) 1 ZEILTEN AGF 111 MERCHANT SHIP (62 OUTSIDE HARBOR) 97 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 5X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ? ???? Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 KH-9 MISSION 1208...2 ITU ABA ISLAND STATUS:OCCUPIED SIGNIFICANT RESULTS SPRATLY IS. MISCELLANEOUS 10-..22..'30N PHYSICAL DESCRIPTION: 318 NM ESE OF CAM RANH BAY. SOUTH VIETNAM. INITIAL NPIC DESCRIPTION. THIS SMALL ISLAND IS IN THE CENTRAL PORTION OF THE SPRATLY ARCHIPELAGO. IT IS APPROXIMATELY 4.615 FEET. VEGETATION CONSISTS MAINLY OF TREES. SCRUB BRUSH. AND GRASS. THE MILITARY FACILITY ON THE ISLAND CONSISTS OF THREE ADMINISTRATION BUILDINGS, SIX BARRCKS. ONE PROBABLE OFFICERS QUARTERS. ONE MESSHALL. ONE LARGE STORAGE BUILDING. FIVE SMALL STORAGE BUILDINGS. AND EIGHT STORAGE/SUPPORT BUILDINGS. ONE LONG FINGER PIER IS ON THE SOUTHERN SIDE OF THE ISLAND AND APPEARED TO EXTEND OUT TO A DREDGED SLIP IN THE CORAL. A SMALL FINGER PIER IS IMMEDIATELY EAST OF THE LARGE PIER. ROADS EXTEND THE LENGTH AND WIDTH OF THE ISLAND AND A MONUMENT HAS BEEN ERECTED AT THE INTERSECTION. NUMEROUS TRAILS RUN THROUGHOUT THE ISLAND. PERSONNEL TRENCHES AND FOXHOLES EXTEND AROUND THE PERIMETER OF THE ISLAND. AT LEAST SIX REVETTED GUN POSITIONS WERE ALONG THE BEACH IN THE VICINITY OF THE FINGER PIERS. TGT DIAM 4.600 FT. ELEV 15 FT. NAVAL ORDER OF BATTLE: 2 EX US BOSTWICK...CLASS DE 1 LST..-1 CLASS (LYING OFF SOUTHERN SIDE OF 3 SPEED BOAT (SMALL. ISLAND) BEACHED) 1 EX US BOSTWICK...CLASS DE 3 PROB SHIPS BOAT (SMALL) (UNDERWAY 1.5 NM SE OF ITU ABA) _ATinEltini_cnRICE ORDER OF BATTLE: 6 CARGO TRUCK 2 PROB GUN (IN REVETTED PSNS, UNID CALIBRE) 99 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TAO ccrocT PlI 25)(1 25X1 KH-9 MISSION 1208-2 MAP SOURCE REFERENCE: PC K-10C SPRATLY IS. MISCELLANEOUS LOAITA ISLAND STATUS: OCCUPIED 10-40-07N 114-25-20E PHYSICAL DESCRIPTION: 318 NM ESE OF CAM RANH BAY' SOUTH VIETNAM, INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL PORTION OF THE SPRATLY ARCHIPELAGO, IT IS APPROXIMATELY I VEGETATION CONSISTS MAINLY OF SCRUB TREES AND 25X1 25X1 25X1 GRASS. THE FACILITY ON THE ISLAND AND TWO SMALL SHEDS. ONE ROAD AND NUMEROUS TRAILS EXTEND FROM THE LARGE SHED. TGT DIAM 1500 FT. ELEV -- NAVAL ORDER OF BATTLE: CONSISTS OF ONE LARGE EXTENDS THE LENGTH OF THE THE BEACH TO THE VICINITY 10 FT. SHED ISLAND OF 25X1 NONE OBSERVED 25X1 MAP SOURCE REFERENCE: PC K-10C - 25X1 NAMYIT ISLAND 10-12-00N 114-21-30E 25X1 STATUS: OCCUPIED NAVAL ORDER OF BATTLE: 25X1 1 EX US CA CO?CLASS WHEC 100 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 SPRATLY IS. KH MISCELLANEOUS NORTHEAST CAY STATUS: OCCUPIED 11...2630N PHYSICAL DESCRIPTION: 299 NM EAST OF CAM RANH BAY. SOUTH VIETNAM. INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL PORTION OF THE SPRATLY ARCHIPELAGO. IT IS APPROXIMATELY 25X1 VEGETATION CONSISTS MAINLY OF TREES. SCRUB BRUSH. 25X1 AND GRASS. THE FACILITY ON THE ISLAND CONSISTS OF ONE 25X1 ADMINISTRATION BUILDING. ONE LARGE BARRACKS. TWO SUPPORT BUILDINGS. AND ONE OBSERVATION TOWER. TWO ALL?WEATHER ROADS RUNNING THE LENGTH AND WIDTH OF THE ISLAND INTERSECT AT THE ADMINISTRATION BUILDING. TGT DIAM 2.400 FT. ELEV 15 FT. NAVAL ORDER OF BATTLE: NONE OBSERVED MAP SOURCE REFERENCE: PC K-10C SAND CAY STATUS: OCCUPIED 25X1 25X1 25X1 ?Ifl223fiNt14-28-45E 25X1 PHYSICAL DESCRIPTION: 319 NM ESE OF CAM RANH BAY. SOUTH VIETNAM. AND 1 NM EAST OF ITU ABA ISLAND. INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL HE SPRATLY ARCHIPELAGO. IT IS APPROXIMATELY 25X1 VEGETATION CONSISTS MAINLY OF SCRUB BRUSH A 2bAl ERMENANT FACILITY WAS OBSERVED ON THE ISLAND. TGT DIAM 1.300 FT. ELEV 10 FT. 5X1 101 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 i , I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 SPRATLY IS. KH-9 MISSION 1208-2 MISCELLANEOUS NAVAL ORDER OF BATTLE: 25X1 6 PROB SMALL LANDING CRAFT 25X1 MAP SOURCE REFERENCE: PC K-10C 25X1 SIN COWE ISLAND 09-53-15N 114-19-42E 25X1 STATUS: OCCUPIED PHYSICAL DESCRIPTION: 330 NM ESE OF CAM RANH BAY. SOUTH INITIAL NPIC DESCRIPTION, THIS PORTION OF THE SPRATLY ARCHIPELAGO. VIETNAM. SMALL IT ISLAND IS IN THE CENTRAL 7X1 IS APPROXIMATELY VEGETATION CONSISTS MAINLY OF GRASS AND LOW BRUSH. 25X1 THE FACILITIES ON THE ISLAND CONSIST OF TWO LARGE BARRACKS?TYPE BUILDINGS. TWO SMALL PROBABLE SUPPORT BUILDINGS. FOUR PROBABLE SHEDS/TENTS, AND ONE OBSERVATION TOWER. TGT DIAM -- 1.050 FT. ELEV 10 FY. NAVAL ORDER OF BATTLE: 25X1 2 PROB SMALL LANDING CRAFT 25X1 MAP SOURCE REFERENCE: PC K-10C 25X1 SOUTHWEST CAY 11-26-31N 114-20-30E 25X1 STATUS: OCCUPIED 102 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-9 MISSION 1208..?2 1 SPRATLY IS. MISCELLANEOUS PHYSICAL DESCRIPTION: 298 NM EAST OF CAM RANH BAY. SOUTH VIETNAM. INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL PORTION OF THE SPRATLY ARCHIPELAGO* IT IS APPROXIMATELY VEGETATION CONSISTS MAINLY OF GRASS WITH A FEW SCRUB TREES AROUND THE PERIMETER OF THE ISLAND. THE FACILITY ON THE ISLAND CONSISTS OF ONE PROBABLE BARRACKS. FOUR STORAGE/SUPPORT BUILDINGS, ONE FOOTING FOR A PROBABLE BARRACKS, ONE FOOTING FOR A PROBABLE STORAGE/SUPPORT BUILDING. ONE OBSERVATION TOWER. AND ONE TOWER/MAST. TGT DIAM 2.900 FT. ELEV 15 FT. NAVAL ORDER OF BATTLE: 8 PROB SMALL LANDING CRAFT MAP SOURCE REFERENCE: PC K.?'10C THITU ISLAND STATUS: OCCUPIED 11-03-15N 11L11659E 25X1 25X1 25X1 25X1 25X1 25X1 25X1 PHYSICAL DESCRIPTION: 300 NM EAST OF CAM RANH BAY. SOUTH VIETNAM. INITIAL NPIC DESCRIPTION. THE SMALL ISLAND IS IN THE CENTRAL PORTION OF THE SPRATLY ARCHIPELAGO. IT IS ROUGHLY TRIANGULAR AND IS APPROXIMATELY VEGETATION CONSISTS 25X1 MAINLY OF SCRUB TREES AND GRASS AND A FEW LARGER TREES. THE VEGETATION APPEARED TO BE RATHER THICK ON THITU. THE MILITARY FACILITY ON THE ISLAND IS PRIMARILY IN A LARGE CLEARED AREA ON THE SW CORNER OF THE ISLAND. IT CONSISTS OF ONE ADMINISTRATION BUILDING. THREE BARRACKS. ONE MESSHALL. TWO STORAGE BUILDINGS. AND THREE SUPPORT BUILDINGS. TWO ROADS EXTEND FROM THE LARGE CLEARING TO THE FAR SIDE OF THE ISLAND AND A THIRD ROAD EXTENDS FROM THE MAIN COMPLEX TO A SMALL CLEARING WHERE THE TWO STORAGE BUILDINGS ARE SITUATED. TGT DIAM 2.600 FT. ELEV 15 FT. 103 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUH- 25X1 25X1 KH-9 MISSION 1208-2 NAVAI npnFR OF BATTLE: 2 PATROL. CRAFT (UNDERWAY 2 NM ESE OF THITu) MAP SOURCE REFERENCE: PC K-10C SPRATLY IS. MISCELLANEOUS 104 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 ??? Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 1 KH-9 MISSION 1208-2 TOP SECRET RUFF 25X1 PAKISTAN AIR BASE FACILITIES 25X1 HYDERABAD AIRFIELD SIGNIFICANT RESULTS NEW 25-19.-20N 068-21-50E 25X1 STATUS: OPERATIONAL AIR ORDER OF BATTLE: 25X1 1 L-19 ASSOCIATED OBJECTS: 25X1 1 POSS POL TRUCK 25X1 MONTGOMERY AIRFIELD EAST 30-44-28N 073-21-17E 25X1 STATUS: OPERATIONAL PHYSICAL DESCRIPTION: 13.6 NM ENE OF MONTGOMERY. THE NEWLY IDENTIFIED AIRFIELD CONSISTS OF A 9.050? X 75?FOOT SERVICEABLE NNW/SSE ASPHALT RUNWAY WITH A _ _ ASPHALT 25X1 AND EARTH OVERRUN AT THE SSE END AND A 1.365?FOOT ASPHALT OVERRUN AT THE NNW END. FACILITIES INCLUDE EIGHT HANGARETTES (FOUR AT EACH END OF THE RUNWAY) AND TEN AIRCRAFT PARKING BAYS PROTECTED BY CONCRETE BLAST WALLS (FIVE AT EACH END OF THE RUNWAY). TGT DIAM -- 18.000 FT. ELEV -- 600 FT. AIR ORDER OF BATTLE: NONE DISCERNIBLE MAP SOURCE REFERENCE: 250?JOG?R. NH 43-5 25X1 25X1 25X1 105 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 25X1 25X1 TOP SECRET RUFF KH-..9 MISSION 1208-2 SIGNIFICANT RESULTS MONTGOMERY MIL CANTONMET AREA STATUS: OCCUPIED PAKISTAN GROUND FORCE FACILITIES 30-44-24N 073-20-57E PHYSICAL DESCRIPTION: 12.5 NM ENE OF MONTGOMERY. THE NEWLY IDENTIFIED MILITARY CANTONMENT AREA CONSISTS OF 37 BARRACKS. 31 ADMINISTRATION BUILDINGS (ONE E SHAPED AND SEVEN U SHAPED). 16 MESSHALLS. 20 STORAGE BUILDINGS, 26 VEHICLE MAINTENANCE/STORAGE BUILDINGS, 17 REVETTED EXPLOSIVES STORAGE BUILDINGS. 157 APARTMENT-TYPE FAMILY QUARTERS' 92 SMALL STORAGE/SUPPORT BUILDINGS, AND 30 BUILDINGS IN VARIOUS STAGES OF CONSTRUCTION. OTHER FACILITIES INCLUDE SEVEN PARADE/ATHLETIC FIELDS, THREE PISTOL RANGES. SEVEN ELEVATED WATER TANKS. AND 32 GREASE RACKS (LOCATED IN THE MOTOR POOLS). THE INSTALLATION IS ROAD SERVED. TGT DIAM -- 18,000 FT. ELEV -- 600 FT. GROUND FORCE ORDER OF BATTLE: 3 FA PIECE 2 LOWBOY TRAILER 123 CARGO TRUCK 1 TANK TRNSPRTR TRAILER 100 UTILITY TRUCK 1 TRUCK.-MOUNTED CRANE 146 SINGLE-AXLE TRAILER 2 MOBILE CRANE MAP SOURCE REFERENCE: 250-JOG-R. NH 43-5 107 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 11 V ?I . .1 , Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 KH-9 MISSION 1208-2 TOP SECRET RUFF 11 SIGNIFICANT RESULTS WROCLAW ARMY BARRACKS 203 KARLOWICE POLAND GROUND FORCE FACILITIES 51-08-34N 017-04-06E STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 21 PROB 0T-64 3 PROB TRACKED VEHICLE 63 TRUCK 22 TRAILER 7 PROB UAZ-69 17 VEHICLE/PIECE OF EQUIP 109 L,JZX I 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 r r ? Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-9 MISSION 1208?.2 1 SOMALIA AIR DEFENSE MISSILES SIGNIFICANT RESULTS MOGADISCIO SA-2 SAM SITE 2 STATUS: OCCUPIED 02...0741N 045.46..?37E PHYSICAL DESCRIPTION: 7 NM NW OF MOGADISCIO? THE NEWLY IDENTIFIED SAM SITE CONSISTS OF A CIRCULAR ROAD. SIX LAUNCH POSITIONS. AND A GUIDANCE AREA. AN ONSITE SUPPORT FACILITY WITH AT LEAST NINE BUILDINGS IS JUST WEST OF THE SITE, TOT DIAM 6.000 FT. ELEV 450 FT. 2 Sk...2 TRANSPORTER 6 PROB ELECTRONICS VAN MISSILE ORDER OF BATTLE: 6 PROB SA-2 LAUNCHER ELECTRONIC ORDER OF BATTLE: 1 PROB FAN SONG GROUND FORCE ORDER OF BATTLE: 2 VEHICLE/IECE OF EQUIP MISSILE ORDER OF BATTLE: 3 SA-2 LAUNCHER 3 POSS SA-2 LAUNCHER ELECTRONIC ORDER OF BATTLE: 1 FAN SONG 1 POSS ACQUISITION RADAR GROUND FORCE ORDER OF BATTLE: 4 VEHICLE/PIECE OF EQUIP 3 SA-2 TRANSPORTER 9 PROB ELECTRONICS VAN MAP SOURCE REFERENCE: 250...JOG(A). NA38..-7 111 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011- ,?. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 I in Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 nav4 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SOMALIA AIR DEFENSE MISSILES MOGADISCIO SA-2 SAM SITE 3 STATUS: OCCUPIED 02-0536N 045..21-09E PHYSICAL DESCRIPTION: 3.5 NM NORTH OF MOGADISCIO. THE NEWLY IDENTIFIED SAM SITE CONSISTS OF A CIRCULAR ROAD' SIX LAUNCH POSITIONS, AND A GUIDANCE AREA. AN ONSITE SUPPORT FACILITY WITH TEN BUILDINGS IS ADJACENT TO THE SITE. TGT ELEV -- 250 FT. mTccur 70ER OF BATTLE: NONE DISCERNIBLE MISSILE ORDER OF BATTLE: 5 PROB SA-2 LAUNCHER 3 SA-2 TRANSPORTER (CANVAS COVERED) ELECTR(INIC_ORDER OF BATTLE: 1 FAN SONG GROUND FORCE ORDER OF BATTLE: 3 VEHICLE/PIECE OF EQUIP 6 PROB ELECTRONICS VAN MAP SOURCE REFERENCE: 250?JOG(A), NA38-7 112 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 11 SOMALIA AIR BASE FACILITIES SIGNIFICANT RESULTS BELEDAI AMIN AIRFIELD STATUS: UNDER CONSTRUCTION (12-39-05N 044-47-25E REMARKS: CONSTRUCTION WAS CONTINUING ON THE RUNWAY. AIR ORDER OF BATTLE: NONE PRESENT C T OBJECTS: 20 VEHXCLEJIECE OF EQUIP (AT LEAST) CHISIMAIO AIRFIELD SOUTHWEST STATUS: OPERATIONAL 00-23-0/S 042-27-0/E REMARKS: SURFACING OF THE RUNWAY APPEARED TO BE COMPLETE. CONSTRUCTION WAS CONTINUING ON THE LARGE TERMINAL PARKING APRON AND THE SECOND LINK TAXIWAY. AIR ORDER OF BATTLE: NONE PRESENT ASSOCIATED OBJECTS: 28 VEHICLE/PIECE OF EQUIP (AT LEAST) 113 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 MOGADISCIO INTERNATIONAL AIRFIELD STATUS:OPERATIONAL SOMALIA AIR BASE FACILITIES 02-00-48N 045-18-48E REMARKS: THIS WAS THE FIRST IDENTIFICATION OF A FISHBED IN SOMALIA. GROUND WAS BEING CLEARED FOR ENLARGEMENT OF A COMMERCIAL PARKING APRON. AIR ORDER OF BATTLE: 4 BEAGLE 2 CREEK 1 FISHBED 2 HIP C 7 FAGOT/FRESCO 2 HOUND 1 PROB BOEING 720 5 SMALL STRAIGHT?WING 5 CAB (1 DERELICT) 1 AIRCRAFT (TAIL PROTRUDING 2 COKE FROM HANGAR) 2 COLT ASSOCIATED OBJECTS: CRAFTFUS SHP CNTNR (AT LEAST) 114 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 7cY1 TOP SECRET RUFF 25X1 25X1 11 SOMALIA NAVAL BASE FACILITIES SIGNIFICANT RESULTS BERBERA PORT FACILITIES STATUS: OPERATIONAL REMARKS: 10-26-30N 045..00-30E 25X1 TWO TO SIX SOVIET NAVAL SHIPS ARE NORMALLY SEEN AT THIS PORT. AsIVIAL?WWYLOF BATTLE: 25X1 2 POLUCHAT-1 PB 1 VYN?CLASS BARRACKS SHIP 1 PROB MAYAK AFL 3 OCEANGOING FREIGHTER 25X1 CHISIMAIO PORT FACILITIES 00-22-14S 042-33-13E 25X1 STATUS:OPERATIONAL NAVAL ORDER OF BATTLE: 2 POLUCHAT-1 PB 25X1 Pb Fl 1 PROB P-6 PT (ON MARINE 1 OCEANGOING FREIGHTER RAILWAY) 25X1 &I 115 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 2 5X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Top SECRET RUFF 25X1 25X1 1 SOMALIA KH-9 MISSION 1208-2 GROUND FORCE FACILITIES BERBERA BH2 OTHER RESULTS?NO APPARENT CHANGE 10-35.10N 045-13-40E STATUS: UNOCCUPIED GROUND FORCE ORDER OF BATTLE: NONE PRESENT 25X1 25X1 25X1 116 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TAP cFCRFT RUFF LAI 25X1 KH-9 MISSION 1208.-2 1 SYRIA AIR DEFENSE MISSILES SIGNIFICANT RESULTS AL QUNAYTIRAH HAWK SITE STATUS: OCCUPIED 33-11...00N 035-47-45E PHYSICAL DESCRIPTION: 4 NM NNW OF AL QUNAYTIRAH IN ISRAELI?OCCUPIED SYRIA. THE NEWLY IDENTIFIED HAWK SITE IS THE SECOND OCCUPIED HAWK SITE IN ISRAELI?OCCUPIED SYRIA. THE OTHER IS AT UYUN HADID (BE THE SITE CONSISTS OF SIX OCCUPIED HAWK LAUNCHERS WITH THREE MISSILES ON EACH LAUNCHER PLUS ONE LAUNCHER IN THE SUPPORT AREA AND ANOTHER ON THE APPROACH ROAD. A CENTRAL BATTERY CONTROL CENTER IN AN EXCAVATION, FOUR PROBABLE RADARS, THREE COMMUNICATIONS VANS, A THREE?GUN LIGHT AAA BATTERY. AT LEAST 17 TRUCKS, AND NUMEROUS OBJECTS/PIECES OF EQUIPMENT. TGT DIAM -- 1,000 FT. ELEV 3,970 FT. MISSILE ORDER OF BATTLE: 24 HAWK MISSILE (3 IN SUPPORT AREA + 3 ON APPROACH ROAD) FLFCTRONIC ORDER OF BATTLE: 8 HAWK LAUNCHER (1 IN SUPPORT AREA + 1 ON APPROACH ROAD) 1 BATTERY CONTROL CENTER 3 COMMUNICATION VAN 4 PROB RADAR ORCE ORDER OF BATTLE: 1 LIGHT AAA BATTERY (3 17 TRUCK (AT LEAST) GUNS) OBJECTS: OBJECT/PIECE OF EQUIP (NUMEROUS) MAP SOURCE REFERENCE: 250?JOG (R) NI 36-12 117 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 SYRIA KH-9 MISSION 1208-2 GROUND FORCE FACILITIES SIGNIFICANT RESULTS DIMASHQ ORD DPO A BKS NNE STATUS: OCCUPIED 036.-20-09E PHYSICAL DESCRIPTION: ON THE NNE EDGE OF DIMASHQ. THE NEWLY IDENTIFIED FACILITY CONSISTS OF ONE ADMINISTRATION BUILDING/BARRACKS, ONE LARGE MAINTENANCE BUILDING. 12 SUPPORT BUILDINGS. AND 12 VEHICLE SHEDS. THIS FACILITY IS FENCED EXCEPT FOR THE FRONT OF THE ADMINISTRATION BUILDING WHICH FACES THE STREET ON THE NORTH SIDE. THE SOUTH END OF THE INSTALLATION WHICH FACES A DITCH. AND THE SOUTH THIRD OF THE WEST SIDE OF THE FACILITY. ENTRANCE TO THE FACILITY IS FROM A DIRT ROAD WHICH PARALLELS THE FENCE ON THE WEST SIDE AND ALSO THROUGH THE OPEN AREA ON THE WEST SIDE WHICH HAS NO FENCE. A LARGE MAINTENANCE BUILDING IS IN THE CENTER OF THE FACILITY AND IS CONNECTED TO TWO SUPPORT BUILDINGS BY VEHICLE SHEDS. A 15?SPACE PARKING AREA IS SOUTH OF THE LARGE MAINTENANCE BUILDING. THIS AREA IS FENCED ON THREE SIDES WITH COLUMNS ALONG THE FRONT. EACH SPACE HAS WHAT APPEARED TO BE AN OPEN GREASE PIT. TO THE REAR OF THE FENCED AREA ARE SIX VEHICLE PARKING REVETMENTS. FACING THE FRONT OF THE 15?SPACE PARKING AREA NEXT TO THE WEST FENCE IS A VEHICLE SHED FOR APPROXIMATELY TEN VEHICLES. MOST OF THE TANKS AND APC WERE IN THE NE CORNER OF THE FACILITY. A NUMBER OF UNDEFINED OBJECTS WERE IN THIS SAME AREA AND APPEARED TO BE JUNK OR VEHICLE PARTS. IN AN AREA WEST OF THE FACILITY, NUMEROUS VEHICLES, COMPRISED OF TRUCKS. BUSES. AND FLATBED TRAILERS. WERE OBSERVED. TGT DIAM 1,640 FT. ELEV -- 710 FT. ?"' ''? ORDER OF BATTLE: 15 TANK 30 TRUCK 10 POSS APC (MAY BE TANKS 8 TRAILER W/TURRET OFF) 3 BUS 4 POSS FA PIECE (MAY BE GUN 3 FLATBED TRAILER FROM TANK) 119 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 1 KH-9 MISSION 1208-2 MAP SOURCE REFERENCE: 250-40G RP NI 37-9 SYRIA GROUND FORCE FACILITIES 120 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 R Next 5 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF KH-9 MISSION 1208-2 SIGNIFICANT RESULTS AL LADHIOIYAH PORT FACILITIES STATUS: OPERATIONAL PFMARKC? SYRIA LOGISTICS 35-30-47N 035-45-52E 25X1 25X1 FIVE MORE 25X1 WERE ON A MERCHANT SHIP ANCHORED OFF THE PORT. ALSO ON THE THE RAILROAD 25X1 UNDER CONSTRUCTION HAD ALMOST REACHED THE WAREHOUSE BUILDINGS AT THE WATERS EDGE. RAILCARS WERE PRESENT AT THE TERMINAL IN LATAKIA. NAVAL ORDER OF BATTLE: 11 LARGE MERCHANT SHIP 4 OSA pTFG 3 KOMAR PTG 30 SMALL MERCHANT SHIP 4 P-4 PT 1 OIL TANKER 1 FISHING VESSEL (145 FT) ASSOCIATED OBJECTS: 10 FISHBED FUSELAGE CRATE 127 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 5X1 II u I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES SIGNIFICANT RESULTS ALEYSK ICBM COMPLEX STATUS: OPERATIONAL 52-28-45N 083-05-20E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. ALUKSNE MRBM COMPLEX STATUS: OPERATIONAL 57-18-59N 026-44-00E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE SEEN r:THREEi SILO DOORS WERE OPEN AT LAUNCH SITE 3 ON BOTH NEW HORIZONTAL DIPOLE ANTENNAS ARE IN A CLEARED RECTANGULAR CLEARING TO THE NORTH OF THE SILOS. AN EXERCISE WAS IN PROGRESS ON FOUR PADS AT LAUNCH SITE 1 AND ON ONE PAD LAUNCH SITE 2 :OVERAGE. THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. AT BELOKOROVICHI mRBm COMPLEX STATUS: OPERATIONAL 51-01-35N 027-55-24E REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. A MISSILE EXERCISE WITH AN ERECTED MISSILE WAS IN PROGRESS AT TWO LAUNCH PADS AT LAUNCH SITE 1. AT LAUNCH SITE 2. AN SS-4 MISSILE ON TRANSPORTER WAS 129 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 J. I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Top SECRET RUFF 25X1 25X1 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES IN FRONT OF ONE OF THE MISSILE?READY BUILDINGS. AT LAUNCH SITE 3. FOUR CANVAS?COVERED MISSILE TRANSPORTERS WERE NEAR THE SILOS. A CLEARING FOR A DIPOLE ANTENNA WAS NEWLY IDENTIFIED ADJACENT TO AND ON THE NE SIDE OF THE LAUNCH SITE. THIS CLEARING WAS NOT PRESENT IN AUG 73 TWO ERECTORS AND ONE EMPTY MISSILE TRANSPORTER WERE Al THE. sspi TRAINING POSITION. BORSHCHEv mRBm COMPLEX STATUS:OPERATIoNAL 48-46-38N 026-08-57 REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE lr THREE AND POSSIBLY FOUR Ss-4 MISSILES ON TRANSPORTERS WERE NEAR THE MISSILE-READY BUILDINGS. AT LAUNCH SITE 2. Two SS-4 MISSILES WERE NEAR THE MISSILE?READY BUILDINGS. THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. BREST mRBm COMPLEX STATUS: UNKNOWN REMARKS: ONLY FIXED FIELD SITE 1 WAS OBSERVED. BRODY MRBm COMPLEX STATU5:UNKNOwN 50-12-49N 025-05-23E REMARKS: THE COMPLEX WAS NOT OBSERVED. 130 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-.9 MISSION 1208-2 SOV/ET UNION DEPLOYED STRATEGIC SSM FACILITIES DERA2HNYA SSM COMPLEX STATUS: OPERATIONAL 49-12-54N 027-08-18E REMARKS: THE ENTIRE COMPLEX AND SEARCH AREA WERE OBSERVED. SILO CONVERSION ACTIVITY CONTINUED IN LAUNCH GROUPS A AND C. IN LAUNCH GROUP A. A TYPE up HEADWORKS ASSEMBLY WAS INSTALLED IN THE SILO AT LAUNCH SITES 10A. 11A, AND 12A. THE 40?FOOT?SQUARE PLATFORM HAD BEEN REMOVED FROM THESE SITES AND FROM SITES 8A AND 9A. AT SITE 9Ar A CYLINDRICAL RETAINING WALL. WAS UNDER CONSTRUCTION ON TOP OF THE SILO WALL. IN LAUNCH GROUP Cr A 40...FOOT...SQUARE PLATFORM WAS PLACED OVER EACH SILO. AND PROBABLE SILO DEEPENING WAS TAKING PLACE AT FIVE SITES. HOUSETRAILERS AND VEHICLES WERE NEAR THE SUPPORT BUILDINGS AT LAUNCH GROUP CONTROL SITE 49F. ACTIVITY RESEMBLING PERIODIC MAINTENANCE WAS IN PROGRESS AT LAUNCH SITES 48F AND 50F. TYPE IIIX LAUNCH SITE 76H WAS THE LAST SITE COMPLETED IN LAUNCH GROUPS G. Ho AND I. AT TYPE IIIX LAUNCH SITES 99 AND 101, THE SILO DOOR HAS BEEN INSTALLED. AND CONSTRUCTION CONTINUED ON THE CANTED BUILDING BESIDE THE APRON AT BOTH SITES. A PROBABLE CAPSULE FOR A TYPE IIIX SILO WAS ON A THREE?CAR?TRAIN IN THE RAIL?TO?ROAD TRANSFER POINT. IN THE COMPLEX SUPPORT FACILITY RAIL. A NEW STORAGE AREA CONTAINING SOME UNIDENTIFIED MATERIAL WAS NEAR THE NORTH END OF THE STORAGE AREA ASSOCIATED WITH THE LARGE GANTRY CRANE. DISNA MRBM COMPLEX STATUS:OPERATIONAL 55-.48...09N 028.-21.-30E REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AN EXERCISE WAS SEEN ON THE LAUNCH PADS AT LAUNCH SITES 1, 2. AND 3. TWO MISSILES WERE OBSERVED ON TRANSPORTERS AT LAUNCH SITE 1. A PROBABLE MISSILE RAILCAR WAS AT THE RAIL?TO?ROAD TRANSFER POINT. 131 25X1 25X1 25X1 25X1 25X1 TAP CFCPFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 Declassified 11 V . in Part - Sanitized Copy Approved ?I . . 1 . for Release 2014/05/01 TOP SECRET RUFF : CIA-RDP78T04752A001500010011-9 25X1 25X1 SOVIET UNION KH -9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES 25X1 DOMBAROVSKIY ICBM COMPLEX 51-07-46N 060-09-57E 25X1 STATUS:OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. AT IIIX 25X1 SITE 75e A CAP/CAN SILO LOADER WAS POSITIONED IN FRONT OF THE SILO. A PROBABLE HARDENED DOME ANTENNA AND A PROBABLE HARDENED HOOK ANTENNA WERE IDENTIFIED FOR THE FIRST TIME AT IIIF LAUNCH SITES 2A AND 72. A PROBABLE IIIX SILO WAS OBSERVED UNDER CONSTRUCTION 25X1 AT LAUNCH GROUP CONTROL SITE 98 AND UNIDENTIFIED ACTIVITY WAS AGAIN OBSERVED OUTSIDE THE SECURITY FENCE AT LAUNCH SITE 12B. A PROBABLE HARDENED HOOK ANTENNA AND A PROBABLE HARDENED DOME ANTENNA WERE IDENTIFIED FOR THE FIRST TIME AT IIIF LAUNCH SITE 74, A PROBABLE HARDENED HOOK ANTENNA WAS ALSO IDENTIFIED AT IIIF LAUNCH SITE 73. A PROBABLE HARDENED DOME ANTENNA WAS IDENTIFIED AT THIS LAUNCH SITE IN OCT 73 A TOTAL OF 12 MULTISYSTEM PROPELLANT TRANSPORTERS, ONE CAP/CAN SILO LOADER. AND ONE CAP/CAN TRANSPORTER WERE IN THE RAIL?To-ROAD TRANSFER POINT. THE AMOUNT OF IIIF SILO CONSTRUCTION MATERIAL IN THE RECEIVING AREA APPEARED To BE UNCHANGED. AT LEAST FIVE INF SILO DOORS AND PARTS OF AT LEAST FIVE INF SILO HEADWORKS WERE IDENTIFIED. THE UNIDENTIFIED ACTIVITY CONTINUED AT LAUNCH SITE 12B. DROGOBYCH MRBM COMPLEX STATUS: UNKNOWN 49-22-24N 023-29-47E REMARKS: THE COMPLEX WAS NOT OBSERVED. 132 25X1 25X1 25X1 25X1 TAP cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-9 MISSION 1208...2 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES DYATLOVO MRBM COMPLEX STATUS: OPERATIONAL 53...3237N 025..20...27E REMARKS: THE ENTIRE COMPLEX, EXCEPT FIXED FIELD SITES 1 AND 2. WAS OBSERVED. AT LAUNCH SITE 1. A PROBABLE SS-4 MISSILE ON A TRANSPORTER WAS ALIGNED WITH THE ERECTOR AT THE SOUTH LAUNCH PAD. AT LAUNCH SITE 2. A PROBABLE SS...4 MISSILE ON A TRANSPORTER WAS ALIGNED TO THE ERECTOR AT THE MIDDLE NORTH LAUNCH PAD. GOMEL MRBM COMPLEX STATUS; OPERATIONAL 52..-21u..30N 03044s.56E REMARKS: THE RAIL?TO?ROAD TRANSFER POINT, FIXED FIELD SITE 1, PARTS OF LAUNCH SITES 1 AND 2. AND FIXED FIELD SITE 2 WERE OBSERVED. TWO FUEL TRANSPORTERS AND ONE OXIDIZER TRANSPORTER WERE OBSERVED ON ONE LAUNCH PAD AT LAUNCH SITE 1. GRANOV IRBM COMPLEX STATUS:OPERATIONAL 48...54...47N 4,11\1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. AT EACH OF THE THREE LAUNCH SITES. A CLEARING FOR A FREQUENCY DIVERSE PAIR OF HORIZONTAL DIPOLE ANTENNAS WAS OBSERVED. THESE AREAS WERE FIRST VISIBLE IN JAN 74 WHEN CLEARING WAS UNDERWAY. 25X1 THE CLEARINGS WERE NOT PRESENT IN AUG 73 AT LAUNCH 25X1 SITE 1. FIVE SS-5 MISSILES ON TRANSPORTERS WERE AT THE LAUNCH SITE. AT LAUNCH SITE 2. TWO SS..-5 TRANSPORTERS AND ONE SILO LOADER WERE IN THE RIM AREA. TEN HOLLOW RECTANGULAR CONCRETE FORMS WERE ON THE GROUND NEAR THE NORTHERN SILO. AT LAUNCH 133 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 11 V I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 25X1 11 SOVIET UNION KH..?44 MISSION 1206...2 DEPLOYED STRATEGIC SSM FACILITIES SITE 3, TWO SS-5 MISSILES ON TRANSPORTERS WERE IN THE RIM AREA.. A NEW RAIL SPUR WAS UNDER CONSTRUCTION AT THE RAIL?TO-ROAD TRANSFER POINT AND PROBABLE CONSTRUCTION MATERIALS WERE IN THE LOOP ROAD AREA. - 25X1 25X1 GRESK MRBM COMPLEX STATUS: OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH MISSILE WAS ERECTED ON THE WEST LAUNCH 53..420..31N 027...4447 SITE 30 PAD. AN SS-4 25X1 GUSEV MRBM COMPLEXX STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. 54?..39..?35N 02208?..18E 25X1 25X1 GVARDEYSK MRBM COMPLEX 54*..44...59N 25X1 STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. A LAUNCH STAND WAS ON THE NE PAD AT LAUNCH SITE 14, 134 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES IMENI GASTELLO ICBM COMPLEX STATUS:OPERATIONAL 51-16-41N 065-55-50E 25X1 REMARKS: ALL COMPONENTS OF THE COMPLEX EXCEPT TYPE IIF LAUNCH SITES 57 AND 58 WERE OBSERVED ON EITHER NO CONSTRUCTION 25X1 PROGRESS WAS SEEN AT THE IIIF LAUNCH SITES. PROBABLE PERIODIC MAINTENANCE WAS IN PROGRESS AT TYPE IIIC LAUNCH SITES 45H AND 48H. JELGAVA MRBM COMPLEX STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED AT LAUNCH SITE 3. THE CLEARING EAST OF THE SILOS HAD BEEN ENLARGED. PROBABLY FOR HORIZONTAL DIPOLE ANTENNAS. AT LAUNCH SITE 2. AN EXERCISE WAS IN PROGRESS ON THE NORTH LAUNCH PAD. ON A MISSILE TRANSPORTER WAS ON THE NW LAUNCH PAD AT LAUNCH SITE 2. 56-38-40N 024-06-09E JONAVA MRBM COMPLEX STATUS:OPERATIONAL 55-00.-05N 024-12-53E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NETTING WAS AT TWO LAUNCH PADS AT LAUNCH SITE 1 AND AT FOUR LAUNCH PADS AT LAUNCH SITE 2. TWO MISSILES ON TRANSPORTERS WERE SEEN AT 135 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 11 SOVIET UNION KH-9 MISSION 12082 DEPLOYED STRATEGIC SSM FACILITIES LAUNCH SITE 1. A TRAINING MISSILE WAS ERECTED NEAR ONE OF THE LAUNCH PADS AT LAUNCH SITE 1. AND ACTIVITY WAS SEEN ON ONE OF THE LAUNCH PADS. STACKS OF MATERIEL WERE AT THE RAIL?TO?ROAD TRANSFER POINT. THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. KARTALY ICBM COMPLEX STATUS: OPERATIONAL 52...5311N 060...347E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. CONSTRUCTION ACTIVITY WAS AGAIN OBSERVED AT IIIF LAUNCH SITE 54 THE ENVIRONMENTAL COVER HAD BEEN REMOVED FROM THE SILO plEkCAV.i4TION AND A CRANE WAS NEXT TO THE SILO AT LAUNCH SITE 56 ON ALL THREE DAYS. SIX SILO LINER SEGMENTS WERE ON THE SILO APRON. NO CHANGE WAS OBSERVED IN THE AMOUNT OF IIIF CONSTRUCTION MATERIAL IN .THE RECEIVING AREA. PROBABLE PREPARATIONS FOR LAUNCH SITE CONVERSION WERE CONTINUING IN THE A GROUP. CONSTRUCTION WAS CONTINUING ON THE BUILDING OBSERVED AT LAUNCH SITE 1 AT LAUNCH SITE 2 THE SMALL BUILDING REPORTED WAS COMPLETE AND A NEW LARGER BUILDING, SIMILAR TO THAT AT LAUNCH SITE 1. WAS UNDER CONSTRUCTION. NEW TEMPORARY SUPPORT AREAS WITH HOUSETRAILERS WERE OBSERVED IN THE TREES NEAR LAUNCH SITES 1 AND 3 AND, AT LAUNCH SITE 6. UNIDENTIFIED MATERIAL WAS LYING ON PORTIONS OF THE APRON AND THE LOOP ROAD. PROBABLE PERIODIC MAINTENANCE ACTIVITY WAS IN PROGRESS AT THE TRAINING SITE NO CHANGE WAS OBSERVED IN THE AMOUNT OF I/IF CONSTRUCTION MATERIEL IN THE RECEIVING AREA. HOWEVER. SOME IIIF MATERIEL OBSERVED IN THE OLD IIIC 7CEIVING AREA WAS NOT PRESENT 136 25X1 25X1 25X1 ')cY1 25X1 25X1 25X1 25X1 25X1 2bA1 25X1 25X1 25X1 25X1 Tnp cFCRFT RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KN.-9 MISSION 1208-2 KIVERTSY MRBM COMPLEX STATUS: UNKNOWN REMARKS: THE COMPLEX WAS NOT OBSERVED. SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES 50-54-14N 025-29-46E KONKOVICHI MRBM COMPLEX STATUS:OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 1, 25X1 FOUR ERECTORS WERE OBSERVED ON ONE LAUNCH PAD AND LAUNCH STANDS WERE OBSERVED ON THE OTHER THREE LAUNCH PADS. A 25X1 PROBABLE ERECTOR WAS ON EACH OF THE FOUR LAUNCH PADS. 52-18-14N 028-38-50E 25X1 25X1 25X1 AT LAUNCH SITE 2' AN ERECTOR WAS AT EACH OF THE FOUR LAUNCH PADS ON BOTH DAYS. KOROSTEN MRBM COMPLEX STATUS: OPERATIONAL 50-.51...56N 028.-15-22E REMARKS: THE ENTIRE COMPLEX AND SEARCH AREA WERE SEEN. AN SS-4 ERECTOR WAS ON EACH LAUNCH PAD AT LAUNCH SITE 1. AN SS-4 MISSILE ON A TRANSPORTER WAS AT EACH OF TWO MISSILE?READY BUILDINGS AT LAUNCH SITE 1. AN 55-4 ERECTOR WAS ON THREE OF THE FOUR LAUNCH PADS AT LAUNCH SITE 2. AN SS-4 MISSILE ON A TRANSPORTER WAS ALIGNED WITH AN ERECTOR AT THE SE LAUNCH PAD. RECTANGULAR REVETMENTS WERE UNDER CONSTRUCTION OFF THE ACCESS 137 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 H u Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1. 25X1 1 KH-9 MISSION 1208-2 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES ROAD IN FRONT OF THREE OF THE FOUR LAUNCH PADS AT LAUNCH SITE 1 AND IN FRONT OF EACH OF THE LAUNCH PADS AT LAUNCH SITE 2. ONE OF THESE REVETMENTS AT LAUNCH SITE 2 WAS NET COVERED. KOZELSK ICBM COMPLEX STATUS: OPERATIONAL RU?n7.10A1 n?c.9Q-22r REMARKS: THIRTY OF THE 110 SS-11 LAUNCH SITES, TWO SS-8 LAUNCH SITES. 25X1 25X1 AND PARTS SUPPORT UNIDENTIFIED ONE OF SUPPORT OF THE RAIL?TO?ROAD TRANSFER FACILITY WERE OBSERVED. MATERIALS WERE OBSERVED THE RAIL SPURS IN THE SOUTHERN FACILITY. NEITHER THE POINT AND COMPLEX A NEW CLEARING AND FOR THE FIRST TIME NEAR PART OF THE COMPLEX CLEARING NOR MATERIALS WERE PRESENT 25X1 25X1 KOZHANOVICHI MRBM COMPLEX 52-12...58N 027-52-51E 25X1 STATUS :OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. A MISSILE?READY TENT WAS NEXT TO EACH OF THE TWO MISSILE?READY BUILDINGS AT LAUNCH SITE 2. A MISSILE TRANSPORTER WAS IN FRONT OF ONE OF THE MISSILE?READY BUILDINGS AT BOTH LAUNCH SITES 1 AND 2 25X1 25X1 KRASNOZNAMENSK MRBM COMPLEX STATUS:OPERATIONAL 55-01.-10N 022-23-07E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED EXCEPT THE RAIL?TO?ROAD TRANSFER POINT WHICH WAS PARTIALLY CLOUD COVERED. 138 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED AN SS-4 MISSILE ON A TRANSPORTER WAS ON SITES 1 AND 2. NETTING OR CANVAS PANELS LAUNCH PADS AT LAUNCH SITE 1 AND ON THREE SITE 2. APPROXIMATELY 25 VEHICLES WERE OF LAUNCH SITE 2. STRATEGIC SSM FACILITIES ONE PAD AT BOTH LAUNCH WERE SEEN ON ALL FOUR OF THE PADS AT LAUNCH IN A CLEARED AREA WEST 25X1 KROLEVETS IRBM COMPLEX STATUS: OPERATIONAL REMARKS: ONLY LAUNCH SITE 3 WAS PARTIALLY OBSERVED. 51-37-17N 033-32-27 25X1 25X1 25X1 25X1 25X1 LIDA MRBM COMPLEX STATUS:OPERATIONAL REMARKS: LAUNCH SITES 1 AND 2 WERE OBSERVED. LUTSK MRBM COMPLEX STATUS: UNKNOWN REMARKS: THE COMPLEX WAS NOT OBSERVED. 50-48-00N 024...54-00E 25X1 MOLOSKOVITSY MRBM COMPLEX 59-33-15N 028-57-16E 25X1 STATUS: OPERATIONAL 139 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified 11 V in Part - Sanitized Copy .1 , Approved for Release 2014/05/01 TOP SECRET RUFF : CIA-RDP78T04752A001500010011-9 25X1 25X1 SOVIET UNION KH-9 MISSION 1208,...2 DEPLOYED STRATEGIC SSM FACILITIES REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. A 25X1 MISSILE EXERCISE WAS IN PROGRESS ON ONE PAD AND UNIDENTIFIED ACTIVITY WAS ON ANOTHER AT LAUNCH SITE 2. AN EXERCISE WAS IN PROGRESS ON ONE PAD AT LAUNCH SITE 1, TWO MISSILES 25X1 ON TRANSPORTERS WERE IN FRONT OF MISSILE-READY BUILDINGS AT LAUNCH SITE 2' AND ONE POSSIBLE MISSILE ON A TRANSPORTER WAS BY A MISSILE-.READY BUILDING AT LAUNCH SITE 1. FOUR PROBABL TRANSFER POINT 25X1 RAILCARS WERE AT THE RAIL-TO-ROAD rIllISSLE FOUR MISSILES ON TRANSPORTERS WERE AT LAUNCH SITE 3 ON 25X1 BOTH DATES. 25X1 NADVORNAYA MRBM COMPLEX 48-41...23N 024.-46-03E 25X1 STATUS: UNKNOWN REMARKS: THE COMPLEX WAS NOT OBSERVED. 25X1 NIGRANDE IRBM COMPLEX 56-35...32N 021.-55-44E 25X1 STATUS: OPERATIONAL REMARKS: ONLY LAUNCH SITES 1 AND 3 WERE OBSERVED. MISSILE ERECTORS WERE ON ALL FOUR LAUNCH PADS AT LAUNCH SITE 1 AND A CLEARING FOR A PROBABLE NEW ANTENNA INSTALLATION WAS NEAR THE REGIMENTAL COMMAND BUNKER. 140 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 SOVIET UNION STRATEGIC SSM FACILITIES 55-17-11N 083-06-02E KH-9 MISSION 1208-2 DEPLOYED NOVOSIBIRSK ICBM COMPLEX STATUS: OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. 25X1 OMSK ICBM COMPLEX 55-04-19N 073-36-02E 25X1 STATUS: UNKNOWN REMARKS: THE COMPLEX WAS NOT OBSERVED. 25X1 OSTROG MRBM COMPLEX 50-15-24N OP6-49-50F 25X1 STATUS:OPERATIONAL REMARKS: AN SS-4 MISSILE THE ENTIRE COMPLEX WAS OBSERVED. 25X1 WAS ERECTED ON THE SW LAUNCH PAD. A SECOND 55-4 MISSILE WAS AT THE NORTH?CENTRAL MISSILE?READY BUILDING. AT LAUNCH SITE 2r TWO SS-4 MISSILES WERE PRESENT AND THE ERECTOR BED WAS RAISED ON THE SOUTH?CENTRAL LAUNCH PAD. 25X1 OSTROV MRBM COMPLEX 57-29-22N 028-19-02E 25X1 STATUS:OPERATIONAL 141 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - 11 V ,..4.1 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 25X1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. ALL FOUR SILO DOORS WERE OPEN AT LAUNCH SITE 3 AND AN AREA FOR A HORIZONTAL DIPOLE ANTENNA WAS BEING CLEARED, TWO RAILCARS WERE IN THE RAIL-40.-ROAD TRANSFER POINT. AN EXERCISE WAS IN PROGRESS ON TWO PADS AT LAUNCH SITE 1. THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. PERM ICBM COMPLEX STATUS: OPERATIONAL 57e-35...58N 056-15.41E REMARKS: ALL ELEMENTS OF THE LAUNCH COMPLEX WERE AT LEAST PARTIALLY OBSERVED ON 25X1 25X1 25X1 25X1 SS-7 LAUNCH SITES 1 AND 2 REMAINED IN A REDUCED STATE OF READINESS. AT LAUNCH SITE 4 ONE SILO DOOR WAS OPEN. 25X1 TWO SS-.7 MISSILES WERE PRESENT ON BOTH A 25X1 MISSILE EXERCISE WITH TWO ERECTED MISSILES WAS IN PROGRESS AT LAUNCH SITE 3 AT LAUNCH SITE 5, TWO SS-.7 MISSILES 25X1 ON TRANSPORTERS WERE OBSERVED ON THE NORTH LAUNCH PAD ON BOTH DATES. SS,-11 SITE MODERNIZATION WAS IN PROCESS AT ALL SITES IN THE H AND I GROUPS. NO EVIDENCE OF A LINEAR EXCAVATION WAS OBSERVED AT ANY OF THE SITES. NO EVIDENCE OF INTRA-SITE CABLING WAS OBSERVED. AN SS-11 MISSILE TRANSPORTER AND SILO LOADER WERE OBSERVED AT LAUNCH SITE 81 AND AT 29H AND 30H TWO PROPELLANT TRANSPORTERS WERE ALSO AT 29H AND 30H. A NEW BUILDING WAS UNDER CONSTRUCTION AT GROUP CONTROL SITES 13G 29Hr AND 101. EIGHT SS.-11 CANISTERS WERE IN REVETMENTS IN THE ADMINISTRATION AND HOUSING AREA OF THE CSI AND FIVE MORE WERE AT THE RTP (THREE ON THE TRAINING SITE APRON AND TWO IN THE PROPELLANT HANDLING AREA). THE RTP ALSO CONTAINED SEVEN MISSILE RAILCARS. A PROBABLE SECURITY RAILCAR. AND 11 PROPELLANT RAILCARS. 142 25X11 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES PERVOMAYSK SSM COMPLEX STATUS: COMPLETE 48?I2.-24N 030e.54.-17 REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. CONSTRUCTION WAS CONTINUING ON THE TYPE IIIX SILOS AT FIVE OF THE SIX TYPE IIID LAUNCH GROUP CONTROL SITES. AT THE SIXTH TYPE IIID LAUNCH GROUP CONTROL SITE. 41E, 14 HOUSETRAILERS AND NUMEROUS VEHICLES WERE VISIBLE THROUGHOUT THE SITE. VEHICLES WERE ALSO OBSERVED AT FIVE OTHER LAUNCH SITES IN THIS GROUP. POSSIBLY PREPARATORY TO SITE CONVERSION. HEADWORKS WERE ASSEMBLED ON THE APRONS OF ALL THE TYPE IIID SITES IN THE A GROUP. AT LAUNCH SITE 14A, IN ADDITION TO THE HEADWORKS, A PARTIALLY ASSEMBLED PROBABLE SILO WALL SEGMENT WAS VISIBLE ON THE APRON. IN THE C GROUP, ASSEMBLED HEADWORKS WERE ON THE APRON OF FOUR OF THE TEN LAUNCH SITES. AT LAUNCH SITE 22C. A PROBABLE SILO WALL SEGMENT 25X1 25X1 25X1 WAS ON THE APRON NEAR 25X1 THE SILO. AND TWO PILES OF UNIDENTIFIED MATERIALS WERE STACKED TO ONE SIDE OF THE APRON. AT THE OTHER SIX LAUNCH SITES IN C GROUP. THE SILO DOORS HAD BEEN REMOVED. PINSK MRBM COMPLEX STATUS:OPERATIONAL 52...11...4AN 0PS...43..09F REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 3.. AN SS-4 MISSILE ON A TRANSPORTER WAS ALIGNED WITH EACH OF THREE ERECTORS. AT LAUNCH SITE 2. AN SS-4 MISSILE ON A TRANSPORTER WAS ALIGNED WITH AN ERECTOR. 143 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 h V Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LOA1 25X1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES POLOTSK MRBM COMPLEX STATUS: OPERATIONAL 55-18-07N 028-19-29E REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AN EXERCISE WAS IN PROGRESS ON ALL FOUR PADS AT LAUNCH SITE 1 AND ON THREE PADS AT LAUNCH SITE 2. POSTAVY MRBM COMPLEX STATUS:OPERATIONAL 55-17-07N 026-49-43E REMARKS: ONLY LAUNCH SITE 2 WAS OBSERVED. AN EXERCISE WAS IN PROGRESS ON TWO LAUNCH PADS AT LAUNCH SITE 2. LAUNCH SITE 1 AND THE RAIL?TO-ROAD TRANSFER POINT WERE IDENTIFIABLE ONLY. PRUZHANY MRBM COMPLEX STATUS:OPERATIONAL 52-28-56N 024-02-48E REMARKS: LAUNCH SITES 1 AND 2 WERE OBSERVED, AT LAUNCH SITE 2. A MISSILE ON A TRANSPORTER WAS IN FRONT OF A MISSILE?READY BUILDING. ERECTORS WERE AT THEIR NORMAL POSITIONS. RAKVERE MRBM COMPLEX STATUS: UNKNOWN 59-09-51N 026-17-50E REMARKS: THE COMPLEX WAS NOT OBSERVED. 144 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Top SECRET RUFF Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : TOP SECRET RUFF CIA-RDP78T04752A001500010011-9 25x1 LOA! 25X1 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES KH-9 MISSION 1208u-2 25X1 RISTI MRBM COMPLEX 59-415.-3SN OP4..05-18 25X1 STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. THE 25X1 ERECTOR BED WAS RAISED ON THE NW LAUNCH PAD AT LAUNCH SITE 1. AN SS-N.4 MISSILE WAS ERECTED ON THE NE LAUNCH PAD AT LAUNCH SITE 2. 25X1 RUZHANY MRBM COMPLEX 52-51...42N 024-35-35E 25X1 STATUS: UNKNOWN REMARKS: THE compLEx WAS NOT OBSERVED. 25X1 SARY?OZEK IRBM COMPLEX 44-32-16N 077-46-06E 25X1 STATUS:OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 3. TWO SILO DOORS WERE OPEN. THE WORK PLATFORMS HAD BEEN REMOVED AND NO MISSILES WERE VISIBLE IN THE SILOS. CONSTRUCTION WAS CONTINUING ON THE APRON BETWEEN THE TWO SOUTHERN SILOS AND ON THE HORIZONTAL DIPOLE ANTENNAS SOUTH OF THE SILOS. AT LAUNCH SITE 2, THE NORTH SILO DOOR WAS OPEN. AT LAUNCH SITE 1. A MISSILE WAS ALIGNED WITH THE ERECTOR ON TWO LAUNCH PADS AND 145 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified 11 II in Part - Sanitized Copy Approved ?I .1 , for Release 2014/05/01 TOP SECRET RUFF : CIA-RDP78T04752A001500010011-9 25X1 LAI 25X1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES THREE OTHER MISSILES ON TRANSPORTERS WERE AT THE SITE. 25X1 SATEIKIAI MRBM COMPLEX 56-01-08N 021-46-23E 25X1 STATUS:OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. AN 25X1 EXERCISE WAS IN PROGRESS ON ALL FOUR LAUNCH PADS AT LAUNCH SITE 1. AT LAUNCH SITE 2. TWO OXIDIZER TRANSPORTERS AND ONE FUEL TRANSPORTER WERE ON EACH LAUNCH PAD NEXT TO THE ERECTOR. AT LAUNCH SITE 3. CLEARING FOR A NEW PROBABLE ANTENNA FACILITY WAS VISIBLE WEST OF THE SILOS. 25X1 SHADRINSK ICBM COMPLEX 56-08-09N 063-49-46E 25X1 STATUS: UNKNOWN REMARKS: THE COMPLEX WAS NOT OBSERVED. 25X1 SLONIM MRBM COMPLEX O-17- 8E 25X1 STATUS:OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 2. AN SS-4 MISSILE ON A TRANSPORTER WAS ALIGNED TO THE ERECTOR AT THE NORTH LAUNCH PAD. 146 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF SOVIET UNION KH-..9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES SMORGON IRBM COMPLEX STATUS: OPERATIONAL 54-31-.07N 026..48.-07E REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 2. AN SS-5 MISSILE WAS ERECTED AT EACH OF TWO LAUNCH PADS. HORIZONTAL DIPOLE ANTENNAS WERE IN A CLEARING SOUTH OF THE CONTROL BUNKER SOUTH OF THE ACCESS ROAD TO THE LAUNCH PADS. A CLEARING. POSSIBLY FOR HORIZONTAL DIPOLE ANTENNAS, WAS SE OF THE SILOS AT LAUNCH SITE 3. G.J/V I 25X1 25X1 25X1 25X1 25X1 25X1 SOKAL MRBM COMPLEX STATUS: UNKNOWN REMARKS: THE COMPLEX WAS NOT OBSERVED. 50-23-53N 024...21.-51E 021-34-08E SOVETSK MRBM COMPLEX STATUS: OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. COVERED ONE LAUNCH PAD AT LAUNCH SITE AT ONE OTHER LAUNCH PAD. UNIDENTIFIED WAS SEEN AT LAUNCH SITE 2. NORTH OF THE WARHEAD STORAGE AREA, A SMALL SQUARE PARTIAL EXCAVATION FOR A BUILDING WAS 55-09.-22N NETTING PARTIALLY 1. AND ACTIVITY WAS SEEN CONSTRUCTION ACTIVITY LAUNCH PADS NEAR THE AREA WAS GRADED AND A SEEN. 147 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 I I V . I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 25X1 SOV/ET UNION KH-9 MISSION 1208...2 DEPLOYED STRATEGIC SSM FACILITIES TATISHCHEVO ICBM COMPLEX STATUS: OPERATIONAL 51-50...42N 045...40-42E REMARKS: ONE HUNDRED AND ONE TYPE IIID LAUNCH SITES, THE COMPLEX SUPPORT FACILITIES (CSF). AND THE RAIL-TO?ROAD TRANSFER POINT (RIP) WERE OBSERVED. THE PROBABLE TYPE IIIX SITE (154) WAS NOT OBSERVED. A TEMPORARY SUPPORT CAMP WAS NEXT TO LAUNCH SITES 94H AND 127H. THE TEMPORARY SUPPORT CAMPS WERE PRESENT TAURAGE MRBM COMPLEX STATUS:OPERATIONAL 55-14-..07N 022-25...39E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. THE BED ON ONE ERECTOR WAS RAISED AT LAUNCH SITE 1. A MISSILE ON A TRANSPORTER WAS OBSERVED AT LAUNCH SITES 1 AND 2. TAYBOLA IRBM COMPLEX STATUS: OPERATIONAL 68-25-27N 033...21.48E REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. NORMAL ACTIVITY AND LEVELS OF EQUIPMENT WERE VISIBLE AT BOTH LAUNCH SITES. 148 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 2bAl 25X1 KH-9 MISSION 1208-2 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES TEYKOVO ICBM COMPLEX STATUS: OPERATIONAL 56..44?05N 040.?40..-54E REMARKS: THE SIX SS-7 LAUNCH SITES. 55 OF THE 80 SS-11 LAUNCH SITES. THE TRAINING SITE, THE RAIL?TO?ROAD TRANSFER POINT. THE COMPLEX SUPPORT FACILITY ADMINISTRATION' AND THE COMPLEX SUPPORT FACILITY RAIL WERE OBSERVED. PROBABLE LAUNCH SITE MODERNIZATION ACTIVITY WAS VISIBLE AT ALL TEN SITES IN LAUNCH GROUP A. THE SILO DOOR WAS OPEN AT THREE AND PROBABLY FOUR SITES AND THE SILO WAS CANVAS COVERED AT FOUR' AND PROBABLY FIVE SITES. NO INDICATIONS OF MODERNIZATION WERE VISIBLE IN LAUNCH GROUPS B' CP Et AND G. OR IN THE VISIBLE PORTIONS OF LAUNCH GROUPS D AND F. LAUNCH GROUP H WAS NOT IMAGED. SS-7 LAUNCH SITES 2 AND 3 REMAINED IN A REDUCED STATE OF READINESS. THE SS?X-18 MISSILE CANISTER WAS STILL PRESENT IN THE RIP. TORVA MRBM COMPLEX STATUS: OPERATIONAL 57-58.?44N REMARKS: ALL COMPLEX COMPONENTS WERE OBSERVED. AN EXERCISE WAS IN PROGRESS ON ONE PAD AT LAUNCH SITE 1 AND AN SS-4 WAS ON ONE PAD AT LAUNCH SITE 2. THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. 149 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 25X1 25X1 25X1 25X1 25X1 UNION SOVIET DEPLOYED STRATEGIC SSM FACILITIES KN....9 MISSION 1208...2 TYUMEN ICBM COMPLEX STATUS:OPERATIONAL REMARKS: ALL COMPONENTS OF THE COMPLEX AND TWO LOX CARS WERE IN THE WERE OBSERVED* RTP. 56...52e.09N 065e.39^.24E A MISSILE RAILCAR UKMERGE MRBM COMPLEX STATUS:OPERATIONAL REMARKS: THE ENTIRE COMPLEX EXCEPT FIXED FIELD 024..40...44E SITE 1 WAS OBSERVED* USOVO MRBM COMPLEX 51...15."11N STATUS: OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS SEEN* AN SS...4 ERECTOR WAS ON EACH LAUNCH PAD AT EACH OF THE THREE LAUNCH SITES* ONE MISSILE ON A TRANSPORTER IN FRONT OF A READY BUILDING WAS OBSERVED AT EACH OF THE LAUNCH SITES. A RECTANGULAR REVETMENT WAS OFF THE ACCESS ROAD IN FRONT OF THREE OF THE LAUNCH PADS AT LAUNCH SITE 2 AND A RECTANGULAR REVETMENT WAS UNDER CONSTRUCTION IN FRONT OF A LAUNCH PAD AT LAUNCH SITE 3, VERKHNYAYA SALDA ICBM COMPLEX STATUS:OPERATIONAL 150 58..08 18N 060..33...36E 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP cFCRFT RUFF 25X1 11 KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES SOVIET UNION REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NORMAL SS-7 ACTIVITY WAS VISIBLE AT ALL NINE LAUNCH SITES. A MISSILE ON A TRANSPORTER WAS SEEN AT LAUNCH SITES 7 AND 9. voRu mR8m COMPLEX STATUS:OPERATIoNAL REMARKS: 57-47-23N 026-48-51E ALL COMPONENTS OF THE COMPLEX WERE OBSERVF11. AN FYFRCTSF WAS IN PROGRESS ON TWO PADS AT LAUNCH SITE 1 AND ON ONE PAD AT LAUNCH SITE 2 THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. VSELYUB MRBM COMPLEX STATUS: OPERATIONAL REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. 53-47-16N 025-44-49E YEDROVO ICBM COMPLEX STATUS: OPERATIONAL 57-46-40N 033-13-15E REMARKS: THIRTY?SEVEN SS-11 LAUNCH SITES AND THE TRAINING SITE WERE OBSERVED. SIX OTHER SS-11 LAUNCH SITES. TWO SS-7 LAUNCH SITES. THE RAIL?TO?ROAD TRANSFER POINT' 151 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 u?.i..I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LOA! 25X1 SOVIET UNION KH-9 MISSION 1208-2 DEPLOYED STRATEGIC SSM FACILITIES FACILITY WERE PARTIALLY OBSERVED. A PROBABLE TYPE IIIX SILO UNDER CONSTRUCTION WAS IDENTIFIED AT LAUNCH GROUP CONTROL SITE 111. THE SILO IS IN THE WOODED AREA ABOUT 400 FEET WEST OF TH 111 SILO APROk A 1 AS kO PRESENT UNIDENTIFIED ACTIVITY WAS SEEN AT THREE SITES IN LAUNCH GROUP 0. A TEMPORARY SUPPORT AREA. CONSISTING OF APPROXIMATELY 18 HOUSETRAILERS AND NUMEOUS VEHICLES. WAS VISIBLE AT THE LAUNCH GROUP CONTROL SITE. . AT TWO OTHER SITES IN THE GROUP. THE SILO DOOR WAS OPEN AND AT LEAST TEN VEHICLES, INCLUDING A TRUCK?MOUNTED CRANE. WERE ON THE SILO APRON AND TURNAROUND. YELSK MRBM COMPLEX STATUS: OPERATIONAL 51...46s.45N 029..-16-26E REMARKS: THE ENTIRE COMPLEX WAS SEEN. AT LAUNCH SITE 1. ONLY LAUNCH STANDS WERE PRESENT AT EACH LAUNCH PAD. AN ERECTOR WAS ON EACH OF THE FOUR LAUNCH PADS AT LAUNCH SITE 2. YOSHKARs.OLA ICBM COMPLEX STATUS: OPERATIONAL 56-47...40N 048...30.-58F REMARKS: FORTY-.FIVE OF THE SS-13 SITES. FOUR OF THE SS-7 SITES. AND FOUR LAUNCH CONTROL FACILITIES WERE AT LEAST PARTIALLY SEEN. LAUNCH SITE 2 REMAINED IN A REDUCED STATE OF READINESS AND LAUNCH SITE 1 WAS NOT SEEN, THE ROOF WAS REMOVED FROM ONE OF THE PROPELLANT SHEDS SOUTH OF THE LOOP ROAD AT LAUNCH SITE 2. THE SHED NORTH OF THE LOOP ROAD HAD BEEN ENTIRELY REMOVED. ONE PROPELLANT TANK WAS ON THE APRON IN FRONT OF THE SHED WITH THE 152 25X1 25X1 25X1 25X1 - 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Top SECRET RUFF KH-9 MISSION 1208-2 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES ROOF REMOVED. ONE SS-7 MISSILE ON A TRANSPORTER WAS IN FRONT OF THE EAST MISSILE?READY BUILDING AT SITE 6. YURYA ICBM COMPLEX STATUS: OPERATIONAL sQ-13-10N 049-35-07 25X1 25X1 25X1 REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NORMAL SS-7 ACTIVITY WAS VISIBLE AT ALL 11 LAUNCH SITES. A 25X1 MISSILE ON A TRANSPORTER WAS SEEN AT LAUNCH SITES 7, 8. AND 10, AND A MISSILE WAS ERECTED ON THE WEST PAD AT LAUNCH SITE 1. ZAGARE MRBM COMPLEX STATUS:OPERATIONAL REMARKS: ALL OF THE COMPLEX COMPONENTS WERE OBSERVED. A MISSILE ON A TRANSPORTER WAS ALIGNED WITH THE ERECTOR ON THE SW LAUNCH PAD AT LAUNCH SITE 2. A MISSILE ON A TRANSPORTER WAS ALIGNED WITH THE ERECTOR ON THE NW LAUNCH PAD AT lAHNCH STTF 2. 56-31.-50N 023...19-48E ZHANGIZTOBE Icpm compLEx STATUS: OPERATIONAL 153 49-17..59N 081.49-44E TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 . 1 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 2)(1 TOP cFCRFT RUFF 25X1 25X1 1 KH-9 MISSION 1208...2 SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. NO CONSTRUCTON ACTIVITY OR CHANGE WAS SEEN AT THE IIIF LAUNCH SITES. ZHITOMIR MRBM COMPLEX STATUS: OPERATIONAL REMARKS: THE ENTIRE COMPLEX AND SEARCH AREA WERE OBSERVED. AT LAUNCH SITE 2, THREE SS...4 MISSILES ON TRANSPORTERS WERE PRESENT. A DRIVE?IN REVETMENT WAS BEYOND THE CONNECTING ROAD IN FRONT OF EACH LAUNCH PAD. AN ERECTOR WAS IN EACH OF TWO REVETMENTS AND AN EMPTY SS...4 MISSILE TRANSPORTER WAS IN EACH OF THE TWO REMAINING REVETMENTS ? THESE TWO ERECTORS WERE /N ADDITION TO THE FOUR ON THE LAUNCH PADS. 028...14..-49E AT LAUNCH SITE 3, FOUR 5S...4 MISSILES WERE PRESENT. A DRIVE?IN REVETMENT WAS BEYOND THE CONNECTING ROAD IN FRONT OF EACH LAUNCH PAD. AN EMPTY SS...4 MISSILE TRANSPORTER WAS IN THE WEST REVETMENT. AT THE INACTIVE LAUNCH SITE 1, TWO STRUCTURES. APPROXIMATELY 100 FEET LONG, WERE ON THE EAST?CENTRAL LAUNCH PAD AND PIECES OF EQUIPMENT WERE AT THE ROAD INTERSECTION NEAR THE PAD. FIVE PIECES OF PROBABLE GROUND FORCE?ASSOCIATED EQUIPMENT WERE IN THE PROPELLANT STORAGE AREA. THREE MISSILE RAILCARS WERE IN THE RAIL?TO?ROAD TRANSFER POINT. ZHMERINKA MRBM COMPLEX STATUS:OPERATIONAL 02801...34E REMARKS: THE ENTIRE COMPLEX WAS OBSERVED. AT LAUNCH SITE 1, ONE SS-4 MISSILE ON A TRANSPORTER AND ONE EMPTY TRANSPORTER WERE PRESENT. AT LAUNCH SITE 2. AN SS.-.4 MISSILE ON A TRANSPORTER 154 25X1 - 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 )1(1 .1 KH-9 MISSION 12082 TOP SECRET RUFF SOVIET UNION DEPLOYED STRATEGIC SSM FACILITIES WAS ALIGNED WITH THE ERECTOR AT THREE LAUNCH PADS. AN ERECTOR WAS ON THE FOURTH LAUNCH PAD AND AN SS?L# MISSILE WAS NEAR THE PAD. AT LAUNCH SITE 3, A CLEARING WAS BEING PREPARED FOR A HORIZONTAL DIPOLE ANTENNA ON THE WEST SIDE OF THE SITE. THE NIIRS RATING FOR INDIVIDUAL TARGETS WILL BE INCLUDED IN THE OAK SUPPLEMENT FOR EACH TARGET. ZNAMENSK MRBM COMPLEX STATUS:OPERATIONAL 021..05.?.13E REMARKS: ALL COMPONENTS OF THE COMPLEX WERE OBSERVED. ONE MISSILE ON A TRANSPORTER WAS SEEN AT BOTH SITES. OTHER RESULTS?NO APPARENT CHANGE UMAN MRBM COMPLEX STATUS:NOT OPERATIONAL 4852e?OON 030?.4223E 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 155 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - ?h . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS AKHTUBINSK FLIGHT TEST CENTER STATUS: OPERATIONAL SOVIET UNION MISSILE RANGES 48-17-53N 046-11-22E REMARKS: THREE RAM?G (ONE WITH AN EXTENDED FUSELAGE) WERE OBSERVED ON THE PARKING APRON AND FOUR FENCER A WERE OBSERVED IN THE AAM SUPPORT FACILITY. THIS WAS THE LARGEST NUMBER OF FENCER EVER OBSERVED IN THE AAM SUPPORT FACILITY. NO BACKFIRE WERE OBSERVED. AIR ORDER OF BATTLE: -- AT MAIN AIRFIELD 3 RAM?G (1 W/EXTENDED FUSELAGE) 8 BLINDER 10 BADGER 1 BEAGLE 3 FOXBAT 3 FIDDLER 4 FLOGGER 2 FLAGON A 1 FLAGON D 6 FITTER 26 FISHBED AIR ORnER OF BATTLE: -- AT AREA AIRFIELD 1 BEAR 7 BADGER 9 BEAGLE 4 FLOGGER AIR ORDER OF BATTLE: -- IN ASM SPT CPLX 1 BLINDER 1 FOXBAT 1 FITTER B AIR ORDER OF BATTLE: -- IN AAM SPT CPLX 25X1 1 FLAGON A 1 FISHPOT 6 FITTER 1 FOXBAT 4 FENCER A 5 FLOGGER 9 FIREBAR/BREWER 1 FAGOT/MIDGET 1 CRUSTY 1 COOKER (W/POINTED NOSE) 2 CAMEL (1 W/POINTED NOSE) 4 CUB 1 CAMP 7 COKE 4 CRATE 2 HIND?A 10 HIP C (1 W/0 ROTOR) 1 PROB LA-17 DRONE 5 FARMER 23 FAGOT/FRESCO 1 COOKPOT 3 FITTER 2 FISHBED 25X1 25X1 25X1 25X1 156 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 LOA! 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 ASSOCIATED OBJECTS: -- IN AAM ASM STOR AREA 85 ASM SHIPPING CRATE SOVIET UNION MISSILE RANGES EMBA MISSILE TEST CENTER STATUS: OPERATIONAL 48-38-00N 0580330E REMARKS: THE ENTIRE EMBA MISSILE TEST CENTER WITH THE EXCEPTION OF THE SA-1 LAUNCH FACILITY WAS COVERED AN SA-8 FIELD EXERCISE WAS IDENTIFIED FOR THE FIRST TIME. TWENTY-ONE SA-8 VEHICLES WERE IDENTIFIED IN OR AROUND A BIVOUAC AREA, APPROXIMATELY 7 NM SW OF THE OPERATIONAL SUPPORT AREA. A PROBABLE MISSILE CHECKOUT AREA WAS NEARBY. A LONG PROBABLE CHECKOUT TENT AND SEVERAL PROBABLE SA-8 CANISTERS' SOME ON THE BACK OF A FLATBED TRUCK. WERE IDENTIFIED IN THE CHECKOUT AREA. ASSOCIATED EQUIPMENT IDENTIFIED NEAR THE SA-.8 FIELD EXERCISE INCLUDED AT LEAST ONE PROBABLE LONG TRACK. TWO PROBABLE THIN SKIN. AND AT LEAST EIGHT POSSIBLE BTR.-60. SIX ADDITIONAL SA-8 VEHICLES WERE IDENTIFIED AT OR NEAR LAUNCH AREA B. (SEE EMBA MISSILE TEST CENTER LAUNCH COMPLEX. FOR READOUT.) FOUR OTHER SA-8 VEHICLES WERE SEEN IN THE OPERATIONAL SUPPORT AREA. ONLY THREE OF THE 31 SA-8 VEHICLES OBSERVED WERE OF THE CONFIGURATION PREVIOUSLY IDENTIFIED AS THE SA-8 TRANSPORTER/LAUNCHER. ONE OF THE SA-8 VEHICLES WAS OF A UNIQUE CONFIGURATION, WITH AN A-FRAME-SHAPED DEVICE MOUNTED ON IT. THIS VEHICLE WAS IN THE OPERATIONAL SUPPORT AREA. WHERE IT HAS BEEN SINCE SEP 72 WHEN IT WAS FIRST OBSERVED* THE REMAINDER OF THE SA-8 VEHICLES IDENTIFIED WERE OF THE CONFIGURATION CALLED A PROBABLE RADAR VEHICLE. THE TOTAL OF 31 SA-8 VEHICLES WAS THE LARGEST NUMBER SEEN IN THE USSR TO DATE. AT THE OPERATIONAL SUPPORT AREA. A SELF-SUPPORTING TOWER WAS NEWLY IDENTIFIED IN FRONT OF THE MISSILE ASSEMBLY AND CHECKOUT BUILDING ADJACENT TO THE U.-SHAPED REVETMENT. THIS AREA HAS BEEN ASSOCIATED WITH THE SA-8 SYSTEM FOR MORE THAN THREE YEARS AND THE TOWER MAY BE FOR SOME TYPE OF CALIBRATION OR CHECKOUT. TWO SA-..8 VEHICLES WERE IDENTIFIED BESIDE THE U-SHAPED REVETMENT 157 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 Kl+..9 MISSION 1208?..2 SOVIET UNION MISSILE RANGES AN APARTMENT BUILDING WAS UNDER CONSTRUCTION AT THE BASE SUPPORT COMPLEX, A BUNKERED BUILDING WAS OBSERVED UNDER CONSTRUCTION APPROXIMATELY 1 NM WEST OF TRACKING FACILITY 2. NO SIGNIFICANT CHANGES WERE OBSERVED AT OTHER FACILITIES. EMBA MSL TEST CENTER LAUNCH COMPLEX STATUS: OPERATIONAL 05803...32E REMARKS: SIX SA.-8 VEHICLES WERE IDENTIFIED AT OR NEAR LAUNCH AREA B ON ALL SIX WERE OF THE TYPE PREVIOUSLY IDENTIFIED AS A PROBABLE RADAR VEHICLE. A PROBABLE. PAT HAND IN TRAVEL CONFIGURATION WAS AT POSITION Cl OF NEW LAUNCH AREA Ce FOUR PROBABLE INSTRUMENTATION POINTS' POSSIBLY CAMERA POSITIONS, WERE OBSERVED AROUND POSITION C2o OTHER PROBABLE INSTRUMENTATION POINTS WERE BEING PREPARED AROUND POSITION Cl. DISCOLORING WAS OBSERVED IN THE CONCRETE PAD AT POSITION C2e NO SIGNIFICANT CHANGE IN FACILITIES WAS IDENTIFIED AT LAUNCH AREAS A AND B. MISSILE 07ER OF BATTLE: 5 PROB SA-6 TEL ELECTRONIC ORDER OF BATTLE: 2 POSS STRAIGHT FLUSH 2 PROB PAT HAND ASSOCIATED OBJECTS: VANS AND EQUIPMENT (NUMEROUS) 6 PROB SA-8 RADAR VEHICLE 158 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 SOVIET UNION MISSILE RANGES 25X1 KAPUSTIN YAR ELECTRONICS RELATED FAC STATUS: UNDER CONSTRUCTION REMARKS: 48-50-08N 045-39-11E 25X1 THE ENTIRE FACILITY WAS COVERED ON PHOTOGRAPHY OF FAIR INTERPRETABILITY. AT AREA At ALL SIX RADAR POSITIONS WERE OCCUPIED. NO SIGNIFICANT ACTIVITY WAS DISCERNIBLE AT AREA B. A POSSIBLE RADAR VAN WAS POSITIONED ATOP THE GUYED 25X1 TOWER. ELECTRONIC ORDER OF BATTLE: -- AREA A 25X1 3 PROB RANGE/AZIMUTH RADAR 1 TALL KING 2 PROB ODD PAIR ELECTRONICS VAN (NUMEROUS) ELECTRONIC ORDER OF BATTLE: -- AREA B 25X1 7 PROB ELECTRONICS VAN 25X1 KAPUSTIN YAR MSL/SPACE TEST CENTER SSM 48-41-07N 045-58-53E 25X1 STATUS:OPERATIONAL REMARKS: PHOTOGRAPHY PROVIDED COMPLETE COVERAGE OF THE 25X1 CENTER. CONSTRUCTION ACTIVITY TO MODIFY LAUNCH PAD 1C-3 AT SITE 1C WAS CONTINUING. MOST OF THE TRENCHING REPORTED 25X1 HAS BEEN BACKFILLED. SHALLOW EXCAVATING WAS OBSERVED AT 25X1 THE PAD ON ? THREE MISSILES ON TRANSPORTERS WERE 25X1 OBSERVED NEAR THE HIGH?BAY RECEIVING AND CHECKOUT BUILDING AT THF MISSILERECEIVING/CHECKOUT FACILITY ON BOTH DAYS. AT SITE 3Ct AN 55-4 MISSILE ON A TRANSPORTER WAS OBSERVED ON PAD 3C-2. MODIFICATIONS TO THE RANGEHEAD TRACKING FACILITY HAVE STARTED. THE MODIFICATIONS APPEARED TO BE IDENTICAL TO THOSE MADE TO THE VT-3 INTERFEROMETER (BOW AND ARROW) AT THE TYURATAM MISSILE/SPACE TEST CENTER AND THE PLESETSK MISSILE/SPACE TEST 159 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 u . .1 . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LOA! 25X1 KH-9 MISSION 1208-2 SOV/ET UNION MISSILE RANGES CENTER* THE MODIFICATIONS INCLUDE EXTENDING ONE BASE LEG DUE NORTH APPROXIMATELY 19.650 FEET TO AN END TERMINAL BUILDING UNDER CONSTRUCTION AND A SECOND LEG DUE EAST APPROXIMATELY TO AN END TERMINAL BUILDING UNDER CONSTRUCTION. FOOTINGS FOR A SMALL SQUARE BUILDING IMMEDIATELY SOUTH OF THE MAIN CONTROL BUILDING WERE INSTALLED. TWO OF THE THREE SRBM TRAINING EXERCISES SEEN IN THE BIVOUAC AREAS SW_OF_THIE_SR8M SUPPORT FACILITY WERE NOT PRESENT , ANOTHER SRBM TRAINING EXERCISE WAS UNDERWAY IN A BIVOUAC AREA SW OF SITE B KAPUSTIN YAR SAM FIRING RANGE STATUS: OPERATIONAL 48-48.-28N 045.-43-43E REMARKS: MAJOR PORTIONS OF THE RANGE WERE COVERED ON PHOTOGRAPHY OF FAIR INTERPRETABILITY, NO ADDITIONAL DETAILS OF THE PROBABLE NEW RADAR AT LAUNCH SITE Fr R AND D LAUNCH AREA. WERE DISCERNIBLE. THE FOUR PROBABLE SA-1 TRANSPORTER...ERECTOR...LAUNCHERS WERE NO LONGER PRESENT IN THE MISSILE?ASSOCIATED HANDLING AREA AT THE REAR OF THE SA-2 LAUNCH AREA* NO OTHER SIGNIFICANT ACTIVITY WAS OBSERVED. NENOKSA NAVAL MISSILE TEST CENTER STATUS: OPERATIONAL 64-38...58N 039-11-25E REMARKS: TWO SS'-N-8?SIZE PROBABLE MISSILE MOCKUPS WERE AT THE TEST CENTER. ONE IN LAUNCH FACILITY B AND THE OTHER AT THE ASSEMBLY/CHECKOUT AREA. ON 25 APR. ONLY THE MOCKUP AT FACILITY B WAS OBSERVED. TWO SS?N...8 TRANSPORTERS WERE ALSO PRESENT. ONE ON THE APRON EAST OF LAUNCH FACILITY B AND THE OTHER IN THE LIQUID PROPELLANT HANDLING AREA. THE TOP SECTION OF THE GOOSENECK CRANE IN LAUNCH FACILITY B APPEARED TO HAVE BEEN LENGTHENED. A PIECE OF PROBABLE ELECTRONICS EQUIPMENT WAS ON 160 25X1 OFYI 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 KH-"'9 MISSION 12082 SOVIET UNION MISSILE RANGES THE THREE INSTRUMENTATION PEDESTALS PREVIOUSLY SEEN UNDER CONSTRUCTION. A NEW CONSTRUCTION AREA BETWEEN LAUNCH FACILITIES A AND B CONSISTED OF ONE LARGE BUILDING BASE OR FOUNDATION. APPROXIMATELY 50 X 180 FEET WITH A POSSIBLE RAMP. ONE SMALL COMPLETED BUILDING. AND STACKS OF BUILDING MATERIAL. THE ALIGNMENT OF THE ROAD SOUTH OF THE AREA HAD BEEN ALTERED SLIGHTLY DUE TO THE CONSTRUCTION ACTIVITY. IN LAUNCH FACILITY Ar AN EXCAVATION WAS OBSERVED BETWEEN THE EASTERN AND CENTRAL LAUNCHERS' THE LAUNCH TUBE OF THE CENTRAL LAUNCHER WAS ORIENTED NW. AND THE BLAST DEFLECTOR WAS ON THE GROUND BEHIND THE LAUNCHER. MISSILE ORDER OF BATTLE: ORDER OF BATTLE: 25X1 25X1 2 TRANSPORTER GROUND FORCE 4 PROB TRUCK TRACTOR 1 POWER SHOVEL 2 MOBILE CRANE 3 VEHICLE/PIECE OF EQUIP ASSOCIATED OBJECTS: 25X1 2 PROB MISSILE MOCKUP 15 RAILCAR (SS....N.?.8 SIZE) 2 PROB SS...W..8 DOLLY 2 SS?N--3?TYPE CRATE 2 POSS MISSILE DOLLY 1 UNIDENTIFIED CRATE 25X1 PLESETSK MISSILE/SPACE TEST CENTER SSM 62?-57-.46N 040=,2346E 25X1 STATUS; PERATIONAL REMARKS: PHOTOGRAPHY PROVIDED TOTAL COVERAGE OF 25X1 THE CENTER. AT LAUNCH SITE 21' THE TENT?LIKE FRAMEWORK AT THE 25X1 EAST LAUNCH PAD HAD BEEN RECOVERED WITH CANVAS. THE FRAMEWORK WAS LAST SEEN UNCOVERED ? THREE 25X1 IRREGULARLY SHAPED OBJECTS WERE ON THE WEST LAUNCH PAD. THE 161 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF LOAI 25X1 KH-9 MISSION 1208-2 SOVIET UNION MISSILE RANGES TENT/NETTING THAT HAD BEEN REMOVED FROM OVER THE PARKING AP IMMEDIATELY OUTSIDE_THE_MAIN ENTRANCE TO THE SITE BEEN REPLACED SILO W ON HAD 25X1 2bAl AT LAUNCH SITE 11. THE SILO DOOR AT THE SOUTH S OPEN. THIS SILO DOOR WAS ALSO OPEN WHEN IT WAS LAST SEEN. AND AN ENVIRONMENTAL COVER WAS OVER THE SILO OPENING. AN UNIDENTIFIED PIECE OF EQUIPMENT REMAINED ON THE LOADING APRON AT THE NORTH SILO. ACTIVITY AT THE OTHER SS-13 LAUNCH SITES INCLUDED AT LEAST EHICLES/PIECES OF, EQUIPMENT AT LAUNCH SITE 22 AND A CRANE WORKING OVER THE OPEN SILO AT LAUNCH SITE' 24 A VAN TRUCK WAS ALSO PARKED ON THE SILO APRON. TWO VEHICLES/PIECES OF EQUIPMENT WERE DISCERNIBLE AT LAUNCH SITE 24 AT LAUNCH SITE 5. THE THREE TENTS SEFN NEXT TO THF WFcTFRN LAUNCH PAD HAD BEEN REMOVEDI A VEHICLE/PIECE OF EQUIPMENT WAS PARKED ON THE PAVED ACCESS ROAD LEADING INTO THE NEW CLERESTORY BUILDING IN THE SITE SUPPORT FACILITY. CONSTRUCTION CONTINUED IN THE INTER?PAD AREA AT THE LAUNCH SITE. AT LAUNCH SITE 7. AN SS-8 SOFT SITE. FOUR CIRCULAR AND FOUR LINEAR EXCAVATIONS HAVE BEEN DUG IN THE TOP OF THE EARTH?COVERED NORTH MISSILE?READY BUNKER, THE CANVAS?COVERED STRUCTURE OVER THE RAIL AT THE NORTH LAUNCH PAD. FIRST SEEN ON WAS STILL PRESENT. NO ACTIVITY WAS SEEN AT LAUNCH SITE 16. PLESETSK SPACE LAUNCH SITE 27 STATUS: UNDER CONSTRUCTION REMARKS: CONSTRUCTION CONTINUED AT THE SITE. HAVE OCCURRED 62-54-23N 040-47-15E NO SIGNIFICANT CHANGES 162 25X1 ')cY1 25X1 OFYI 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-9 MISSION 12082 SOVIET UNION MISSILE RANGES SARYSHAGAN MISSILE TEST CENTER STATUS: OPERATIONAL 4611...05N 072?.41...30E REMARKS: ALL FACILITIES AT THE SARY...SHAGAN MISSILE TEST CENTER EXCEPT THE ASAT/SPACE TRACKING RADAR FACILITY, SAM SITE E06....20 AND TRACKING FACILITIES 6 THROUGH 16 WERE COVERED ON STEREO PHOTOGRAPHY OF GOOD INTERPRETABILITY PHOTOGRAPHY OF 25X1 COVERED ONLY A PORTION OF LAUNCH COMPLEX E AND WAS OF 25X1 POOR INTERPRETABILITY DUE TO OBLIQUITY AND SCALE. DOWNRANGE TRACKING FACILITIES 14 AND 15 WERE COVERED ON PHOTOGRAPHY OF GOOD INTERPRETABILITY 25X1 HX1 25X1 25X1 25X1 AT LAUNCH COMPLEX B TWO GALOSH CANISTERS WERE OBSERVED ONE WAS ENGAGED HORIZONTALLY IN THE LAUNCHER AT POSITION Cl AND THE SECOND WAS ERECTED IN THE LAUNCHER AT POSITION C20 AT LAUNCH COMPLEX p" A LARGE APRON WAS UNDER CONSTRUCTION TO THE REAR (SE) OF MODIFIED TRY ADD BUILDING A. NO ABM CANISTERS WERE OBSERVED AT COMPLEX Do 25X1 25X1 AT LAUNCH COMPLEX Et AN UNOCCUPIED SA-3 TRAINING SITE WAS NEWLY SEEN THE SITE WAS UNDER CONSTRUCTION 8.5 NM 25X1 NNE OF TRACKING FACILITY 3 AT 45-..46?..04N 072-.39-34E. IT CONSISTS OF FOUR EARTH-GRADED REVETTED LAUNCH POSITIONS AND A REVETTED GUIDANCE AREA IN THE CENTER OF THE SITE. THIS IS THE FOURTH SA..-3 SITE TO BE CONSTRUCTED AT LAUNCH COMPLEX E. AT SAM TRAINING SITE D193' ALL FOUR LAUNCH POSITIONS WERE OCCUPIED BY A FOUR-RAIL SA-3 LAUNCHER. AT LAUNCH COMPLEX F, ONE OF THE TWO MOBILE POWER UNITS FOR THE PLANAR APERTURE RADAR AT THE LAUNCH SITE 2 RADAR APRON WAS NOT PRESENT NO MISSILES OR MISSILE CANISTERS WERE OBSERVED AT COMPLEX F. 25X1 AT LAUNCH COMPLEX G, PADS G2 AND G3 WERE OCCUPIED BY AN UNIDENTIFIED PIECE OF EQUIPMENT. ON PAD G2, THE PIECE OF EQUIPMENT APPEARED TO BE CONNECTED BY CABLE TO A VAN ON PAD G2 AND POSSIBLY TO SEVERAL VANS PARKED ALONG THE EDGE OF PAD G3. A SIMILAR CABLE CONNECTION DID NOT APPEAR TO EXIST FOR THE UNIDENTIFIED PIECE OF EQUIPMENT ON PAD G3. THIS PIECE OF EQUIPMENT WAS SIMILAR' IF NOT IDENTICAL' TO THE ONE REPORTED ON PAD G3 A GENERALLY CIRCULAR 25X1 163 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 .1 . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 SOVIET UNION KH-9 MISSION 1208-2. MISSILE RANGES EXCAVATION WAS NEWLY OBSERVED NEAR THE WESTERN END OF COMPLEX G A RECTANGULAR FOUNDATION WAS _UNDER CONSTRUCTION AT THE BOTTOM OF THE EXCAVATION. AT THE OPERATIONAL SUPPORT BASE. ALL EIGHT LAUNCH POSITIONS AT THE DRONE LAUNCH AREA WERE OCCUPIED BY LA-17 ON LAUNCHERS. SEVENTEEN ABM CANISTERS WAS OBSERVED AT THE OPERATIONAL SUPPORT BASE , AT LEAST FIVE OF .THE 17 WERE GALOSH CANISTERS. MISSILE ORDER OF BATTLE: LAUNCH COMPLEX B 2 GALOSH CANISTERS MISSILE ORDER OF BATTLE: OPERATIONAL SUPPORT BASE 17 ABM CANISTER (INCLDNG AT LST 5 GALOSH CNSTRS) TYURATAM MISSILE/SPACE TEST CENTER SSM STATUS: OPERATIONAL REMARKS: THE TEST CENTER WAS PARTIALLY OBSERVED ON CLOUDY PHOTOGRAPHY OF AND TOTALLY OBSERVED ON CLEAR COVERAGE 45-56...37N 0A3.27-55F THE TOP OF A LAUNCH VEHICLE. NOT PRESENT ON THE SERVICE GANTRY AT SPACE LAUNCH SITE Al WAS SEEN IN THE APRON AREA AROUND THE LAUNCH POINT AT SITE GlA APPEARED TO BE STAINED OR SCORCHED BUT NOT AT SITE G1B. TWO MISSILE TRANSPORTERS AND THEIR POWER UNITS WERE ON THE G1B SIDE OF THE SITE. THIS ACTIVITY WAS PROBABLY RELATED TO THE TWO REPORTED SL-11 LAUNCHES AT LAUNCH PAD G4, THE REFURBISHMENT ACTIVITY PREVIOUSLY REPORTED APPEARED TO HAVE BEEN COMPLETED THE GANTRY FOR THIS PAD HAD BEEN MOVED FROM THE STOWED POSITION TO THE LAUNCH PAD 164 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KW-9 MISSION 1208-2 SOVIET UNION MISSILE RANGES AT SITE Ll. THE DIRT USED AS A DOOR STOP FOR THE TYPE IIID DOOR HAD BEEN REMOVED AND THE SILO DOOR HAD BEEN MOVED TO THE END OF THE DOOR RAILS. THIS MOUND OF DIRT WAS REMOVED 25X1 25X1 25X1 25X1 THE SILO DOOR MOUND HAS ALSO BEEN REMOVED AT LAUNCH SITE N2 BUT EXTENSIONS HAVE BEEN ADDED TO THE EXISTING RAILS. ALLOWING THE SILO DOOR TO BE OPENED BEYOND ITS NORMAL STOPPING POINT. THE MOUND WAS REMOVE6 AN OBJECT RESEMBLING 25X1 A TYPE IIID DOOR SHELL HAS NOW BEEN PLACED ON THE RAILS BETWEEN THE OPEN SILO AND THE N2 SILO DOOR. THE PURPOSE OF THIS ACTIVITY AT SITES Ll AND N2 IS UNCLEAR AT THIS TIME. TWO PROPELLANT TRANSPORTERS OF THE NEW TYPE PREVIOUSLY ASSOCIATED WITH THE SS?X-17 AND SS?X-18 MISSILE SYSTEMS WERE IDENTIFIED ON THE APRON AT SS.-X-19 LAUNCH SITE S2I 25X1 BECAUSE THESE TRANSPORTERS HAVE NOW BEEN SEEN WITH ALL THREE NEW SYSTEMS (SS?X-47/18/19)r NPIC WILL REFER TO THEM AS MSP (MULTISYSTEM PROPELLANT) TRANSPORTERS. ALSO AT SITE 52. THE LIGHT?TONED TOP OF A CANISTER WAS OBSERVED IN THE SILO. A SILO LOADING OPERATION WAS OBSERVED AT SS?X-19 LAUNCH SITE S3 A CANISTER. WAS ON AN SS-11 TYPE SILO LOADER WHICH WAS BEING POSITIONED AT THE OPEN SILO. THIS CANISTER SECTION IS CONSIDERED TO BE THE LOWER PORTION OF THE APPROXIMATELY 80?FOOT?LONG SS?X-19 CANISTER. A CANVAS?COVERED SS.-11 TRANSPORTER WAS ALSO IN THE APRON. 25X1 LAUNCH SITE S8 IS CONSIDERED TO BE COMPLETE THIS 25X1 SITE IS SIMILAR TO PREVIOUSLY COMPLETED SITES S6 AND 57. BOTH REPORTED AS MODIFIED TYPE IIID SITES. BASED ON THEIR DIFFERENT SITE SIGNATURE, INCLUDING THE SHAPE AND SIZE OF THE SILO DOOR FROM THAT SEEN AT TYPE IIID SITES. THESE THREE SITES WILL NOW BE DESIGNATED BY NPIC AS TYPE IIIH SITES AND ARE DESIGNATED AS LAUNCH SITES V1 (S6),V2 (S7). AND V3 (58). AT TEST SUPPORT FACILITY 1, A PROBABLE WARHEAD?ASSOCIATED VEHICLE WAS IN THE MISSILE ASSEMBLY AND CHECKOUT FACILITY 2 ON THIS VEHICLE. IS OF THE SAME CONFIGURATION AS THE ONES SEEN AT THE ALEYSK ICBM COMPLEX 165 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 5X1 .IL ..,... Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 2bA1 25X1 KW-9 MISSION 1208-2 SOV/ET UNION MISSILE RANGES CONSTRUCTION WAS CONTINUING IN THE AREA OF UNIDENTIFIED ACTIVITY MIDWAY BETWEEN THE MAIN SUPPORT BASE AND LAUNCH COMPLEX A. THE SEVEN LARGE PAVED RECTANGULAR AREAS WERE BEING CONNECTED BY A SINGLE ROW OF PAVING BLOCKSI AN OPEN DITCH EXTENDED FROM THIS AREA TO THE MAIN NORTH?SOUTH ROAD. 166 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS ALMA?ATA SAM COMPLEX B35-5 STATUS: OPERATIONAL SOVIET UNION AIR DEFENSE MISSILES 43-26-55N 076-50-55E REMARKS: LAUNCH SITE A CONTAINED FOUR MISSILES ON LAUNCHERS AND SITE B CONTAINED TWO MISSILES ON LAUNCHERS. A TALL KING RADAR HAD BEEN ERECTED IN THE WESTERN PORTION OF THE TRACKING AND GUIDANCE FACILITY. ARCHED SECTIONS WERE OBSERVED IN THE MISSILE?HANDLING AREA. CONSTRUCTION WAS CONTINUING AT BOTH THE MISSILE?HANDLING AND SUPPORT AREAS. MISSILE ORDER OF BATTLE: 25X1 25X1 LAUNCHER 6 SA-5 MISSILE 12 SA-5 16 PROB SA-5 TRANSPORTER ELECTRONIC ORDER OF BATTLE: 25X1 2 SQUARE PAIR 1 TALL KING 25X1 MOSKVA ABM LAUNCH COMPLEX E31 56-08-05N 036-29-37E 25X1 STATUS:OPERATIONAL REMARKS: FOURTEEN GALOSH CANISTERS WERE OBSERVED IN LAUNCHERS. MISSILF ORDER OF BATTLE: 25X1 14 GALOSH CANISTER 25X1 MOSKVA ABM LAUNCH COMPLEX E33 --_56_211A_ON_113 25X1 STATUS: OPERATIONAL 167 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH-9 MISSION 1208-2 SOVIET UNION AIR DEFENSE MISSILES REMARKS: THE COMPLEX WAS PARTIALLY COVERED ON MONOSCOPIC PHOTOGRAPHY. SIX GALOSH CANISTERS WERE ENGAGED IN LAUNCHERS. THREE GALOSH CANISTERS WERE PROBABLY ENGAGED IN LAUNCHERS IN THE PARTIALLY OBSCURED SECTIONS OF THE COMPLEX. MISSILE ORDER OF BATTLE: 6 GALOSH CANISTER 3 PROB GALOSH CANISTER 168 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75X1 TAP cFrprT oucr 25X1 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS CHERNYAKHOVSK AIRFIELD STATUS: OPERATIONAL SOVIET UNION AIR BASE FACILITIES 54-36-07N 0,1-46-56E REMARKS: THIS WAS THE FIRST IDENTIFICATION OF FLOGGER AT THIS THE FLOGGER WERE NOT SEEN ON SUBSEQUENT COVERAGE AIR ORDER OF BATTLE: 57 PRO8 BREWER 5 BEAGLE 2 FLOGGER (1 LANDING) 1 COKE 1 CAB 1 CLOD 1 COLT 1 HIP C AIRFIELD. SIAULIAI AIRFIELD 55-53-3QN STATUS: OPERATIONAL AIR ORDER OF BATTLE: 25 FLOGGER 27 FITTER 2 FISHBED 40 CUB 8 MOSS VITEBSK AIRFIELD NORTHEAST STATUS: OCCUPIED PHYSICAL DESCRIPTION: 4 NM NE OF VITEBSK. UPDATED DESCRIPTION. THE AIRFIELD CONSISTS ENE/WSW SERVICEABLE CONCRETE RUNWAY, A PARALLEL SOD LANDING STRIP, A PARALLEL TAXIWAY, TWO END?CONNECTING LINKS. 55-15..-24N 030-1_9?n3F 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 169 TOP SECRET RUFF nAciassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 11 11 . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25)S11 KH-9 MISSION 1208-2 1 SOVIET UNION AIR BASE FACILITIES ONE CROSSOVER LINK. TWO CONCRETE PARKING APRONS. THREE SERVICE APRONS. AND FIVE REVETMENTS. SUPPORT FACILITIES INCLUDE AN OPERATIONS BUILDING. A CONTROL TOWER. A HANGAR, THREE MOTOR POOLS. A STEAMPLANT, AND 32 STORAGE/SUPPORT BUILDINGS. A RAIL-SERVED POL STORAGE AREA SOUTH OF THE AIRFIELD INCLUDES THREE PARTIALLY UNDERGROUND VERTICAL STORAGE TANKS. APPROXIMATELY 150 HORIZONTAL STORAGE TANKS, AND SIX STORAGE/SUPPORT BUILDINGS. THE AIRFIELD HAS ILS AND GCA. AIR ORDER OF BATTLE: 17 CUB 1 CRATE 170 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS GUBA LITSA SUB BASE SE STATUS: OPERATIONAL SOVIET UNION NAVAL BASE FACILITIES 69-25-45N 032-22-40E REMARKS: CONSTRUCTION WAS CONTINUING ON TWO PROBABLE BARRACKS IN THE SUPPORT AREA. NAVAL ORDER OF RATTLE: b E-II SSGN 2 BOLVA APL 2 KHERSON A APL NAVAL ORDER OF BATTLE: 1 SPECIAL PURPOSE BARGE 6 MISCELLANEOUS VESSEL (5 5 POSS SUBMARINE 2 POSS BOLVA APL GUBA LITSA SUBMARINE BASE SOUTH STATUS:OPERATIONAL 69-26-20N 03P-2S-26r REMARKS: THE LONG VARIANT C SSGN WAS IDENTIFIED AT THIS FACILITY FOR THE FIRST TIME ON A FLOATING CRANE WAS ON THE OPPOSITE SIDE OF THE PIER FROM THIS SUBMARINE. THE CRANE BOOM WAS OVER THE BOW OF THE SUBMARINE, BUT IT WAS NOT POSSIBLE TO IDENTIFY ITS ACTIVITY. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 NAVAL ORDER OF ATTL 25X1 1 LONG VARIANT C SSGN 1 P-6 PT 4 C SSGN 2 BOLVA APL 1 E-II SSGN 2 SPECIAL PURPOSE BARGE 4 V SSN 1 OSS 7 MISCELLANEMIS VESSEL (5 25X1 171 25X1 TOP SECRET RUFF npriaccifipri in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 L I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF KH-9 MISSION 1208-2 NAVAL ORDER OF BATTLE: 1 U SSN NAVAL ORDER OF BATTLE: 5 POSS SUBMARINE SOVIET UNION NAVAL BASE FACILITIES 2 POSS BOLVA APL OLENYA GUBA SUBMARINE BASE STATUS: OPERATIONAL 69-12-51N 033-22-32E REMARKS: A Y SSEIN WAS MOORED AT THE WEST PIERS. A V SSN WAS SEEN AT THE 25X1 25X1 25X1 25X1 25X1 REPAIR FACILITY ALONGSIDE A RECTANGULAR SUPPORT OF THE BARGE 25X1 25X1 THE MAJOR REPAIR OR OVERHAUL G?CLASS SSB WAS CONTINUING AT THE REPAIR FACILITY. MOST OF THE SUBMARINES DECK PLATING HAD BEEN REMOVED AND EXTENSIVE REPAIR WORK WAS GOING ON ON THE SAIL AND MISSILE AREA. CONSTRUCTION WAS CONTINUING ON THE ADDITIONS TO THE REPAIR FACILITY AREA. AN F SS WAS APPARENTLY DEAD IN THE WATER IN THE BAY HEAVY CLOUD 25X1 COVER OBSCURED THE NAVAL BASE 25X1 NAVAL ORDER OF BATTLE: 1 ATREK ASL (AT REPAIR 25X1 1 Y SS8N (AT WEST PIERS) 1 POSS G?II SSB FACILITY) 3 G?I SSB 1 LIBAU AGRL 1 G SSB (AT REPAIR 1 BOLVA APL (AT REPAIR FACILITY) FACILITY) 1 V SSN (AT REPAIR 1 RECTANGULAR SPT BARGE FACILITY) I YR 1 OSS 4 MISCELLANEOUS CRAFT NAVAL ORDER OF BATTLE: - PARTIAL COVERAGE 1 G SSB (AT REPAIR 1 FACILITY) 1 V SSN (AT REPAIR 172 ATREK ASL (AT REPAIR FACILITY) 1 BOLVA APL (AT REPAIR 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 TOP SECRET RUFF KH-9 MISSION 12082 FACILITY) 1 F SS (DEAD IN WATER IN BAY) SOVIET UNION NAVAL BASE FACILITIES FACILITY) 1 RECTANGULAR SPT BARGE (AT REPAIR FACILITY) PALA GUBA NVB A SHP RPR YO STATUS: OPERATIONAL REMARKS: TWO Y..CLASS SSBN WERE AT THE SHIPYARD SECOND Y SSBN ARRIVED AT THE SHIPYARD BETWEEN THE SUBMARINE WAS MOORED ALONGSIDE A FINGER PIER AND HAD TWO ACCESS SHEDS PLACED OVER THE REACTOR AREA. THE FIRST Y SSBN REMAINED IN THE ARD-D. REACTOR MAINTENANCE WORK CONTINUED ON TH C S N. THE LONG VARIANT C SSGN HAD DEPARTED THE YARD BY 03325..24F THE NAVAL ORDER OF BATTLE: 2 Y SSBN (1 IN ARD-D) 2 C SSGN (1 IN ARD...0) 4 SSGN 1 N SSN 1 F SS (IN ARD-T) 1 F/Z SS (IN BAY) 1 DNEPR AR 1 202A AR 1 112B YRSN 2 ROSTA.?A YRSN NAVAL ORDER OF BATTLE: PARTIAL COVERAGE 2 V SSBN (1 IN ARD-0) 2 C SSGN (1 IN ARD-D) 3 SSGN 1 DNEPR AR 1 202A AR 1 YR 1 ROSTA..B YRSN 1 ZEYA YRSN 2 PM-12L YRSN 1 DVINA YR 2 YR 1 DUNA YFP 2 BOLVA APL 3 ARD (D) 1 ARD (T) 7 MISCELLANEOUS VESSEL 1 112B YRSN 2 ROSTA...A YRSN 2 PM...124 YRSN 1 ZEYA YRSN 2 BOLVA APL 2 ARD...D 173 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/.01 : CIA-RDP78T04752A001500010011-9 KH-9 MISSION 1208-2 Top SECRET RUFF 25X1 SOVIET UNION NAVAL BASE FACILITIES POLYARNYY SUBMARINE BASE STATUS: OPERATIONAL 69-12-09N 033-27-58E REMARKS: A T-58 MSF WAS IN AN ARD(D) ACROSS THE BAY FROM THE BASE. CONSTRUCTION CONTINUED ON THE APARTMENT BUILDINGS. NAVAL ORDER OF BATTLE: 8 F SS 3 VANYA MSC 6 POSS F SS 2 YEVGENYA MSI 2 F/Z SS 11 MSD 3 MEDIUM SS 1 DON AS 1 OSS 1 OSKOL AR 3 PETYA-I DE 2 POLUCHAT YPT 1 PETYA DE 1 P-6 HULL 2 GRISHA PCEP 1 BOLVA APL 2 NATYA MSR 1 PSKL-16 YFMB 2 YURKA MSR 17 MISCELLANEOUS VESSEL 1 T-58 MSR (IN ARD-D) ROSTA NAVAL BASE A SHPRPR YD SEVMORPUT STATUS: OPERATIONAL 69-01.-47N 033-04-00E REMARKS: A G-I SSB AND A G-II SSB WERE IN THE SMALL GRAVING DOCK. A KRESTA-II CLGM WAS IN THE LARGE GRAVING DOCK WITH A PETYA-II DE AND A F/Z SS. THE DON AS HAD A VEE CONE ANTENNA INSTALLED ON THE AFTER RADAR MAST. NAVAL ORDER OF BATTLE: 2 G-II SSB (1 IN GRAVING DOCK) 1 G-I SSB (IN GRAVING DOCK) 6 J SSG 3 F/Z SS (1 IN ARD-D) 1 W/R SS (IN ARD-D) 174 1 KAZBEK AO 1 KOLA AG 2 NEPTUN ALBD 1 SURA ALBD 1 KRASIN AGB 1 KLASMA ARC 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 2bAl TOP SECRET RUFF 25X1 UNION SOVIET NAVAL BASE FACILITIES POLNOCHY LSM BORIS CHILIKIN AOR KH-9 MISSION 1208-2 1 MEDIUM SS 2 KRESTA-II CLGM (1 1 IN 1 GRAVING DOCK) 1 CHAPAYEV HULL 1 KOTLIN DD 1 AO 1 SKORYY DD 3 DVINA YR 1 PETYA.-II DE (IN GRAVING 2 YR DOCK) 1 ARD (D) 1 RIGA DE 4 YGTN (LONG TYPE) 1 OSA-I PTFG 3 YGTN 2 UGRA AS 38 MISCELLANEOUS CRAFT 1 DON AS (SMALL) SAYDA GUBA SUBMARINE BASE STATUS: OPERATIONAL REMARKS: AN UGRA AS WITH A SMALL UNIDE PLATFORM WAS SEEN AT THE BASE MOST OF THE FACILITY 69-15-32N 033-19-51E NAMALaRnER OF BATTLE: L3 SSBN 8 Y SSBN 5 H-II SSBN (1 IN DEGAUSSING AREA) 1 OSS 1 UGRA AS 2 AMUR AR NAVAL ORDER OF BATTLE: -- PARTIAL COVERAGE 1 POSS D SSBN 6 Y SSBN 3 POSS Y SSBN 4 H-II SSBN (1 IN DEGAUSSING AREA) 25X1 25X1 CT ON ITS HELICOPTER 25X1 HEAVY CLOUDS COVERED 1 DNEPR AR 5 BOLVA APL 1 DVINA YR 1 PSKL-16 YFMB 1 MISCELLANEOUS YR 3 POLUCHAT-1 YPT 9 MISCELLANEOUS CRAFT 1 OSS 2 BOLVA APL 175 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 11 . I. Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF KH MI S 0 SEVERODVINSK NAVAL BASE WEST STATUS: OPERATIONAL 25X1 SOVIET UNION NAVAL BASE FACILITIES 25X1 64...34..46N 039..45..51E 25X1 REMARKS: THE DISMANTLED DUMMY SSB WAS NOT OBSERVED AT THE BASE. SNOW HAS MELTED FROM THE HELIPAD AND A POSSIBLE SIEMAN STAR WAS OBSERVED. A N SSN WAS ALONGSIDE THE Z/V SSB AT A PIER. NAVAL ORDER OF BATTLE: T...4 LCM 1 Z/V SSB 1 1 N SSN 1 P...6 HULL 5 W SS 5 PO...2 PGM 2 RIGA DE 1 IRTYSH ASL 1 T...58 MSF 1 YDT 2 T-43 MSF 6 SPECIAL PURPOSE BARGE 2 K.-8 MSB 7 YGTN (2 LONG TYPE) 1 MP-8 LSM 2 BARGE (WITH PILINGS) 1 MP...4 LSV 16 MISCELLANEOUS VESSEL DEFENSES SECURITY: THE DISMANTLED DUMMY SSB WAS NOT OBSERVED AT THE BASE. A POSSIBLE SIEMAN STAR WAS ON THE HELIPAD? SEVEROMORSK NAVAL BASE STATUS: OPERATIONAL 033..25...57E REMARKS: CONSTRUCTION WAS CONTINUING ON THE NEW BARRACKS AND THE LARGE PIER. 25X1 25X1 25X1 176 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Top SECRET RUFF 25X1 25X1 SOVIET UNION KH-9 MISSION 1208-2 NAVAL BASE FACILITIES mAvai mulFR BATTLE: ifF 25X1 1 POSS MINOR COMBATANT 2 POS KRtrA?II CLGM 2 SVERDLOV CL 1 PROB UGRA AS 1 PROB KRIVAK DDGSP 11 MISCELLANEOUS VESSEL 5 PROB MAJOR COMBATANT NAVAL ORDER F BATTLE: 25X1 1 F SS 1 PETYA?II DE 2 KRESTA?II CLGM 1 RIGA DE 2 SVERDLOV CL 2 ALLIGATOR LST 2 KANIN DDG 1 LAMA AEM 1 KASHIN DLG 1 UGRA AS 1 KRIVAK DDGSP 1 NEPA ASR 1 KOTLIN DDG 1 PASSENGER HYDROFOIL 1 MOD KOTLIN DD 26 MISCELLANEOUS VESSEL 2 SKORYY DD URA GUBA SUBMARINE BASE STATUS: OPERATIONAL REMARKS: ONE BUILDING WAS IN THE MIDSTAGE OF CONSTRUCTION ONE J SSG HAD A DECKHOUSE ENCLOSURE IN THE AREA OF THE AFT MISSILE TUBES. THREE W/R SS WERE CANVAS COVERED THIS WAS THE FIRST TIME THAT CANVAS?COVERED SUBMARINES HAVE BEEN OBSERVED AT URA GUBA. THE ARD (T) HELD A W/R SS 11A2..61....ngE NAVAL ORDER OF BATTLE: 7 J SSG 1 ATREK ASL 1 B SS 1 LIBAU AGF 6 W/R SS (1 IN ARD (T)) 1 SUPPORT YR 3 W/R SS (CANVAS COVERED) 1 REPAIR BARGE 1 0 SS 1 ARD (T) 1 WILHELM BAUER AS 8 MISCELLANEOUS VESSEL NAVAL ORDER OF BATTLE: 25X1 25X1 25X1 25X1 25X1 25X1 177 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 II Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : 6AIRDP7e-f04i52A001500010011-9 25X1 TOP SFCRFT RUFF 25X1 25X1 SOVIET UNION KH-9 MISSION 1208-2 NAVAL BASE FACILITIES 6 J SSG 1 ATREK ASL 1 B SS 1 LIBAU AGF 5 W/R SS 1 SUPPORT YR 3 W/R (CANVAS COVERED) 1 REPAIR BARGE 1 OSS 1 ARD (T) 1 WILHELM BAUER AS 10 MISCELLANEOUS VESSEL DEFENSES SECURITY; THREE CANVAS?COVERED W/R SS WERE OBSERVED, 178 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 SIGNIFICANT RESULTS BELAYA TSERKOV ARMY BKS ROSS AL 1 SOVIET UNION GROUND FORCE FACILITIES 49-48-43N 030-05-47 25X1 STATUS: OCCUPIED REMARKS: OBLIQUITY PRECLUDED A READOUT OF THE EQUIPMENT. BOBRUYSK ARMY B c F AL STATUS: OCCUPIED RA...fliAwRM flil..14..Urt GROUND FORCE ORDER OF BATTLE: -- IN VEHICLE PARK A 2 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: -- IN VEHICLE PARK B 40 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: IN VEHICLE PARK C 45 VEHICLE/PIECE OF EQUIP 40 TRUCK GROUND FORCE ORDER OF BATTLE: ? IN VEHICLE PARK D 32 PMP BRIDGE BAY 2 TRUCK?MOUNTED CRANE 3 PROB PMP RAMP BAY 7 TRUCK 1 PROB PMP SERVICE TRUCK GROUND FORCE ORDER OF BATTLE: -- IN VEHICLE PARK E 21 NEW?TYPE ENGINEER EQUIP 1 TRUCK?MOUNTED CRANE 1 PROB ARMD ENGR TRACTOR 17 TRUCK M1972 26 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: -- IN VEHICLE PARK F 12 VEHICLE/PIECE OF EQUIP 2 TRUCK 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 179 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy 1 OF Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP cFrRFT RUFF 25X1 SOVIET UNION GROUND FORCE FACILITIES BATTLE: KH-9 MISSION 1208-2 GROUND FORCE ORDER - IN VEHICLE PARK G 25X1 9 VEHICLE/PIECE OF EQUIP 25X1 CHERNOVISY ARMY BKS SOUTHEAST AL 1 48-17-30N 025-57-49E 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 25X1 70 VEHICLE/PIECE OF EQUIP (AT LEAST) 25X1 KALININGRAD ARMY BKS LUGOVOyE AL 15 54-40-32N 020-38-24E 25X1 STATUS: OCCUPIED REMARKS: THE COUNT OF MAZ-537 AND 60-TON TRAILERS HAS RETURNED TO NORMAL 25X1 GROUND FORCE ORDER OF BATTLE: 25X1 302 MAZ-537 8 POL TRUCK 405 60-TON TRAILER 10 VEHICLE/PIECE OF EQUIP 25X1 KOROSTEN ARMY BARRACKS LUGINY AL 3 51-05-31N 028-22-51E 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 20 MEDIUM TANK 1 T-55 MTU 1 BAT-'M 180 115 VEHICLE/PIECE OF EQUIP (AT LEAST) 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25)(1 TOP SECRET RUFF 25X1 25X1 KH-09 MISSION 1208-2 SOVIET UNION GROUND FORCE FACILITIES KRIVOY ROG ARMY BARRACKS AL 2 STATUS; OCCUPIED 47-53-00N 013.14.7 REMARKS: CONSTRUCTION CONTINUED ON VEHICLE STORAGE BUILDINGS IN VEHICLE PARKS C AND E. TRAINING WAS IN PROGRESS IN THE TANK FIRING RANGE' WITH SIX TANKS ON THE FIRING LOOPS AND NUMEROUS TARGETS SET UP DOWNRANGE. GROUND FORC ? ? BATTLE: NOVOGRAD.-VOLYNSKIY ARMY BARRACKS AL 2 50-35-29N 027..39-04F STATUS: OCCUPIED PHYSICAL DESCRIPTION: ON THE EASTERN EDGE OF NOVOGRAD-VOLYNSKIY. UPDATED DESCRIPTION. THE ARMY BARRACKS CONTAINS FIVE BARRACKS AND ADMINISTRATION AREAS, 13 VEHICLE PARKS. TWO AMMUNITION STORAGE AREAS. A GENERAL STORAGE AREA. THREE SMALL-ARMS FIRING RANGES. AND A DRIVER-TRAINING COURSE. BARRACKS ADMINISTRATION AREA 1 CONTAINS ONE MULTISTORY HEADQUARTERS BUILDING. SIX SINGLE-STORY ADMINISTRATION BUILDINGS' AND THREE MULTISTORY AND NINE SINGLE-STORY BARRACKS. BARRACKS AND ADMINISTRATION AREA 2 IS SE OF BARRACKS AND ADMINISTRATION AREA 1. IT CONTAINS A MULTISTORY HEADQUARTERS BUILDING. TWO MULTISTORY AND ONE SINGLE-STORY ADMINISTRATION BUILDINGS' 12 MULTISTORY BARRACKS (ONE IN THE EARLY STAGES OF CONSTRUCTION), SIX QUARTERS, AND 15 SUPPORT BUILDINGS. BARRACKS AND ADMINISTRATION AREA 3 IS EAST OF BARRACKS AND ADMINISTRATION AREA 2. IT CONTAINS TWO MULTISTORY ADMINISTRATION BUILDINGS. THREE MULTISTORY BARRACKS. AND THREE SUPPORT BUILDINGS. 25X1 25X1 25X1 25X1 25X1 BARRACKS AND ADMINISTRATION AREA 4 IS NORTH OF BARRACKS AND 181 TOP SECRET RUFF n.rincQifipri in Part - Sanitized Coov Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RD KH.-9 MISSION 1208-2 TAO crroFT RUFF P78T0452.A001500010011-9 SOVIET UNION GROUND FORCE FACILITIES ADMINISTRATION AREA 3 AND CONTAINS THREE MULTISTORY AND THREE SINGLE-STORY ADMINISTRATION BUILDINGS. EIGHT MULTISTORY BARRACKS. AND FIVE SUPPORT BUILDINGS. BARRACKS AND ADMINISTRATION AREA 5 IS EAST OF BARRACKS AND ADMINISTRATION AREA 3. IT CONTAINS TWO MULTISTORY ADMINISTRATION BUILDINGS. THREE MULTISTORY BARRACKS. AND A SUPPORT BUILDING. VEHICLE PARK A IS ON THE EASTERN EDGE OF THE BARRACKS. NORTH OF BARRACKS AND ADMINISTRATION AREA 4, AND CONTAINS THREE SUPPORT BUILDINGS. VEHICLE PARK B IS IMMEDIATEY NORTH OF VEHICLE PARK A AND CONTAINS A LARGE VEHICLE MAINTENANCE BUILDING AND FOUR SUPPORT BUILDINGS, VEHICLE PARK C IS IMMEDIATELY WEST OF VEHICLE PARK A. IT CONTAINS TWO VEHICLE STORAGE BUILDINGS (ONE SINGLE WIDTH AND ONE DOUBLE WIDTH). VEHICLE PARK D IS IMMEDIATELY NORTH OF VEHICLE PARK C AND CONTAINS SEVEN VEHICLE STORAGE BUILDINGS (ONE SINGLE WIDTH AND SIX DOUBLE WIDTH). VEHICLE PARK E IS IMMEDIATELY WEST OF VEHICLE PARK D AND CONTAINS FIVE DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS. VEHICLE PARK F IS NORTH OF VEHICLE PARK E AND CONTAINS THREE SINGLE.-WIDTH VEHICLE STORAGE BUILDINGS. VEHICLE PARK G IS IMMEDIATELY WEST OF VEHICLE PARK E. IT CONTAINS THREE DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS AND TWO SUPPORT BUILDINGS, VEHICLE PARK H 15 IMMEDIATLY WEST OF VEHICLE PARK G. IT CONTAINS TWO DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS (ONE UNDER CONSTRUCTION). AND A VEHICLE MAINTENANCE BUILDING. VEHICLE PARK J IS A SEPARATELY SECURED VEHICLE PARK WITHIN VEHICLE PARK H. IT CONTAINS TWO DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS. VEHICLE PARK K IS SOUTH OF BARRACKS AND ADMINISTRATION AREA 3. IT CONTAINS 22 DOUBLE-WIDTH VEHICLE STORAGE BUILDINGS (FIVE UNDER CONSTRUCTION). TWO SINGLE-.WIDTH VEHICLE STORAGE BUILDINGS. A VEHICLE MAINTENANCE BUILDING. AND THREE SUPPORT BUILDINGS. 182 Top SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A0015onni nnil_a 225X1 25X1 ??? 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 SOVIET UNION S ON 1208*.2 GROUND FORCE FACILITIES VEHCLE PARK L IS IMMEDIATELY SOUTH OF VEHICLE PARK K. IT CONTAINS A SINGLE?WIDTH VEHICLE STORAGE BUILDING AND A DOUBLE?WIDTH VEHICLE STORAGE BUILDING, VEHICLE PARK M IS IMMEDIATELY EAST OF VEHICLE PARK Le IT CONTAINS A DOUBLE?WIDTH VEHICLE STORAGE BUILDING, A SMALL SINGLE?WIDTH VEHICLE STORAGE BUILDING, AND A SUPPORT BUILDING. VEHICLE PARK N IS IMMEDIATELY EAST OF VEHICLE PARK Me IT CONTAINS THREE DOUBLE?WIDTH VEHICLE STORAGE BUILDINGS AND A SUPPORT BUILDING. THE GENERAL STORAGE AREA IS SW OF BARRACKS AND ADM/NISTATION AREA 5. IT CONTAINS AN ADMINISTRATION BUILDING. SIX STORAGE BUILDINGS' AND A SUPPORT BUILDING. AMMUNITION STORAGE AREA 1 IS NORTH OF BARRACKS AND ADMINISTRATION AREA 1 AND CONTAINS FOUR AMMUNITION STORAGE BUILDINGS. AMMUNITION STORAGE AREA 2 IS EAST OF BARRACKS AND ADMINISTRATION AREA 5 AND CONTAINS ONE AMMUNITION STORAGE BUILDING. THE DRIVER?TRAINING COURSE AND THE SMALL?ARMS FIRING RANGES ARE EAST AND NORTH OF BARRACKS AND ADMINISTRATION AREA 5. RESPECTIVELY. AN UNIDENTIFIED SECURED AREA WAS UNDER CONSTRUCTION SE OF VEHICLE PARK A. NO BUILDINGS OR PIECES OF EQUIPMENT WERE SEEN IN THIS AREA. THE VEHICLES AND PIECES OF EQUIPMENT INDICATED THE POSSIBLE PRESENCE OF ELEMENTS OF THE FOLLOWING UNITS: VEHICLE PARK A UNIDENTIFIED ENGINEER UNIT VEHICLE PARK B ENGINEER TECH COMPANY VEHICLE PARK C ASSAULT CROSSING PLATOON AND PONTON BRIDGE COMPANY VEHICLE PARK E ARTILLERY REGIMENT VEHICLE PARK G HEAVY EQUIPMENT TRANSPORT REGIMENT VEHICLE PARK K MEDIUM TANK REGIMENT VEHICLE PARKS Dr Ft Hr Jo Lo Me N UNIDENTIFIED UNITS GROUND FORCE ORDER OF BATTLE: ? VEHICLE PARK A PROB K-?61 TRACKED 16 PROB CRANE SHOVEL AMPHIBIAN 9 BULLDOZER 10 PROB KMM 2 GRADER 10 KMS SET 2 PROB SAWMILL 183 TOP SECRET RUFF IThnnlaccifiari in Part - Sanitized Coov Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF KH-.9 MISSION 1208-2 11 PROB PMR-60 2 MDK-2 13 BTM GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK B 8 TMM 10 KMM 4 PROB BAT?M 1 CRANE SHOVEL GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK C 2 PROB PTS 11 K-61 TRACKED AMPHIBIAN 4 BMK-150 6 GSP 9 PMP GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK 20 CARGO TRUCK 2 TRUCK TRACTOR GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK E 8 FA PIECE GROUND FORCE ORDER OF BATTLE: H VEHICLE PARK F NONE DISCERNIBLE GROUND FORCE ORDER OF BATTLE: h- VEHICLE PARK G 144 MAZ-537 263 LOWBED TRAILER GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK H 3 MEDIUM TANK 6 CARGO TRUCK GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK J 7 MEDIUM TANK 3 PROB PMR-60 SOVIET UNION GROUND FORCE FACILITIES 30 CARGO TRUCK 13 TRUCK TRACTOR 10 VEHICLE/PIECE OF EQUIP 1 UAZ-69 35 CARGO TRUCK 15 VEHICLE/PIECE OF EQUIP 2 POSS TMM 1 MDK.-2 6 BAT 4 VEHICLE/PIECE OF EQUIP 25X1 25X1 25X1 25X1 3 LOWBED TRAILER 25X1 15 VEHICLE/PIECE OF EQUIP 80 CARGO TRUCK 1 POL TRUCK 6 VEHICLE/PIECE OF EQUIP 3 POSS BACKHOE 12 VEHICLE/PIECE OF EQUIP 25X1 25X1 25X1 25X1 25X1 2 184 5X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A00150001nn11_a Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF 25X1 2bAl SOVIET UNION MISSION 1208-2 GROUND FORCE FACILITIES GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK K 45 MEDIUM TANK 1 BAT GROUND FORCE ORDER OF BATTLE: H- VEHICLE PARK L 6 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK M 4 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: h? VEHICLE PARK N 2 PT-76 1 PROB BRDM 25 CARGO TRUCK 20 CARGO TRUCK 6 VEHICLE/PIECE OF EQUIP SLAVUTA ARMY BARRACKS AL 1 STATUS; OCCUPIED REMARKS: ADDITIONAL VEHICLES AND PIECES OF EQUIPMENT INDICATE THE PRESENCE OF ELEMENTS OF A MULTIPLE ROCKET LAUNCHER BATTALION. 25X1 25X1 25X1 25X1 25X1 25X1 FROG EQUIPMENT WAS NOT OBSERVED. GROUND FORCE ORDER OF BATTLE: 25X1 44 POSS AT?L 1 POSS ARMD ENGR TRACTOR 19 70 MEDIUM TANK FA PIECE 12 BM-14/24 M-1972 3 BM-13 2 CRANE SHOVEL 4 PUAZO-6 2 TRUCK?MOUNTED CRANE 3 POSS PTS 24 CARGO TRAILER 14 K-61 TRACKED AMPHIBIAN 290 CARGO TRUCK 4 TMM 175 VEHICLE/PIECE OF EQUIP 2 ARMORED TRKD MINELAYER (AT LEAST) ELECTRONIC ORDER OF BATTLE: 1 PROB FIRE CAN 1 POSS BREAD BIN 185 TOP SECRET RUFF nariaccifipn in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 IGV4 TOP SECRET RUFF 25X1 25X1 SOVIET UNION GROUND FORCE FACILITIES KH-9 MISSION leuo-4 25X1 URECHYE ARMY BK5--cE_M--1___ R2-56-26N 027-54-22E 25X1 STATUS;OCCUPIED GROUND FORCE ORDER OF BATTLE: H.- VEHICLE PARK A 25X1 29 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: VEHICLE PARK B 33 MEDIUM TANK 22 VEHICLE/PIECE OF EQUIP 25X1 1 PT-76 MISSILE ORDER OF BATTLE: -- VEHICLE PARK C 2 FROG-7 TEL 1 POSS UAZ-452 COMPUTER VAN 25X1 I PROB FROG-7 TRANSPORTER GROUND FORCE ORDER OF BATTLE: -- VEHICLE PARK C 7 VEHICLE/PIECE OF EQUIP 25X1 GROUND FORCE ORDER OF BATTLE: - VEHICLE PARK D 10 MEDIUM TANK 1 PROB ARV 25X1 3 PROB ASSAULT GUN 10 TRUCK I PROB T54 MTU 24 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: VEH MA TNT AREA I TRUCK-MOUNTED CRANE 3 VEHICLE/PIECE OF EQUIP 25X1 I 40-ToN TRAILER GROUND FORCE ORDER OF BATTLE: -- IN BKS/ADMIN AREA EQUIP 25X1 10 VEHI(A.E/PIECE OF 25X1 186 25X1 TOP SECRET RUF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500nirmi1_q Declassified in Part- Sanitized Copy Approved forRelease2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 S ON 1208-2 VOLNOYE ARMY BKS SAMARA RIVER E AL 1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK A 214 MA2-537 GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK B 31 TANK (CANVAS COVERED) 3 POSS GSP 4 K-61 TRACKED AMPHIBIAN GROUND FORCE ORDER OF BATTLE: - IN VEH PARK C 1 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK D 21 TANK (CANVAS COVERED) 10 TRACKED VEHICLE GROUND FORCE ORDER OF BATTLE: H? IN VEH PARK E 30 TANK (CANVAS COVERED) 43 VEHICLE/PIECE OF EQUIP (8 CANVAS COVERED) GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK F 315 TANK/ASSAULT GUN 15 PMP (2 END SECTIONS) GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK G 4 BAT?m (CANVAS COVERED) 32 CARGO TRUCK GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK H 8 TANK SOVIET UNION GROUND FORCE FACILITIES 48-42?49N 035-23-05E 25X1 227 60?TON TRAILER 25X1 25X1 1 BAT?M (CANVAS COVERED) 18 VEHICLE/PIECE OF EQUIP 25X1 25X1 11 CARGO TRUCK 26 VEHICLE/PIECE OF EQUIP 25X1 25X1 13 VEHICLE/PIECE OF EQUIP 25X1 28 VEHICLE/PIECE OF EQUIP 25X1 11 CARGO TRUCK 25X1 187 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - - KH-..9 MISSION 1208-2 TOP cFCRFT RUFF 25X1 25X1 VOLNOYE ARMY BKS SAMARA RIVER N AL 2 SOVIET UNION GROUND FORCE FACILITIES 48-44...22N 035...19-30E STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK A 35 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK B 7 VEHICLE/PIECE OF EQUIP GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK C 94 TANK 39 CARGO TRUCK GROUND FORCE ORDER OF BATTLE: ? IN VEH PARK 0 37 CARGO TRUCK GROUND FORCE ORDER OF BATTLE: ? IN VEH PARK E 25X1 7 K-61 TRACKED AMPHIBIAN 26 VEHICLE/PIECE OF EQUIP 11 TANK 3 GSP 17 VEHICLE/PIECE OF EQUIP 13 VEHICLE/PIECE OF EQUIP 25X1 25X1 25X1 25X1 25X1 GROUND FORCE ORDER OF BATTLE: -- IN VEH PARK F 51 VEHICLE/PIECE OF EQUIP zHiTomIR ARMY BA RACKS WFST AL 3 50-14-43N 028-37-38E STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 1 POSS MEDUM TANK 4 PT-.76 11 PROB SU-100 35 CARGO TRAILER 25 CARGO TRUCK 10 VEHICLE/PIECE OF EQUIP (AT LEAST) 25X1 25X1 25X1 25X1 188 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF HX1 25X1 UNION 25X1 SOVIET GROUND FORCE FACILITIES KH KAUNAS -9 MISSION 1208-2 OTHER RESULTS?NO APFARENT CHANGE ARMY BKS SE AL 2 54-51-35N 023-57-37 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 25X1 -17E KRIVOY PERECHIN VOLKA ROG ARMY BARRACKS AL 1 47-53-32N 013-1Q 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 25X1 ARMY BKS AL1 48-44-15N 022-29-05E 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 25X1 ARMY BARRACKS AL 1 52-47-40N 025-39-47E 25X1 STATUS: OCCUPIED nRnumn Fnprr nPrIpP OF BATTLE: 25X1 189 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 OFYI TOP SECRET RUFF 25X1 25X1 SOVIET UNION KH-9 MISSION 12082 SIGNIFICANT RESULTS BREST RR TRANSLOADING YARD SEVERNYY LOGISTICS 5206...59N 25X1 25X1 25X1 25X1 25X1 25X1 STATUS: OPERATIONAL REMARKS: THE YARD WAS APPROXIMATELY 50 PERCENT FILLED* NO MILITARY EQUIPMENT WAS OBSERVED. BREST RR TRANSLOADING YARD TSENTRALNYY STATUS: OPERATIONAL REMARKS: THE YARD WAS APPROXIMATELY 30 PERCENT EQUIPMENT WAS OBSERVED* 5206...04N 023..^41.47E FILLED* NO MILITARY CHERNYAKHOVSK TRANSLOADING YD SW STATUS: OPERATIONAL REMARKS: THE YARD WAS FILLED TO APPROXIMATELY 25 NO MILITARY EQUIPMENT WAS SEEN. 54?..37...22N 021?..46...08E PERCENT OF CAPACITY* GRODNO RR STATION YARDS A SHOPS STATUS: OPERATIONAL 534120N 023..?51?42E 25X1 REMARKS: THE YARD WAS APPROXIMATELY 25 PERCENT FILLED* NO MILITARY EQUIPMENT WAS OBSERVED* 191 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 SOVIET UNION LOGISTICS KALININGRAD 25X1 25X1 25X1 25X1 25X1 25X1 RR TRANSLOADING YARD STATUS: OPERATIONAL REMARKS: THE YARD WAS APPROXIMATEY 10 PERCENT FILLED. EQUIPMENT WAS OBSERVED. 54-39-46N 020-31-57E NO MILITARY MOSTISKA RR TRANSLOADING YARD 2 STATUS: OCCUPIED REMARKS: THE YARD WAS FILLED TO APPROXIMATELY GROUND FORCE ORDER OF BATTLE: 50 49-48-57N 023-01-41E PERCENT OF CAPACITY. NONE DISCERNIBLE 192 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 R Next 7 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 Kft..9 MISSION 1208...2 SIGNIFICANT RESULTS BRYANSK GUIDED MISSILE SPT EQUIP P II SOVIET UNION INDUSTRY STATUS: OPERATIONAL ASSOCIATED OBJECTS: 18 PROB SS..4/5 ERECTOR 2 POSS SSL/5 ERECTOR 75 SUPPORT VEHICLE (AT LEAST) CHALMPUSHKA SHIP REPAIR YARD STATUS: OPERATIONAL E 033...13...43E REMARKS: A 0?CLASS SSBN WAS IN THE ARD (D). THE SHIP DID NOT APPEAR TO BE UNDERGOING MAJOR REPAIRS, FLOATING SCREENS WERE POSITIONED AFT OF THE ARD (D). NAVAL ORDER OF BATTLE: 1 POSS LARGE SUBMARINE (IN 1 POSS BOLVA APL ARD?D) NAVAL ORDER OF BATTLE: 1 D SSBN (IN ARD?D) 1 PETYA?qI DE 1 PETYA...4 DE 1 GRISHA PCEP 3 POTI PCE 10 VESSEL (AT LEAST) 1 T...43 AGSC 2 LIBAU AG 2 BOLVA APL 18 MISCELLANEOUS VESSEL 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 201 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 11 V . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TOP SECRET RUFF 25X1 KH-..9 MISSION 1208-2 DNEPROPETROVSK MISL DEVEL PROD CENTER STATUS:OPERATIONAL SOVIET UNION INDUSTRY 48-26-03N 034-58.-21E REMARKS: ROCKET ENGINE TEST FACILITY -- MODIFICATIONS THROUGHOUT THE TEST FACILITY WERE CONTINUING. A NEW EXCAVATION WAS OBSERVED APPROXIMATELY 400 FEET SOUTH OF TEST STAND NO 1. THE EXCAVATION IS APPROXIMATELY 110 FEET SQUARE AND 35 FEET DEEP. THE MODIFICATIONS TO TEST STAND NO 1 FIRST OBSERVED IN FEB 74 WERE STILL IN PROGRESS. A CRANE WAS POSITIONED IN THE FLAME BUCKET AND SEVERAL RING-LIKE OBJECTS WERE NEARBY. AN UNIDENTIFIED BUILDING WAS UNDER CONSTRUCTION OUTSIDE THE SECURITY FENCES TO THE WEST OF THE TEST FACILITY. KAZAN AIRFRAME PLANT GORBUNOV 22 55-5138N 049--0655E STATUS:OPERATIONAL ASSOCIATED OBJECTS: 7 BACKFIRE B 1 BACKFIRE A 5 BLINDER 3 BADGER 2 FITTER 2 FAGOT/FRESCO 1 CLASSIC 1 CAT 1 CAMP 7 CAB (3 W/0 WING PANEL) 2 COLT 1 SAILPLANE 3 POSS KITCHEN LENINGRAD GUIDED MISSILE PROD PLT 458 STATUS:OPERATIONAL 59-59.-31N 030-17-44E REMARKS: AT LEAST 119 SA...-5 SHIPPING CONTAINERS, 22 LONG FIN BOXES, AND 22 SHORT FIN BOXES WERE IN THE OPEN STORAGE AREAS. IN THE NORTH-CENTRAL SECTION OF THE FACILITY, TEN CYLINDRICAL OBJECTS' 202 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 I 1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 7 -5X1 TOP SECRET RUFF 25X1 25X1 1208-2 ASSOCIATED OBJECTS: 119 SA-5 SHIPPING CONTAINER 22 SHORT FIN BOX 22 LONG FIN BOX 10 CYLINDRICAL OBJECT SOVIET UNION INDUSTRY LENINGRAD SHIPYARD ADMIRALTY 194 STATUS: OPERATIONAL REMARKS: 59-55-09N 030-16-27E 25X1 25X1 25X1 25X1 TWO AGBL WERE STILL FITTING OUT NO 4, PREVIOUSLY MOORED ALONGSIDE FITTING?OUT BASIN IS NOW AT SVDOMEKH 975?CLASS YRSN AND 925.'-CLASS YRSN OTHER AT THE FITTING?OUT QUAY. NAVAL ORDER OF BATTLE: ON BUILDINGWAY 50$ THE ARD (T) THE QUAY IN THE MERSHIP SHIPYARD 196. THE WERE MOORED ALONGSIDE EACH 25X1 1 975 YRSN 9 MISCELLANEOUS VESSEL (2 1 925 YRSN ON WAYS) 1 ARD (0) 2 AGBL (UNDER CONSTRUCTION ON WAYS) 25X1 LENINGRAD SHIPYARD SUDOMEKH 196 59-55..45N 030.-16...46E 25X1 STATUS: OPERATIONAL REMARKS: THE BOW HALF OF THE A SSN REMAINED IN THE 26 TRANSPORTER DOCK ALONGSIDE THE QUAY. THE F SS ALONGSIDE THE QUAY WAS PROTECTED BY SECURITY SCREENS OUTBOARD. THE W SS WITH AN UNIDENTIFIED TUBULAR OBJECT ON THE BOW REMAINED ALONGSIDE THE BOLVA APL. A POSSIBLE SUBASSEMBLY REMAINED ON THE INCLINED RAIL ALONGSIDE TH ? ? NINE SUBMARINE HULL SECTIONS MEASURING WERE ON THE QUAY IN THE PRODUCTION AND ASSEMBLY AREA. THREE HULL SECTIONS MEASURING 28 FEET IN DIAMETER WERE INSIDE THE ARD (D)r WHICH WAS MOORED ALONGSIDE 203 TOP SECRET RUFF narinQcifipn in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 I Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TciPsECREF 2SX1 25X1 1 KH-9 MISSION 12082 THE QUAY. NAVAL ORDER OF BATTLE: 1 F SS (ALONGSIDE QUAY) 1 A SSN BOW SECTION (IN 2B ARD?T) 1 W SS (ACROSS RIVER) 1 W/R SS (IN RIVER) 1 KIROV CA (IN RIVER) 2 RIGA DE (IN RIVER) 1 T...43 MSF (IN RIVER) ASSOCIATED OBJECTS: 12 SUB HULL SECTION (3 IN ARD?D) SOVIET UNION INDUSTRY 1 1.?..58 MSF (IN RIVER) 1 PROB SONYA MSF (IN RIVER) 1 BOLVA APL (ACROSS RIVER) 1 28 ARD (T) 1 ARD (T) NO. 4 1 ARD (D) 9 MISCELLANEOUS VESSEL LENINGRAD SHIPYARD ZHDANOV 190 STATUS:OPERATIONAL 03013...59E REMARKS: VDS CONVERSION CONTINUED ON THE KASHIN DLG ON WAY 64C. CONSTRUCTION ON THE NEW LAUNCH WAY WAS CONTINUING. NAVAL ORDER OF BATTLE: 2 KRESTA 11 (.1-GM 1KRESTA I CLGM 2 KASHIN DLG (1 ON WAY 64C) 1 BOLVA APL 1 ARD (D) 6 MISCELLANEOUS VESSEL NIKOLAYEV SHPYD NORTHERN 61 KOMMUNA445 STATUS: OPERATIONAL 03200....19E REMARKS: HEAVY CLOUDS AND HAZE PRECLUDED A DETAILED INTERPRETATION OF 204 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001sonninni1_cv 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 THE SHIPYARD. NAVAL ORDER OF BATTLE: 2 POSS KARA CLGMP 1 POSS KASHIN DLG 1 POSS MED COMBATANT NOVOSIBIRSK AIRFRAME PLT CHKALOV 153 STATUS: OPERATIONAL SOVIET UNION INDUSTRY 55-04-01N 082-59-10E REMARKS: FIVE FENCER A WERE OBSERVED AT THE PLANT THIS IS A REDUCTION OF NINE FENCER A FROM A HIGH COUNT OF 14 WHICH WERE AT THE PLANT ON NO NEW CONSTRUCTION WAS OBSERVED IN THE PLANT AREA. ASSOCIATFD OBJECTS: AT THE PLANT 5 FENCER A (1 W/1 POSS MISSILE) 13 FLAGON D/E (1 W/2 MISSILES) 3 FLAGON C 3 CUB 1 CAT 1 CAMP 1 CRATE 1 COLT 2 CREEK 2 MIDGET 2 HOUND 1 CAB FUSELAGE PERM AC ENGINE PLANT STALIN 19 STATUS: OPERATIONAL _7-58-_,4?N 056I5-1k REMARKS: THERE WAS NO CHANGE IN THE STATUS OF THE CONSTRUCTION ACTIVITY FROM THAT OBSERVED IN APR 74 NO OTHER CONSTRUCTION ACTIVITY WAS OBSERVED. NUMEROUS ENGINE SHIPPING CONTAINERS WERE AT THE PLANT. MOST IN THE VICINITY OF THE TRANSSHIPMENT FACILITIES. 205 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 II V Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 Top SECRET RUFF KH -9 M SEVERODVINSK NAVAL MISSILE SUPPORT FAC STATUS: OPERATIONAL SOVIET UNION INDUSTRY 64-33-45N 039-46-30E REMARKS: A CIRCULAR BUILDING WAS UNDER CONSTRUCTION IMMEDIATELY NORTH OF THE FACILITY, A LONG VEHICLE STORAGE SHED HAS ALSO BEEN ADDED TO THIS AREA. FENCE LINES WERE EVIDENT AROUND THE NEW AREA. A CYLINDRICAL OBJECT APPROXIMATELY 42 FEET LONG WAS OBSERVED ADJACENT TO THE SS-N-8 DOLLIES IN FRONT OF THE HIGH-BAY BUILDING. MISSILE ORDER OF BATTLE: 2 SS-N-6 TRANSPORTER ASSOCIATED OBJECTS: L. SS-N-3 TRANSPORTER 1 SS-N-3 CANISTER 1 CYLINDRICAL OBJ 2 FUEL TRANSPORTER 42 SS-N-3 TYPE CRATE 8 SS-N-8 DOLLY 9 PROB SS-N-9 CRATE 3 PROS SS-N-3 DOLLY 4 PoSS SS-N-7 CRATE 3 SS-N-6 CANISTER 9 SA-N-1 CANISTER 2 SS-N-5 CANISTER 10 $A-N-3 CANISTER GROUND FORCE ORDER OF BATTLE: 35 TRUCK 2 TRUCK-MOUNTED CRANE 1 RAIL-MOUNTED CRANE 60 VEHICLE/PIECE OF EQUIP SEVERODVINSK NUC SUB SPECIAL SPT FAC STATUS: OPERATIONAL 64-34-55N 039-46-36E REMARKS: THE Y SSBN REMAINED IN OVERHAUL AT POSITION III. THE E-II SSGN REMAINED AT POSITION II AND WAS SCAFFOLDED ABOUT THE SAIL AND 206 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRET RUFF 25X1 25X1 KH-9 MISSION 12082 SOVIET UNION INDUSTRY HULL. THE V SSN WAS STILL UNDERGOING DECONTAMINATION AND DEFUELING WITH A ZEYA YRSN OUTBOARD. NAVAL ORDER OF BATTLE: 1 Y SSBN 1 1 SSGN 1 1 V SSN 2 ASSOCIATED OBJECTS: 1 SS.41...6 MSL TUBE 16 ZEYA YRSN YR RECTANGULAR SPT BARGE SS.??11..?6 BALLAST CAN SEVERODVINSK SHIPYARD YAGRY ISLAND STATUS:OPERATIONAL 6435.".11N 039...48 52 REMARKS: THE Y SSBN ON THE SOUTH SHELF REMAINED IN OVERHAUL WITH NO APPARENT CHANGE. THE 402M SSB REMAINED AT THE MAIN QUAY WITH ALL MISSING TUBE DOORS OPEN. SIX SS?N-8 BALLAST CANS WERE ON THE QUAY NEAR THE SUBMARINE. SCAFFOLDING WAS STILL EVIDENT ABOUT THE HULL AND SAIL. THE 402K SSB REMAINED AT THE MAIN QUAY. THE E?'?II SSGN WAS STILL HEAVILY SCAFFOLDED ON THE NORTH SHELF, A MISSILE LOADING TRAY WAS SEEN IN FRONT OF THE PORT SIDE FORWARD MISSILE TUBE OF THE SSGN AT THE WEST QUAY. THE SAIL OF THE N SSN REMAINED CANVAS COVERED. SOME DECK PLATING MAY HAVE BEEN REMOVED, THE STERN HALF OF THE A SSN REMAINED AFLOAT AT POSITION II MAIN QUAY. THE STABILIZERS REMAINED ON THE QUAY, THE PROBABLE MISSILE TEST PLATFORM/402K AMIDSHIPS SECTION REMAINED AT POSITION It MAIN QUAY. THE BARGE UNDER CONSTRUCTION ON THE NORTH SHELF APPEARS TO BE REPAIR RELATED. FOOTINGS WERE BEING EMPLACED AS CONSTRUCTION CONTINUED ON THE NEW REPAIRWAYS ADJACENT TO THE TRANSVERSER. NAVAL ORDER OF RATTIP. 1 Y SSBN 1 A SSN STERN HALF 25X1 25X1 25X1 25X1 25X1 207 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SECRET RUFF KH-9 MISSION 1208...2 SOVIET UNION INDUSTRY 1 402M SSB 1 ZEYA YRSN 1 402K SSB 5 RECTANGULAR SPT BARGE 2 E...II SSGN 1 FERRY 1 N SSN 1 PROB REPAIR BARGE 1 W SS 2 MISCELLANEOUS VESSEL ASSOCIATED OBJECTS: 1 PROB MSL TST P M MIDSEC SEVERODVINSK SHIPYARD 402 STATUS:OPERATIONAL 64...34..?42N 039...49.49E REMARKS: POST LAUNCH DEBRIS ALONG RAIL C CONFIRMED THE LAUNCH OF THE SSBN UNIT 8 FLOTATION DEVICE SUPPORTS, AND TRANSFER DOLLIES WERE IN POSITION WHERE THE UNIDENTIFIED LINEAR OBJECT WAS SEEN I UNIT 8 WAS FITTING OUT AT POSITION IV. MAIN QUAY. D SSBN UNITS 6 AND 7 WERE FITTING OUT AT POSITIONS II AND III. PREPARATIONS FOR THE LAUNCH OF D SSBN UNIT 9 WERE OBSERVED WHEN SNOW REMOVAL OPERATIONS WERE UNDERWAY ALONG LAUNCH RAIL A. THE BASIN WAS PARTIALLY FLOODED AND FLOTATION DEVICES WERE BEING AFFIXED TO AN E-4I SSGN ALREADY INSIDE THE BASIN. THIS SHIP WOULD HAVE TO BE MOVED TO THE SHALLOW END OF THE BASIN AND THE BASIN ITSELF DRAINED BEFORE THE LAUNCH OF D SSBN UNIT 9 COULD BE ACCOMPLISHED. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 THE Y SSBN REMAINED IN OVERHAUL AT THE DEGAUSSING/CALIBRATION QUAY. WORK HAD BEGUN AROUND THE REACTOR AREA OF THE LIGHT?TONED V SSBN AT POSITION I. SCAFFOLDING WAS BEING PLACED AROUND THE HULL. THE ARD(D) WITH THE W.III SSBN WAS MOVED FROM THE CALIBRATION 25)S11 25X1 25X1 PIER TO THE EAST QUAY AND FINALLY TO POSITION WITH MOST REMOVED. VI THE SHIP REMAINED HEAVILY SCAFFOLDED SAIL PLATING V AND WAS OUTBOARD OF THE DECK AND NEARLY ALL OF THE THE P SSGN REMAINED AT POSITION 208 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25x1 TOP SFCRFT RUFF 25X1 SOVIET UNION KH-9 MISSION 1208-2 INDUSTRY THE H?III PORTIONS OF ITS SAIL HAD BEEN REMOVED. 25X1 THE E?II SSGN AT POSITION II WAS THE VESSEL IN 25X1 THE BASIN ON ? THE C SSGN REMAINED IN OVERHAUL IN THE 25X1 ARD(D) AT THE EAST QUAY. THE 402H CATAMARAN WAS IN THE LAUNCH BASIN. MISSILE BAY PRESSURE HULL SECTION WAS JUST OUTSIDE THE MAIN CONSTRUCTION HALL. NO SECTION WAS PRESENT. SEVEN ADDITIONAL PRESSURE HULL SECTIONS. A BOW SUBASSEMBLY, AND A STERN SECTION WERE ALSO IN THE STAGING AREA. A POSSIBLE HULI SFCT ION WAS ON A HOLDING TRACK OUTSIDE THE NO 2 CONSTRUCTION HALL. THIS POSSIBLE SECTION WAS CRATED SO MORE ACCURATE MEASUREMNT WAS IMPOSSIBLE. THREE SS?N-8 BALLAST CANS WERE NEAR THE WEST END OF THE NO 2 HALL. APPROXIMATELY 85 PERCENT OF THE PANELS HAD BEEN INSTALLED ON THE NEW CONSTRUCTION/REPAIR HALL. THE REAR OF THE NEW HALL WAS STILL OPEN. THE TRANSVERSER IN THE PRESSURE HULL STAGING AREA HAD BEEN MODIFIED TO ACCEPT SECTIONS GOING INTO AND OUT OF THE SUBASSEMBLY BUILDING SIMULTANEOUSLY. THE TRANSVERSER AND FENCE OUTSIDE HALL NO 2 WERE COMPLETE. NAVAL ORDER OF BATTLE: 925 YRSN D S5BN 1 2 Y SSBN 1 402C YRSN 1 H?III SSEIN 1 402F YRSN 1 P SSGN 1 402H CATAMARAN 1 C SSGN 3 YR 1 E?II SSGN 5 RECTANGULAR SPT BARGE 2 POLUCHAT PGM 5 BARGE 1 POLUCHAT YPT 2 ARD(D) 1 975 YRSN 15 MISCELLANEOUS VESSEL ASSOCIATED OBJECTS: 8 PRESSURE HULL SECTION 1 STERN SECTION 1 BOW SUBASSEMBLY SECTION 1 POSS HULL SECTION 3 SS?N-8 BALLAST CAN (NEAR NO 2 SHED) 209 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 9Y1 25X1 25X1 25X1 25X1 25X1 11 , Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Top SECRET RUFF 25X1 25X1 KH-9 MISSION 1208-2 OTHER RESULTS-NO APPARENT CHANGE BIYSK ROCKET MOTOR TEST FACILITY STATUS:OPERATIONAL SOVIET UNION INDUSTRY 52-29-00N 085-07-00E BIYSK SOLID MOTOR PRODUCTION PLANT 52-29-24N 085-05-34E STATUS: OPERATIONAL BRYANSK ROAD MACH__A_GJLLL STATUS: OPERATIONAL 53-14-49N 034-22-54E KURUMOCH ROCKET 7INE TEST FACILITY STATUS: OPERATIONAL 53-32-18N 049-51-33E KUYBYSHEV AEROSPACE PRODUCTION PLT 1 STATUS:OPERATIONAL 53-13-15N 050-18-04E 210 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 225X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 0 ii, t Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 75X1 TOP SECRET RUFF LOA! 25X1 KH-9 MISSION 1208-2 SIGNIFICANT RESULTS HA NOI SAM SITE A17-3 45 STATUS: UNOCCUPIED REMARKS: THE AREA IS NO LONGER BEING USED AS AN SA-3 SITE. VIETNAM p NORTH AIR DEFENSE MISSILES 20-52-37N 105-54-23E PA LAY SA-3 SAM SUPPORT FAC STATUS: ABANDONED 21-57-00N 106.21-1Ar REMARKS: NO MISSILE?RELATED EQUIPMENT WAS OBSERVED. THE SITE IS PROBABLY NO LONGER USED AS A MISSILE STORAGE/SUPPORT AREA. PHUC YEN SA-3 SAM SUPPORT FACILITY STATUS: OCCUPIED 24 VEHICLE 21-17-25N 105-50-08E 211 TOP SECRET RUFF 25X1 25X1 25X1 25X1 npriacsified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 25X1 25X1 25X1 25X1 11 . Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 TnO CPCPFT RUFF 25X1 25X1 KH-9 MISSION 120 DONG SUONG AIRFIELD STATUS:OPERATIONAL SIGNIFICANT RESULTS VIETNAM. NORTH AIR BASE FACILITIES REMARKS: APPROXIMATELY 95 PERCENT OF THE AIRFIELD WAS VISIBLE. NO AIRCRAFT WERE DISCERNIBLE. AIR ORDER OF BATTLE: ---NONE?DTsCERNIBLE HA NOI/GIA LAM AIRFIELD STATUS: OPERATIONAL ...1,,..2nN 105-53-26E REMARKS: APPROXIMATELY BO PERCENT OF THE AIRFIELD WAS VISIBLE THROUGH SCATTERED CLOUDS AND HAZE. AIR.QRnEROF BATTLE: 25X1 25X1 25X1 25X1 9 COLT (AT LEAST) 25X1 2 BEAGLE 2 COOT 2 HIP C (AT LEAST) 5 COKE 1 HOOK 6 CRATE 3 HOUND 15 CAB 25X1 HOA LAC AIRFIELD 21-01-51N 105-30-06E 25X1 STATUS: UNKNOWN REMARKS: APPROXIMATELY 40 PERCENT OF THE AIRFIELD WAS VISIBLE THROUGH HEAVY CLOUDS. 25X1 212 Top SECRET RUFF Declassified in Part- Sanitized Copy Approved forRelease2014/05/01 : CIA-RDP78T04752A0015000inni1A Declassified in Part - Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 25X1 TOP SECRFT RUFF 25X1 LOKI NORTH 25X1 25X1 VIETNAM, AIR BASE FACILITIES 10615....54E KH-9 MISSION 1208-...2 AIR ORDER OF BATTLE: NONE DISCERNIBLE KEP AIRFIELD 2123...36N 25X1 STATUS :OPERATIONAL AIR ORDER OF BATTLE: 2 HOUND (W/0 ROTOR) 25X1 25X1 21 FISHBED 36 FAGOT/FRESCO PHUC YEN AIRFIELD STATUS: OPERATIONAL 2113...15N 1054837 25X1 REMARKS: ALTHOUGH CLOUDS PRECLUDED A TOTAL ASSESSMENT OF THE AIRFIELD, REPAIRS ON THE CENTER PORTION OF THE RUNWAY APPEARED TO BE COMPLETE. THE AIRFIELD IS PROBABLY OPERATIONAL. AIR ORDER OF BATTLE: 1 BEAGLE 36 FISHBED ASSOCIATED BJECTS: L T BEAGLE 9 DERELICT FISHBED 7 MAYA 2 DERELICT FAGOT/FRESCO QUANG TE AIRFIELD 105?.31....35F STATUS:NOT OPERATIONAL 213 TOP SECRET RUFF 25X1 25X1 25X1 25X1 25X1 nprdaccifien in Part - Sanitized Copy Approved for Release 2014/05/01 CIA-RDP78T04752A001500010011-9 11 V -- I? I Declassified in Part- Sanitized Copy Approved for Release 2014/05/01 : CIA-RDP78T04752A001500010011-9 - - 25X1 TAD