OAK SUPPLEMENT PART 6 KH-9 MISSION 1205 10 MARCH - 18 APRIL 1973

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04752A000500010006-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
126
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 5, 2013
Sequence Number: 
6
Case Number: 
Publication Date: 
May 1, 1973
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04752A000500010006-6.pdf4.04 MB
Body: 
- Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER rn,-sEGRu_ P/LEMEMI OAK SUPPLEMENT PART 6 KH-9 MISSION 1205 10 MARCH - 18 APRIL 1973 25X1 _Top_sEcRET 25X1 25X1 MAY 1973 COPY NO 120 112 PAGES (1205) IPIR 11/73 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 WARNING This document contains information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT-KEYHOLE Contiol System. TARGET CATEGORIES AND ASSOCIATED NTP FUNCTIONAL AREAS (CODES) 1. STRATEGIC SSM Deployed Strategic SSM Facilities (A) 2. MISSILE RANGES Missile Ranges: Strategic SSM/Space Facilities (P) Missile Ranges: Air- Launched Missile Facilities (0) Missile Ranges: Naval-Launched Missile Facilities (R) Missile Ranges: Tactical SSM Facilities (S) Missile Ranges: SAM/AMM Facilities (T) 3. AIR DEFENSE MISSILES Deployed AMM Facilities (B) Deployed SAM Facilities (0) 4. ELECTRONICS/COMMUNICATIONS Deployed Communication/Electronic/Radar Facilities (C) 5. AIR Air Base Facilities (E) 6. NAVAL Naval Base Facilities (F) 7. GROUND Ground Force Facilities (6) 8. TACTICAL SSM Deployed Tactical SSM Facilities (H) 9. LOGISTICS Military Logistics Facilities (K) 10. NUCLEAR ENERGY Atomic Energy Facilities (0) 11. CBR CBR Facilities (V) 12. INDUSTRY Strategic Weapons Industrial Facilities (J) General Purpose Weapons Industrial Facilities (L) Non -Military Industrial Facilities (N) Communication/Electronic/Radar R&D Facilities (U) 13. MISCELLANEOUS Non-Military Logistics Facilities (M) Miscellaneous/Unidentified Facilities (Z) These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional association (i.e., missile range tracking facilities are reported under "MISSILE RANGES," fly-away airfields at aircraft plants are reported under "INDUSTRY," airfield nuclear weapons storage facilities are reported under "AIR," etc.). WARNING NOTICE Sensitive Intelligence Sources and Methods Involved. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP- SECRET' RUFF. 25X1 25X1 11 25X1 IOIR KH-9 MISSION 1205 TABLE' OF'? CONTENTS PAGE PREFACE 1 CHINA, COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES 2 . , AIR DEFENSE MISSILES 7 COMMO/ELEC/RADAR FACILITIES 8, AIR BASE FACILITIES 12' , NAVAL BASE FACILITIES 22 GROUND FORCE FACILITIES 25 LOGISTICS 45 INDUSTRY 46 CZECHOSLOVAKIA AIR BASE FACILITIES 52 GROUND FORCE FACILITIES 54 LOGISTICS 60 UNITED ARAB REPUBLIC INDUSTRY 61 HUNGARY COMMO/ELEC/ROAR FACILITIES 02 GROUND FORCE FACILITIES 63 INDIA . AIR BASE' FACILITIES 64 ? GROUND FORCE FACILITIES 66 'POLAND (,) GROUND FORCE FACILITIES 68 ROMANIA GROUND FORCE FACILITIES 70 SOVIET UNION AIR: DEFENSE MISSILES _ 71' , _ COMMO/ELEC/RADAR FACILITIES 73 AIR BASE FACILITIES 85 NAVAL pA'st FACILITIES . 92 GROUND .FORCE FACILITIES 94, INDUSTRY 96 MISCELLANEOUS 97 5X1 TOO SECRET RUFF' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO SECRET RUFF' 25X1 25X1 IPIR 41 25X1 KH-A3 MISSION 1205 VIETNAM. NORTH , GROUND FORCE FACILITIES ?] II PAGE 98 25X1 , TOP. SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET' RUFF 25X1 IP IR 11' 'PREFACE 25X1 KH-9 MISSION 1205 PREFACE THIS IS THE SIXTH OAK SUPPLEMENT REPORT, MISSION 1265. FOR ADDITIONAL PREFACE DETAILS o SEE FIRST 6k SUPPLEMENT 25X1 TOP. SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TAP SFeRFT RUFF J 25X1 IP IR 11 KH-9 MISSION 1205 ? .. CHINA r COMMUNIST DEPLOYED' STRATEGIC SSM FACILITIES SIGNIFICANT RESULTS LIEN?KENGWANG POSS SSM SITE 19 29-4 6-0 0 N 117-15 0 E STATUS: UNDER CONSTRUCTION PHYSICAL. DESCRIPTION: , . 25 NM SW OF LIEN.KENG?WANG SSM SITE 40 , THE NEWLY IDENTIFIED, POSSIBLE. SITE CONSISTS OF SIX _sppppRt BUILDINGS AND TWO ADITS0 THE CONSTRUCTION TIMING AND LOCATION WERE CONSISTENT WITH CONSTRUCTION OF THE FIRM SITES IN THE AREA? ,THE,AbITS ARE UNDER CONSTRUCTION IN A WELL, pilkINFO, RAVINE OFF THE COMPLEX ACCESS ROAD. THE ACTIVITY 0 AMTS. SUPPORT BUILDINGS. AND SITE ACCESS ROAD WEE' NOT PRESENT /N TGT DIAM 1.500 M (5A60 FT)? ELEV 300 M (1.0d0 FT)'. MAP SOURCE REFERENCE: 200.4493-13 LIENKENG?WANG POSS SSM SITE 20 STATUS: UNDER CONSTRUCTION 29-42-30N. 117-12-55E PHYSICAL DESCRIPTION: 29 NM SW OF LIEN.KENG?WANG SSM' SITE 40 THE NEWLY IDENTIFIED POSSIBLE SITE cOs;sTs OF Fin' sympOt BUILDINGS AND TWO ADITS? THE coNsTRycTION. TIMING AND LOCATION WERE CONSISTENT WITH CONSTRUCTION OF THE FIRM SITES IN THE . , . AREA? THE SUPPORT Eiumm6.ANO,ADITS ARE IN A RAVINE OFF THE cOmPak ACCESS ROAD? THEY WERE NOT PRESENT IN THE ADITS WERE UNDER CONSTRUCTION. ANDs THE CONSTRUCTION WERE SIMILAR' TO At;Tr. cpNsTcwcTON OBSERVED ;N' AT SITE 4. THE SUPPORT BUILDINGS ARE AT. THE, , ,INTERSECTION OF .THE SITE AND COMPLEX, ACCESS ROADS AND NEAR THE ADIT CONSTRUCTION? TOT DIAM Iffle 1.500 M (50(0 FT)0 2 Eav 300 M j.1.000 FT)e 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 25X1 11 CHINA, COMMUNIST . _ , DEPLOYED STRATEGIC SSM FACILITIES 25X1 IOIR KH -9 MISSION 1205 25X1 'MAP SOURCE 'REFERENCE': A.1 2000493...13 25X1 LIEN...KENG...WANG POSS SSM SITE 23 .24-52.040N 117...35..45E' 25X1 STATUS:UNDER CONSTRUCTION PHYSICAL DESCRIPTION: 10 NM SOUTH OF LIEN...KENG.4ANG SSM SITE 4. THE NEWLY IDENTIFIEO, COMPLETED' POSSIBLE SITE CONSISTS OF k , LEVELED' AREA AND AN ADO: Fkom' THE ADIT A .CURVEQ. VEHICLE TRACK ANO A L....SHAPED CABLE SPAR LEAD Tow00 THE L00-0 000 THE FLOOR OF THE RAVINE IN THIS AREA -1.AID THE APPEARANCE OF HAVING BEEN CAMOUFLAGED WITH VEGETATION. THE CONSTRUCTION TIMING AND LOCATION WERE NOT, CONSISTENT WITH. THE CONSTRUCTION OF FIRM:_ SITES IN THE AREA. RATHER THAN BEING ISOLATED, THE SITE IS IN k RAVINE WITH A BARRACKS AREA AND AGR/CULTURAL IN 25X1 SITE AND THE BARRACKS AREA WERE NOT PRESENT AND WERE FIRST SEEN UNDER CONSTRUCTION IN. 25X1 THE BARRACKS AREA CONTAINS AN AUDITORIUM, TWO ADMINISTRATION BUILQINGS, A MESSHALLP EIGHT BARRACKS,. FOR GARAGES, 15 svpIDDIRT EiViLDINso AND k SWIMMING POOL?. THE SITE NORTH OF THE BARRACKS MAY BE FOR UNDERGROUND STORAGE? .Ck TGT DIAM 1500M (50000 Ft)o ELEV ..... 300 M (1,000 FT). MAP SOURCE '? REFERENCE: 200.4493...13 POSS SSM SITE 24 STATPS:.UNDER coN$TRUctxoN 3 1173055E' 25X1 25X1 25X1 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 25X1 IPIR 11' MISSION 1205 _ CHINA s COMMUNIST DEPLOYED STRATEGIC SSM' FACILITIES PHYSICAL DESCRIPTION 6?5 NM WSW OF LIENH(EN6'..WANG SSM SITE 40 THE NEWLY IDENTIFIED' POSSIBLE SITE CONSISTS OF TWO SUPPORT BUILDINGS, THREE ADITS,WITHIN A RAVINES ANP 11 SUPPORT BUILDINGS SOUTH OF THE SITE ACCESS ROAD' AS IT ENTERS THE RAVINEo THE CONSTRUCTION TIMING AND LOCATION WERE CONSISTENT WITH CONSTRUCTION OF THE FIRM SITES IN THE AREA? THE SITE WAS NOT PRESENT IN THE SITE IS OFF THE COMPLEX Accs Ron'. TWO CONSTRUCTION SUPPORT BUILDINGS HAVE BEEN REMOVED SINCE, TOT DIAM 19500 M (50000 FT)o ELEV 300 IA' (19000 FT)o _ MAP ,s0uRtE REFE0E4CE: 20-0493-13 LIEN...KEN0'..WANG PROB SSM SITE le 29-46,-40N 117 13-10t STATUSWNDER CONSTRUCTION PHYSICAL' DESCRIPTI00, 26 NM SW OF LIENKENG.*WANG SSM SITE 4o , THE NEWLY IDENTIFIED PROBABLE SITE CONSISTS OF APPROXIMATELY 40' SUPPORT BUILDINGS AND EXCAVATING ACTIVITY ? THE TIMING ANP, LOCATION OF CONSTRUCTION WERE CONSISTENT WITH CONSTRUCTION OF THE FIRM SITES IN THE AREAo THE SUPPORT BUILDINGS AND EXCAVATING ACTIVITY ARE IN 'A RAVINE PF* THE COMPLEX ACCESS ROAD AND WERE NOT PRESENT IN co, THE EXCAVATION IS AT , ? THE NORTHERN END OF THE RAVINE ANP IS THE RESULT OF ADIT , ? , , , CONSTRUCTION. THIS SEEMS To BE THE MOST LIKELY LOCATION FOR .THE LAUNCH PAD. THE sOpoRT BOLpOds ARE JUST OFF THE SITE ACCESS, ROAD WHERE IT APPROACHES THE EXCAVATION FROM' THE' SOUTH. TOT DIAM 1.500M (59000 FT); ELEV 300 M (19000 FT), MAP_SPORCE.REFEiRENCE': 2074)493-13 4 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05. CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved 11 for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 F 25X1 25X1 25X1 CHINA, ,COMMUNIST DEPLOYED STRATEGIC SSM FACILITIES IPIR KH. LIEN.P.KENGWANG -9 MISSION 1205 25X1 PROB SSM SITE 22 29-35140N 11/-12-10E* 25X1 STATUS: UNDER CONSTRUCTION PHYSICAL' DESCRIPTION': 34.5 NM SW OF LIENKENG..-WANG StM SITE 4o , THE NEWLY IDENTIFIED PROBABLE, SITE coNtIt5 OF 21 supp6RY , BUILDINGS AND TWO ADITS0 THE CONSTRUCTIONAND LOCATION TIMING A ,. WERE CONSISTENT WITH CONSTRUCTION OF THE FIRM SITES IN THE . AREA? THE SUPPORT 00.(PINP 400AOT:$ ARE IN A RAVINE OFF THE OMOLEX. ACCESS ROADS THEY WERE NOT PRESENT IN 25X1 THE ADITS WERE UNDO CONSTRUCTION:AND:THE CONSTRUCTION OFYI METHODS WERE SIMILAR TO ADIT CONSTRUCTION IN , 25X1 AT SITE 21. MIDWAY IN THE RAVINE, AN AREA HAS BEEN FILLED AND LEVELED' ANP THE WALLS OF THE RAVINE co' AWAY. THIS AREA IS THE MOST LIKELY LOCATION FOR THE. LAUNCH PAD. . TGT DIAM 1,500 M' (50000 Ft) 0 ELEV 300 M (1000 FT). MAP SOURCE REFEOENCE': 2007,0493.48 LIEN-KEN6.4ANG SSM SITE 1/ 29-54.-40N 117-4445E. .$1.ATUS:COMPLETE PHYSICAL DEgApTpN: _ 22 NM 'WSW OF 'LIEN...KENG-PWANG- SSM SITE ,40 THE NEWLY, IDENTIFIED'y .COMPLETED! LAUNCH SITE coNsitt$'0',A, A.AuNCH, PAD AND APRON 16 YPPOIT BUILDINGS AND FPuR,ApiTs,. PROPELLANT PIPELINES WERE INDICATED BY PROPELLANT TRANSFER POINTS IN THE PAD SURFACE. A VEHICLE' ADIT NE OF THE PAD HAS 'POD' A.00s TP.THE.P!kP AND APRON AND PROBABLY SERVES FOR MISSILE piEciwyT OR HOLD. ALSO IN THE IMMEDIATE, PAD AREA '.101E 70,0PITIONALADITS AND A spiappRT, 0.1LoING!, THE'AuT5, ARE SOUTH AND -.:THE..5YPPORT.B.VILDING'NORTH OF THE PAD.. THE _FOURTH ADIT AND THE REMAINING SUPPORT 25X1 25X1 25X1 25X1 25X1 5 TOP SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013)03/05 : CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 25X1 I' IR 11 KH...9 MISSION 1205 ' CHINA. COMMUNIST - , DEPLOYED STRATEGIC SSM FACILITIES BUILDINGS ARE ALONG, THE SITE Ac'cEts RoAb. AS IT APpRoAtHEs,T PAD FROM THE soyTH. THE SITE IS ORIENTED' ON AN AZIMUTH OF DECREES? THE SITE WAS NOT PRESENT TGT DIAM 19500 (5.000 Ft)o ELEV 300 M (19000 FT)o MAP sovRtE REFERENCE: 200?4493.43 LIEW.KENG..,WANG SSM SITE 21 29-42...37 117....06??00E' 25X1 25X1 25X1 25X1 25X1 25X1 STATUS: UNDER CONSTRUCT ION PHYSICAL DESCRIPTION: . 34 NM SW OF LIEN'7KENGWANG SSM SITE 4. THE NEWLY IDENTIFIED SITE CONSISTS OF A LAUNCH PAD AND APRON. TEN SUPPORT BUILDINGS. AND FIVE AbiTs. THE LAUNCH PAD AND APRON ARE NEARLY COMPLETE? NO EVIDENCE OF PROPELLANT PIPELINES PAD HAS GOOD ACCESS.TO THE AN PROBABLY pAb AND APRON D 1 IO j FUNCTNS WAS. oBsEkVED.. A' VEHICLE AW SE OF THE 25X1 ,. _ ?,. . FOR MISSILE' CHECKOUT OR HOLD THE OTHER FOUR ADITS'ARE ALONG THE SITE ACCESS ROAD AS IT APPROACHES THE PAD FFom THE soUTH.'_ EIGHT SUPPORT BUILDINGS ARE NORTH ,(:.,F,THE,PAD AT THE END OF THE RAVINEp TWO ADDITIONAL SUPPORT BUILDINGS ARE ALONG THF crrE' Atotss ROAD'. THEMtE'IS_ORIENTED ON AND AZIMUTH Or 25X1 DEGREES? THE SITE WAS NOT PRESENT IN 25X1 TGT DIAM 1,500M (5.000 FT) o ELEV 300 M (1'0000 FT)o MAP SOURCE REFERENCE': 2004493..43 6 25X1 25X1 25X1 TOP SECRET RuFF: Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 IPIR 11 KH-9 MISSION 1205 SIGNIFICANT RESULTS TAI?YUAN/SHOU?Yrn ctiim nrPOT CHINA COMMUNIST' AIR' DEFENSE MISSILE'S 37-52-40N 113-08-18E' STATUS: OPERATIONAL MISSILE' ORDER OF BATTLE': 72 CSA-1 TRANSPORTERS ASSOCIATED OBJECTS: , CSA-1 CANISTER TRNSPTRS , , 6 PROB CSA-1 CANISTER TRNSpTRS 145 OXIDIZER TANKS (AT LEAST) 53 VAN TRUCKS .7 PROB FUEL TRUCKS 7 PROB CSA-1 TRANSPORTERS 3 PROB TRUCK?MOUNTED CRANES (cANyptt COVERED) 71 CARGO ,TRUCKS 1.3 PROB TRACKED?PRIME MOVERS 6 PROB CANISTERS (AT LEAST) OTHER' RESULTS-;NO APPARENT CHANGE' PEI-CHING SAM SITE D28-1 STATUS: UNOCCUPIED 1440.cilwit 115-42-15E' 7 TOP SECRET RUFF: Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 -5')"(1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SFCRE'T RUFF 25X1 25X1 b, L+ IOIR 11 KH-9 MISSION 1205 CHINA. COMMUNIST CbMMO/ELEC/RADAR FACILITIES SIGNIFICANT RESULTS .1.-PA.-HA=NA..ERH-CrI Aid RAhAR FAC 43-47 14N 115-39-59E' STATUS:OCCUPIED REMARKS: THP c1111.17 r awn TE KUN-MING A REMAIN ORIENTED AS THEY WERE IN ELECTRONIC ORDER OF BATTLE: 2 PROB SUUJI B 1 KUN-MING A ASSOCIATED OBJECTS: 7 PROB VAN TRUCKS 1' SUUJI C 7 PROB VAN TRAILERS CHIU-HO.*SHIH RAOR FACILITY 41-51;.00N 087-41-00E' STATUS: OPERATIONAL ELECTRONIC ORDER. OF BATTLE: I. POSS ,BAR LOCK, 1 PROB HEIGHT FINDER 1 POSS VAN KUN..MING ELECTRO ICS FACILITY' 24-53-50N. 102-47-45E' STATUS: OPERATIONAL' ELECTRONIC ORDER OF BATTLE: 1 KUN-'MING A 8 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF, 25X1 IPIR 11 ki+uP9 MISSION 1205 LU-SHAN POSS COMMO FAC CHINA. COMMUNIST COMMO/ELEC/RADAk FACiLITIES 29-35-00N 115-59-33E $TATPS:UNDER CONSTRUCTION PHYSICAL DESCRIPTION: 191 NM NE OF LUSHAN'o THIS IS AN UPDATED DESCRIPTIONo. THE FACILITY CONSISTS OF A' PROBABLE UNDERGROUND RADIO RELAY TERMINAL WITH THREE TUNNEL' ENTRANCES. A LARGE BARRACKS/SUPPORT BUILDING. FOUR SUPPORT _ . _ BUILDINGS. A PROBABLE POL, TANK'. A CISTERN, AND A BASKETBALL COURT0 GROUND FORCE ORDER OF BATTLE: 1 CARGO TRUCK NING-AN PROB ECM SITE 44720-20N 129?6?3-40E. STATUS: OPERATIONAL REMARKS: _ THIS FACILITY HAS BEEN IDENTIFIED AS AN AIR WARNING' RADAR SITE.' ELECTRONIC ORDER OF BATta'7, AT EAST END OF FACILITY. 1 BAR LOCK AT WEST END OF FACILITY 1 POSS RADAR 1' LATTICE TOWER OMIN AW RADAR SITE ,I130-45N 086-4-40E STATUS: OCCUPIED ELECTRONIC ORDER OF BATTLE: 2 spooN REST (CHINESE'. 9 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05 : CIA-RDP78T04752A000500010006-6 - Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 Q.; IOIR ii KH-9 MISSION 1205 ' VARIANT) CHINA. COMMUNIST , . COMMO/ELEC/RADAR FACILITIES PU?TAI PROB HF COmMO FAC 37-23-15N 118-01-50t STATUS: OPERATIONAL PHYSICAL DESCRIpTION: 105 NM NORTH OF PU?TAI0 THE NEWLY IDENTIFIED L WALL-SECURED FACILITY CONSISTS 0'1* , _ _ _ HORIZONTAL DIPOLE ANTENNA 5ysTEMso Two _TUNING BUILDINGS, ONE CONTROL BUILDING.. TO pARRAtkt/%ippoRT BUILDINGS. AND THREE SMALL-SUPPORT BUILD/NGS0 TGT DIAM 12.2M (400 Fr) ELEV-- 9 (3O FT) OiFiNtRhOc_DRDER OF BATTLE': 2 HORIZONTAL DIPOLES MAP SOURCE REFE'RENCE'; 200-0381717' TUNG-HAO?CHI?TE' AW RADAR' SITE 'WEST 447277.00N 11/?-3ot STATUS: OCCUPIED ELECTRONIC ORDEA OF BATTLE: 1 awl p 1 PROB SUkkli Aip' RADAR'. cHkssxs (WITH ANTENNA REMOVED) 2 POO ELECTRONICS VANS (IN SUPPORT AREA) 10 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 v 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO' SECRET RUFF' 25X1 25X1 25X1 CHINA r COMMUNIST' IPIR 11 KH-9 MISSION 1205 COMMO/ELEC/RADAR' FACILITIES YU...CHA AW RDR FAC 6 5-40N 101-58-30E' 25X1 STATUS OCCUPIED REMARKS: OCCURRED SINCE' . SEVERAL CHANGES HAVE TWO 25X1 REMOVED FOpm THE AREA OF THE BASKETBALL' SMALL BUILDINGS WERE COURT' ONE BARRACKS WAS REN10/0' AND ONE SMALL SUPPORT pumbING' WAS RAZED FROM THE 4HILLSIDE BELOW THE SPOON REST RADAR. THREE NEW MINOR SUPPORT BUILDINGS WERE ERECTED IN THE NORTHERNMOST PORTION OF THE SITE. . * ? CTRONIC ORDER OF BATTLE: 1 PROB CROSS LEGS . 1 SPOON REST (CHINESE VARIANT) (VAN MOUNTED) 4 ELECTRONICS VANS 25X1 25X1 25X1 25X1 25X1 25X1 25X1 OTHER RESULTS?NO' APPARENT CHANGE' CHENG-KU SPACE TRACK/NG FACILITY 33-42-50N 107-15-40E* STATUS: OPERATIONAL LA?SA AW RADAR FACILITY' 29-40-10N 091703=30E' STATUS:UNOCCUPIEb 11 TOP SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO. SECRET RUFF 25X1 25X1 . ? IPIR . 11 CHINA. COMMUNIST 25X1 KH-9 MISSION 1205 AIR BASE FACILITIES SIGNIFICANT RESULTS CHIAO.H0 'AIRFIELD 43.49.?20N 127-31-10E' 25X1 STATUS: UNDER CONSTRUCTION REMARKS: SNOW COVERED' THE RUNWAY' AND THE TAXIWAYS. THE SOUTHERN AIRCRAFT. TUNNEL WAS oak CONSTRUCTION., OtAtk CONSTRUCTION ACTIVITY APPEARED TO BE AT A STANDSTILL, AT nOnOk BATTLEi NONE DISCERNIBLE CHIH?44I....CHIH. AIRFIELD STATUS: OPERATIONAL 37...62.?03N 110-004...04E REMARKS: THE SUPPORT AREAS APPEAR COMPLETE AN, INCLUDED AN OPERATIONS' AREA. A' FLIGHT SUPPORT AREA. TWO 'ApIckOt MAINTENANCE AREAS. AN , AIRCRAFT STORAGE TUNNEL. A VEHICLE JMAINTENANCE AREA. Two Hous1Np AREAS. A' POL:$TORAGE AREA. AND AN txkLotIvEt sTokAdt` ,fl . AREA*. ? . . . . AIR ORDER OF BATTLE: 21 BAT CHILIN/ERH-TAt.T7U AiRFIELD 43-.59.?59N 126...23$3t . , STATUS: OPERATIONAL 25X1 25X1 25X1 25X1 25X1 25X1 REMARKS: THE AIRCRAFT PARKED' AT CHI"*LIN/ERH.TAI?PTZU AIRCRAFT REPAIR' BASE' ARE UNDER T ' REPORTED TARGET. . , _HIS _ , . 25X1 25X1 ?12 TOO-SttRO'RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 - Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 Y66 el ? IPIR 11' KH'-9 MISSION 3.205 AIR ORDER OF BATTLE': .- AT MAINTENANCE AREA 8 PROB FAGOT/FRESCO CHINA! ,OMMOIST AIR BASE FACILITIES 13 SMALL, SWEPT-WING' - AT PARKING AREA 1 SMALL SWEPT-WING 1 POSS COLT 37 FARMER 14 FA _GOT/FRESCO FU-JUNG' TAO TARGET RANGE 37-48-40N 119-49 10t STATUS: PERATIONAL PHYSICAL' DESCR/PTION': ON FU-JUNG TAO (ISLAND) IN. LAI-CHOW WAN (BAY) IN THE P6-HAI T4- _ NEWLY IDENTIFIED ROBE-PON5,W$,or TWO WHITE TARGET MARKERS ON OPPOSITE ENDS OF THE ISLAND. ONE TARGET IS A 'LARGE WHITE CROSS, THE OTHER IS A CIRCLE WITH A poT_Of_THE' CENTER* CRATES AND SCARS PROBABLY FORMED By EXPLOSIONS WERE OBSERVED THROUGHOUT THE ISLAND:. THE ISLAND IS UNINHABITED ,AND NO OTHER MANMADE FEATURES WERE oB5E0E6.IT IS OTO5s;p4 TO DETERMINE WHETHER THIS TARGET RANGE IS FOR AERIALS NAVAL, OR FIELD ARTILLERY BomoAkOMEilt.. THE ISLAND Is. APPROXIMATELY 3.5 NM FROM THE NEAREST NEIGHBORING SHORELINE. TGT DIAM 782'M' (2'0500 FT).' ELEV -- 9M (30 FT); ASSOCIATED OBJECTS: NONE DISCERNIBLE MAP SOURCE REFERENCE': 200r0381-48 13 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF: Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TAO' SF.CRFT' RUFF IPIR 11. KH...9 'MISSION 1205 HSI...LIN.LHAO?eTE Al CHINA. COMMUNIST' AIR BASE FACILITIES 43...5540N 116...010.?40E STATUS: OPERATIONAL REMARKS: THE NEW TERMINAL BUILDING REPORTED IN IS A ., SIPPED.? TWO7STORI BUILDING WITH A POSSIBLE CONTROL TOWER ATOP THE SECOND STORY* AIR ORDER OF BATTLE': NONE DISCERNIBLE HSP.WA AIRFIELD STATUS: UNDER CONSTRUCTION xn xi?Anm no7?nR.;OOF' REMARKS: CONSTRUCTION' WAS'CONIINUING ON THE'RUNWAY'AND SUPPORT FACILIIESo BUT PROGRESS HAS BEEN: VEO,SLOWo AIR ORDER OF BATTLE.: NONE DISCERNIBLE .JIH....K0?..ISE' AIRFIELD EAST STATUS: OPERATIONAL 29-20-59N 089..47...58E' REMARKS: A SUPPORI AREA WITH NINE DISPERSED AMMUNITION STORAGE , . , BUILDINGS AND A POL STORAGE AREA WITH FOUR BURIED YERTICA!-- TANKS AND THREE BUILDINGS WERE IDENTIFIED 7 NM ESE OF THE AIRFIELD. ATR ORnFR O BATTLE': 25X1 LAI ZOA1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF. 25X1 25X1 CAINA, COMMUNIST 25X1 IPIR 41 KH....9 MISSION 1205 AIR BASE FACILITIES NONE DISCERNIBLE 25X1 KAI..YUAN POSS AIR TRAINING SCHOOL N 124..02.00E' 25X1 ci STATUS: OCCUPIED PHYSICS...DESCRIPTION': IN THE CENTER OF KAI...YUANo . THE NEWLY _IDENTIFIED' WALL-SECURED ROAD?SERVED FACILITY CONSISTS OF TWO LARGE MULTISTORY 6.SHAPED BARRACKS/CLASSROOMS, THREE MEDIUM MULTISTORY BARRACKS. ONE LARGE MESSHALL. ONE STEAMPCANT, ONE POSSIBLE' TRAINING HALL. FOUR BASKETBALL COURTS. AND A PARADE FIELD.? TGT DIAM 195 M (650 FT) 0 ELEV 90 M' (300 FT)o ASSOCIATED OBJECTS: 2 FAGOT MAP SOURCE REFERENCE': 200.0290...6 KUNG?KA AIRFIELD' 99.17.44N 090..54.53E' STATUS: OPERATIONAL REMARKS: ONE BARRACKS WAS UNDER CONSTRUCTION IN THE TERMINAL suppokt AREAo AIR ORDER OF BATTLE': 1 CAT/CUB 15 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF._ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 IPIR, 11 KH-9 MISSION 1205 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 PEICHING AIRFIELD CAPITAL' STATUS:OPERATIONAL ? CHINAo COMMUNIST 25X1 AIR BASE' FACILITIES REMARKS: A MAINTENANCE BUILDING WAS UNDER CONSTRUCTION NW OF THE , , , . TERMINAL APRON? NumERoys CONSTRUCTION SUPPORT BUILDINGS AND CONSTRUCTION 'MATERIAL'S WERE OBSERVED WITHIN THF CONSTRUCTION' SITE? .THE COMSAT STATION PREVIOUSLY REPORTED WAS IN THE SAME, LOCATIONS AND A POSSIBLE MICROWAVE TOWER WAS ADJACENT TO THE cOmsO SUPPORT BUiLbING0 AIR ORDER OF BATTLE': 6 COKE 4 CLASSIC 2 TRIDENT 3 CRATE' 4 COOT 1 CAB 2 VISCOUNT '1' HOUND ELECTRONIC ORDER' OF BATTLE: 1 COMSAT DISH ANTENNA ASSOCIATED' OBJECTS: 3 PROB CAB FUSELAGES' 4 Poss MICROWAVE' TOWER PEIa.CHING/HSI?CHIAIRF1EL139-57728N 116-15-22E STATUS: OPERATIONAL AIR ORDER OF BATTLE': 1 CAB ASSOCIATED OBJECTS: 7 POL TRACTOR?TRAILERS 4 WING, PANELS 44 CARGO TRUCKS 8 PROB pIEcts OF CONST 9 . PROB VAN TRUCKS EQUIP 16 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 25X1 11 CHINA' COMMUNIST 25X1 IF, IR KH -9 MISSION 1205 AIR BASE FACILITIES 25X1 PEIrCHING/tUNG HSIEN AIRFIELD 39.48..32N 116-.42..23E' 25X1 STATUS: OPERATIONAL PHYSICAL' DESCRIPTION: 15.8 NM SW OF PEKING.' THIS IS AN UPDATED. DtscOptION.., THE AIRFIELD CONSISTS OF THE FOLLOWING FLIGHT OPERATIONS AND? SUPPORT FACILITIES. RUNWAY THE PRIMARY' RUNWAY IS 2e.077 X 63 METERS (79240 X 205 FEET) NORTH/SOUTH SERVICEABLE AND CONCRETE. THE AUXILIARY RUNWAY IS 405 X 52 'METERS (1.330 X 1.70 FEET) NW/SE' SERVICEABLE AND SOD? THE REFERENCE POINT (RP) IS THE CENTER' OF THE PRIMARY RUNWAY. PARKING' PARKING'FACILITIES'CONSIST OF A'PAkALLEL , . TAXIWAY', ONE SHORT,DISPERSALTAX/WAY. TWO END-CONNECTING AND .FOUR c.;:spV(FR LiNktp ONE PARKING APRON, TWO ALERT APRONS, TWO SMALL MAINTENANCE APRONS. 29 HARDSTANDS (28 REVETTED)! ONE FIRINGIN BUTT' AND TEN SOD HELICOPTER PADS ON THE EAST SIDE OF THE PRIMARY RUNWAY. ? 4 , SUPPORT FACILITIES r- suppokTFACIOTI..ALL WEST OF THE !RP, .I.NCLUDE. O? NE CONTROL TOWER/OPERATIONS,BUILDIN'6 ONE WEATHER STATION,. FIVE BARRACKS/CREW QUARTERS, THREE HANGARS. THREE FURNACE BUILDINGS. 31. SUPPORT BUILDINGS , TWO MOBILE GCA s0",E5p AND AN AW RADAR MOUND. THE AW SITE IS SEPARATELY TARGETED AS TUNG4(SIEN AIR WARNING RADAR FACILITY ADMINISTRATION AND BARRACKS FACILITIES ADMINISTRATION' AND BARRACKS FACILITIES. ALL WEST OF THE RP. CONSIST OF TWO ADMINISTRATION BUILDINGS, 58 BARRACKS, ONE AUDITORIUM, NINE' MESSHALLS, ONE DISPENSARY. ONE PARACHUTE LOFT, TWO FURNACE BUILDINGS, THREE VEHICLE MAINTENANCE BUILDINGS. SIX VEHICLE' STORAGE' B? UILDINGS. AND NUMEROUS STORAGE/SUPPORT BUILDINGS. AMMUNITION FACILITIES .....'EXPLOSIVES'STORAGt. LOCATED'1'.311' METERS (4,300 FEET) WNW OF THE RP. CONSISTS OF THREE REVETTED STORAGE' B? UILDINGS ANb ONE SUPPORT BUILDING.' POL FACILITIES ... 'POL. STORAGE'. LOCATED, APPROXIMATELY 1 NM' NW OF THE fq7p IS RAIL SERVED AND coN1.$T5,9F_14, STORAGE BUNKERS. NINE' SUPPORT BUILDINGS. TRANSLOAOING FACILITIES, AND OPEN STORAGE. 17 25X1 25X1 TOP SECRET RUFF' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF. 25X1 25X1 25X1 11 CHINA, COMMUNIST AIR BASE FACILITIES IPIR KH-..9 MISSION 1205 TEN FUELING' POINTS ARE ADJACENT TO THE PARKING APRON. THE FUELING POINTS ARE 'SERVICED BY TWO PUMPHOUSES, ONE DISTRIBUTION . ?. BUILDING. AND TWO SMALL STORAGE BUNKERS. NAVIGATION AIDS NAVIGATION AND LANDING' AIDS INCLUDE TWO INNER MARKER BEACONS. TWO MOBILE GCA SITE'S. PRIMARY RUNWAY AND TAXIWAY LIGHTS. THRESHHOLD LIGHTS, AND APPROACH LIGHTS. DEFENSES SAM SITE B12...1 15 AT THE 25X1 SW END OF THE DISPERSAL TAXIWAY. 1.524 METERS (5.000 FEET)'SW OF. THE RP. AIR ORDER OF.BATTLE: 2 CAB 22 COLT 2 MAX/MOOSE' (P0SS DERELICTS) 18 HOUND (1 IN FLIGHT SOUTH' OF RUNWAY) PE1...TUN/YUW-NAN. ATRFIriD 25..26-.47N 100...44..06t STATUS: OPERATIONAL REMARKS: THIS 15 THE FIRST TIME MAYA AIRCRAFT (SINGLE?ENGINE JET TRAINERS) HAVE BEEN IDENTIFIED AT THIS AIRFIELD. 25X1 25X1 25X1 0 AIR ORDER OF BATTLE: 25X1 25X1 33 FAGOT/FRESCO 4 COKE 7 CAB 4 MAY SHAN"tHAN AIRFIELD 090...16..30E' 25X1 STATUS: OPERATIONAL REMARKS: CONSTRUCTION WAS CONTINUING' ON THE AIRFIELD SUPPORT FACILITIES.' 18 25X1 TnP SE'CREt RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TAD' crig4PT RUPP' 25X1 25X1 IPIR KH-9 MISSION 1205 AIR ORDER OF BATTLE: 26 PROB FAGOT/FRESCO CHINA! COMMUNIST 25X1 AIR BASE FACILITIES WEI...FANG'AIRFIELD? 36...38.?51N.119...07712E STATUS: OPERATIONAL 25X1 25X1 25X1 REMARKS: THIS IS THE FIRST TIME THAT BEAGLE AIRCRAFT HAVE BEEN SIGHTED ? - ? AT THIS AIRFIELD SINCE' WHEN A SINGLE BEAGLE 25X1 WAS PRESENT* AIR ORDER OF BATTLE: 15 BEAGLE 35 F...9 . . 16 FAGOT/FRESCO cOLt WU...CHAI AIRFIELD NORTH STATUS: OPERATIONAL 39-03.-35N iii-4L$.5 25X1 25X1 25X1 REMARKS:, A SUPPORT AREA 1o6 NM NW OF THE CENTER OF THE RUNWAY' PREVIOUSLY REPORTEDAS A HOUSING AREA UNDER 25X1 . , CONSTRUCTION. CONSISTS OF ONE AUDITORIUM, EIGHT MULTISTORY. FLAT...000FED BUILDINGS. TWO POSSIBLE MESSHALLS,. ONE FURNACE BUILDING. AND NINE SUPPORT BUILDINGS* CONSTRUCTION' WAS CONTINUING ON A HoysINp. AREA APPROXIMATELY 300 METERS (984 FEET) NORTH OF THE SUPPORT AREA. AIR ORDER OF BATTLE: 3 FRESCO 35 FAGOT 19 TOP SECRET RUFF' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 25X1 IPIR 11 'KH-9 MISSION 1205 WU.4..U?mMUa.CHI AIRFIELD' STATUS: OPERATIONAL .COMMUNIST. 25X1 AIR BASE FACILITIES 43....53.'.34N 087 2B...16E REMARKS: ? .A ? , CONSTRUCTION WAS CONTINUING ON THE PfkAi4.4- TAxItoiy' FOR THE NEW RUNWAY AND: ON THE SUPPORT, FACILITIES. A PROBABLE INSTRUMENT LANDING SYSTEM HAS BEEN CONSTRUCTED FOR THE NEW RUNWAY.,A PROBABLE TEMPORARY STORAGE YARD' CONTAINING tlx BUILDINGS AND STACKS OF, UNIDENTIFIED CONSTRUCTION MATERIAL WAS SSE OF THE OLD RUNWAY. AIR ORDER ?F BATTLE: 2 CRATE 2 CAB., 18 COLT 16 PROB HOUND (6 WITHOUT ROTORS) WU"'LU?mMU?..CHI AIRFIELD SOUTH STATUS: UNKNOWN 43..28.q 5N 087.?32...10E' REMARKS: WITH THE Excp),TX9N SMALL CLEARED SECTION, THE RUNWAY' WAS . . . . , SNOW COVERED AND NOT sEkOctAkt!, F BATTLE': tONEISERNIBLE' ASSOCIATED' OBJECTS: 4 vEmicLEsipiEts o'F'tQUIP" ON RUNWAY). 20 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF z 0X1 25X1 1'1* CHINA:.' COMMUNIST 25X1 ? IPIR KH-9 MISSION 1205 AIR BASE FACILITIES YU.NG.-NING' AIRFIELD 40-30,-13N 116-06-05E' 25X1 STATUSOPERATIONAL REMARKS: THE RUNWAY AND pAk414, TAXIWAY ARE itOo PERCENT PAVED AND ARE ? . SERVICEABLE. coNsTROOTi* WAS CONTINUING ON THE DISPERSAL TAXIWAY AND FOUR AD;TS. AT_LEAST_TWO. ,A005 ARE FPR AIRCRAFT ; STORAGE'. A-CONTROL. TOWER AND ONE OPERATIONS BUILDING/CONTROL TOWER HAVE BEEN CONSTRUCTED ON A SMALL HILL NORTH OF THE RUNWAY. PROBABLE SRA .SYSTEMS SERVICE BOTH RUNWAYS. EACH SYSTEM CONSISTS OF AN LORENZ INNER mAkkEk BEACON AND ,ONE , . . . TRANSMITTER. CONSTRUCTION WAS CONTINUING ON THE. SUPPORT AIR ORDER OF BATTLEi NONE DICERNIBLE' YUN7NAN.0I AIRFIEtrD 25-25-21N 160-41.-58t STATUS: OPERATIONAL AIR ORDER OF BATTLE: 19 FAGOT/FRESCO 6 CAB 21 TOO SECRET RUFF_ 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 )(1 TAP SF('RPT RUFF 25X1 IO/R 11- 10-(-9 MISSION 1205 SIGNIFICANT. RESULTS HAI?YANG TAO NAVAL BASE WEST COMMUNIST 25X1 NAVAL' BASE'FkILITItt 39-03511N 1,23-09!-;14E STATUS: OPERATIONAL NAVAL ORDER OF BATTLE: - AT PIERS 6 SHANGHAI-II PGM 4 p-6 PT 2 POSS LCM 1' LCM' (UNDERWAY. APPROACHING PIER) 2 YI2' HAI-YANG TAO NAVAL FACILITY EAST 39-04-03N 123-09-56E' STATUS: OPERATIONAL OF BATTLE': 1 SHANGHAI-II PGM 3 SWATOW PGM HAI-YANG TAO.NA?T FACILITY NORTH 39-04-20N 123 09-43E' STATUS:OPERATIONAL NAVAL ORDER OF BATTLE': -- ON TRANSVER5ER 1 SHANGHAI-II PGM 1 PROB SWATOW PGM 1 ORO YP 22 TOP' SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 ? IPIR 11 KH-9 MISSION 1205 SHANG-HAI NAVAL BASE WU-SUNG CHINA COMMUNIST NAVAL BASE` FACILITIES 31723-41N 121-30.-05t STATUS:OPERATIONAL NAVAL ORDER OF BATTLE: 1 PROB R SS 1, KIANoNAN .DE 1 CHANGCHIANG PF Eit.AtHyft$i PF 1 HAINAN PC 2 HUCHWAN PTH 2 SHANGHAI II PGM 1 SHANGHAI-4 PGM 2 PROB wHAii40.0A PGM 2 T-43 MSF 3 LCT-6 LCT YAG' (SEVERAL) SHANG-HAI NVB A SHIPYARD INTL' STATUS:OPERATIONAL 31-15-42N 121-32-48E' 25X1 25X1 25X1 25X1 25X1 REMARKS: CONSTRUCTION WAS CONTINUTNG ON THE BUILDING BEHIND T,H, . REPAIRWAYS REPORTED ON ? CONSTRUCTION OF THE 25X1 AIR RAID SHELTER PREVIOUSLY REPORTED APPEARE6 25X1 COMPLEtE. NAVAL ORDER OF BATTLE': - AT UPSTREAM' FITTING-OUT AREA 4- YEOTA1. S? HIJIANG AGS METTAWEE, AOTL' ARL-1 ARL 3, FUCHOU AW 1' F? LOATING CRANE 1 PROB R SS 1 CASTLE PF 1, FLOWER PF, 1 HAINAN PC 1 P"6 PT ,5 SHANGHAI-II PGM 1 LSM-,41 LSM , -4- IN GRAVING DOCK 1' RIGA DE (NO' TORPEDO 1 FLOATING DRYDOCK TUBES). 4- ON WAYS' 2 SHANGHAI-II PGM 1 PROB P-6 PT HULL 1. LCT4-6 LCU L? SIL 23 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF 25X1 25X1 11 CHINA. COMMUNIST 25X1 IPIR KA-9 MISSION 1205 NAVAL BASE FACILITIES 1 T.-43 AGS 2, R/W SS 1 S-1? SS AT DOWNSTREAM' FITTING-PVT WHARF , I FITTING-OUT BARGE 25X1 25X1 25X1 25X1 24 TOP SECRET RUFF: Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF' 25X1 25X1 11 CH/NA . 'COMMUNIST' 'WlcoUND rokeE rAttLitIEt 25X1 - IF IR KH-9 MISSION 1205 S/GNIFICANT RESULTS A-LU7TU4)0 BKS AREA 43-28-10N 083-58-00t 25X1 STATUS:OCCUPIED REMARKS: A LIVE-FIRE TRAINING EXERCISE RECENTLY TOOX'PLAtE'IN THE WESTERN END OFTHIS INSTALLATION. AT LEAPT FIVE IMPACT CRATERS WERE OBSERVED IN THE SNOW APPROXIMATELY 500 'METERS (1,640 FEET) EAST OF NINE UNOCCUPIED FA' POSITIONS, GROUND FORCE ORDER OF BATTLE: 12 FIELD GUNS 4 HOWITZERS 7 MORTARS 5 PRO MORTARS 30 TRUCKS CHANG-HSIN-TIEN ARMY BKS AC 4 39-48-04N 11612-56t STATUS: OCCUPIED _AaAlcalinLpntt ORDER OF BATTLE: 25X1 25X1 25X1 25X1 1 CARGO TRUCK 25X1 CHU-TIEN' ARMY BARRACKS AL 1 27-49-50N 099-38-30E' 25X1 STATUS: OCCUPIED REMARKS: .THE OBSTACLE COURSE FIRST OBSERVED' ON APPEARS 25X1 TO HAVE BEEN AEMOVE6. GROUND FORE. otiotR OF. BATTLE: NONE DISCERNIBLE 25 25X1 25X1 TOP SECRET RUFF' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 ToP' SECRET RUFF 25X1 25X1 IPIR 11 KH-9 MISSION 1205 CHINA'.-COMMUNIST 25X1 GROUND FORCE FACILITIES HSIAO-I HO ARTY 14 AND BKS AL 1 37-08-30N 111-46-10E' STATUS: OCCUPIED REMARKS: SIX TRUCK-MOUNTED ROCKET LAUNCHERS. 20 FA PIECES. AND 93 CARGO , . _ TRUCKS. WERE DISPERSED WITHIN5 NM OF HSIAO-I. 'Gkoimn FoRE ORDER OF, BATTLE: - ADJACENT TOAREA A 12 ROCKET LAUNCHERS (TRUCK 37 CARGO TRUCKS MOUNTED) - DISPERSED' 6 ROCKET. LAUNCHERS (TRUCK MOUNTED) 20 FA PIECES 93 CARGO TRUckS HSIAO-I UG STOR AREA 37-n7-nnN STATUS: OPERATIONAL PHYSICAL' DESCRIPTION': 5.5 NM ESE OF , THE NEWLY IDENTIFIED FACILITY CONSISTS OF, THREE SEPARATE AREA CONTAINING AT LEAST 98 AoITS. TEN SUPPORT BUILDINGS. AND THREE BUILDING FOUNDATIONS. TGT DOM -- 2 Nm.' 'ELtv -- 762 M(2.500 FT). ASSOCIATED OBJECTS: NONE DISCERNIBLE' MAP s,opICE? REFERENCE': 200-0382-17 26 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF zoX1 25X1 -IPIR 11 KH-9 MISSION 1205 CHINA. COMMUNIST 25X1 'GROUND FORCE' FACILITIES KUNGLIU ARMY BARRACKS NE AL 1 STATUS: OCCUPIED 082-34-29E' REMARKS: , TWO SIX-POSITION UNOCCUPIED AAA SITES WERE ON THE SE EDGE OF THE FACILITY. GR ND FORCE ORDER OF BATTLE: RN! BLE LA-SA' ARMY BARRACKS SOUTH THIP? 29-37-52N 091 08-41E' STATUS: OCCUPIED ARAHNn FivwF' ORDER OF BATTLE: 8 FA PIECES ASSOCIATED OBJECTS: 29 TRUCKS LA?SA MILITARY DISTRICT BARRACKS AL 4 STATUS: OCCUPIED 29-38-35N 091-07-35E' PHYSICAL DESCRIPTION: ON THE SOUTH EDGE OF LkAtke THIS IS AN UPDATED DESCRIPTION. THE WALL?SECURED INSTALLATION EXTENDS APPROXIMATELY 2 NM ALONG THE NORTH BANK OF THE. LHASA RIVER AND APPARENTLY SERVE'S AN ADMINISTRATIVE FUNCTION." IT CONSISTS OF ONE MAJOR AOMIN,Ism7010 Akp\,. THREE HOUSING/BARRACKS AREAS. AND :TWO SUPPORT AREAS. 27 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 ?? 25X1 25X1 IPIR 11' KH.-9 MISSION 1205' TOP' SECRET RUFF, CHINA. COMMUNIST 25X1 'GROUND FORCE FACILITIES THE ADMINISTRATION - AREA CONTAINS ONE LARGE MULTIWING. MULTISTORY ADMINISTRATION BUILDING, ONE MULTISTORY, ADMINISTRATION BUILDING. FOUR ANNEX_ BUILDINGS, ONE C-SHAPED MULTISTORY ADMINISTRATION BUILDING, ONE SINGLE-STORY MULTIWING ADMINISTRATION BUILDING'. AND ONE POSSIBLE DISPENSARY. HOUSING AREA 1 CONTAINS FOUR MULTISTORY BARRACKS WITH INTERIOR COURTYARDS. EIGHT MULTISTORY BARRACKS, TWO P6ssIpLt'kEssHALLs, FOUR BASKETBALL COURTS. TEN SINGLE-STORY BARRACKS. EIGHT PROBABLE STORAGE' BUILDINGS. ONE WATER TOWER. AND ONE POSSIBLE HEATING PLANT. SUPPORT AREA 1 CONTAINS ONE GYMNASIUM, ONE MULTISTORY' ADMINISTRATION/CLASSROOM BP;000, TWO BASKETBALL COURTS' 25 SINGLE-STORY BUILDINGS. UNDER CONSTRUCTION, 19 SUPPORT BUILDINGS, AND ONE' LARGE'PARADE/RECREATION HOUSING AREA 2 CONTAINS 27 SINGLESTORYBARRACKS, TWO . MULTISTORY WAINisTROTORLONps!_TwO SINGLE-STORY BARRACKS WITH INTERIOR COURTYARDS, AND ONE WATER TOWER. SUPPORT AREA '2 cokTAIivt eb sini6LF=GTpkf srok'keuvEHIcLE. _ . . , MAINTENANCE BUILDINGS' FOUR PROBABLE, BARRACKS, AND ONE BASKETBALL COURT. HOUSING AREA 3 CONTAINS 37 SINGLE-STORY pAkRAcK'st ONE pOssibLE AUDITORIUM. ONE POSSIBLE MESSHAL6 SEVEN SMALL STORAGE BUILDINGS' AND AN ATHLETIC FIELD; ONE AAA'SITE IS LOCATED AT THE' INSTALLATION, AND THREE OTHERS ARE IN THE IMMEDIATE.AREk. ANTIAIRCRAFT ORDER OF BATTLE: 6 AAA GUNS ASSOCIATED OBJECTS: 34 TRUCKS 13 VEHICLES LA-sA MILITARY INSTALLATION STATUS :UNKNOWN 28 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 2Q5-20N 091-01'-20E 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 TOP-SECRET RUFF - IPIR 11 CHINA. cbmmUNIsT 25X1 GROUND FORCE: FACILITIES KH-9 MISSION 1205 PHYSICAL DESCRIPTION': _7 NM WSW OF LHASA. THIS IS AN UPDATED DESCRIPTION. THE FACILITY CONSISTS OF TWO A A , ,?, , ' .;. .,4 AREAS CONTAINING FOUR BARRACKS.-TYPE pLuDINpst ONE MESSHALL, AND SEVEN miscE4ANEDUs(5T0RAOE BUILDINGS. THE INTERIOR AND SURROUNDING' AREA OF THE FACILITY ARE BOO ACTIVELY CULTIVATED. ROADS SERVING THE FACILITY ARE NO LONGER WELL DEFINED. THE ACTIVITY LEVEL' OF THE INSTALLATION APPEARS LOW. THIS FACILITY IS NOT MILITARY RELATED'. GROUND FORCE ORDER OF BATTLE': NONE DISCERNIBLE' 'LING.-SHIN ARTY DISPERSAL AREA 36.51-7N 111-46...00E STATUS: OCCUPIED PHYSICAL' DESCRIPTION: CENTERED' AROUND THE TOWN OF LING-SHIN. , , . ,THIS IS AN UPDATED DESCRIPTION. ,THE DISPERSAL AREA'S ARE IN sMAL4. UNNAMED VILk.A0EsWITHIN AN 8.-NM RADIUS OF LING-sHIH. THE , ? . ? . FA PIECES ARE GENERW-Y PARKED'IN SMALL, GROUPS OF FOUR. 'GROUND FORCE ORDER OF BATTLE: 36 FA PIECES 4 POSS FA PIECES 70 CARGO TRUCKS 3 PIECES OF. EQUIPMENT LIN7CHIH ARMY BARRACKS AL1 29-29-51N 094 27.-27E STATUS: OCCUPIED 'GROUND FOR7 ORDER OF BATTLE': 2 cAtip6 TRUCKS 29 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOO SECRET, RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Tora' SECRET RUFF 25X1 25X1 IPIR 11 KH-9 MISSION 1205 CHINA COMMUNIST 25X1 'GROUND FORCE' FACILITIES LIN-CHIH ARMY BARRICK:sALL2._29-3_39_9_- 3-5 N 0 4-;2 -06E. STATUS: OCCUPIED nRnuNn FoRc* ORDER OF BATTLE: 5 CARGO TRUCKS LIN-HSI ARMY BKS AL 1 STATUS: OCCUPIED 43-36-00N 118-0250E 25X1 25X1 25X1 25X1 PHYSICAL DESCRIPTION': ON THE NE EDGE' OF LIN-HSI. THIS IS AN UPDATED DESCRIPTION. THE FACILITY UNDERGONE' , , , MINOR. EXPANSION SINCE , THE FENCE-SECURED 25X1 FACILITY CONSISTS OF 11 BARRACKS, TWO ADMINISTRATION BUILDINGS. THREE VEHICLE STORAGE BUILDINGS' ONE mESsHALL. TWO STORAGE' BUILDINGS. SIX' SUPPORT BUILDINGS, AND FOUR BASKETBALL cbuRtso TRENCHING WAS PRESENT WITHIN THE AREA. GROUND FORC' ORDER OF BATTLE: NON( DISCERNIBLE MI-TU ARMY BARRACKS SOUTH AL 1 STATUS: OCCUPIED PHYSICAL DESCRIPTION.: 1.260 METERS (Oa NM) SE OF MI7TU. , THIS IS AN UPDATED DESCRIPTION THE .INSTALLATION TNcLuotS, APPROXIMATELY 46 BARRACKS. six BAROkO'ics,?suppoRT BUILDINGS. 20 QUARTERS. 15 VEHICLE STORAGE 'BUILDINGS. SEVEN PROBABLE AMMUNITION STORAGE' BUILDINGS. ONE MAIN ADMINISTRATION BUILDING' TEN mESpHAW,S. ONE AUDITORIUM. NINE STORAGE BUILDINGS. AND 44 .SUPPORT BUILDINGS. 30 25X1 25X1 25X1 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO St'cRT RUFF 25X1 25X1 11' CHINA COMMUNIST 25X1 ? IPIR KH-9 MISSION 1205 'GROUND' FORCE' FACiLITIES GROUND' FORCE ORDER OF BATTLE: 4 FA PIECES 16 CARGO TRUCKS OMIN BARRACKS AN STORAGE' AREA 46-31-37N 083-37-00E' STATUS: OCCUPIED GROUND FORCE ORDER' OF BATTLE: 18 85MM FA PIECES 18 CARGO TRUCKS PING?YIN ARMY BARRACKS AC 1: 36-18.=20N 116=27-20E' STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 27 TTP/TMP SECTIONS (ON CARRIERS) 19 CARGO TRUCKS (4 WITH POWERBOATS) 7 UTILITY VANS RANGAO ARMY BKS AL 1 29-44 45N? 096-06750E* STATUS: OCCUPIED rh7CE ORDER OF BATTLE: 18 TRUCKS 21 PROB TRUCKS 31 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 IPIR 11' CHINA. COMMUNIST 25X1 KH-9 MISSION 1205 GkOuN6 FiAtt PAtiLitiEs TAI-YUAN' ARMY BA RACKS NORTH AL 1 37-56-25N i1'232-40E. 25X1 STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 54 TANKS/ASSAULT GUNS 28 CARGO TRUCKS TA HO-YEN TRANSSHIPMENT, DEPOT 43-09-00N 088-52-30E' STATUS: PERATIONAL REMARKS: STACKS OF UNIDENTIFIED MATERIAL WERE, DISPERSED THROUGHOUT THE INSTALLATION,o FARM-GRADING WAS IN PROGRESS AT THE EASTERN AND WESTERN ENDS OF THE DEPOT. ASSOCIATED OBJECTS: TA TUNG ARMY BKS AL 8 40-13-18N-113-18.-00E STATUS: OCCUPIED GROUNn FORCE ORDER OF BATTLE': 5 AAA pIEcEs, _, 4 FA PIECES.(IN VILLAGE 5 4 PROB AAA PIECES NM NORTH) 7 kkop:AAHMG (3 PARKED NEAR 29 CARGO TkUcks (bIspEk'sEb) VILLAGE 1 NM EAST) ANTIAIRCRAFT oriptk OF BATTLE': 4 AAA PIECES ? 32 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved 11' for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF' 25X1 25X1 25X1 IPIR 1205 CHINA, COMMUNIST . _ ? ? GROUND FORCE FACILITIES KH-9 MISSION TA4UNG ARMY BKS AL '9 urint),;hki 113-13-00E' 25X1 STATUS: NEGATED REMARKS: ? . NO ARMY BARRACKS WAS OBSERVED WITHIN 2 NM OF 40-09-20N 25X1 TIEN?CHEN AAA' DISPERSAL AREA40.-25-00N 114 -05M-00E 25X1 STATUS: OCCUPIED GROUND' FORCE' ORDER OF BATTLE': 25X1 18 POSS AAA PIECEt, (PARKED' NEAR AN OCCUPIED SITE) ANTIAIRCRAFT ORDER OF BATTLE': 64 AAA PIECE TU?LU?FAN SUPPLY ARPAS 089-16.-07 STATUS:OPERATIONAL GROUND FORCE ORDER'OF.BATTLE': 7 AAA PIECES 75 TRUCKS TZUrMU?TSUNG ARO BKS DP6 + SPT AREA 5TATUSOCCUPIED 33 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 29.40-2hN 094-20-40E' 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Trio crrorT PIMP 25X1 25X1 Ii CHINA,' COMMUNIST 25X1 IPIR KH-9 MISSION 1205 GROUND FORCE' FACILITIES REMARKS,:, TWO SMALL?ARMS FIRING RANGES HAVE BEEN ADDED ADJACENT TO AND EAST OF AREA C. TZU...P0 GROUND' FORCE ORDER OF BATTLE; TRUCKS 25X1 25X1 4 FA PIECES 55 CARGO ARMY BARRACKS AL2 sTATuP:ocCuPIEO plopIcAL DESCRIPTION: 1 NIA EAST OF TSUI?CHUN. A6.11.4.-3flN 1- 1 ia..nu.;1'nF' 25X1 THIS IS AN UPDATED DESCRIPTION, THE FACILITY CONSISTS OF TWO BARRACKS/SUPPORT AREAS. AREA 'A CONTAINS TWO PROM:4LE ApivipsOTOtION BUILDINGS. 28 BARRACKS, FIVE PROBABLE pA001,ktO UNDER COPTRuctjoro ONE 'PROBABLE lAttsHALL? ONE PROBABLE /01:47011XYM., Pp( PROBABLE sioRAPOsupPORt BUILDINGS. 12 smALL. SUPPORT BUILDINGS, AND TWO AAA SITES. AREA p CONTAINS TWO ADMINISTRATION BUILDINGS, SEVEN BARRACKS. THREE PROBABLE BARRACKS UNDER CONSTRUCTION, FIVE VEHICLE SHEDS. SEVEN SMALL suppoRTBUILONGs,. AND A AAA SITE. ANTIAIRCRAFT -ORDER OF BATTLE: 6 AAA PIECES (IN AREA A' 5 AAA" PIECES (IN AREA'B SITE) SITE) ASSOCIATED' OBJECTS: 1 PIECE OF, EQUIPMENT (IN AREA B) 34 25X1 25X1 25X1 25X1 TOO SECRET RUFF; Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 ? CHINAi COMMUNIST 25X1 IPIR 11 1205 GROUND FORCE FACILITIES KNa.9 MISSION WU?CHIA'CHUANG A Mv BKS AL 1 26...09...0 ON 10'0..41s -55E' 25X1 STATUS:OCCUPiEb aRnmin FOR7'ORDER'OF BATTLE: lO CARGO TRUCKS 3 POS5 cA146o TRUCKS WULA..*PAI POSSIBLE' MILITARy? INtTLN 43.49?.30N 087-08-58E STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 70 jRPCKs 1 PROB CRANE' (TRUCK MOUNTED) H I ARMOR I NSTLN AL' 1 43 28...48N 087-0.7-2,1e STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE': 1' VEHICLE WU.A,U.41U.?CHI ARM 43??26??32N 087...114730E' STATUS: OCCUPIED REMARKS: THIS IS THE FIRST TIME NO -,VEHICLES HAVE BEEN. OBSERVED AT THE _ _ INSTALLATION* 35 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP* SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP. SF'CRFT RUFF 25X1 25X1 IPIR 11 KH...9 MISSION 1205 GROUND FORCE ORDER OF BATTLE: NONE DISCERNIBLE CHINA COMMUNIST 25X1 GROUND FORCE' FACILITIES WU.-.LU...MU?CHI ARMY BARRACKS 43-49-30N 087-33-20E STATUS:OCCUPIED GROUND FORCE ORDER OF BATTLE: 12 AAA PIECES 37 TRUCKS WU...LU?MU.-CHI ARMY BARRACKS AL 10 43-44-50N 087-347.20E' STATUS: OCCUPIED GROUND FORCE' ORDER OF BATTLE': 63 TRUCKS wu-4.y-mu-cHx ARMY BARRACKS AL 7 43-48-40N 087-40-50E' STATUS; OCCUPIED REMARKS: , A SMALL' PROBABLE POL FACILITY AND THREE' NEW BUILDINGS HAVE BEEN , . CONSTRUCTED MIDWAY BETWEEN, THE MAIN, BARRACKS AREA AND THE ARMOR PARKING AREAQ IN AppiTIoto SEVERAL TUNNELS WERE BEING DUG ESE OF THIS INSTALLATION. THESE TUNNELS ARE PROBABLY MINING ASSOCIATED. HOWEVER. THEY MAY BE USED FOR STORAGE. GROUND FORCE ORDER OF BATTLE: , 25 TANKS (CANVAS COVERED) '1 POSS, TANK (CANVAS 30 9 PO3_04...1967: APC' 6 PRO AAA PIECES 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOO SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 C, Ii ToP? SECRET RUFF' 25X1 25X1 IP IR CHINA.' COMMUNIST GROUND' FORCE' FACILITIES '100 TRUCK'S (AT 'LEAST) 25X1 25X1 25X1 KH WU'LUrMU-CHI -9 MISSION 1205 COVERED) ARMY BARRACKS SOUTH' AL 4 43-46-30N 087-37-30E' ST A TUS OCCUPIED GROUND FORCE. ORDER OF BATTLE: 1 TRUCK WU-LU-MU-CHI ARMY Bics AL tg 43-44-48N 087-32-30E STATuS:oCCuPIE6 GROUND FORr. ORDER OF BATTLE': 6 TRUCKS' 4 VEHICLES wii-iiiirmu-CHI ARMY' BKS AL 20 STATUS: OCCUPIED 43-41-48N 087-46-45E' REMARKS EIGHT TENTS. SEVERAL' POSSIBLE' COTES. AND EIGHT HOWITZERS WERE AT ' f HE SOUTHERN END' OF AREA A' ;NDfcATIMP, A :TRAINING EXERCISE WAS POSSIBLY UNDERWAY. LUMBER AND OTHER CONSTRUCTION NATERIAL. WERE DISPERSED THROUGHOUT ' AREA B. A POSSIBLE TWO-LANE ALL-WEATHER ROAD APPROXIMATELY 6 NM' LONG WAS UNDER CONSTRUCTION CONNECTING AREA B Aivb THE' MAIN' TURFAN/WU-LU-MU-CHI 'H4GHWAY0 aonlimn C E ORDER OF BATTLE: -- IN AREA A 24 HOWITZERS 4 PROB HOWITZERS 85 TRUCKS (75 IN AREA" A) 37 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved Ii for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO SECRET RUFF 25X1 25X1 25X1 25X1 25X1 25X1 25X1 CHINA, COMMUNIST GROUND' FORCE' FACILITIES -'IPIR KH-9 MISSION 1205 WU-LU-MU-CHI ARMY BKS STATUS: OCCUPIED REMARKS: THE PRE'uoug w'rk cnona AL 22 43-30-28N 087-10-26E' oF VEHICLES AT THIS INSTALLATION WAS 20 . .. 17 TRUCKS ON I [ CONSTRUCTION OF PERMANENT SUPPORT FACILITIES wAS'coN7NUING. _ HAVE BEEN cONsYRucTTP.5.INCE THREE LARGE C-SHAOED BARRACKS, AND TEN OTHER AT 30 MAJOR BUILDINGS . , . _ _ . THESE _ , .INCLUDE PROBABLE ADMINISTRATION BUILDINGS, BUILDINGS. ' GROUND FORCE ORDER OF BATTLE: 90 TRUCKS 13 UTILITY VEHICLES WU-LU-MU-CHI ARMY BKS AL: 23 STATUS:OCCUPIED' 25X1 25X1 0A7-44?-27' 25X1 REMARKS: CONSTRUCTION WAS CONTINUING THROUGHOUT THE INSTALLATION. TEMPORARY FACILITIES WERE BEING REPLACED BY MORE PERMANENT . STRUCTURES. A POSSIBLE TRAINING EXERCISE WAS UNDERWAY. SIX FA' PIECES AND SIX' TRUCKS WERE PARKED 3.2 NM NORTH AND slx FA PIECES? SIX TRUCKS', AND SIX TENTS WERE 4,.5 NM NNE.. IN ADDITIONS EXTENSIVE TRACK' ACTIVITY WAS EVIDENT IN THE SOUTHERN PORTION OF THE FACILITY. , . GROUND FOR7 ORDER OF BATTLE: 30 FIELD GUNS 46 TRUCKS 8 POSS ARTILLERY PIECES 38 TOO' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 ? IPIR 11 K4-9 MISSION 1205 CHINA, 20mONisT 25X1 'GROUND FORCE FACILITIES WU...LU7MU7CHI ARMY RKS AL: 24 437146...40N 087...257.42t STATUS: OCCUPIED GROUND' FORCE ORDER OF BATTLE: 18 FIELD GUN 12 HOWITZERS 12 moRtMit 46 TRUCKS WU...LU7MU7CHI BARRACKS AREA WSW 43735...28N 087...05739E' STATUS: OCCUPIED REMARKS:. THIS INSTALLATION PROBABLY HOUSES AN AAA BATTALION. GROUND FORCE ORDER OF BATTLE: 16 pRopp MED IUM AAA PIECES 8 LIGHT AAA PIECES 50 TRUCKS WU6.L.U...MU7CHI HQ HSI.N CHIAN& MIL DIST STATUS: OCCUPIED 43747??30N' 087...39705E REMARKS: A PROBABLE' TRACKED?VEHICLE DRIVER-TRAINING AREA" AND A NEWLY , CONSTRUCTED OBSTACLE COURSE WERE ADJACENT TO THE SE' EDGE OF THE INSTALLATION. THE SUBC AL /PER FIRING RANGE'. PREVIOUSLY REPORTED? NORTH OF THE AREA IS 1.2 NM ENE ? FIVE PROBABLE' TANKS WERE PARKED 2 NM SOUTH OF THIS INSTALLATION. . , GROUND FORCE ORDER OF BATTLE : 6 PROB TANKS L. TRUCKS 39 TOP SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF ZoX1 25X1 IPIR ii KH-9 MISSION 1205 CHINA.' COMMUNIST' 25X1 GROUND FORCE FACILITIES WU...LU.440.?CHI MIL INSTALLATION 43.?45??25N 087.??34??10E? STATUS: OCCUPIED PHYSICAL' DESCRIPTION: 2 NM' SW OF wu-LU-my-64;. THIS IS AN UPDATED DESCRIPTION. THE FACILITY PROBABLY 'HOUSES , , - _ - AN AAA BATTALION. IT IS ppm() AT THE MOUTH, OF A VALLEY WHICH EXTENDS INTO A MOUNTAINOUS REGION. EXTENSIVE TUNNELING HAS BEEN CONSTRUCTED IN THE AREA. THIS UNSECURED INSTALLATION CONTAINS 11. BARRACKS. A mEssmALL, TWp'PRosAbLE-mtttmA4S, AND A SUPPORT BUILDING. THREE FOUR-POSITION AAA SITES WERE ON ADJACENT RIDGES. 'GROUND FORCE ORDER OF BATTLE: 11 AAA PIECES 31 TRUCKS WUr.LU7-MU7CHI INSTC 43??27??38N 087??16??01E' STATUS: OCCUPIED Pm*s,Ic4. otscRIpT;oN':, 24.2 NM SW OF WU...PrMU7C0Io_ :THIS IS AN UPDATED DESCRIPTIONo THE INSTALLATION. DISPERSED ALONG BOTH SIDES OF A 1.-Nm Rom)! SERVES IN AN ADMINISTRATION/SUPPORT CAPACITY fPfl THE .11-WEE' ARMOR FACILITIES N THIS AREA -.7 .W.U7q.U-MU-CH.1 ARMOR .INSTALLATION ALA ,(BE wu-LU-44Urck; ARMOR ;NsT44,ATIpm AL 2 (BE, AND wv...:Ly.;mp-cml ARMY BARRACKS AC 25 (BE IT IS PROBABLY THE REGIMENTAL' HEADQUARTERS. : .?.. ..J . .THE INSTALLATION CONSISTS OF' FOUR SMALL, AR?EAS ON THE EASTERN s;pE OF THE, ROAD. AND ONE AREA ON THE WESTERN SIDE. TOGETHER THEY CONTAIN 23 BARRACKS (INCLUDING TWO (ARP L.....51100 AND ONE CARGE,C.?SHAPED)., SIX mEsSmALLS'Apm;N;sTRAT;pN BUILDINGS! TWO , LARGE b..SHAPED mtAtiptiAkyERS-TypE, BUILDINGS. THREE ARMOR VEHICLE PARKING' sHEbst TEN STORAGE BUILDINGS' TEN syppoRT pV;0010, 15 ADITS/REVETMENTS, SEVERAL uNciERORpoP PERSONNEL SHELTERS. AND A' 40 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 IPIR 11 CHINA, CbMMUNIST' 25X1 KH-9 MISSION 1205 GROUND FORCE FACiLITIES smALL:KA. sTpRAGE FAOLITY;DENSIVE'TFENCHING AND, A SIX.-POSITION AAA SITE WERE ATOP THE RIDGES IMMEDIATELY WEST. flPrEn ORDER OF BATTLE: 8 TANKS 2 TANKS/ASSAULT GUNS 1 POSS. SU776 ASSAULT GUN 2 TRACKED APC' 3 ARV WU-LU-MU-CHI PROB BARRACKS AREA 25X1 25X1 uA.4Lig..1r 087-37-30E 25X1 STATUS: OCCUPIED PHYSICAL pEtcRiptpil; ON THE NE EDGE' OF WU-1.0-MUs-CHI. :THIS IS AN UPDATED DESCRIPTION, THIS REGIMENTAL-SIZE' ROAD-SERVED SECUREDINSTALLATION' CONS/STS OF THREE IDENTICAL ,? , . z ? . , ? .BATTALION AREAS. A REGIMENTAL HEADQUARTERS AREA' AN INTERNAL AMMUNITION stokAGE AREA. ANDA TRAINING AREA. EACH BATTALION AREA CONTAINS THREE CELLULAR-ROOFED BARRACKS. A . , MESSHALL/ADMINISTRATION BUILDING, AND A SUPPORT BUILDING. THE REMAINING AREAS CONTAIN A LARGE' C'-SHAPED ADMINISTRAT/ON , - , - , BUILDING! AN AUOI,TORPMP_A HEATING PLANT, NINE, CELLULAR-ROOFED BARRACKS' THREE PROBABLE mgss.mALLsp 30 STORAGE/SUPPORT Gu;LOINGst THREE (mob:4110.m STORAGE smLE:TEkst. AND FOUR REVETTO AmMuNITION, STORAGE BUILDINGS. A SMALL-ARMS FIRING RANGE IS 1 NM EAST. GROUND' FORC' ORDER OF BATTLE: 15 TRUCKS WU-LU-MU-.CHI STORAGE AREA 2 STATUS: OPERATIONAL PHYSICAL pEScRIF!tx(*: 2.9 Nm. NW OF WU..LU-MU-CHI. 41 43-49-35N 087-34-18E' 25X1 25X1 25X1 25X1 TOP SECRET RUFF: Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 0 IOIR KH-9 MISSION 1205 TAO SF[I4FT RUFF 25X1 25X1 CHINA. COMMUNIST 25X1 GROUND FORCE FACILITIES , THIS Is AN UPDATED DttblIONIN. TK.FENct.7,.StuRED INSTALLATION CONTAINS TWO LARGE STORAGE BOOmps. FOUR_ LARGE STORAGE BUILDINGS/VEHICLE SHEDS. TEN' OTHER STORAGE BUILDINGS. AN , H-SHAPED MESSHALL/ADMINISTRATION BOLDING, SEVEN PROBABLE BARRACKS. AND FIVE SUPPORTBUILDINGS. AUTOMATIC WEAPONS POSITIONS AND TRENCHING SURROUND THIS INSTALLATION. GROUND' FORCE ORDER 230 TRUCKS OF BATTLE: wU-MANG TAO CO SITE 2 39-15-02N 123-.00N-1.5E' STATUS: OCCUPIED REMARKS: . _. A PossiB4 CRUISE MISSILE LAUNCHER WAS AT THE NUMBER' 2 FIRING' POSITION. FOUR UNIDENTIFIED CRATE-LIKE OBJECTS WERE ALSO OBSERVED. ONE ADJACENT TO LAH OF THE FOURFIRING POSITIONS. No OTHER CRUISE MISSILE EQUIPMENT WAS OBSERVED; MISSILE ORDER OF' BATTLE: LAUNCHER ASsociAtED OBJECTS: SE MISSILE 4 CRATO-LIKE OBJECTS' YEN-cHoU HQ ARTY DIV AND ARMY BKS AL 35-36-1.4N 116-58-.18E' _STATUS: OCCUPIED 'GROUND FORCE ORDER OF BATTLE: (IN AREA 1 PRO CARGO TiRuci A) 42 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO' SECRET RUFF 25X1. 25X1 ?IPIR 11' KH-9 MISSION 1205 ASSOCIATED OBJECTS: 1 PIECE OF EQUIPMENT (IN AREA 'A) CHINA, COMMUNIST 25X1 GROUND FORCE FAC/LITIES ZEKTA BARRACKS AND STORAGE AREA 43-33-15N 083-06-25E' STATUS: OCCUPIED ROVO2K5: A LIVE?FIRE TRAINING EXERCISE RECENTLY TOOK PLACE' IN THE , WESTERN END OF THIS FACILITY0' FIVE IMPACT CRATERS WERE OBSERVED IN THE SNOW 2'000 METERS. (60560 FEET) EAST OF SIX. UNOCCUPIED POSSIBLE FA POSITIONS. ? GROUND' FORCE ORDER OF BATTLE: 25X1 25X1 25X1 25X1 20 VEHICLES/PIECES OF EOUIP 25X1 OTHER RESULAS.;NO' APPARENT CHANGE' WE1?HSI ARMY BARRACkS__M-1_1_2750N 099-1710E' 25X1 STATUS: OCCUPIED GROUND FORCE' ORDER OF BATTLE: 25X1 25X1 NONE DISCERNIBLE YU?MIN BORDER OUTPOST NO 2' 45451.-00N 082-30400E' 25X1 STATUS: OCCUPIED aPrImmn PAR'r0 ORDER OF BAt71.. 43 25X1 25X1 TOP' SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 TOP' SECRET RUFF IPIR .11 KH-9 MISSION 1205 SIGNIFICANT RESULTS KUN?MING RR STA `Ift) A cHhi:k N CHINA', COMMUNIST 25X1 LOGISTICS 25;413.-25N 102 43.48E STATUS: OPERATIONAL GROUND FORCE ORDER OF BATTLE: 8 CARGO TRUCKS (4 ON FLATCARS) ASSOCAATED OBJECTS: 71 PIECES (1).' ROLLING STOCK' SHUANG?CHENG?TZU WEAPONS POSITIONS 42-03-18N 101-22-12E' STATUS: OCCUPIED GROUND FORCE ORDER OF BATTLE: 8 FA PIECES 45, 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP' SECRET RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 IPIR 11 KH-9 MISSION 1205 TOO SECRET RUFF 25X1 25X1 SIGNIFICANT RESULTS AN.7NING AMMO Lo7ING PLT 0 CHINA. COMMUNIST 25X1 INDUSTRY 24-55-52N 102-32,4-11E' STATUS:OPERATIONAL GROUND FORCE ORDER OF BATTLE: 4 CARGO TRUCKS CHAO?YUAN POSS mINING/ST0R. AREA 37-30-40N 120-29-00E' STATUS:OPERATIONAL PHYSICAL:DESCRIPTIO0 10 NM NNE. OF CHAO?YOAN. THE NEWLY IDENTIFIED ROAD?SERVED FACILITY CONSISTS OF A . PROBABLE ADIT ON A 'RID6ET0p,. AN ADIT IN THE RIDGE SIDE, FIVE' POSSIBLE HOUSING BUILDING'S. AND THREE SUPPORT BUILDINGS. TGT DIAM -- 762 m (2.500 FT). ELEV -- 457 m' (1.500 FT). ASSOCIATED OBJECTS: NONE DISCERNIBLE MAP SOURCE REFERENCE: 200-0381719 HA?ERH?PIN AIRF): 07 PIT 1.22 45-35-14N 126-39-23E' STATUS:OPERATIONAL. *ASSOCIATED OBJECTS: AT THE PLANT. 46 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TAP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TAP' SF'N2FT RUFF 25X1 ? IP IR 11' KH-9 MISSION 1205 2 BEAGLE 25 HOUND (20 W/0 ROTOR BLADES) 1 BEAGLE CHINA. COMMUNIST 25X1 INDUSTRY 2 PRP HOUND WO ROTOR' BLADES) 1 DERELICT BEAST ^ AT THE PLA?NT (IN CLOUD-FREE' AREAS) 9 PROB HOUND (AT LEAST) ? AT THE PLANT 5 BEAGLE 25 HOUND (AT LEAST 7 WITH ROTORS) . 10 PROB ENGINE SHIPPING CRATES (AT LEAST) DERELICT BEAST 1 DERELICT HARE I...HSIEN CHEM FTLZR PLT STATUS:OPERATIONAL 37...12...40N 119..55..40E' PHYSICAL' DESCRIPTION': 2o5 NM NNE OF I..HSIEN. a THE NEWLY IDENTIFIED' WALL-SECURED FACILITY CONSISTS OF A GASHOLDER. A GAS puR1F;cAtIpN BUILDING, k RETORT BUILDING'. AN AMMONIA SYNTHESIS BUILDING, A' HEAT .PLANT, A COAL YARD. FOR DRYING BUILDINGS o Opiit SUPPORT BUILDINGS. A SUPPORT AREA CONTAINING ONE ADMINISTRATION BUILDING AND NINE' WORKERS HOUSING' BUILDINGS IS 91 METERS (300 FEET) EAST. TGT DIAM 137 M (450 FT). ELEV 15 M (50 FT). ASSOCIATED OBJECTS: NONE DISCERNIBLE. MAP SOURCE REFERENCE: 200...0361...18 25X1 25X1 25X1 25X1 25X1 25X1 25X1 47 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X1 25X1 IPIR 1i' KW.43 MISSION 1205 CHINA. COMMUNIST, INDUSTRY KUANGm'CHI SHIPYARD STATUS: UNDER CONSTRUCTION 241.49.,04nN ?11-5?.30...40E REMARKS: THE FIRST EVIDENCE OF SHIPBUILDING WAS OBSERVED A BARGE WAS UNDER CONSTRUCTION /N THE'OPENSIDED CONSTRUCTION HALLO CONSTRUCTION HAS BEEN COMPLETED ON TWO DOUBLE?BAY FABRICATION/ASSEMBLY pUILDINGsy A PROBABLE SUBASSEMBLY BUILDING. AND SEVERAL SUPPORT BumpiNes. DREDGING AND LANDFILL ACTIVITY WERE CONTINUING? THE CANAL HAS BEEN IMPROVED BUT WAS NOT CONNECTED TO THE' LAKE OR THE YANGTZE RIVERo NAVAL ORDER OF BATTLE: 1 DREDGE' 1 LARGE BARGE 7 SMALL. BARGES' OBJECTS: 16 CARGO TRUCKS 1 PROB. LCM SMALL RIVER CRAFT (NUMEROUS) KUANG?+U=.YINGTZU ORE PROC PLANT S 42??04....40N 120(.?54...20E. STATUS OPERATIONAL PHYSICAL DESCRIPTION': . , 7 NM SOUTH Of KUANG....FU7.1/N04ZU AND'34_101' WEST OF, FOU..HSINo THE NEWLY IDENTIFIED FACILITY CONSISTS OF ONE pit 0,ROtEs5mo WILOimpo Two CONCENTRATE THICKENERS. ONE RAIL TRANSLOADING BUILDING. ANP FIVE SUPPORT BUILDINGS. A COAL MINE IS COLLOCATED WITH .THE FACILITY? TGT DIAM es 1 NMo' ELEV 305 M (1.000 FT)o 48 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 , 25X1 TOP' SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 To'''. SECRET RUFF 25X1 25X1 .11 CHINA. COMMUNIST, 25X1 IPIR KH-9 MISSION 1205 INDUSTRY MAP SOURCE REFERENCE': 200-0289-14 25X1 KUN?MING ARMS PLANT 356 HAI7KOU 24-48740N 102-34-53E' 25X1 STATUS: OPERATIONAL REMARKS: THREE LARGE ASSEMBLY BUILDINGS? TWO. STORAGE' BUILDINGS, THREE MULTISTORY BARRACKS? AND SEVEN SMALL QUAkTFkS HAVE BEEN ADDED OF THE PLANT, SINCE TO THE NORTHERN PART 25X1 nimuNn Fe7t ORDER OF BATTLE: 12 CARGO TRUCKS NAN?CHING RADAR PLANT 720 32-05-18N 118-46718E STATUS:OPERATIONAL ASSOCIATED OBJECTS: 40 VEHICLES/PIECES OF EQUIP (APPROXIMATELY) 150 VEHICLES/PIECES OF EQUIP (APPROXIMATELY) SHANG?HAI SHIPYARD CHIU?HSIN STATUS: OPERATIONAL 49 TOP SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 31 12....41N 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOO' SECRET RUFF 25X1 ? 25X1 IPIR /1 CHINA', COMMUNIST INDUSTRY' KH-9 MISSION 1205 REMARKS: ROOF TRUSSES AND WACL BEAMS WERE PRESENT IN THE AREA OF BUILDING FOOTINGS OBSERVED ON NAVAL ORDER OF BATTLE: -- AT UPSTREAM FITTING?OUT AREA 2 HAINAN PC' 2 YULIN PB 2 HOKU PIG 1 BARGE ? ON WAYS 1 KIANGTUNG DE (ON WAY 2) 4 PROB TRAWLERS (2 ON WAY ? IN GRAVING' DOCK 1 HAINAN PC 2 ON WAY 2) AT DOWNSTREAM FITTING-.0(1T AREA 4 HOKU PTG 2 BARGES' 5 PROB TRAWLERS SHANG?HAI SHIPYARD CHUNG?HUA 31-16-59N 14,?337?34E' STATUS OPERAT NAVAL ORDER OF BATTLE: 1 LUTA DDGS (ON WAY. 3) 1 AG, (SIMILAR TO 1-43) 2 PROB AG 2 COASTAL CARGO VESSELS (1 ON WAY 2) 16 TRAWLERS 1 FLOATING CRANE TAI...YUAN AMMO LOADING' PLANT NORTH STATUS: OPERATIONAL REMARKS: SIX OF THE EIGHT MULTISTORY: BUILDINGS UNDER cbNsTRUCTION' IN ARE NOW COMPLETE 38-0023N 112-30?42E' 50 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP SECRET RUFF zoX1 25X1 IF'IR KH-9 MISSION 1205 ASSOCIATED OBJECTS: 20 CARGO TRUCKS COMMUNIST INDUSTRY' TO-.CHIA=CHUANG CHEM F1L2R PLT 37.33...2N 118=25=50E' . , STATUS: OPERATIONAL ,PHYSICAL' DESCRIPTION: Nm NW OF To-CHIA?cHuAN0'. THE NEWLY, IDENTIFIED WALL-SECURED FACILITY CONSISTS OF A, GASHOLDER. A GAS PURIFICATION BUILDING, A RETORT BUILDING. AN AMMONIA SYNTHESIS BUILDING, i( HEAT -PLANT. A COAL YARD. SIX DRYING SHEDS. AND TWO SUPPORT BUILONGS0 AN ADJACENT ... 4 ? SEPARATELY SECURED SUPPORT AREA CONTAINS ONE ADMINISTRATION BUILDING/MESSHALL AND i1WORKERS HOUSING BUILDINGS; TGT DIAM 152 M (500 FT) ELEV SSOCIATED BJECTS: RNIBLE MAP sowl4 REFERENCE: 200=0381=17 emp.m 9 M (30 FT)0 51 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 , Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 TOP' SECRET RUFF 25X111 25X1 IF IR ii CZECHOSLOVAKIA 25X1 KH-9 MISSION 1205 AIR BASE' FACILITIES SIGNIFICANT RESULTS BRATISLAVA/IVANKA AIRFIELD 48-10-13N 017-12-50E' 25X1 STATUS: OPERATIONAL' F BATTLE: C 1 CLOD 1 CREEK 1 PROB. MEOlUfv1 ;TRANSPORT 16 SMALL STRAIGHT?WING KOSICE/BARCA AIRFIELD' 48-4009N 021-1'4-35E STATUS: OPERATIONAL AIR OR6Fil OF BATTLE': 14 FISHBED 2. FARMER_ 1 FAGOT/FRESCO 32 royA' coo mALACKY AIRFIELD 48-24-09N 017-0709E' STATUS: PERATIONAL AIR ORDER OF BATTLE": 5 BEAGLE 6 FARMER, 6 FAGOT/FRESCO 1: MAYA. 2 HOUND 52 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET RUFF' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010006-6