OAK KH-9 MISSION 1205-3 5-18 APRIL 1973

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04752A000500010001-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
219
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 5, 2013
Sequence Number: 
1
Case Number: 
Publication Date: 
May 1, 1973
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04752A000500010001-1.pdf7.8 MB
Body: 
- Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 ZOP'gEER?~- NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER OAK KH-9 MISSION 1205-3 5-18 APRIL 1973 25X1 25X1 MAY 1973 COPY NO ~ 2 7 211 PAGES (1205) IPIR 13/73 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 _ --~-- -25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 This document contains Information affecting the national security of the United States within the meaning of the espionage laws U. 5. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of tho Untied States. It is to be seen only by personnel especially indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertoining toTALENT-KEYHOLE Control System. TARGET CATEGORIES AND ASSOCIATED NTP FUNCTIONAL AREAS (CODES) 1. STRATEGIC SSM Deployed Strategic SSM facilities (A) 2. MISSILE RANGES Missile Ranges: Strategic SSM/Space Facilities (P) Missile Ranges: Air- launched Missile Facilities (O) Missile Ranges: Naval-Launched Missile Facilities (R) Missile Ranges: Tactical SSM Facilities (S) Missile Ranges: SAM/AMM Facilities (T) 3. AIR DEFENSE MISSILES Deployed AMM Facilities (B) Deployed SAM Facilities (D) 4. ELECTRONICS/COMMUNICATIONS Deployed Communication/Electronic/Radar Facilities (C) Air Base Facilities (E) 6. NAVAL Naval Base Facilities (F) 7. GROUND Ground Force Facilities (G) 8. TACTICAL SSM Deployed Tactical SSM Facilities (H) 9. LOGISTICS Military Logistics Facilities (K) 10. NUCLEAR ENERGY Atomic Energy Facilities (0) 11. CBR CBR Facilities (V) 12. INDUSTRY Strategic Weapons Industrial Facilities (J) General Purpose Weapons Industrial Facilities (L- Non -Military Industrial Facilities (N~~ Communication/Electronic/Radar RB~D Facilities (U) 13. MISCELLANEOUS Non-Military Logistics Facilities (M) Miscellaneous/Unidentified Facilities (Z) These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National Tasking Plan. To enhance the analysis of readout on operationally associated targets, each target is reported relative to its primary functional association (i.e., missile range tracking facilities are reported under "MISSILE RANGES," fly-away airfields at aircraft plants are reported under "INDUSTRY," airfield nuclear weapons storage facilities are reported under "AIR" etc.-. WARNING NOTICE Sensitive lntclligcnce Sources and' Methods Involved. Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 _ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOPSECRET RUFF I 125X1 25X1 IPIR 13 KH~-9 MISSION 12053 TABLE OF CONTENTS PAGE CHINAr COMMUNIST _ DEPLOYED STRATEGIC SSM FACILITIES MISSILE RANGES AIR DEFENSE~MISSILES AIR BASE, FACILIT'YES NAVAL BASE FACILITIES GROUND FORCE FAC~YLITIES LOGISTICS NUCLEAR ENERGY INDUSTRY MISCELLANEOUS UNITED ARAB REPUBLIC AIR BASE FACILII`IES NAVAL ~BASE~ FAC~IL~ITIES GROUND FORCE FAC~Y~.~ITIES 6 9 10 ~il 17 19 21 24 27 28 29 30 INDIA AIR BASE FACIL~I'~YES GROUND FORCE FAC~IL{ITIES LOGISTICS IRAN COMMO/ELEC%RADAR FACI~~ITIES AIR BASE FACILITIES AIR BASE FACILITIES KOREAr NORTH AIR BASE FACILITIES NAVAL BASE FACIL~YTIES GROUND FORCE FAC~IL~ITIES INDUSTRY 35 36 37 38 40 44 50 53 59 I 25X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 --- - - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 I __ TOP SECRET RUFF. .~ 25X1 ~ 25X1 IPYR 13 25X1 KH?9 MISSION 1205*~3 PAGE LAOS LOGISTICS 61 AIR DEFENSE MISSILES 63 AIR BASE FACILITIES b8 LOGISTICS 69 SOMALIA GROUND FORCE~~FACIL~ITIES 70 SOVIET UNION DEPLOYED- STRA~'EG~YC' SSM~ FAC%LITIES 71 MISSILE RANGES ib2 AIR DEFENSE MISSILES 110 AIR BASE FAC"ILITIES 113 NAVAL BASE FACILITIES 115 GROUND FORCE FACILITIES 130 LOGISTICS 137 NUCLEAR ENERGY 140 INDUSTRY 147 VIETNAMe NORTH AIR DEFENSE MISSILES 155 COMMO/ELEC%RADAR FACILITIES 171 AIR BASE FAC~IL~ITYES~ 173 NAVAL, BASE FACIL~YTYES 179 GROUND FORCE FACI~I'fIES 180 LOGISTICS 186 INDUSTRY 205 MISCELLANEOUS 207 VIETNAMo REPUBLIC OF AIR DEFENSE MISSILES SOUTHERN YEMEN AIR BASE FAC~ILITIE5 209 TOP~SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 _ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RU F. ?~ Z~X1 25X1 IPIR' ~13 KH~-9 MISSION 1205-3 ~PREFACE~ 25X1 PREFACE THIS OAK, REPORT ON~M~ISSION 1205-3 PROVIDES INFORMATION~ON THE A AND B PRIORITY COMIREX TARGETS OBSERVED ON PNOTOGRAPHY,~ ~, ; ,TARGETS. IN:THIS, REPORT ARE, SEQUENCED ALPHABETICALLY ,WIT~i~I~1, THE. 13, TARGET,, CATEGORII:S,~ESTABL',ISHED 8Y COMLREXe, A. LISTING OF THE ?TARGET CATEGORIES 'APPEARS ON~THE INSIDE. FRONT COVER OF__THIS. REPORT. TARGETS.ARExFURTHER SEQUENCEQeBY CbUNTRY AND DIVIDED INTO TWO SECTIONS ~- SIGNIFICANT RESULTS~AND OTHER~~RESUl:T5.~ (COMIREX-D-31.2/110 ,1ST REVISIONo JANUARY, 1969 AND JUNE 1968e THE~SUPPLEMENT TO COMIREX-D-31?2%11)m .TRANSMISSION OF?FIRS'-,AND SECOND-PHASE EXPLOITATION THE SIGN~IF~ICANT,RESULTS~SECTIONS.INCLUDE NEW TARGETSr , PERISHADLE ITEMS-,AND,TARGETS,WHICH REFLECT~CHANGE AND/OR,ORDER OF BATTLE. ALL REMAYNING TARGETS_ARE_INCLUDED IN THE OTHER RESULTS'SECTION. A~ CUMULATIVE INDEX WILL BE PUBLISHED AT +THE CONCLUSION OF~ EACH OAK~REPORTING=PHASE. AN INDEX~WILL BE INCLUDED WITH EACH~OAK~ SUPPLEMENT. FOR EXPLANATION, OF PREFIXES AND COPES USED. IN THIS~REPORTo SEE THE NATIONAL. STANDARD, MESSAGE. FORMAT, FOR EL'ECTRICAL' THE ORDER OF_BATTLE REPORTED IS CONFIRMED UNLESS OTHERWI5E DUALIFIED AS PROBABLE (PROB) OR POSSIBLE tPOSS). ._. .... RECIPIENTS, ARE, CAUTIONEO~ THAT__THE INITIAL SCAN OF PHOTOGRAPHY IS,A000MP~ISHED IN A SHORT TIME AND PRIOR TO F1INAL~REFINEMENT OF EPHEMERIS DATA.. CONSEWUENTLYo FUTURE, ANALYSIS MAY~_RESULT IN ADDITIONAL INFORMATION. MOREOVERv RECIPIENTS ARE CAUTIONED THAT ~ THE IDENTIF~ICA1'ION. OF~ TARGETS IS BASED PR~IMAR~IL.Y~ ON. , PHOTOGRAPHY AND DOES NOT CONSTITUTE~A FINISHED INTEL:L~IGENCE~ JUDGMENT. 1 TOP SECRET,. RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 - - ~ - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF.. -~ 25X1 25X1 CHINAw COMMUNIST 25X1 - IPIR 13 _ a. KH-9 MISSION 1205-3 DEPLOYED STRATEGIC S5M FACILITIES SIGiIF~ICAiVT RESULTS CH~ING-YU SSM R+D/TEST COMPLEX STATU5o0PERATIONAL 42=17-05N 126-53 .THE. ENTIRE COMPLEX, WAS?COVEREp~o, . 7HE. SILO-DOOR WAS C1.05EDo FIVE POSSIBLE PROPELLANT VEHICLES WERE IN THE~BARRACKS A~EAo REMARKSe CHIN-HSI SSM~R+D TEST COMPLEX STATUSoOPERATIONAI. 40-w1~-26fV 120-53~-09E~ NO SIGNIFICANT CHANGES IN THE FACILITIES HAVE~BEEN NOTED SINCE REMARKSt ., POSITIONSo ?AN,AREA?ACROSS FROM THE~PROBABLEFACQUISITION GUIDANCE RADAR POSITION, IN THE SAMI.ET/STYX 'LAUNCH A~2EA WAS VEHICLES, OR VANS WERE` NEWLY OBSERVED b, FIVE. ~~~ . IN THE HILLTOP INSTRUMENTAtION SITE BEHIND THE TWO NAVAL GUN OCCUPIED BY TWO VEHYCLESo M~ISSILE~ ORDER OF 2 SAMLET CRATES BATTLE~t 15 S X CRATES 4 DUMMY SLBM MISSILES ASSOCIATED OBJECTSS 4 LONG RAILCARS VEHICLES%P~YECES OF~ EQUIP (NUMEROUS) CHU~CHI M~ISSILE~LAUNCH COMPLEX STATUS:UNKNOWN 23-54 30N~102m43-40E 2. ~ 25X1 TOP' SECRET RUFF:. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 20E~ -- 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001 G JX1 TOP . SECRET. RUFF. _. 25X1 IPIR ~13f KH~9 MISSION 1205-3 CHINAr COMMUNIST 25X1 DEPLOYED STRATEGIC ~SSM~FACILITIES REMARKSt ALL OF THE LAUNCH SI~'ES WERE. COVERED,. ~ N0~ M~ISSILE~ EQUIPMENT WAS DISCERNIBLE. CONSTRUCTION~HAS CONTINUED. ~L~IUaCH~ING~KOU SSM LAUNCH COMPLEX STATU5;UNDER CONSTRUCTION REMARKS,o , _ _ THE COMPLEX WAS, PARTIALLY OBSCURED 8Y' CL.OUDSm LAUNCH 5ITE~ 1 WAS CLOUD COVERED EXCEPT FOR'PART OF_TH~ HOUSING AND~SUPPORT AREAo~ MOST OF~ LAUNCH. SITE, 2~ ,WAS OBSERVEDo CONSTRUCTION HAS ,, CONTINUED AT,~;THIS~~IfiE?~ . LAUNC.H~ SITE? 3 WAS COMPLETELY' OBSERVEOr ANt~ THE? PROBABLE; COMPLEX, ,SUPPORT. AREA WAS ~PARTIAL.LY~ OBSERVED THROUGH HAZEo N0~ MISSILESe MISSILE*"RELATED~ E~UI~PMENTr OR~ SIGN~IF'IGANT ACTIVITY WERE OBSERVEDe~ TENG-SHA~HO~SSM SP7 FAC STATUS%OCCUPIED 17E' REMARKSS WM ICH WAS OBSERVED ON MOST OF THE CSS-1~ EQUIPMENT , , WAS APPARENTLY STILL PRESENTo THE CSS~1 ~~ . _ _ .: TRANSPORTER-ERECTORr'THE~A-FRAME CRANE~r AND+FOUR CRYOGEN ?_,,, .TRAILERS WERE, AGAIN,rOBSERVEDo .THE ~E?UIPMENT WAS PARKED STila.~ IN ORDERLY ROWSr AT 'THE MOTOR POOE~AREA? MISSILE ORDER OF~ BATTLE: 1 CS5-1~ TRNSPR'TR%ERECTOR~ 4 CRYOGEN TRAILERS 1~A-FRAME CRANE ASSOCIATED OBJECTSS 44 TRUCKS 9 SMALL TRAILERS 1 POSS_SMALL TRAILER 25X1 25X1 3 TOP SECRET RUFF_ Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 LJX1 KuF r 25X1 ~ IPIR 13 _ KH?~9 MISSION 1205-3 DEPLOYED~STRATEGIC SSM~FACI~ITIES TIAO?YU-~TA~I M'ISSILE~ ~I.AUNC~i{ COMPLEX 4203-10N ~125~57~-O0E~ STATUSoUNDER CONSTRUCTION REMARKS 2 . ,. THE ..ENTIRE COMPLEX WAS OBSERVED THROUGH. LIGHT ,HAZE.. N0~ M~ISSILESi.M~ISSILEwRE~.ATEp EQUIPMENT- OR SIGNIFICANT~ACTIVITY WERE OBSERVED. TUNG-HUA SSM COMPLEX 41~-28~33N 126~08W28E STATUS:000UPIED REMARKS. TNE~, ENTIRE COMPLEX. WAS,, COVERED,o_ , N0. SIGNIFICANT; ACTIVITY WAS. , OBSERVED~- ALTHOUGH; THE ~GENERA6.n LEVEL, OF, ACTLVITY HAS INCREASED OVER THE, LEVEL OBSERVED'xDURING THE? PAST FEW. ~MONTHS~o, CARGO~_ . , TRUCKS,WERE~AT MOST OF THE. SITES. AND COMPLEX~ASSOCIATED AREASa TWO CSS-2 RECTANGULAR-TYPE~TRANSPORTERS~WERE~AT POSSIBLEALAUNCH SITE 3o WHERE THEY {HAVE BEEN\ OBSERVEDf PREVIOUSt`Y.{ WOmNIwCHAI MISSIhE~LAUNCH COMPLEX 23-24~401V 102~47~-10E~ STATUSYCOMPLETE ?ONLY, LAUNCH?SITES 3 AND\4 CONTINUED?TO BE?ACTIVE. AT LEAST_TWO PROBABLE PROPELLANT~.TRUCKS WERE. PARKED NEXT TO THE'LAUNCH PAD AT BOTH SITES. NO OTHER MISSI~.E.'EQ~IIPMENT COULD BE~ IDENTIFIEDo SITES 3 AND 4 CONTAINEDk.A~ TOTA~? OF 26, TRUCKS., THE?FOUR ._ PERSONNEL TENTS OBSERVEO+DURING~THIS EXERCISE WERE STII.L~IN PLACE~a REMARKS: _ AI.L~ OF. THE COMPLEX WAS OBSERVED. THE"POSSIBL.E~ MISSILE YEXERCISE FIRST OBSERVED ON WAS, CONTINUING., MOWEVEf~o, 4 TOb+SECRET RUFF CHINAr'COMMUNIST 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- - _ -- 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 TOP'SECRET RUFF .? 25X1 25X1 I- IPIR 1S KH~?9 MISSION 12053 WU-WEI SSM TRAINING POSITION CNINAe COMMUNIST 25X1 ,~ .,: DEPLOYED STRATEGIC SSM~FACILITIES 3756?50N 102-X39-50E' REMARKS: CSSp2 TRAINING WAS'.OBSERVED ON~ 5 APR. IN, THEE 55M TRAINING POSLTION A C5S=2 TRANSPORTER??ERECTOR~, A LAUNCH STAND'- AND* A' TRUCK. WERE' WITHIN 1~HE' SCREEN AND ~NTNE, TRUCKS. WERE SPARKED'. _. OUTSIDEkTNE,SCREENm' ADDITIONALLY~TWO CANVAS?COVERED~C55~2 TRANSPORTERS. pR, TRANSPORTERS-ERECTORS,. WER~ ~ ~~ ~ IN ~1`HE SSM EQUIPMENTMAINTENANCE, AND STORAGE' AREAO THE, CSS=2 EQUIPMENT WAS NO LONGER VISIBLE~o ADDITIONAL. GROUND SUPPORT, EQUIPMENT, NOT, INVOLVED IN TRAINING WQS~ OBSERVED, ON BOtH _DAYS? ,THIS EQUIPMENT INCLUD~D~ TW0 CSS-~1~ TRANSPORTER-ERECTORSo~ THREE MOBILE?GANTRY CRANESe A C~tYOGEN TRAILERo AND APPROXIMATELY 40 VEHICLESo OTHER RESULTSWNO APPARENT CHANGE CHIUrFENG-JUN SUSPECT~~ SSM LAUNCH SITE 40-00??30N 11803--08E' 5'TATUS:UNKNOWN FU-SUNG FIXED FIELD POS (MRBM) STATUSoUNOCCUP'IED 42-14-20N 12702-21 TOP~SECRET RUFF Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 TOP SECRET_RUFF.. 25X1 25X1 h, IPIR 13 KH-9 MESSION 1205-3 SIGN+It`'ICANT RESULTS CHAN-I SPACE TRACK~ING~ FAC`IL{ITY STATU5EOPERATIONAL CHINA'r ~ ~COMMUN~IST~ 25X1 M~ISSILE+ 'RANGES REMARKS: TWO SMALL~BUILD'INGS HAVE'BEEN CONSTRUCTED NEAR ,THE DOME~r ONE JUST INSIDE~AND~ONE"JUST~OUTSIDE THE SECURITY'FENCEa SHUANG?~CHENG-TZU AIRFIELD AIR' ORDER OF' BATTLES 6 PROS FARMER STATUS'oOPERATIONAL REMARKSa _ THE A~IRF~IELD WAS OPERATIONAL IN THE VISIBLE PORTYONSa 1 PR08 FAGOT/FRESCO' SHUANG~?CHENG-TZU MISSIfLE~ TEST CENTER' 100?15~-DOE STIlTU5 0 OPERAT ZONAL' 40-23-51~N 099a47~-29E~ 41-08~OON REMARKS,:. , , _ .. . ALL COMPLEXES AND OPERATIONAL'AREAS-ANQ~MOST OF THE~TEST CENTER' WERE COVERED ON BOTH` THE.-FIRSTS AND SECOND~STAGE SCT-~1 TRANSPORTERS WERE STILL PARKED NEAR PAD B~?1 AND THE TEN..- ELECTRONICS VANS ,WERE,. STILL, ALIGNED. ACROSS PAD Ago THE TRANSPORTERS WERE NO LONGER AT COMPLEX B_AND,THE ., .. GANTRY WAS, AT~THE,.GANTRY,PARKING..SPACE MIDWAY.,,BETWEEN PADS B1 AND 82 AND THE EMPTY B2 LAUNCH'STAND,WAS,VISIBLEo THERE WERE' NO NEW, CRATERS WITHIN, A, 25-NM RADIUS OF, COMPLEX Bo THE PLACARDS, HAVE', BEEN, REMOVED .,FROM ?HE VI-CINITY OF PAD B2, AND THE ELECTRONICS VANS, HAVE, BEEN REMOVED: FROM COMPLEX C'o THE TWO, ELECTRONICS VANS AT? TRACKING, FACILITY' +11 ~AND~ THE TWO CRYOGEN VANS HAD BEEN REMOVED FROM PAC} Ago ON BOTH DAYS THE LARGE. 6 I 125X1 TOP SECRET RUFF Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 -- - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP*,~SECRE~' ~ RUFF, ,, _, , .~ 25X1 25X1 IPIR ,I~. KH~9 MISSION 1205-?3 TRAILERS NEAR PAD B1 WERE'STIL~ PRESENTa SHUANG?CHENG~?TZU MTC SAM' LAUNCH Ci'L.X 41404W53N 100-31-05E~ STATUS:000UPIED TTL_E'o _ 40 LAUNCH SITES A 4 CSA~1 LAUNCHERS 8 MISSIL.E',TRANSPORTERS 1~ PROB GIN 'SLING RADAR' (EMPTY) 11 RADARpASSOCIATED'VANS` -?? LAUNCH SITE' 8 4 CSAwI LAUNCHERS 3 CSA-1 MSl.S ON TRNSPRTRS 1 PROS B%C FAN~'SONG' RADAR ~~? ~LAUNCH~ SITE C~ 1 PROB~CSA~1 LAUNCHER WU?CHAI MISSILE TEST COMPLEX STATUSoOPERATI0IVAL CHINAvtCOMMUNIST 25X1 MISSILE RANGES 38-49~50N 111?36?20E REMARKS: _ MOST OF THE COMPLEX,v EXCEPT FOR TRACKING FACILITIES,~1v 2o~5r AND 7r WAS OBSERVED NO ACTIVITY WAS OBSERVED'AT 25X1 LAUNCH SITE'Ao CONSTRUCTION CONTINUED AT LAUNCH SITE5 B'AND*Cp~ YA-ERH-TANG IMPACT SEARCH 40-55~-/iN 088~52~/%E~ STATUS:UNKNOWN 7 TOP SECRET RUFF'' Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF ~ Z~X1 25X1 IPIR ~13' KN-9 MISSION ~1205~-3 MISSILE 'RANGES REMARKS: ., APPROXIMATELY 35 PERCENT OF THE, SEARCH AREA, WAS COVERED. 'NO' ? MISSILE. IMPACT AREAS,ORxMISSILE-RELATED ACTIVLTY WAS~OBSERVED. CAMP' WAS OBSERVED. CHINAr COMMUNIST 25X1 INSTRUMENTATION SIt`ES WERE'NO r H WE ERr THE~NEW TENT, ASSOCIATED OBJECTSS NONE DISCERNIBLE 100 ARGO RUCKS'(APPROX) OTHER~RESULTSaNb'APPARENT CHANGE SNUANG-TA' SSM FIELD 'fNG~ SITE 37-36-~15N 102?51-20E STATUS t (1NOCCUPIED TOP~SECRET RUFF: Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - _ - 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 TOP SECRET. RUFF. . 25X1 25X1 ~? IPIR ~13~ KH-9 MISSION 1205-3 CNINAw COMMUNIST 25X1 AIR DEFENSE M~ISSYl.ES OTHER ~RESUI.T~~-N0~ APPARENT CHANGE SHAN-TAN SAM TRAINING'~AREA 8~ 38-56~?50N 101?08~-18E STATUSBUNOCCUPIED g 125X1 TOP SECRET. RUFF., Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001 c ~X1 TOP SECRET RUFF. ~ ~~,. , 25X1 'Ii~IR ~13 CHINAS COMMUNIST 25X1 KN~9 MISSION 1205-3 AIR~BASE3FACI~ITIES ShGNIF~ICANT RESULTS 40-30-13N 116-~06-05E STATUS:OPERATIONAI. 7 FISHBED REMARKSo THE RUNWAY: AND PARALLEL. TAXIWAY' ARE OPERATIONAI.~o CONSTRUCTION WAS, CONTINUING ON_ THE DISPER5AL~ TAXId,JAY~ ,STORAGE' TUNNELSr ANDY SUPPORT.,FACILI$IESq THIS.;IS, THE FIRST, OBSERVATION OF ,AIRCRAFT AT,_ THIS AIRF;IE~ AND THE FIRST APPARENT. DEPLOYMENT OF~'FiSHBED~ IN CHLNA SINCE 25X1 F BATTLE: 25X1 14 FAGOT/FRESCO ~ ~ TOP SECRET RUFF I ' Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET, RUFF _ ~ _ 25X1 25X1 IPIR 13 SIGN~IF{ICANT RESULTS CHAN-CHIANG NAVAL BASE AND'SHIPYARD STATUS:OPERATIONAL BEEN COMPLETEDa, TW0 ADD,ITIONAL~ BUYI.?, NGS HAVE BEEN ADDED`v,~AND TWO OTHER BUILDINGS WERE_UNDER CONSTRUCTION. TWO CONSTRUCTION SUPPORT BUILDINGS HAVE~BEFN REMOVEQ SINCE'SEP 72.j NAVAL' ORDER OF' BATTLE: CHINAr COMMUNIST 25X1 NAVAL BASE F'ACI'LITIES 21-12?~12N 110-=25-21E' ALL~BUILDINGS UNDER CONSTRUCTION IN (HAVE 2 US LST~1 LST (1 MOORED IN CHANNEL) 1 US LSM~1 LSM 1~ EBANOL~ ATOL 5 POSS ~SMALL~ COMBATANTS 5 LCM HAIwKOU NAVAL BASE STATUSoOPERATIONAL 1 FUCHOU AWK 6 P055 TINGMAI AG~ 1 DREDGE 1 FLOATING CRANE SMALL~CRAFT (SEVERAL) REMARKS: THE RAIL~~LINE UNDER CONSTRUCTION IN "~ 21N 110 ECTS THE.FAC'ILITY WITH HAI-KOU COMPLETED AIRFIELD' AND TERMTR~ATES AT SHtJ~CHANG IMMEDIATELY SW OF AI~KbU. NAVAL ORDER OF~ BATTLE: 2 SHANGHAIaII PGM 2 WHAMPOA ~PGM 1 PROS WHAMPOA PGM 2 PROB~ YAG 1 POSS_HUMEN YP 2 PASSENGER FERRY 3 CQASTAL~CARGO VESSELS SMALL~CRAFT (NUMEROUS) it TOP SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - ~ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ?^ 25X1 IPIR ~13 KHv9 MISSION 12053 HSIAO-PING~TAb SUBMARINE BASE STATUSoOPERATIONAL NAVA6. ORDER OF BATTLE: 1 PROS R~ SS ~ -~ ON REPAYRWAYS 2 POSS SHANGHAI PGM ASSOCIATED OBJECTS: HSIN-HSING NAVAL+ FACIL.~ITY 19-~53?SSRi 109~31m09E~ STATUSoOPERATIONAL REMARKS: THE .THREE BUELDINGS,,IN THE.ADMINISTRATION/BARRACKS AREA~AN~ THEt AREA,v ALI.~ UNDER CONSTRUCTION IN IN THE, OPERATIONS TWO BUILDINGS . ,., ARE~COMPLETEa THE, GRAVING DOCK IS PROBABLY 25X1 NAVAL ORDER OF~ BAT'1?LE~: 3 SLAB 6 PROB SLwB (1 UNDERWAI(~) 3 SL?2 3W5S CHINA? COMMUNIST 25X1 NAVA(i~~ BASE FACILITIES 38-49?~04N 121-?29~31E 3 POSS SWATOW~PGM 2 PROS SL-2 (ON MARINE RAIL-WAY) 2 PRO?~ SL.~ (1 UNDERWAY) HU~?I.U~TAO NVL~ BASE SITYD~ + PORT FAC 40-42~51N b20~59~45E~ $TATUSoOPERATIONAL REMARKSo ,THE HAN SSU? THE SUPPORT, PL.ATFQRMe AND TNE~ WORK BARGE ~WITH~ TWO TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ~oX1 25X1 IPIR ~13' CHINAr~ COMMUNIST ~ 25X1 BASE FACILITIES KH?9 MISSION 12053 NAVAL CYLINDRIGAL.~ TANKS ON~ ITS DECK REMAIN SECTION OF PRESSURE Ht~LL~MEASURING 25X1 FEET) WAS STORED ON THE~WORK BARGE AND MAY HAVE~BE HANo THE~POSSIBLE SECTION WAS 'PRESENT ON 25X1 _ THE BUT. -WAS NOT?PRESENT, ON~ 25X1 _ ENVIRONMENTAL SHELTEE REMAINED IN PLACE OVER THE OPENING YN THE SH I P~o .THE LARGE SUBMARINE~COMPONENTS WERE IN THE SAME~APPROXYMATE ~OCQTIONS AS WHEN LAST OBSERVED 25X1 ACTIVITY AT` THE UN~IDENTIFIEp~ FACILITY NORTH OF~ THE MAIN YARD' REMAINED MODERATE. CONSTRUCTION OF SHIPYARD FACILITIES WAS CONTINUING AT~AtSLOW PACEo NAVAL ORDER OF~ BATTLE: LUNG-MEN NAVAL AND PORT FAC~II.~ITY 21-44~41N 108~32~-3! STATUSmOPERATIONAL NAVAL ORDER OF BATTLE: 11 5HANGHAIWII PGM 1 POSS SHANGHAI-2I PGM SMALL~VESSELS (NUMEROUS) ANTIAIRCRAFT ORDER~OF BATTLEs 12 AAA PIECES PAImLUNG NAVAL~FACILITY~ 21-30A36N 108?12-54E~ STATUSSOPERATIONAL NA1lAL ORDER OF BATT'LE~: TOP SECRET RUFF: 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- -- 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF ~ ~~X1 25X1 ?~ I~'IR 13~ KH~9 MISSION 1205-3 6 SMAI.L~ CRAF'T' CHINAr~COMMUNIST~ 25X1 NAVAL' BASE' FACILITIES PAI~MA~CHING NAVAL FACILITY STATUSoOPERATIONAI. OF~ BATTLES 1 PROS METTAWEE~ATOL~ (BERTH~ING~P TONG-TSUN NA1%AL' FACI~~YTY STATU5SOPERATIONAL 19-43m50N 109~12~-40E 20-25~^19N ~ 109m56~00E REMARKSS CONSTRUCTION. OF THE''GR' ~?~G~ DOCK WAS CONTINUINGo ,THE' BUILDING UNDER. CONSTRUCTION~IN APPEAREp TO BE~ 25X1 ' a EXTERNALLY COMPLETE NAVAL OROER~ OF'' BATTLE.. 1 PROS HAIKOU PGM 5 PROB~ SHANGHA B ~-I I PGM' 3 PROS PGM SMALL'CRAFT (SEVERAL WEI-CHOU?HSU NAVAL. FACILITY 21-O1w37N 109~06~20E STATUSSOPERATIONAL R OF~ BAT1`LE~S NONE DISCERNIBLE 3 SHANGHAI-II PGM 14 25X1 TOP` SECRET RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- -- 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP'SECRET RUFF ~ L~X1 25X1 ? IPIR .13. KHa9 MISSION 1205?3 CHINAr COMMUNIST 25X1 NAVAL BASE FACILITIES YU?LIN NAVAL BASE AND SHIPYARD 18-13m1'7N 109--31-59E~ STATUSoOPERATIONAL ` OF~ BATTLE: 2 KIANGNAN DE 1~ ETOROFU PF~ 3 SHANGHAI PGM 1 PROB~SHANGHAI-II PGM tON WAYS) 3 KRONSHADT ~PC ti~ ON~ WAYS) 1 PROB~ AKL~~ 1 PROS LCT-3 *LCU 1 PROS LSM 1 PROS RUMEN YP 2 P?~ PT tON QUAY) 2 POSS_ P=4 PT 5 LCM~ 1 PROS E.(:M~ SMALL CRAFT (NUMEROUS) YU?LIN~NAVAL FACILITY EAST 18-14~OON 109?33~-31E STATUS;OPERATIOIVAL NAVAL ORDER OF BATTLE: 2 SHA GH - PGM GRAVING DOCK ?- ~ IN , 1 PROS SHANGHAI-II P6M YU?LIN SHIP REPAIR YAR[3 STATUSoOPERATIONAL 18x13?-~b'SN 10933?05E~ REMARKSo A~ LARGE, PROBABLE ,SUPPORT.. BUILD~ING~ ADJACENT ; T0, THE, SOUTH EDGE OF ~'HE GRAVING DOCK WAS IN AN INITIAL. STAGE? OF CONSTRIdCTIONo~ 15 TOP SECRET RUFF_ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- 25X1 '~ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF. ~ 25X1 25X1 IPIR }13 KH~9 M~ISSION~ 1205-3 NA1/oL ~~thER OF BATTLE: 1 YTL~ 1 PROS YAG 1 SMALL CRAFT YU?~IN SUBMARINE~BASE~ STATUSpOPERATIONAL THE TWO QUAYS AND YU~LIN~ SHIP REPAIR YARD CHINAr COMMUNIST 25X1 NAVAL BASE FACILITIES REMARKS: _ _ _ AN OFFSHORE WHARF WAS IN A LATE STAGE OF~CONSTRUCTION OF~ BATTLE: 6R 5S 2 KRONSHTADT PC~ 2 LCM OTHER~RESULTSANO APPARENT CHANGE PEIwHAI NAVAL FACYL~TTY STATUSoOPERATIONAL A ~AL RDER OF~ BATTLE: NONE D~ISCERN~IBLE BETWEEN 16 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF. ~ _ RT~ 25X1 25X1 ~- IPIR 13 CHINAr COMMUNIST- 25X1 KHm9~MISSION 1205m3 GROUND FORCE FACILITIES SIGNIFICANT_RESULTS KUE~I-HSIEN~ ARMY + ~ A 1 _ - -- ORDER OF BATTLE: NONE DISCERNIBLE ANTIAIRCRAFT OR?ER OF BATTLE': 1. A 5 6 POSS_ ZRU~2~ AAHMG 8 P055 AAA PIECES MENG~-LA ARMY BARRACKS WEST AL~ 1 STATUS:OCCUP~IED 21-29~20N 101~33~30E REMARKS: A~ POL STORAGEy AREA WITH AT LEAST FOUR NORaZONTAI. TANKS WAS UNDER CONSTRUCTION ON THE NORTH SIDE. OF THE FACI~L.+ITY. 17 PROB CARGO TRUCKS E~ ORDER OF BATTLE: MENG~-TZU INF~ DIV HQ ANa+ BKS Al.' 1 ~23-21~?50N 103^23-32E STATUSoOCCUPIED GROUND FORCE ORDER OF BA1'TLEa 7 CARGO TRUCKS 5 PROB CARGO TRUCKS 5 VEHICLES 17 TOP~SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 --- ~ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF ~ 25X1 25X1 '~ IPIR 13 KH~9 MISSION 1205-~3 CHINAe COMMU(~lIST 25X1 GROUND FORCEf FACIL=ITIES OTHER~RESULTS~NO APPARENT CHANGE MO~TA-CHINE STORAGE DEPOT ~L,l.~ 1 20N 10143-OOE~ STA`fU5o0PERATIONAL GROUND FORCE~ORDER OF BATTLEo ERNIBLE NAO~CHOU TAO POSS DEF STR4NGPOINTS ~2U455~UON 110w35m0UE STATUSoUNKNOWN GROUND~FORCE~ORDER OF BATTLEa ,. ERN~IBL~~ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF 25X1 25X1 ~? IPIR '13 CHINAS COMMUNIST 25X1 KH~9 MISSION 12053LOGISTICS SIGNIFICANT RESULTS MAN?CHOU?LI RR SHOPS- 49~35w04N 117?26~-28E STATUSZOPERATIONAL ONE HUNDREt? AND SIXTY=TWO PIECES OF ROL~ING~STOCK WERE~OBSERVED 156 PIECES 51NCE REMARKS. A 'LOW. ~LEVEI. OF .ACTIVITY, WAS _085ERVED. THE APPROXIMATELY 100 PIECES OF ROLLIN IS A~DECREASE'OF 2525X1 OBJECTSS 100 PIECES OF ROLLING STOCK (APPROX) 52~FLATCARS (b WITH VEH/PCS 27 GONpOLA,CARS OF~ E?UIP') 6 PASSENGER, CARS 38 BOXCARS 6 STEAM ENGINES 33 TANK CARS PANG-PEI RR ?RNSLDG YARD~AND STATION STATUS o OPERAT I OtUAL RAIL ACTIVITY, HAS. INCREASED. FROM. AN ESTIMATED, 200 RALL.CARS ON 2 REMARKSa ,.~ ,. .. .,. .. .. .. .~a.. TO 285 RAILCARSr INCLUDING FIVE STEAM ASSOC~IATED~ OBJECTS2 132 BOXCARS 95 FLATCARS (3 LOAOED'WITH LUMBER) 23 PASSENGER CARS 7 CABOOSES, 4 POL CARS 10 UNID CARS 5 STEAM LOCOMOTIVES 19 TOP' SECRET' RUFF_ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - - -- ~ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET. RUFF, Z~X1 25X1 ~ IPIR 13 KH~9 MISSION 1205-3 8 GONDOLA CARS CHINAr COMMUNIST LOGISTICS 1 RAIL CRANE SUI?FEId-MHO R12 TR STATUSoOPERATI0IVAL 131?09~05E~ REMARKS,S ., , A LOW ,LEVEL. OF ACTIVLTY WAS OBSERVED AT aTHE TNSTALLATION'a~ P00R IN7ERPRETABIL~ITY PRECLUDED A COUNT AND IDENTIFECATION OF'THE% ROLL'ING' STOCK'm TOP'SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X125X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Next 2 Page(s) In Document Denied Q Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 -- -25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 c~X1 TOP SEGRETa RUFF. .~ 25X1 ?~ IPIR 13 KH?9 MISSION 12053 SIGNIFICANT' RESULTS FENG-CHOU ROCKET ENGINE~TEST FACILITY STATUS?OPERATIONAI.+ 25X1 25X1 THE.C0I~ERED MISSILE, RAILCAR WA LONGS AND 25X1 THE DOLhY A SHORT DISTANCE~AWAY,fNEAR RAIL BIFORCATION+) WAS AT BOTH OF I.ONGa PROPELLANT RAILCARS WERE OBSERVED 25X1 THE PROPELLANT TRANSLOADING AND 5TORAGE~FACILITIESo . . THE .TWO, POSSIBLE MISSILE, UPPER.. STAGES, WERE IN .THE, SAME POSITIONS NEAR TEST STAND,2 AS PREVIOU5LY~OBSERVEDo' AN UNIDENTIFIABLE PIECE OF EQUTPMENT WAS ON THE~SERUICE APRON~OF TEST STAND 10 AND, .,TWO, PROPELL.ANT_ TRANSPORTERS WERE ON THE APRON OF THE NEARBV~PROPELLANT STORAGE FAC I l.I TY PRO ILE DOLLIES 4 TYPED PROP RAILCARS 2 MISSILE RAILCARS_ 2 PRQPELLANT~T ~ RANSPTRS 2 TYPEmC PROP RA~IL.CARS UNID PIECE O 1 F EGtUIP HSI~AN AIRFRAME PLT' YENwL~IANG~ 172 CHINAv COMMUNIST` 25X1 INDUSTRY 33-5b-50N 106-43-40E 3~b~-38~54N 10913-36E~ ST'AT'US o OPERAT I OVAL. TOP SECRET ~ RUFFS Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 ... TOP SECRET RUFF ~ 125X1 25X1 - IPIR 13 H- M SION 1205-3 ---- THREE-BAY SHOP BUILDING ~I'N~ THE NWt PLANT YAREA~ HAS BEEN. ~COMPL.ETED~ SINCE SEP 72~.~ THE BUILOI,NG~ REPORTEb UNDER CONSTRUCTION IN THE AREA SE OF~ THE NEW FTNA~~ ASSEMBLY BUILDING IN 25X1 WAS IN THE LATE~STAGES OF CONSTRUCTION. THE~TWO BUILDINGS OBSERVEb UNDER CONSTRUCTION IN~THE EL.ECTRICAL~SUBSTATION~IN 25X1 CHINAS COMMUNIST 25X1 INDUSTRY 72. THE. WAREHOUSE.OBSERVED,IN THE LATE STAGES, OF CONSTR C 0~r~ PLANT PER~IMETER~ WEST,. 0~' THE (HEATING PLANTr IN 25X1 HAVE BEEN~COMPLETEb.~ 2X1 OBJECTS: -- AT~TH~ PLANT BADGER ~1~ BEAGLE 3 FISHBEb 1 SING-A 10 FARMER 9 FRESCO (3 W/O EMPENNAGE) 1 FAGOT 1~ CAB 1~ COLT 2 CC-6 ., LU-TA SHPYD A~ DI - - - - - STATU5~:OPERATIONAL REMARKS: TWO POSSIBLE LUTA DOGS VdERE~ OBSERVEDr ONE, IN GRAVING DOCK 1 AND THE SECOND BERTHED ON THE SOUTH SIDES OF. THE FITTING-OUT ~MOL.E.~ THE POSSIBLE~GORDYY ODGS~REMA~INED OUTBOARD A LUTA POL BARGE AT THE BREASTING PLATFORM SOUTH OF 'GRAVING.DOCK~lo~ A LARGE-HATCH CARGO VE5SEL WAS IN. GRAVING DOCK 2.~ TWO TA-CHING~SERIES AOT WERE`BERTHED ON THE NORTH SIDE~OF THE~FITTING-OUT MOLE, GRAVING DOCK 1) 1 P05S GORDYY ODGS 1 SHANGHAI PGM 2 CARGO~VESSELS (1 IN GRAVING DOCK OF~ BATTLE: 2 POSS LUTA`DDGS t1 IN 2)(LARGE=HATCH ) . 2 TA--CHING SERIES AQT~ (AT FITTING-OUT MOLE) TOP SECRET RUFF Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 L Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 X1 TOP .S, ~ F, ~ox~i 25X1 '~ IPIR 13 CHTNA COM MU ..25X1 KH-9 MISSION~1205-3 r IN NI DUST ST RY WU-KUNG AFLD - e . ' .,~ .,., . ._.. ~ - . ~ .. 25X1 STATUSSOPERATIONAL REMARKS: NUMEROUS CRATES WERE., 06SERVED~ IN ,THE' ,OPEN STORAGE ~AREA~ AND~'AT~ THE .TRANSSHIPMENT POINT OF. THE' ADJACENTAIRCRAFT' REPAIR BASEo_~ HOWEVERr SMALL SCALE'PRECLUDED AN ACCURATE~DETERMINATION OF'THE NUMBER OR TYPE OF CRATES OBSERVED~o ASSOCIATED OBJECTS: ~~ AT THE AYRFIELD 1 BADGER ~10 BULLiti WtTH~TURBO~ROPS) 8 BEAGLE t3 WITH TIP PODS) 1~ COL.T 1 AWAC BULL~(WITH TURBOPROPS) OTHER' RESULTS-NO~ APPARENT CHANGE PEI-CHINE GM DEV STATUS;OPERATIONAL~ TOP SECRET RUFF Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 X1 ~- IPIR 13 KH-9 MISSION 1205-3 SIGNIFICANT RESULTS PING-TUNE U/I ACTIVITY STATUS:UNDER~CONSTRUCTION REMARKS: ONLY TUNNEL GROUPS ,9, AND 10 AND A 5P'IAh.L F'UKT i UN yr ~ ht Wt5 i ttcN EDGE OF SITE WAS, OBSERVED THROUGH. SCATTERED CLOUDS, AND. NAZEo NO SIGNIFICANT CHANGES WERE APPARENT. IN CLOUD-FREE PORTIONS. CHINAr COMMUNIST25X1 M~ISCE~LAtVE0U5 32-06-31N 104-48-16E~ 25X1 27 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 - -- 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001 L~X1 TOP SECRET RUFF __ 25X1 IPIR 13 KH-9 MISSION 12053 UNITED A~tAB REPUBI.~IC~25X1 AIR BASE FACII.~ITIES SIGNIFICANT RESULTS WADI AL~ ,JANDAL~I AIRFIELD 30- 3-1 N 0' -5' - 5E STA7US:OPERATIONAL REMARKS: HEAVY HAZE PREC~UDED'A COMPLETE'REAbOUT. AIR ORf1F12 OF"BATTLE'i 1~ PROB F'ISHBED 1 P05S AIRCRAFT TOP'SECRET RUFF? Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 c~X1 25X1, - IPIR 13 KH-9 MISSION 12053 SIGNIFICANT RESULTS BUR SAID NAVAL BASE STATUSeOPERATIONAI. UNITED ARAB' REPUBL~IC~ 25X1 NAVAL BASE~FACILITIES ~._ 31- - - - E 25X1 REMARKSS THE POLNOCNY, LSM WHICH fHAD BEEN ABSENT. FROM' THE PORT, SINCE OEC 72 HAD ~RETURNEO. T`HE ALLIGATOR ~L'ST NORMALLY OBSERVED WAS NO LONGER PRESENTo NAVAL ORDER OF BATTLEt 1 RIGA DE 2 OSA PTFG 2 POLNOCNY LSM 2 VYDRA LCU 29 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 ~X1 T P SECR T RUFF 25X1 - IPIR 13 KH-9 MISSION 1205-3 SIGNIFICANT RESULTS AL OAH~IRAH AMMO A ORDDEPOT TURA~ CAVES. STATUS:OCCUPIED UNITED- ARAB REPUBL'IC' 25X1 GROUND FORCE FACILITIES 29-54-4 N 0 - -2 25X1 REMARKS: _ EQUIPMENT WAS .OBSERVED IN THE TURA CAVESSTORAGE' AREA , , (29-55-35N 031-19-OOE~) AND, AT TNE~TRANSSMIPMENT AREA t29-54-45N 031-18o30E) WITHIN RTURA~ ,CAVES. , AQD~ITIONAL~ EQUIPMENT VdAS OBSERVED AT THE RAILS OFFLOADING POINT (29~54~-25N,031-19-20E~) AND PARKED IN AN' OPEN, AREA (29-54-20N 031=19-10E) ~WITHIN~ TURA CAVES. THE,. EQUIPMENT IN THE ~.TRANSSH,IPMENT AREA' WAS NOT, ALIGNED' IN ,THE SAME MANNER .A5 THE .SA-6S EQUIPMENT OBSERVED', THERE ON~ 31 MARCHo EQUIPMENT. IN THE. STORAGE AREA}- ~AT~ THE' RA~IL~ OFFLOADING, 'POINTr AND PARKED IN~THE OPEN AREA WAS NOT PRESENT ON 31 MARCH. ., ..., .. ,THE EQUIPMENT COULDSNOT..BE'IDENTIF'I~DBECAUSE OF~VERY LIMITED INTERPRETABILITY RESULTING FROM HEAVY HAZEr OBL'IQUITYi AND SMALL SCALE. MISSILE ORDER OF~ BATTLE: VEHICLES/PIECES OFiEQUIP~ (NUMEROUS) GROUND FORCE ORDER OF BATTLE: VEHICLES/PIECES OF~EOUIP~ (NUMEROUS) TOP SECRET RUFF? Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Q Next 3 Page(s) In Document Denied Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET..RUFF~ ~ IPIR 13 KH-9 MISSION 12053 SIGtVIFICAIyT RESULTS 25X1 25X1 INOIA~ 25X1 AIR BASE FACI~L~ITIES DELHI PALAM'AIRF~IELD 28-34-25N 077 -06-03E~ 25X1 STATUSSOPERATIONAL ~BATT~E. 25X1 1 CARAVELLE 1 PROS C-47 1 PROS COOKPOT 1 POSS KING AIR 2 VICKERS VISCOUNT. 2 .. TRANSPORT AIRCRAFT 1 PR08 VICKERS VISCOUNT 2 L.IGNT AIRCRAFT 10 CRATE 1 POSS LIGNT AIRCRAFT 6 PROS CRATE 1~ 8-24 tON DISPLAY) 3 C-47 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 c~X1 TOP~SECRET RUFF 25X1 IPIR 13 IND~IA~ 25X1 KH-9 MISSION 1205-3 GROUND FORCE~FACILITIES SIGNIt`ICANT RESULTS JHANSI CANTONMENT AREA STATUSSOCCUPIED STAGES OF CONSTRUCTION. ~~ _~ 25X1 REMARKSS SEVEN OF THE MULT STORY OUSING UNITS REPORTED-UNDER GONSTF2UCTION IN .WERE IN THE MID-TO-~I.ATE~ 160 CARGO TRUCKS EQUIP 7\PROB-CARGO TRUCKS ORDER ~OF BAT7LE~: 24 POSS WHEELED PRIME 53 UTIt.~LTY TRUCKS, MOVERS 38 PROB UTILITY. TRUCKS 5 PROS TANK TRANSPORTERS ,.176 PROS VEHICLES/PIECES OF 36 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF _~ 25X1 25X1 IPIR 13 KH-9 MISSION 1205-3 SIGNIFICANT RESULTS DELHI RR CLF YD MAIN INDIA 25X1 ~LOGYSTICS 28-39-4QN 0??-13-4?E STATUS:000UPIED~ REMARKS: _ THE YARD WAS, APPROXIMATELY 40. PERCENT,FILLEp VdTH ROLLING S70CK. THERE WAS NO EVIDENCE OF MILITARY EGIUIPMENT AT THE~YARD.~ TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TnP~ ~FrRt`'T RUFF 25X1 i 25X1 IPIR ~13 KH-9 MISSION 12053 IRAN COMMO%ELEC/RADAk~ FACILITIES SIGNIFICANT RESU~'f5 BUSHEHR AW RADAR FA(:IL~ITY STATUS:000UP'IED N 050-51-20E~ PHYSICAL DESCRIPTION: 5.9 NM SSE OF BUSHEFiR. THE NEWLY' .IDENTIFIED, AW RADAR FA(:~IL,ITY IS SECURED, 8Y TWQ FENCES. TW0 TOWER-MOUNTED,'ENV,IRONMENTAL DOMESr ONE'CONTROL~ BUILDINGr TWO .TROPOSCAtTER SCREENS WITN, AN? ASSOCIATED, (;t)NTROI.' BUILDINGr FIVE VHF/UHF.ANTENNASr.A STEEL~LATTTCE TOWER WITH AN ATTACHED MICROWAVE D~ISHr A POWERPLANTr AN[) FIVE' SMALL, POL ,STORAGE. TANKS ~WERE~ OBSERVED INSIDE THE, INNER SECURITY FENCEt. THE TROPOSCATTER'SCREENS.WERE~ORIENTED ENE~tTOWARD SHIRAZ). .., .. RADARAWITHIASSOCIATEDaVAN AND ONE~MARCONI,404 HEIGHT FINDER TRUCKS AND GENERATOR TRAIhERS,WERE DEPLOYED BETWEEN THEE INNER. AND THE~'OUTER SECURITY FENCES., ONE' SECURITY BUILDING~t THREE BARRACkSr.FIVE ?UARTERS BUI~LDINGSr. FOUR SUPPORT BUILDINGSr' AND AN~ MF ANTENNA~'WERE' A1.50' BETWEEN THE TWO FENCES. TWO TIGERCAT SURFACE=TO-AIR MISSILE~tSAM) D~IRECTOR~TRAILERS AND TW0 POSSIBLE TIGERCAT ~MISSIL,E~ LAUNCHERS 'WERE' OBSERVED' NEAR THE MARCONI RADARS.' THIS 35'THE' FIRST IDENTIFICATION OF~TIGERCAT SAMS IN THE BUSHEHR AREA. ELECTRONIC ORDER OF BATTLE: 1'MARCONI 330 GCI RADAR 1 MARCON1I 404 HFw RADAR 1 POSS SEARCH RADAR tIN ENVIRONMENTAL OOME~) MISSILE' ORDER OF BATTLE': 2 POSS TIGERCAT SAM LAUNCHERS ANTIAIRCRAFT ORDER OF BATTL.E~: 3 LIGHT AA GUNS ASSOCIATED OBJECTS: :,.;_,. 1'POSS.HEIGHT,FINDER RADAR (IN ENVIRONMENTAL DOME) 25X1 25X1 TOP'SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF, .~ ~oX1 25X1 IPIR 13 KH-9 MISSION 1205-3 2 TIGERCAT DIRECTOR~TRLRS ...< .. , :: .. ,. ,:. I RAN 25X1 COMMO/ELEC/RADAR FACILITIES MAP SOURCE REFERENCE~t 250-JOGS-R ~ NH 39-15 TOP SECRET RUFF.. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 --- _ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 T~P~SECRET RUFF 25X1 25X1 ~- IPIR 13 IRAN 25X1 KH--9 MISSION 1205-3 AIR BASE-FACI~CITIES SIGNIFICANT RESULTS AGHA JARi AIRFIELD' NW' 3n..S~~~ ~ni 049-34-29E STATUSoUNDER CONSTRUCTION PHYSICA~'DESCRIPTION: ' 16.4 NM NW OF AGHA JARI AND, 35.4 NM', NE OF BANDAR~E~ MAS R. THIS NEWLY iDFNTiFiFn e~TRt~iFl n~ CONSISTS OF~ A NW/SE, RUNWAY IAL' _ _ NSTRUCTION CAMP'WAS OBSERVEO'NEAR ~ ' _ .THE SE END OF THE RUNWAY. F' BAT'T~E~t `NONE PRESENT ~tiu~ 25X1 MAP SOURCE REFERENCEt 250-JOG-R r NH 39w6 BUSHEHR HELICOPTER FIELD' ' ~ , 050-51-10E~ STATUS:UNDER CONSTRUCTION PHYSICAL'DESCRIPTIONo 3.4 NM SSE OF BUSHEHR. THIS NEWLY IDENTIFIED NEL'ICOPTER FIELD CONSISTS OF~ A EiW cONCR TER W Y, FINAL 25X1 25X1 AGES OF CONSTRUCTION AtVD A 25X1 NW/SE.SERVTCEABLE' ON RET RUNWAY, THE TWO RUNWAYS 25X1 \ , , A E CONNECTED BY TWO CONCRETE LINK TAXIWAYS SUPPORT FACILITIES , ., _ o CONSIST, OF' TWO HANGARSr ONE"PR013ABL~. OPERATIONS BUILD~INGr' TW0 SUPPORT BUIL.DINGSv ~AND~ TWO BUItLDINGS .UNDER CONSTRUCTION. A'~R ORDER OF~ BATTLE. NONE DISCERNIBLE 40 25X1 TOP"SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP~SECRET RUFF ~ 25X1 .. IPIR 13 KH-9 MISSION 1205-3 MAP ,SOURCE~REFERENCE2 250-JOG-R~ NH 39-15 GOL-E ZARO A I RF I EI.D 25X1 IRAN 25X1 AIR BASE FACILITIES - - IV U50-07?-49E~ 25X1 STATUSeUNDER CONSTRUCTION PHYSICAL' DESCR'IPTION': _ 2 NM WEST, OF~ GOL-E~ ~ZARt) AND 13.5 NM NNW OF' BEHBEHAN. THIS NEWLY ~CONS~STS OF'A NW/SE RUNWAY IN THE INITA'L AGES OF CONSTRUCTYON.~ TWO SMALL' BUILDINGS VdERE~ UNDER CONSTRUCTION JUST EAST OF THE'RUNWAYo A'FENCE-SECURED MIL'ITARY' INSTALLATION IS APPROXIMA'TELY~1o500 ME7ER5 t4-921~FEET) NE~OF THE CENTER OF _THE~ RUNWAYo' IT CONTAINED_ 14 BARRACKS? 12 PROBABLE SMALL' BARRACKS ~ FIVES PROBABLE, GIUARTERS BUILDINGSr TWO+ SECURITY BUILD'INGSr TWO STORAGE BUILDINGSrTMREE PR08ABLE~MAINTENANCEj BUILD'INGS- 16 .SUPPORT,BUILD~INGSo THREE BUILDINGS~UNDER CONSTRUCTIONo'AND~A WATER TOWER. A SEPARATELY SECURED AREA' CONTAINING TEN'SMALL BUILDINGS AND TWO WATER/GUARD TOWERS WAS OBSERVED JUST EAST OF THE INSTALL.ATION.~ A'IR ORDER OF BATTLE~i NONE PRESENT MAP SOURCE REFERENCES 250-JOG-Rr NM 39-6 TOP SECRET RUFF 25X1 2o~~i Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 1.,X1 TOP SE R T R FF ~--- - 25X1 IPIR 13 KH-9 MISSION 1205-3 SIGNIFICANT RESULTS HABBANIYAFi PLATEAU AIRFIEI.t) STATUS:OPERATIONAL IRA? 25X1 AIR BASE FACILITIES 33-20~-25N 043-35-30 ' 25X1 REMARKSS THESE END OF THE~3r032- X 30-METER t9-950- X 100-FOOT) NW/SE CONCRETE RUNWAY WAS BE'ING~ EXTENDEt)~ 879, METERS ( 2 r.882, FEET) . A PROBABLE ALERT _APRON~ WAS, NEWLY OBSERVED UNDER, CONSTRUCTION AT THE SE?END OF, THE. EXTENSION. ITS TOTAL,~LENGTH WHEN. COMPLETED ~, .~ ., , PROBABLY WILl.8~+3~911 METERS (~2-832_FEET) THE PARALLEL TAXIWA_Y~FIRST REPORTED UNDER'CONSTRUCTIO 25X1 WAS BE CONVERTED INTO A? Z~X1 NW~SE RUNWAY. 25X1 CONSTRUCTION WAS CONTINUING ON THE~SURFACE,OF THE NEW~RUNWAY~i AN? OVERRUN AREAS WERE UNDER CONSTRUCTION AT BOTH ENpS.~ THIS IS THE THIRD 'NW/SE RUNWAY.AT~THIS A~IRFIELD.,EXTEjVSIVE GRADING%SCRAPING ACTIVITY~WAS NEWLY OBSERVE?~AT~THE SW ENO, OF. THE NE/SW RUNWAY AND ~AT THEE ENO OFD A LINK TAXIWAY NEAR, THE, SW END, OF, THE. NE%SW RIfNWAY. _FOUR~ TOWED SCRAPERSr F,IVE~ TRUCKSr AND TWO VEHICLES/P=IECES OF? EGIUIPMENT WERE? OBSERVED AT THE EN[) OF~ THE LYNK' TAXIWAY. FIVE OF TME?NINE LARGE AIRCRAFT REVETMENTS WERE~CLOUD-0CQVERED. BADGER BOMBERS~WERE'OBSERVED IN TWO~OF THE~VISIBLE REVETMENTS. F~ BATTLE E BADGER 4 MIDGET ~ 6 BEAGLE. 21 MAYA (8 AIRBORNE) 12 _FISHBED (2 ON TAXIWAY) ASSOCI `TE OBJECTSS 4 DERELICT FISHBED 3 DUMMY HUNTER TAMUZ AIRFIELD 33-22 35N 043-33-45E~ STATU5OPERATIONAL 42 I I 25X1 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ~r~ TOP SECRET RUFF J 25X1 25X1 IPIR ,13~~ KH-9 MI55ION 12p5-3 _ IRAa~ 25X1 AIR BASE FACI~~ITIES THREE LARGE EXCAVATIONS WERE-NEWLY IDENTIFIED, NEAR THE,,SE END . OF THE RUNWAY. THE~HAWKER~~HUNTER AIRCRAFT NORMALLY.OBSERVED AT THIS AIRFIELD WERE~NO~~LONGER PRESENT?~ THIS IS THE FIRST IDENTIFICATION OF A~CUB AT THIS AIRFIELD. REMARKSS AIR ORDER QF~ BATT(LEt JECTS: 2 DUMMY~HUNTER 9 ZLIN TRENER 5 AIRCRAFT CRATE5 43 TOP SECRET, RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 G JX1 TOP SEGKET KuFr 25X1 ~- IPIR 13 KOREAr NORTH 25X1 KH-9 MISSION 1205-3 SIGNIFICANT_RESULTS CHANGJIN~-UP AIRFIELD STATUS;OPERATIONAL AIR BASE FACILITIES REMARKS: CONSTRUCTION ON THE_TWO LARGE REVETMENTS AND THE.~EIGHT HARDSTANDS APPEARS TO HAVE, STOPPED. ALTHOUGH THEY DIp~NOT APPEAR COMPLETES THEY WERE OCCUPIED BY DUMMY/DECOY FISHBEDt. AIR ORDER ~F BATTLE: 5 BEAGLE ~1 PROB BEAGLE 20 DUMMY/DECOY FISHBED HAMHUNG AIRFIELD STATUS;OPERATIONAL REMARKS: THE AIRCRAFT STORAGE, TUNNELS APPEAR COMPLETEzAND OPERATIONAL WITH NETTING IN PLACE OVER THE ENTRANCES. CONSTRUCTION WAS CONTINUING ON TWO OF THE FOUR D~UBL'E-BAIT HANGARETTES. AIR ORDER OF~BATTLE: 28 FISHBED HWANGJU AIRFIELD 38-38-59N 12a-47-30E~ STATUS:OPERATIONAL ORDER OF~BATTLE: 3 FISHBED 5 FAGOT/FRESCO 6 COLT 1 PROS MAX/MOOSE 7 DUMMY%DECOY FISHBED1 20 DUMMY/DECOY FAGOT/FRESCO 44 25X1 TOP~SECRET RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ---- - - - - - - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET. RUFF. , -~ 25X1 25X1 - IPIR 13 KH-9 MISSION 1205-3 HYON~NI AIRFIELD STATUS:UNDER CONSTRUCTION REMARKS: CONSTRUCTION WAS CONTINUING ON THE~RUNWAY~ THE PARALLEL TAXIWAYi ANO THE~TUNNELSe~ AIR ORDER OF~BATTLE: KOREA-~NORTH 25X1 AIR BASE FACILITIES 38-36-30N 127-27~-20E NONE` DISCERNIBLE KOKSAN AIRFIELD STATUS:UNDER CONSTRUCTION CONSTRUCTION WAS CONTINUING ON THE .TUNNELS. THE RUNWAY APPEARED 'SERVICEABLE~a ~I OR~ ~ R OF~ BATTLE: NONE D~ISCERN~~IBL~~ 38-41-15N 126 36-IOE` REMARKS: NAMSI AIRFIELD STATUS:OPERATIONAL NAMSI REPAIR~BASE 39-55-28N 125-12-23E REMARKS: EIGHT. OF THE FAGOT/FRESCO AND THE'HXP-C HEL~ICOPT~R~WERE AT F BATTLE: 0 ESCO (3 WITH TOP~SECRET RUFF. ~ 1 HIP-C~ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 X1 TOPt SECRET RUFF ~ ``' 25X1 ~- IPIR 13 KH~9 MISSION 12053 TAIL SECTION REMOVED) 4 COLT (2 WITH WINGS REMOVED) ONCHON-UP AIRFIELD STATUSSOPERATIONAI. 38-54-17N 125-14-03E REMARKS: CONSTRUCTION WAS CONTINUING ON~THE HANGARET'TES. AIR ORDER OF~ BATTLES KOREAr NORTH 25X1 AIR BASE FACILITIES 5 DUMMY%DECOY FISHBEO 15 DUMMY/DECOY FAGOT/FRESCO 3 DUMMY/DECOY FISHBED 9 FAGOT/FRESCO (2 WITH~TAIL~ ~1? OUMMY/DECOY FAGOT/FRESCO SECTION REMOVED) PUKCHANG-NI A~IRFIELO STATUSSOPERATIONAL 39-30-07N 125=58-02E REMARKSS THE AIRCRAFT~SNIPPING CRATES~WERE D~ISPERSEO~NEAR THE THREE LARGE CAVE..ENTRANCES. AT ,THE, NW END OF THE MATN~ RUNWAYr NEAR THE THREE CAVE. ENTRANCES aN .THE, 5E ENO OF THE SOD RUNWAY r ~AND~ IN THE AIRCRAFT DISPERSAL AREA. AIR ORDER OF~BA7TLES O F 2 1 W SECTION REMO 21 FISHBED ITH VED) TA T/ IL 1 FAG 11 DUMMY 6 DUMMY/ RESC /DECO DECOY O Y FISHBED,.,.. FAGOT/FRESCO AS5OCIATED OBJECTSS 30 PROS ACFT SHIPPING CRATES 46 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 --- - -- - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF,, ~oX1 25X1 ~- IPIR 13 KH-9 MISSION 1205-3 PYONGYANG AIRFIELD EAST 50~-45E' STATUSSOPERATIONAL KOREAr NORTH 25X1 AIR BASE FACILITIES 39-00-50N 125 REMARKS: _ THE 63 COLT: SNIPPING,. CRATES.~CONSISTED OF~30 FUSELAGE CRATES AND 33 WING~CRATESo ASSEMBLY OF NEW COT AIRCRAFT WAS IN-PROGRESS. F~ BATTI.E~: ~1~ SAIL PLANE ' 2 CREEK 2 HIP-C 2 PROB~MAX%MOOSE 8 HOUND ASSOCIATED OBJECTS: 1~COLT FUSELAGE (WITH TAIL ASSEMBLY AND W%O WINGS) 6 CO~.T H PPING CRATES 1 COLT FUSELAGE~,(WITNOUT WINGS OR'TA~IL ASSEMBLY) PYONG~NI AIRFIELD 39-24-29N 125?53-39E' STATUS:OPERATIONAL A REVERSEaSLOPETUNNEL ENTRANCE IN AN EAREY STAGE OF , CONSTRUCTION~CONNECTS THE?UNDERGRbUND STORAGE~WITH'THE SUPPORT AREA~o REMARKS: AIR ORDER OF~BATTLE: 1 COOT 1CUB 3 COKE 8 CAB 9 COLY 1'0 DUMMY/DECOY F~ISHBED 7 DUMMY%DECOY~FAGOT/FRESCO 4? TOP SECRET RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF' ~oX1 25X1 - IPIR 13 _ KH~9 MISSION 1205-3 SAAMCHAM~AIRFIELD STATUS.OPERATIONAL A~ ~ BATTLE: 25 FARMER 2 FAGOT/FRESCO 1 PROB~FAGOT/FRESCO KOREA- NORTH AIR BASE FACILITIES ." E. 2 DUMMY/DECOY FISHBED~ 14 GUMMY/DECOY FAGOT/FRESCO SONDONG-NI AIRFIELD 39-44~-42N 127=28"3~E, STATU5OPERATIONAL~ REMARKSS CONSTRUCTION WAS CONTINUING' ON~ THE HANGARETTES AT~''THE~ 5QUTH END OF THE FIELD. F~ BATTLE'S 55 FAGOT/FRESCO~(1 WITH TAIL~5ECTION REMOVED) SUNAN-UP~AIRFIELD 39-11=40N 12540-30E~ STATUSoUNDER CONSTRUCTION REMARKSS .,CONSTRUCTION' WAS CONTINUING' ON, THE+ RUNWAY AND TUNNELS. 7HE' ~OCATIO~ S OF' TH ~ SHtIPP~NG CRATES NAVE NOT CHANGEO~ SINCE AIR ORDER OF BATTLES 3 HIP~C~ 48 TOP'SEGRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP_SECRET RUFF 25X1 25X1 ,. IPIR 13 KH-9 MISSION 1205-3 ASSOCIATED OBJECTS: 12 PROS ACFT'SHIPPING~ CRATES' WONSAN'AIRFIELD STATUS:OPERA'TIONAL 39-~9~-54N 127-29-~7E~ CONSTRUCTION APPEARED .COMPLETE ON THE RUNWAY EXTENSION AND-WAS CONTINUING ON THE HANGARETTES. ., THIS IS THE FIRST? 085ERVATION OF' A~ BEAGL.E' AIRCRAFT AT THIS" FACILITY. REMARKS: AIR ORDER OF~ BATTLE. 1 BEAGLE 61 FAGOT/FRESCO 1 CAB 1 COLT ~KOREAr NORTH AIR' BASE4 FACII.~ITIES 18 PROB 120MM'MORTARS 48 TRUCKS 1 HIP-C 1 MEDIUM HELICOPTER 10 PROB DUMMY/DECOY~FISMBED' OTHER ~RESULTS~-NO' APPARENT CHANGE HOEMUN~-NI AIRF'IELq STATUSeUNKNOWN 41-25-4pN 129-39~-OlE' REMARKSS PARTIAL~COVERAGE'PRECLUDES DETERMINATION OF THE STAYUS OF TUNNEL CONSTRUCTION AND THE'SERVICEABILITY OF THE'FIELD~. I OR ~ R OF BATTLE: NONE DISCERNIBLE 49 I I - 25X1 TOP'SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP~SECRET-RUFF, ~ Z~X1 25X1 I- IPIR 13 KH-9 MISSION 1205-3 KOREAr~NORTH 25X1 IdAVAL~ BASE FACIL.~ITIES SIGNIFICANT RESULTS CHAHO NVB PUG - ~ - ~ -3~ -58 STATUSSOPERATIONAL REMARKSS a .. ,. CONSTRUCTION WAS CONTINUING ON, THE _TUNNEL_COMPLEX AND?ON. THE..., SHORELINE REA~~IGNMENT .ON, THE, EAST. SIDE OF ,THE BAY., A 320-METER t1-050-FOOT) OUA~( MARGIN~HAS BEEN CONSTRUCTED: ON TNE~EAST SIDE OF~THE BAY OPPOSITE~THE NORTH TUNNEL ENTRANCE. NAVAL ORDER OF~ BATTLES ~- AT T-HEAD PIER 25X1 3 P-6 tMODIF+IED) 3 SHERSMEN PTF~ _ 2 PROS NEW-CLASS PATROL BOATS ~^- AT NW G1UAY 4 05A PTFG 6 PROS NEW-CLASS PATROL 8 NEW-CLASS PATROL BOATS _ BOATS (WITH RADOMES) 1'P96 (MODIFIED) IN HARBOR 25X1 ~- AT -EAST QUAY 1 PROS PGM 1 POSS FLOATING DRAGL~INE 1 P055 AKL 1~ PR08 FLOATING CRANE MAYANG?~00~ SUBMAi2INE AIUD NAVAL BASE 39-59~-39N~ 128?12-42E STATUSSOPERATIONAL REMARKS: A 93-METER (306~FOOT) QUAY HAS BEEN C?NSTRUCTEQ ALONG~FTHE~SW SHORELINE. TOP SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP. SECRET RUFF ~ IPIR 13 KHp9 MISSION 1205-3 RDER OF~ BAT7LE~. AT FINGER PIER 5 SoOa 1 PCS 2 BARGES ~~X1 25X1 KOREAo NORTH 25X1 NAVAL' BASE F~CIL~ITIE5 1 SMALL' CRAFT ~- ALONG SHORELINE MUNCHON UP~ NVB~ AND SHIPYARD' STATUS;OPERATIONAL. 39-18~O1N 127-~23-54E~ REMARK58 THE ,USS PUEBLO WAS BERTHE? AL.ONGSIDF THE MOL.Ef. OBSERVED~AT MAYANGDO,SUBMARINE AND NAVAL BASE NAVAL ORDER OF BATTLE: -,.IN~NORTH BASIN 3 PROB PW6 PGM -- IN GRAVINGk DOCK' 1 HANCHON L.CU 1 P-6 3 PT/PGM 2 SMAI-L~ CRAFT 1~ PROB YP ON NORTH TRANSVERSER 2 SMALL' CRAFT SINHUNG PT 2 PROS SINHUNG PT ..~ IN SOUTH BASIN 6 SINHUNG PT 1 PROS PGM 2 PROB SINHUNG PT 1 POSS PGM AT MOLE' 1 USS PUEBLO 1 PGM 3 P-6 'PGM (WITH STAGGEREDS 2 YP~ y GUN MOUNTS'~AFT) "1 POSS AG IT WAS LAST 25X1 25X1 51 25X1 TOP'SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF Z~X1 25X1 IPIR ~13 KOREA'r' NORTH 25X1 ,.t ... ~Kli~-9 MISSION 1205-3 NA1/AL' BASE FACILITIES YOHO-RI NAVAL BASE STATUSSOPERATIONAL pm AT NORTH PIER REMARKS:. _ A~ LANDSLIDE, ABOVE .THE, NWp TUNNEL ENTRANCE HA5 PARTIALLY, FILLED THE~WATER-LEVEL APPROACH BASIN AND OBSCURED~THE ENTRANCEYo CONSTRUCTION HAS BEGUN ON A SECONQ PROBABLE' WATER~LEVEL.~ .TUNNEL ENTRANCE ON THE NE ~S~IDE OF~ THE HEADLAND. EXTENSIVE' SPOI'L' WAS ... . ~ ' i ADITS. THE TWO SE PRESENT OUTSIDE NAVAL ORDER OF3 BATTLE'S 1 CHODO PGM 9 IWON PT 3 PROB PGM 1 YP 1 PROB~ PGM 39-52'=20N 127-47~-05E' -- BEACHED 1 LCM 1 HANCHON LCU (NEAR 5E~ ADITS) 2 VESSELS ON TRANSVERSER 2 VESSELS ON MARIPIE RAILWAY ~- NEAR TUNNEL, COMPLEX 3 WORK CRAFT TOP SECRET' RUFF,. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF, ? _ 25X1 25X1 IPIR '13 KH~?9 MISSION 1205-3 SIGN~IFICANT_ RESULTS CH~ILCHONm00NG`ARMY SUPPLY. DEPOT STATU5o0PERAT'IONAI. GROUND FORCE ORDER OF GATTLEo 2 TRUCKS 1 PROB TRAILER KOREAo NORTH 25X1 GROUND FORCE~FACILITIES 38-39-46N~126-3302E CHONGDAN BKS AND MV ~DPO STATUStOCCUPIED cROUN~ FORCE ORDER OF BATTLER 82 TRUCKS 38-22m40N~125~51-50E 16 TRUCK BED5 !, 25X1 CHONS4-RI HQ TK REGT A~BKS AREA STATUS:000UPIED GROUND FORCE ORDER OF BATTLE~a AULT GUNS 9 TRUCKS 39-10~-O ON 125?39?10E 4 VEHICLES%P~IECES OF~EQUIP KALGOL~ Ha HV TK REGT A~ BKS~ AREA 39-06m10N 125~57W10E STATUS;000UPIED GROUND FORCE ORDER OF BATTLE~B 11 TANKS/ASSAULT GUNS ~ TRUCKS TOP-SECRET-RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP ,,.SECRET, RUFF; 25X1 25X1 ~- IPIR F13 KH~9 MISSION 1205-3 ' KOREAr,NORTH 25X1 GROUND `FORCE FACILITIES KOUM-~DONG H@ ARMY RKS STATUSoOCCUPIED ~~ ~ ORDER OF BATTLE e 4 TRUCKS 23~?08N 12622-11E~ KUMCHON H@ TK DIV/ARMY BK5~5TOR 39-24-~40N~ 12544-40E~ ~RCE ORDER OF BATTLEe STATUSoOCCUPIE? IN AREA A 19 TRUCKS 1 TANK/ASSAULT GUN ~16 BTRw60PB IN AREA B 35 TANKS/ASSAULT GUNS 9 TRUCKS ~^- IN AREA C '~? IN AREA D 29 TANKSAASSAULT GUNS KUMSONG ARMY BKS ESE 38-24~OON 12?-39-20E GROUND" FORCE ORDER OF ~ BATTLE e STATUSoOCCUPIED 7 VEHICLES/P~~ECES OF~E~UIP 54 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP ~SECRET~ RUFF, 25X1 25X1 ~ IPIR 13 KHa9 MISSION 12053 KUUM+-NI ARMY BKS A STOR AREA STATUSoOCCUPIED 175-PROS TRUCKS tAPPROX) GROUND FORCE ORDER"OF BATTLE: POKKYE~RI HD TK STKTUSmOCCUPIED FORCE ORDER OF BATTLE~e KOREAr NORTH 25X1 'GROUND~'FORCEf FACILITIES 38-50~^38N 12729-40E~ 38-26-38N 12~ 17a55E~ 9 PROS TANKS/ASSAULT GUNS 25 PROS TRUCKS PYONGYANG ARMY BKS + STORAGE AREA EAST, 39-03~25N 125?~52A35E STATUSoOCCUP~IED GROUND FORCE ORDER OF BATTLE: ~-- IN WATER SECTIONS 22 TMP/TPP END SECTIONS 156 PONTON , 22 TMP/TPP CENTER SECTIONS 5 POWERBOATS 6 K-61 TRACKED'AMPHI8IAN5 102 TRUCKS ~?~? TN BARRACKS AREA SANGJOKwTONG ARMY'BARRACKS WEST 38-29~30N 127~19~14E STATUSoOCCUP~IED 55 TOP SECRET RU~F~ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRE`f RUFF.... -~ 25X1 25X1 IPIR 13 KH~9 MISSION ~.205~3 ORDER OF BA1'TL'E~b B KS' SANGJOK-TONG ARMY' BKS A' HQ_ AG~ STATUSoOCCUPIED GROUND FORCE ORDER ~ OF BATTLE o 6 PROS TRUCKS KOREAr NORTH 25X1 'GROUND FORCE FACILITIES 38-29?44N 127 -09E+ TOHA~-RI MIL. INSTALL NORTH 38-41~40N 126~18~10E~ STATUSaOCCUP~IED FORCES ORDER OF BATTLE o 2 POSS'BTR-60PB 73 TRUCKS YONGYON=~NI ARMY BARRACKS STATUS%OCCUP~IED GROUND FORCE ORDER~OF BATTLE? 4 PROS TRUCKS ' 38-23~25N 127?11=-45E YU-LI VEH STOR/MA~INT AREA 38-49~55N 126m15-32E~ STATUSeOCCUPIED 56 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP _SEGRET RUFF.,, ? , 25X1 TPIR 13 KH~9 MISSION 1205-3 ~GR~UND~ FORCE ORDER OF BATTLE Z +KOREAr NORTH GROUND FORCE FACYL.~ITIES OTHER ~RESULTS~-NO APPARENT CHANGE ANHYOP~ ARMY BKS A~ HD ~ YNF~ D~IV A REGT 38-20A21R1 12654 57E~ STATU5a000UPIED~ GROUND~F~RCE ORDER OF BATTLED NONE DISCERNIBLE SARIWON ARMY BKS a STnR' aRi" o tiNF S'T'ATUSa OCCUPIED ~RCE ORDER OF BATTLED NONE DISCERNIBLE 38-31~55N 125-46=12E~ SINANSANG-NI ARMY BKS 38-38~27N 12743-~15E~ STATUSoOCCUPIED R UND FORCE~ORDER OF BATTLEa s NONE DISCERNIBLE TOP SECRET RUFF_ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP Sf~CRET RUFF ~o>C1 25X1 r. IPIR 13 KH~?9 MISSION 12053 KOREAr NORTH 25X1 GROUND~FORCE FACILITIES . , SONGAM-NI ARMY BKS AND HQS.INF DIV_ 38-23~2ON 127~25~-22E~ STATUSaOCCUPIED GROUND FORCE ORDEF2 OF BATTLEb NONE DISCERNIBLE T4K~ KOL~ Ha INF~ DIV A ~ARMY~ BKS 38-35-42N 12717-~16E STATUS o OCCUP~IEO~ NONE DISCERNIBLE YANGJIpCHON BK5 A~ MD ~ YNF~ OIV 26?42N 128?06-54E STATUSoOCCUPTED c;Rni~tin' ~oRCE ORDER ~OF BATTLE: NONE D~ISCERNIBI.E 58 TOP SECRET. RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF .~ ~ox1 25X1 IPIR ~13 KH-~9 MISSION 1205-3 SIGNIFICANT RESULTS SINPQ SHIPYARD SOUTH STATUS:OPERATIONAL PHYSICAL DESCR~IPTION~: S F NPO UT ~ I N o O ~ DE , THE SO H, S, I O THE SHIPYARD HAS UNDERGONE MAJOR. EXPANSION SINCE 25X1 THE RAIL=SERVED WALL~_SECUREO_ FACILITY CONSISTS OF SiX ~ 25X1 ING MAJO F NCTIONA~ AREAS COVERING 69 ACRES AN_D I,NCLU? ERECTION~o FITTING~OUTe REPAIRe FABRICATION~o ENGINEER~ING'- AND SUPPORT FACTL~ITIES? AREA CONTAIINS ONE, I. , INCL. NED THE ERECTION 25X1 . BUII.DINGWAY UNDER CONSTRUCT IONo ONE NEW 25X1 CONSTRUCTION HALLe AND-TWO BUILDINGWAYSa~ KOF2EAo NORTH 25X1 INDUSTRY GANTRY-S THE FITTING-OUT. AREA~CONTAINS 223 METERS (731 FEET} OF FINISHED QUAY AND AN ADDITIONAL AREA BEING FILLED. THE REPAIR ~AREA~ SOUTH CONTAINS A MARINE RAILWAY AND 1`RANSVERSERa A OUAY~ AREA~r' AND A FINGER PIER ._, : , THE FABRICATION_AREA,CONTAINS,FIVE LARGE~MULTIBAY FABRICATION BUTLDINGSr AN OPEN FABRYCATION AREAo AND~A POSSIBI.E~HEAT TREATMENT FACILITY?' THE~ENGINEERING AREA~CQNTAINS TWO LARGE~MULTIBAY SHOP BUILDINGSo FOUR SHOP{BAYS UNDER~CONSTRUCTI[ONo FIVE, SHOP BUILDINGSo A~POSSIBLE FOUNDRVo AND~A RAIL~SERVED STORAGE+AREA'? THE SUPPORT AREA~CONTAINS A~CONVEYOR-SERVEQ POWERPLANT AND' COVERED COAL, STORAGE _AREAr A LARGE OPEfU,STORAGE~AREAo EIGHT STORAGE%SUPPORT BUILDINGSo AND TWO MULTISTORY~PROBABLE ADMINISTRATION BUI~QINGSo THE STERN-HAUL TRAWLER HAS A LENGTH, OFD 54, METERS (178 FEET) AND A BEAM OF 1~O METERS t32 FEET)? THE. DREDGE UNDER CONSTRUGTION HAS A LENGTH OF 39 METERS (126 FEET) AND A BEAM OF 12 METERS (38 FEET). NAVAh ORDER OF BATTLE,: 1 STERN?HAUL TRAWLER (UCONI 4 VESSEL'S (UCON) 59 TOP* SECRET RUFF 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - - - - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF ~ox1 25X1 IPIR ~13~ Kti~?9 MISSION 1205-3 1 DREDGE~(UCON) AT FITTING-^OUT QUAY 1 PROS TRAWLER 1~VESSE~ IN WATER NEAR BUIL.~INGWAYS 1 DREDGE dOPERATING~) 1 BARGE 2 VESSELS 6 VESSELS At FINGEF2 PIER ~ AT SOUTH QUAY KOREAS NORTH INDUSTRY' TOP` SECRET RUFF, Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF. ~ I ~~X1 25X1 IPIR ~13 KH-9 MI S ON 1205?3 SIGIV~IF~ICANT RESULtS HIGHWAY SEGMENT 912 A STATUSSOPERATIONAL~ LAOS 25X1 ~LOG~YSTTCS REMARKSS .. , .. THE. ROUTE WAS., SERVICEABLE{.AND. IN GOOD CONDyITIONo NO SIGNIFICANT MILITARY ACTIVITY.WAS OBSERVED. GROUND FORCE ORDER~OF BATTLES HWY SEG 12 F 17-34~?lON 105~43~-40E~ STATUSSOPERATIONAI.~ REMARKSS THE SEGMENT, WAS PARTIALLY OBSERVED BY TREE.CANOPYw BUT I APPEARED TO 8E SERVICEABLE~a NO TRAFFIC~WAS OISCERNIBLE~. ORDER OF BATTLES NONE DISCERNIBLE OTHER~RESULTS~NO APPARENT CHANGE HIGHWAY~SEGMENT 1201 17-36-50N 105?44-~55E STATU5o0PERATIONAL~ GROUND FORCE ORDER ~OF~ BA'PTLE~S NONE-DISCERNIBLE 61 TOP SEGRET~~ RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP _ SECRET, RUFF. IPIR ~13 KH~9 MISSION 1205-3 SIGNIFICANT RESULTS TARABULUS ~ SAM SIT'E~ A07-2~ LIBYA 25X1 AIR DEFENSE M~TSSILES 32-54?32N 013 15~-19E~ STATUS:UN000UPIED PNYSICAL~ OESCRIPTION~: .. ., . 4 NM ENE .OF TARABULUS., , ,. UPDATEp?DESCRIPTION.. THIS NEWLY COMPLETED SA-2 SITE CONSISTS OF A CENTRAL GUIDANGE._AREA;CONTALNTNG.A SINGLE I BUNKER WITH THREE, DRIVE~IN~EQUIPMENT-HOLD REVETMENTSc,SIX REVETTED? DRIVE-THROUGH,LAUNCN, POSITIONS tEAGH WITH,A TMIRD ENTRANCE')v DRIVE-SIN RADAR.BUNKERP ONE DRIVE-IN SUPPORT BUNKER~WITH AN~ ADJACENT. SINGLE-BAY, pRIVE~-IN EOUIPMENT~HOLD? REVETMENTv pNE~ DRIVE-THROUGH SUPPORT BUNKER WITH AN ADJACENT DOUBLE?~BAY DRIVE-SIN EQUIPMENT~HOLD REVETMENTr AND SIX~DRIVEmTHROUGH~ MISSILE-HOLD REVETMENTS. ER OF~ BA1'TLE~: NONE DISCERNIBLE 25X1 TARABULUSoSAM SITE A09~2~ S'TATUS:UNDER~CONSTRUCTION 10 32~53~-50N 013-20-1UE~ REMARKS: SIX LAUNCH POS,ITIONSo'THREE~DR~IVE~IN.EQUIPMENT~HOLD REVETMENTS ADJACENT TO THE,SINGLE~I BUNKERv AND STX DRIVE-THROUGH MISSILE=HOLD REVETMENTS 'WERE IN .THE FINAL~STAGE OF~ CONSTRUCTIONa ER OF' BATTLE. NONE OfISCERNIBLE 63 TOP SECRET- RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF ~ 25X1 25X1 IPIR ~13 KH~9 MISSION 1205-3 TARABULUS SAM SITE A12m2 17 STATUS 8 UNDER COtVSTRUC'T I ON LIBYA 25X1 ~s. AR~ DEFENSE MISSILES 32-49-30N 013-=18-00E~ REMARKS: THE SINGLE~I BUNKER WAS NEARLY,COMPLETE'? SEVEN MISSILE-HOLD REVETMENTSv TWO~HARDENED~SUPPORT BUNKERSe,AND,THREE DRIVE-YN EQUIPMENT-~HOLp~ ~REVEYMENTS ADJACENT ~.TO .THE SINGLE I REVETMENT WERE~COMPLETEo MISSILE ORDER OF~ BATTLE;t NONE DISCERNIBLE TARABULUS SAM SITE A14~2 STATU58UNDER CONSTRUCTION REMARKS: _. FOUR LAUNCH, POSITIONS WERE~IN EARLY-TO?MID STAGES OF CONSTRUCTIONo, THE ,SINGLE?I?_BUNKER. ONE~HARDENED SUPPORT, BUNKERv AND TWO LAUNCH POSITIONS. WERE IN FItVAL STAGES OF CONSTRUGTION~o THE SECOND SUPPORT_BUNKER~AND THREE DRIVE=IN EQUIPMENT-HOLD REVETMENTS ApJACENT,TO THE SINGLE I BUNKER~ARE COMPLETEo M~ISSILE~ ORDER OF~ BATTLEo ERNIBLE 14 32-49~30N 013p15~-OOE~ TARABULUS SAM SITE A17~-2 STATUSoUNDER CONSTRUCTION REMARKS.. , CONSTRUC;f ION WAS, NEARLY COMPLETE.. ON ALL= BUNKERS; AND. _, , _, , EQUIPMENT-HOLD REVETMENTSo THE MISSILE-HOLD REVETMENTS WERE IN 39..49?5(lN 01?5~-11-30~`~ TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001 LJX1 25X1 I" IPIR ~13 KH-9 MISSION 1205-3 AN EARLY STAGE'OF CONSTRUCTIONo MISSILE ORDER OF~ BATTLE: NONE DISCERNIBLE TARABULUS SAM~SITE 809?2 TARABULUS~SAM SITE'A20?2 STATU5mUNDER CONSTRUCTION REMARKS: _ CONSTRUCTION OF THE~TWO'HARDENED SUPPORT BUNKERS WAS COMPLETE'm THE SINGLE I BUNKER WAS IN THE'F.INAL STAGES OF CONSTRUCTIONa DER OF~ BATTLE: STIATUSoUNDER CONSTRUCTION 32-51~OON 013-09-40 REMARKS: .THE, SINGLE I BUNKER AND ,TWO HARDENED SUPPORT. BUNKERS..VdERE~IN THE MIDSTAGE'OF:CONSTRUCTIONa, THE .THIRD HARDENED, SUPPORT BUNKER, WAS, S1`ILL IN, AN EARLY, STAGE .OF, CONSTRUCTIONef , , , , , CONSTRUCTION OF THREE MISSILE-HOLD REVETMENTS WAS CQMPLETE. MI SIL ~ ORDER OF' BATTLE: LIBYA 25X1 ., AIR DEFENSE' MISSILES 32-~53*~20N 013-23-40E NONE DISCERNIBLE TARABULUS' SAM SUPPORT FAC~IL.ITY 32~50~-40N 013~15~ObEf STATUSaUNDER CONSTRUCTION 65 25X1 TOP~SECRET RUFF ~ Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 X1 LJ TOP SECRET RUFr -1 25X1 IPIR 13 KH~9 MISSION 1205^3 REMARKS: LIBYA 25X1 AIR DEFENSE'M'ISSILES IN,THE~CHECKOUT AND ASSEMBLY AREAr_ONE T^SHAPED BUNKER ANO ONE OFFSET.PLUS-SHAPED BUNKER,WERE~IN THE FINAL STAGES_.OF CONSTRUCTION. ON_E,T-SHAPED BUNKER- ONE OFFSET,PLUS-SHAPED BUNKERe AND ONE DRIVE-IN DOUBLE~BAY EQUIPMENT STORAGE BUNKER'S WERE IN THEE MIDSTAGE' OF CONSTRUCTION.. , ONE T^SHAPED' BUNKER+ AND FIVE BUILDINGS WERE IN, THE. EARLY STAGES OF~ CONSTRUC`TIONe IN THE EQUIPMENT^HOLD AREA~e 18 DRIVE-THROUGH, EQUIPMENT-HOLD REVETMENTS WERE IN THE,EARI.Y STAGES .OF CONSTRUCTION. ALL STORAGE BUNKERS IN THE MISSILE STORAGE Af2EA~ WEF2E IN THE FINAL STAGE5' OF CONSTRUCTION'. M~ISSILE~ ORDER OF~ BATTLE': NONE DISCERNIBLE TARABULUS~SA^3 SAM SUPPORT FAC 50p20N 013=15-10E~ STATUS:UNDER COIVSTRl1CTI0N REMARKS:., IN,THE,MISSILE ASSEMBLY AN0',CHEGKOUT AREAS ONE T-SHAPED BUNKER AND THREE SINGI.E~BAY_.EQUIPMENT STORAGE, BUNKERS, WERE IN THEE FINAL STAGES OF 'CONSTRUCTIONo`ONE,DOUBLE-BA_Y EQUIPMENT STORAGE BUNKER. WAS IN THE MI D_ 5TAGE~ OF CONSTRUCTION,.. IN, THE, _ , EQUIPMENT^HOLD' AREAe .,SIX DRIVES-IN E~UIPMENT-HOL.D REVETMENT_5 WERE IN ,THE,EAR~Y?STAGES OF: CONSTRUCTION. AND ,S IX .MORE WERE IN THE MIDSTAGE OF CONSTRUCTION. IN THE MISSI'L.E~ STORAGE AREA'v SEVEN ORLVE--IN M'ISSIk.E-HOLD BUNKERS WERE IN THE EARLY'STAGES OF CONSTRUCTIONe FIVE+WERE IN THE MIO$TAGE.OF:CONSTRUCTIONr AND EIGHT WERE IN THE~FINAI.~STAGES OF CONSTRUCTION. MISSILE ORDER OF' BATTLE: NONE DISCERNIBLE OTHER~RESULTS-NO APPARENT CHANGE TARABULUS SAM SITE 811-2 32^51??OON 01322-1OE' TOP'SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X125X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 .. F Z~X1 25X1 IPIR 13 KH-9 MISSION 1205-3 SIGNIFICANT RESULTS OKRA I BN"NAFAy A I RF I EF~C? STATUSSOPERATIONAL AIR BASE FACILITIES REMARKS: ~, EIGHT ZSU 23/4 IN POSITIONS ANO SIX.EMPTY~ZSU 23/4 POSITIONS WERE DISPERSED AROUND THE AIRFIELDm TNIS,EaUIPMENT WAS,AL.50 OBSERVED~IN . CONSTRUCTION WAS CONTINUING ON FIVE OF THE~EIGHT HANGARET ES AT THE E5FtEND OF THE1RUNWAY. AIR ORDER OF BATTLES 3 BADGER 26 M~IRAGE~ 4 F~5 3 T-33 1 CU8 6 0130 9 C-47 f1~ WITH WINGS REMOVE_ D~) 1~SUPER FRELON TOP SECRET RUFF_ { Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 1.,X1 25X1 IPIR 13 KH-9 MISSION 1205.3 SIGNIFICANT RESULTS TARABUWS PORT FACILITIES STATUSoOPERATIOtVAL SINCE LIBYA 25X1 EOG?ISTICS REMARKS: THIS IS THE FIRST IDENTIFICATION OF A~T-43 MSF AT~TARABULUS 3 BRAVE PTGL. 1 BROOKE MARINE PGM~ 4 VOSPER 100+FT PB 2 POSS TROGIR P8 1 CORVETTE PG NAVAL RDER OF~ BATTL'E~S 1 T--43 MSF 1 ZELTIN AGP 2 TANKERS 43 FREIGHTERS (3 UNDERWAY OUTSIDE HARBOR) 69 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 1 >C1 25X1 IPIR ~13 KH?9 MISSION 1205..3 OTHER~RESUL.TS-NO APPARENT CHANGE BERBERA BH1 SOINAI,IA 25X1 f GROUNO FORCE~FACI~ITIES 10-28-00N 045-01-00E BERBERA BH2 . - ~ ~ 045?^13-40E' STATU5oUNKNOWN~ BERBERA BH3 STATUSoUNKNOWN 70 TOP SECRE? RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 KH~9 MISSION 1205-3 ~- IPIR 13 SOVIET UNION DEPLOYED STRATEGIC SSM~FACTLITIES SIGNIFICANT- RESULTS ALEYSK ICBM COMPLEX STATUS:OPERATIONAL VEHICLES-WERE .PRESENT, ON THE APRON OF THE PROBABLE WARHEAD HANDLING BUILOING~? NO NEW MISSILE-RELATED ACTIVI~`Y~ WAS 085ERVED~o 'LARGE, WARHEAD, CANISTERS REMAINED AT -TEN., , A LARGE, NUMBER, OF 25X1 REMARKS: _ RE C0 P EX AND SEARCH AREA .WERE. OBSERVED. IN THE ONLY 22 SMALL WARHEAD CANISTERS WERE OBSERVED. H THE,F'IRST CONFrIRMED CHANGE' SINCE ~ WHEN. 24 .WERE,. OBSERVEOa, THE NUMBER OF ALUKSNE~MRBM COMPLEX STATUSoOPERATIONAL 57=18-59N 02b~44~00E' REMARKS: ALL PARTS OF. THE COMPLEX EXCEPT LAUNCH, SITE, ,3, WERE OBSERVED,o HOWEVERr THE RAIL-TO~ROAD TRANSFER POINT COULD. BE IDENTIFIED ONLYo AN_ EXERCISE, WAS, IN PROGRESS ON ONE ~PAD~ ,AT .. ON TRANSPORTERS WERE MTSSILES THREE PROBABLE LAUNCH SITE 2. . . - , 08SERVED AT LAUNCH SITE 1. ERECTORS_WERE.ON AL.L PADS AT BOTH SITESo NO SILO CONSTRUCTION WAS OBSERVED ON PARTIAL COVERAGE OF~ THE SEARCH AREA?+ BELOKOROVICHI MRBM'COMPLEX STATUS:OPERATIONAL 51-01?35N 02755-24E+ REMARKS: THE-ENTIRE COMPLEX AND SEARCH, AREA ,WERE,.~BSERVEDo ONE MI,SSILE~ WAS AT LAUNCH SLTE le THREE MISSILES WERE., AT LAUNCH-SITE 2ir AND 'l i TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- - - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 KH-9 MISSION 1205^3 25X1 ? IPIR 13 WAS OBSERVEDo TOP SECRET RUFF ~ 25X1 SOVIET UNION 25X1 DEPLQYED~STRATEGIC SSM FACILITIES ONE MISSI~E~WAS AT~THE TRAINING POSITION~o~ NO~SILO CONSTRUCTION BORSHCHEV MRBM COMPLEX 48-46?38N 026-08-51E STATUS: OPERAt101VAL REMARKS: , , OF THE, READY BUILDINGS AT LAUNCH SITE 1 AND FOUR WERE AT LAUNCH SITE 20 NO SIt~O CONSTRUCTION WAS OBSERVE?~ON PARTIALiCOVERAGE OF~ THE SEARCH AREA v MISSILES, WERE, IN FRONT OBSERVED._ .THREE.. THE ENTIRE COMPLEX WAS BREST MRBM~COMPLEX ,: , , . 51-43-30N 024~02~-56E STATUS:OPERATIOM1IAL REMARKS: _ THE., ENTIRE COMPf~EX WAS OBSERVED.. N~ SILO~CONSTRUCTION WAS OB5ERVED ON PARTIAE~COVERAGE OF THE SEARCH AREAo BRODY MRBM~COMPLEX 50A12-49N 025~?05~23E' STATUS:OPERATIONA~ REMARKS: LAUNCH .SITES, 1,.AND R2 WERE 085ERVEDo LAUNCH SITE 3 WAS IDENTIFIABLE ONLYa NO SILO CONSTRUCTION~WAS OBSERVEQ ON ~PARTIAL~ COVERAGE OF~ THE SEARCH AREA~o 72 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - 25X1 Declassified in Part - Sanitized copy Hpproved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TnP SF('RFT Rl1FF 25X1 25X1 UNION 25X1 IPIR 13 SOVIET : KH~9 MISSION 1205.3 DEPLOYEq~STRATEGIC SSM1FACIL'ITIES DERAZHNYA SSM=COMPLEX STATUSoOPERATIONAL 49~12~54N 02708-18E~ -_ THIRTYwNINE?OF THE 61,TYPE.,IITD LAUNCH SITES tINCLUDING, HE TRAINING SITE') WERE, OBSERVED AND ,FOUR, SITES WERE PARTYAL.L.Y OBSERVED o. ,TWENTY OF~ THE 30 .TYPE II,IG. LAUNCH. SITES. WERE _. , OBSERVEOo SITES 68Gv 83H,r AND 96I WERE. IDENTIFIABLE ONI.Ye,'AND SITES 77G a 79H o 85M,v , 86H~~ 98H ? 92I R , AND, 95I. WERE .NOT OBSERVED TYPE,IIIX LAUNCH, SLTES 76H AND 91Io:THE RAIL=TO^-ROAD TRANSFER POINTa AND COMPLEX SUPPORT FACILITY A WERE~OBSERVED. LAUNCH SITE 66G' ISEXTERNALLY' COMPLETEKo~ CONSTRUCTION SUPPORT BUILDINGS NEAR PROBABLE 'LAUNCH CONTROL STTE'65G~WERE'BEING D'ISMANTI.ED.~ --SILO DOOR HOUSINGS HAVE. BEEN_ INSTALLED, AT. SOME OF~ .THE' SLTES YN THE I GROUP~? AND. HEApWORKS ARE' IN PLACE AT SOME SITES TN THE ~H~ GROUPo IN THE. RAIL-TO-ROAD TRANSFER?POINT CONSTRUCTLON~CONTINUED ON THE BUILDINGS~IN THE PROBABLE.NUCLEAR~ WARHEAD HANDLING AREA~AND ON~THE_ BUILDING'FOOTINGS BE5IDE THE RAIL~OFF~LOAD~ING RAMPS, N0 NEW SILO. CONSTRUCTION WAS OBSERVED ON PARTIAL COVERAGE~OF~THE SEARCH AREA. DISNA MRBM~COMPLEX 55a48P09N 02827.-38E~ STATU5:OPERATTONAL, REMARKSt THE~ENTIRE COMPLEX WAS OBSERVED. MOWEVER? LAUNCH SITES 2 AND.3 AND THE RAILwTOpROAD TRANSFER 'POINT COUL.D~BE IDENTIFIED,QNLYo AN EXERCISE WAS,IN PROGRESS AT LAUNCH SITE to N? ~ OF THE SILO CONSTRUCTION WAS OBSERVED ON PARTIAL COVERAGE SEARCH AREA'? 73 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -- - ~ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF. ~ 25X1 25X1 IPIR 13 KHW9 MISSION 12053 DOMBAROVSKIY ICBM'COMPLEX STATUS;OPERATIONAL 51?07~?46N 060?09?57E REMARKSa, ALL COMPONENTS OF THE COMPLEX WERE OBSERVEDm THE', 25X1 AT IIIF.LAUNCH SITE 75o AT LAUNCH SITE 72 A POSSIBLE SILO COMPONENT AND A CONSTRUCTION FORM,V~ERE ON THE'SILO APRONm~ AT LAUNCH SITE ?4 A POSSIBLE.SIL'0 COMPONENT WAS ON THE'S~UTHERN PORTION OF'THE APRON BETWEEN'THE OPEN SILO AND TH~'BRIDGE~, CRANEa A CONSTRUCTION. FORM WAS ON THE NORTHERN END, OF THE SILO APRONo AT 'LAUNCH SITE 76 A POSSIBLE SILO COMPONENT OR CONSTRUCTION FORM'WAS UNDER THE BRIDGE'CRANE'a~ PERIODIC MA'INTENANCE'ACTIVITY WAS OBSERVED AT LAUNCH SITES"21I~ INITIAL CONSTRUCTION~PHASE OF SILO CONVERSION WAS OBSERVED, AT 559 LAUNCH. SITES lA' .AND 2A~? AT LAUNCH. SITE. lA 'THEx SILO DOOR HAS BEEN REMOVE?. AND A'COVERING HAS .BEEN PLACED OVER THE , EXHAUST DUCTS ON EACH" SIDE, OF, THE 5ILO,o FOUR CVL'INDRICAL. , OBJEC'~S WERE ON THE 'LOOP. ROAD AT THE _END OF THE SILO, APRON? THE SILO APRON WAS BEING WIDENED AND A CONSTRUCTION SUPPORT, ,, BUILDING WAS UNDER~CONSTRUCTION OUTSIDE,T`HE~SECURITY FENCE? AT LAUNCH. SITE, 2A THE SILO DOOR, HAD BEEN. REMOVED AND A COVERING HAD BEEN PLACED OVER THE EXHAUST DUCTS ON EACM SIDE'.OF THE' SILOo A LARGE' MOBII..E. CRANE= WAS BEHIND. THE SILO' AND'.,, THE, D4QR WAS EXTENDED OVER THE,SILO?, A. CONSTRUCTION_SUPPORT' BUILDING WAS OUTSIDE THErSECURITY,~FENCE AND A SECOND BUILDING FOUNQATION HAS BEEN STARTEDo CONSTRUCTION ACTIVITY WAS OBSERVED A1''IYIF LAUNCH SITES 72? 73v'74? AN0 76o ONLY MINOR~ACTIVITY WAS SEEN UB ILpING IN T'HE SINCE 25X1 AND 24D'? NO CONSTRUCTIO ACTIVITY HAS BEEN'NOTED AT THE a NO NEW MISSILE ACTIVITY WAS OBSERVED ON PARTIAL 25X1 COVERAGE OF THE'SEARCH'AREAo DROVYANAYA ICBM COMPLEX 51-~28~OON 11301?OOE' SOVIET UNION 25X1 DEPLOYED STRATEGIC SSM FACIhITIES TOP~SECRET RUFF STATU580PERATTONAL Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET' RUFF - IPIR ~13 KH-9 MISSION 1205-3 25X1 25X1 SOVIET UNION 25X1 DEPLOYED STRATEGIC SSM FACI'CITIES REMARKSS ONLY SS-7 LAUNCH' SITES 5 AND 6r PART OF SITE 3r AND SS-,11~ , LAUNCH SITES 19H'o 21Hr AND 26H~ WERE OBSERVED. S5~-11 5,I TES 20Hr~ 25Hr 38Jr 39J- 42J- 43J,v 44Jo AND 56K,WERE.IDENTIFIABLE ONLYo LAUNCH GROUP Gr WHERE THE' TEN. SITES ARE CURRENTL.Y~ BEING MODERNI2ED~r WAS NOT OBSERVED. THE SS~-7 LAUNCH SIT`ES_ APPEARED NORMAL. HOWEVERr AT SITE .3~ :. _ PROBABLE. MISSILES ON TRANSPORTERS WERE AL~IGNEp WITH ERECTORS ON BOTH PADSo NO ACTIVT~'Y WAS VISIBLE~AT SITE 19Ho AT SYTE 21Mr THERE_ WAS PQSS~IBLE DITCHING, FROM. THE., SILO, AREA TO THE' SECURITY FENCE. AT SITE 26H THE SILO DOOR WAS OPEN AND A POSSIBLE SS-11 CANISTER WAS VISIBl.~,o. A. TRUCK-MOUNTED CRANE: WAS BY~ THE, SILO AND SIX VEHICLES `WERE., ON THE APRON. ABOUT FIVE VEHICLES/PIECES OF EGIUIPMENT WERE ON THE ACCESS, ROAD.o~ NO TRENCHING WAS VISIBLE AND THE' PERSONNEL. ACCESS AREA OF THE SILK' WAS NOT INTERPRETABLEa NO. NEW MISSILE ACTIVITY WA5 OBSERVED ON PARTIAL.'COVERAGE OF THE SEARCH AREAo DYATLOVO MRBM~COMPLEX 53-32~37N 025-2?-27E STATU5SOPERATIONAL REMARKSt :: THE~ENTIRE COMPLEX WAS OBSERVED. EXERC~iSES WERE IN PROGRESS ON TWO ~PADS~ AT~ LAUNCH SITE 1. A MISSILE, ON TRANSPORTER. WAS OBSERVED~AT LAUNCH SITE 2. UNIDENTIFIEQ _ VEHICLES `WERE DISCERNIBLE, AT FIXED FIELO~ SITE 1'v AND A LONG RAILCAR WAS OBSERVEO~AT THE RAIL-TO-?ROAD TRANSFER POINTm NO SILO CONSTRUCTION WAS OBSERVES ON PARTIAL~COVERAGE OF THE SEARCH AREA. GLADKAYA ICBM COMPLEX STATUSOPERATIONAL 75 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ___ ______ _ _~ 25X1 ?- IPIR 13 SOVIET UNION KH-9 MISSION 1205-3 DEPL.OYED~ STRATEGIC SSM' FACIL.TTIES REMARKSS ALA, THREE. SS-7 LAUNCH SITES, AND 30 OF~ THE. 60 S5=11 LAUNCH SITES (80 90 120 14- 15v AN? 22 IN THE F_GROUP'0 180,210 AND 39 IN .THE G~ ~GROUPO 25v 260 28m31o 33D 34v ,AND 36 IN ,THE H GROUP,e, 43-~45v' 470 48v. 58- AND 65 'IN THE, I, GROUPa 54 JAND,:56 IN THE J GROUPo AND 600 64r AND~70 IN THE K GROUP)O~AND PARTS OF THE COMPLEX SUPPORT FACILITIES ANDS THE RAIL.=TO-ROAD ,TRANS!ER,,POFINT (RTP) WERE'08SERVED. A MLSSTLE.EXERCISE WAS IN, PROGRESS AT LAUNCH SITE 3v~ WHERE' AN~ 557 M~ISSILE~~WAS EREGTED~ ON EACH 'LAUNCH ,PAD.' PROPELLANTO.HANDt*~INGLFACILITYSANDRTENBOXIDIZER~RAI~NT OF~THE .CARS WERE, IN FRONT OF~THE RAIL?TO-ROAD,OFF-LOADING DOCK I,N,THE~RECEYVING A~2EAo~ ,THIS, ISt THE =LARGEST ~,NUMBER~ 0~=. FUEL*; RAILCARS, OBSERVED SINCE, THREE WERE OBSERVED IN, OCY 69 AND' THE' LARGEST NUMBER, OF OXIDIZER' RA4ILCARS OBSERVED SINCE ONE WAS OBSERVED IN~ FEB 670 COVERAGE OF THE, SEARCH AREA. GOMEL ~MRBM' COMPLEX STATU5;OPERATIOIVAL REMARKS: 52-21~30N O~n..4a..~~~" 25X1 i LAUNCH SITES: 1 AND ~2 AND ,THE' RAIL-TO'?ROAO~ TRANSFER POINT WERE OBSERVEDo NO S,IL4r,CONSTRUCTION WAS OBSERVED ON PARTIALf COVERAGE~~OF THE SEARCH AREAa 6RANOV IRBM COMPLEX STATUSaUNKNOWN REMARKSS T`HE COMPLEX WAS NOTuOBSERVEDo NO~,SILO CONSTRUCTION WAS OBSERVED ON PARTIAL COVERAGE~OF THE.SEARCH'AREA'o 76 25X1 TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 N0 NEW, .MISSILE~REI.ATED AC'TIVITY'- WAS ~ OBSERVED ON PARTIAL' ' 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ?~ TOP SECRET RUFF ,~ 25X1 25X1 ~ IPIR 13 KH-9 MISSION 1205-3 GRESK MRBM~COMPLEX STATUS:OPERATIONAL 53-18-3 N 0' ' - - E' 25X1 REMARKS: _ THE~ENTIRE COMPLEX WAS OBSERVED.. AN WAS IN PROGRESS 25X1 ON ONE LAUNCH PAD AT LAUNCH., SITE 1~ AT LAUNCH SITE 2~ - - - -_'--~~. ~..~~v. v~tiV VVI.IJ t(1VVIiV~V WAS OBSERVED ON PARTIAL~COVERAGE~OF THE~SEARCH AREA'e GUSEV MRBM~COMPLEX 25X1 STATUS:OPERATIONAL REMARKS: 54-39-35N 02208-18E . ?VVr~v i..4.. MISSILE, ON A TRANSPORTER WAS OBSERVED. AT ,LAUNCH SIYE~ to TWi ~ .... E 20 .... . ERECTORS,WERE~ON~ALL PADS AT BOTH SITESo NO SILO CONSTRUCTION WAS OBSERVED ON PARTIAL~COVERAGE OF THE SEARCH AREA~o PROBABLE MISSILES ON TRANSPORTERS WERE OBSERVED AT SIT GVARDEYSK MRBM COMPLEX STATUS:OCCUPIED 54-44~-59N 02i-o ONLY LAUNCH SITE 1r THE~SUPPORT FACILITY? AND,-THE RALLwTO-ROAD TRANSFER POINT WERE OBSERVEDo AT LAUNCH SI~'E 1~o UNIt3ENTIFIED VEHICLES WERE ON TWO PADS AND AN UNIpENTIFIED~LONG OBJECT WA5 ON A THIRD PApv, NO~ SILO CONSTRUCTION WAS OBSERVED ON 'PARTIAL, COVERAGE OF THE SEARCH AREA, ' REMARKS: 77 THE?ENTIRE COMPLEX WAS OBSERVED SOVIET. UNION `v~~ DEPLOYED STRATEGIC SSM~FACIL~ITIES TOP~SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 -~ ~ 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 ,,~ TOP'_ SECRET RUF~~ .~ 25X1 25X1 IPIR '13' _ SOVIET, UNION ~? ON 1205-3 pEPLOYED STRAYEGIC SSM FACILITIES 25X1 IMENI GASTELLO ICBM COMPLEX STATUS;OPERATIONAL LAUNCH SITES 56r 58r AND 59 HAVE REMAINED DORMANT SINCE ALL THE COMPONENTS OF~THE~C~MPLEX WEREf08SERVEDo TYPE IYIF VEHICLES WERE' AT OR NEAR' SITES 4A0 78 r, AND' 17Co TWO VEHICLES WERE'NEAR THE'PERSONNEL~ACCESS AT THE TRAINI G S ) IN .THE RAIL.~TO~-ROAD' TRANSFER 'POINTo . RESPECTIVELY 25X1 Z~X1 o THE ~ ULAR ACTIVITY AT S TE 57 WHICH, WAS EVIDENT ON REMAINED AND,APpEAREDyUNCHANGEDo THERE HAD 25X1 EN ADDITIONAL GROUND'SCARRING AND TRACK~ACTI T TE 600 HOWEVERO WHICH WAS NOT PRESENT ON 25X1 A LINEAFt~ PATTERN' OF HOLE5 WAS' SEEN INSIDE AND OUTSIDE' ALLS SIX LAUNCH SITES IN LAUNCH GROUP A~AND AT ONE'SITE'(8B) IN LAUNCH GROUP 8o THE PATTERN WAS MOST EXTENSIVE ATY SITE 4A'0 WHERE' IT EXTENDED INTO THE GROUP SUPPORT AREA, THIS~PAT7ERN,DOES'NOT APPEAR TO BE~ RELATED TO' NOW ' G' oR SNOW MELTiNG~m iT was FIRST SEEN ON 25X1 PEL,I.ANT AREA o A .. , , PROPELLANT TRANSPORTERO~~A" BUSo ANDS TEN, VEHICLES WERE' VISIF3LEo FIVE VEHICLES/PIECES OF EQUIPMENT WERE~IN THE'RECE~IVINGo I~NSPECTIONO AND MAIN~fENANCE~ AREA. TENS VEH'ICLESO ~ 13HOUSE' TRA~ILERSv AND, FIVE CHECKOUT, FRAMES,WERE'IN THE GROUND'SUPPORT,. E~UTPMENT AREAo ,THE RECEIVING AREA CONTAINED,TWO'SINGLE-DOMED RAILCARS~AND ONE FLATCARo WHICH WAS AT THE LOADING DOCKo THERE WAS A' SMALL' AMOUNT OF UNIDENTIFIED ~MATERIAL~ IN' THE NEW RECEIVING' AREAp~ IN THE COMPLEX SUPPORT FACILITIES THERE'WERE ABOUT lOQ VEHICLES%PIECES OFEQUIPMENT IN THE' MOTOR.'POOL~ AND~'ABOUT 25 HOUSE TRAILERS TN OR NEAR THE MOTOR POOLo NO NEW MISSILE ACTIV~TY'WAS OBSERVED ON PARTIAL COVERAGE~OF THE 5EARCH AREA'o ~g 25X1 TOP' SECREY RUFF, Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 --- 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP~SECRET RUFF ~ 25X1 25X1 -~IPIR 13 SovlEr u~tuN,25X1 KH-9 MISSION 1205W3 DEPLOYED STRATEGIC SSM'FACIL.~ITIES 25X1 ITATKA ICBM COMPLEX STATUSoOPERATTONAL 56-52-46N'085=22-59E~ REMARKSt, ,. , SS-7 LAUNCH SITES ~1'r .2~~ AND. 3 WERE, OBSERVED., THE ,RAIL-TO-ROAD TRANSFER POINT AND THE, COMPLEX SUPPORT FACILITIES COULO~BE~ IDEN7.I,FIED ONLY. NO NEW MISSILE,. AC~'IVITYt WAS ~ OBSERVED ON PARTEAL COVERAGE OF,THE'SEARCH AREA'o 25X1 JEI.GAVA 'MRBM COMPLEX STATUS:OPERATIONAL OBSERVED. .ERECTORS, WERE- ON. ALL' PADso , N0~ SILO CONSTRUCTION WAS OBSERVED'ON PARTIAL COVERAGE~OF THE SEARCH AREAo TRANSPORTER WAS OBSERVED. ERECTORS. WERE ,ON .ALL, PADS. AT LAUNCH SITE 1? ~ ONE' MISSILE ON A~ TRANSPORTER,. WAS 25X1 ... ., . . ALI.' BUT. FIXED FIELD SITE ~ "' ' ERVED ON AT LEAST ONE .OF TW0 ~ ' MISSIL ,SITE, 2 ONE. POSSLBLE PASSESo , AT, LAUNCH WERE OBSERVED. THE, TRAINING.FACIL,ITY COULD, BE IDENTIFIED_ONL 25X1 25X1 25X1 25X1 .. . ONLY PART. OF. LAUNCH SITE 1 AN0 THE~RAIL-TO~ROAD~TRANSFER POINT Y 08E 'PAD AT LAUNCH S,I'fE, l.. NO?SIl.,O CONSTRUCTION WAS 25X1 SERVED ON PARTIAL_COVERAGE OF THE ,SEARCH AREA. 79 TOP' SECRET RUFF JONAVA MRBM COMPLEX STATUS;OPERATIONAL REMARKSS 56-38-40N 024-06-09E~ Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET_RUFF ~ I ~~X1 25X1 ~? IPIR 13 KH-9 MISSION 1205-3 SOVIET UNION 25X1 DEPl.OYED~ STRATEGIC SSM' FACILITIES KARTAI.Y~ ICBM COMPLEX 52-53m111V 060-34~-17E STATU5SOPERATIONAL REMARKSI _ THE ENTIRE COMPLEX ANO SEARCH, AREA, WERE, OBSERVEDo~ , N0 , CONSTRUCTION PROGRESS HAS OCCURRED AT~THE~-FIVE TYP II F LAUNCH SITES.,NOR AT~THE BUILDING~IN THE 25X1 FACILITY SINCE THE GANTRY CRANE,~WAS 25X1 COMPLETELY ASSEMBLED IN THE RECEIVING~AREA OF THE~COMP~EX SUPPORT., FACILITIES~~AND SEVERAL VEHICLES WERE~ON THE~APRONo~ NO MISSILE-RELATED ACTIVITY WAS OBSERVEDo KIVERTSY MRBM~COMPLEX 50-54~14N 02529?~6E~ S?'ATUSoOPERATIONAL REMARKSt _ .. . ,. ,. THE ENTIRE COMPLEX WAS OBSERVED. THE,TWO~~PARALLEL ARCH-ROOFED STRUCTURES BESIDE. T'HE~ ~L'AUNCH PAD .WERE. EARTH COVEREDa THE SINGLE ARCH~ROOFED STRUCTURE~IN THE~PROPELLANT STORAGE AREA WAS .EARTH COVERED AND AN ADJACENT, NEW ARCH-R40FED,STRUCTURE~WAS EXTERNALLY COMPLETEo NO SILO CONSTRUCTION WAS OBSERVED'ON PARTIAL COVERAGE OF~THE~SEARCH AREAo KONKOVICHI MRBM COMPLEX 52-18-14N 028~38~-50E~ STATUSoOPERATIONAL 80 I 125X1 TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 _. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001 Jx1 TOP' SECRET RUFF .. ~~n i 25X1 IPIR 13 KH~-9 MISSION 1205.3 SOVIET UNION 25X1 DEPL,OYED~ STRATEGIC SSMC FACILITIES REMARKS: THE'_ ENTIRE' COMPLEX AND SEARCH AREA WERE OBSERVE?~o AT, ~IAUNCH SITE 1 THREE~SS-~4 ERECTORS AND A PROBABLE 55?-4 MISSILE WERE ON ONE LAUNCH PADo~ AN 41NIDENTI~IED VENICLE'e NOT' AN EREC~ORo, WAS ON~ ANOTHER' LAUNCH'~PAD. AT LAUNCH SITE 2ERECTORSWERE ON EACH LAUNCH~PAD BUT FUEL~AND OXIDIZER TRANSPORTERS WERE NOT PRESENT. NO SILO CONSTRUC~fION WA5 065ERVEDe~ KOROSTEN MRBM COMPLEX 50-51-56N 0 = 5~- STQTUSoOPERATIONAL REMARKS: ' THE ENTIRE COMPLEX AND~SEARCH AREA WERE'OBSERVED 'TWO MISSILES WERE' OBSERVED'- AT LAUNCH SITE' 1' ANp~ ONE, A'~ LAUNCH, SITE 2. TWO PROBABLE TRA'INING'POSITIONS AND; TWO REVETMENTS WERE IMMEDIATELY, SOUTH OF, 1`HE'~ EASTERNMOST. LAUNCH PAD' AT LAUNCH SITE 2. NO SILO CONSTRUCTION'WAS OBSERVED. KOZELSK ICBM COMPLEX STATUSOPERATIONAI. REMARKS: THE FOLLOWING SUES MERE'OBSERVEDo ALL'FIVE SS-B~SITES AND 61 OF THE 110 S5-11 LAUNCH SITES CALL 5ITE5 IN T_HE' G'o Po AND' I, GROUPS EXCEPT 45I o A5 WE1.1.' AS SITES 16H o 19H'o 20H ~ 43J o ~~ 44J o 47J r 49J o 51J'- 53J - ~ ~ 56J r 57K o ' 59K v 60K o 61K o 83K o 63L'o 65L,o 67L,- .741.0 78L o 79L o 68M - 76M o 81 M o 86M o 88M~o 92N o 980 s? ,1230 0 124Qo ~125a- 1270) o THE RA.I~I.-TO^?ROAD TRASFER~ POINT (RTP) AND THE' COMPLEX 5UPPORT FACILITIES {CSF).~ THE FOLLOWING SITES WERE IDENTIFIABLE ONLY -- 15Hw 58K'r 71Kr~69Mr 70Mr 90Nv 94No 1040r 1060o'1~OQe AND 13200 VEHICLES AND/OR PIECES OF EQUIPMENT WERE~VISIBLE IN OR NEAR SS-11' LAUNCH SITES 118Po 60Ko 7Gr AND 25G~o AT 55.?8 LAUNCH SITE' 3 A POSSIBLE, VEHICI.E~ WASH AT~..THE~ SITEo~ ALL' OF THE 55-8 'SITES APPEAREb NbRMAI'. IN THE RTP~ABOUT 20 HOUSE~TRAILERS AND 14~VEHICLES%PIECES OF 81 54-07-~34N 035~29~-22E' TpP'SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - ----. 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET. RUFF. ~ ~oX1 25X1 IPIR 13 KH~9 MISSION 1205-3 SOVIETtUNION 25X1 DEPLOYED'STRATEGIC SSM FACILITIES EGIUIPMENT WEREt IN THE GSE, AREA,. THREE- PROPELLANT RAILCARS,r ,ONE OTHER RA~ILCAR~ SIX MISSILE TRANSPORTERS t55-8) AND ONE VEHICLE WERE IN, THE RECEIVING AREA. IN, THE SS-11'RIM AREA, ONE MISSILE TRANSPORTER AND'13 VEH'ICEES/PIECES OF,EDUIPMENT WERE SEENo~ .. ~ .... SEVEN VEHICLES/PIECES OF, EQUIPMENT WERE IN THE PROPELLANT AREAo IN THE CSF,ABOUT 30~HOUSE TRAILERS WERE PARKED IN THE, MOTOR POOL.o~ . N0, NEW MISSILE' ACTIVITY WAS OBSERVED' ON PARTIAL COVERAGE OF THE SEARCH AREA. KOZHANOVICHI MRBM COMPLEX STATUS;OPERATIONAL 52-12-58N 027-52-51E REMARKSe- , THE~_ENTIRE COMPLEX, AND SEARCH. AREA WERE' OBSERVED. AT LAUNCH SITE to THE ,BED OF ,THE, ERECTOR ON THE, NORTHERN' PAD WAS IN, A. RAISED POSITION. THERE-WAS No ERECTOR ON THE SOUTHERN PAD. dN AUNCH SLTE+ 2 AND ONE ,MISSILE, WAS, AT, LAUNCH SITE?3o CONSIDERABLE TRACK ACTIVITY. WAS OBSERVEO.AT,FIXED FIELD SITE 3e NO'SILO CONSTRUCTION WAS~OBSERVEDQ 2HMERINKA MRBM COMPLEX STATUSoOPERATIONAL ugs9'1~23N 09A?01~-34E~ REMARKS: THE., ENTIRE COMPLEX: WAS OBSERVED EXCEPT, FOR L.AUNCM SITE 1 AND' PART OF, FIXED FIELD~SITE~ 1o TWO MISSILES WERE OBSERVED, A?, f~AUNCH 5ITE 20 NO SILO CONSTRUCTION. WAS OBSERVED ON PARTIAL COVERAGE OF THE SEARCH AREA~a ZNAMENSK 'MRBM~ COMPLEX STATUS:OPERATIONAL REMARKS: _ THE~ENTIRE.COMPLEX WAS~OBSERVED EXERC~YSES WERE IN PROGRE55 ON ALL~FOUR PADS AT LAUNCH SLTE~20, TWO MISSILES: ON TRANSPORTERS WERE' OBSERVED AT READY BUIL.D~%NGSa ACTIVITY, WAS OBSERVED ON. TWO PADS. AT LAUNCH' SITE l~o, ERECTORS WERE ON ALL PADSo NO_ SYLO CONSTRUCTION' WAS" OBSERVEDL ON~ PARTIAL. COVERAGE OF~ THE SEARCH AREAo l0i 25X1 TOP' SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 ' 25X1 Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF... ~I ~o>C1 25X1 a IPIR 13 KH~-9 MISSION 1205-3 SIGNIFICANT. RESULTS AKHTUBINSK~FL~IGHT TEST CENTER STATUS:OPERATIONAL ONE BACKFIRE,A- ONE~BACKFIRE A MOD 2e ONE RAM_ F? AND ON_E RAM G WERE OBSERVED _ THE BAClCFIRE~A MOD 2 WAS IN THE BLINDER PARKING AREA OF THE MAIN. PARKING APRON? AND THE'RAM G WAS ON~THE MAIN. PARKING APRON APPROXIMATELY 380 M (1e25Q FTD,NW OF. THE SE'CROSSOVER TAXIWAYo THE' RAM F WAS ON~ THE' PARKING, APRON- OUTSID'E' THEx AAA ~AREA~o 51X FOXBAT AND SEVEN FLOGGER WERE ALSO OBSERVED.o .. REPAIRS WERE CONVINU~%NG~ ONi THE .RUNWAY, AT THE MAIN; A,IRF~IEL.D~ AND FLIGHT, OPERATIONS WERE~,BE;LNG CONDUCTED FROM, THE AREA AIRFIELDa CONSTRUCTION-WAS CON7INUTNG ON. THE, HANGAR ;OUTSIDE THE AAM~AREA AND ON SEVERAL' OTHER' BU%LDINGS_ THROUGHOUT, THE' FLIGHT TEST, CENTERo ,FOR COMPLETE ORDER OF BATTLEc SEE REPORTS OF 'THE FOLLOWING FACILITIES~WITHXN THE FLIGHT TEST CENTER'?~ AKHTUB%NSK%VLAD%MIROUKA A'IRF'IELD 25X1 ' AKHTUBINSK%VLADIM'IROVKA 'AREA 'AIRFIEL.D 25X1 AKHTUB%NSK/VLADIMIROVKA AAM SUPPORT COMPLEX 25X1 AKHTUBI.NSK/VLADIMIROVKA ASM, SUPPORT COMPLEX AICHTIJBINSK%1%LADIMIR01/KA' AAM AND ASM STORAGE EMBA MISSILE TEST1 CENTER SOVIET UNION 25X1 MISS%LE RANGES 48--17~53N 046~i1p22E' 48-38~OON 058?03m30E STATUS;OPERATIONAL REMARKSo .THE'.ENTIRE EMBA MI55I~E~TEST CENTER, WAS COVERED~EXCEPT FOR, ?TRACKING, FACaI.%TY. 5, AND THE. 5A~1_ LAUNCH FAC,IL;LTY?~ THE ~OME~ COVERING?ONE OF THE CINETHEODOL4ITES AT TRACKING FACILITY .4,WA5 OPEN AND A~ BUILDING' WAS UNDER, CONSTRUCTION 'AT~ TRACKING FAC%LITY 1o NO SIGNIFICANT CHANGES-WERE 08SERVED AT THE~OTHER FACIL~ITIESo? THE BACKFIRE,A WAS IN THE~ASM.AREAa 102 TOP SECRET RUFF Declassified in Part -Sanitized Copy Approved for Release 2013/03/05 :CIA-RDP78T04752A000500010001-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF 25X1 25X1 ~- IPIR 13 KH-9 MISSION 1205-3 SOVIET UNION 25X1 MISSI'L'E RANGES KAPUSTIN YAR SAM FIRING~RANGE STATU5;OPERATIONAL REMARKS: ,. . ,, THE SAM LAUNCH COMPLEX~e THE SUPPORT. AREAo~,AND~ SAM TRAINING SUES,Ao Bo AND.C\WERE~COVERED ON PHOTOGRAPHY OF FAIR INTERPRETABILITY _ ,.. AT THE~~ELECTRONICS-RELATED FACILITY IMPROVED PHOTOGRAPHY OF THE PREVIOUSLY REPORTED, NEW RANGE ANDAZIMUTH RADAR AT ~AREAt A~ REVEALED THAT IT DOES NOT HAVE A CUT PARABOLIC ANTENNA'~AS REPORTED ON THE~ANTENNAo THE FUNCTION OF~ .. WHICH IS UNCLEARr MAY, STIL4, BE INCOMPLETE_? IT PRESENT~.Y_ CONSISTS OF TWO CLOSELY SPACEDo PARALI.EI.o HORIZONTAL. BARS EACH END. ,SHADOWS INDICATED THAT. A ~ , t,.EAST vNE q e hE~t, LAK~trc ANTENNA OF AN UNKNOWN CONFIGURATION IS MOUNTED AT THE CENTER~OFA THE HORIZONTAL BARS,o THE+ NUMBER OF VANSlVEHIC~ES, OBSERVED, LN THE ADJACENT PREPARED POSITIONS TO THE EAST INCREASED~_FROM it ADJACENT CIRCULAR, APRON NOW APPEARS~TO,BE A, POSSIBLE RAOAR~ THIRTEEN . UNDER CONSTRUCTION MOUNTED ON A CIRCULAR PLATFORM , . VEHICLES/VANS WERE PARKED. IN THE'PREPARED POSITIONS.,WEST OF THE APRON. TWO CLUTTER, SCREENS. WERE, BE`TWEEN' THE TWO CIRCUL.AR~ APRONSo TWENTY-SEVEN VANS/PIECES. OF, EQUIPMENT, WERE ON THE . LARGE CONCRETE'ELECTRONICS.~HARDSTAND TO THE REAR OF THE'APRONS. A CLUTTER ',SCREEN, HAD, BEEN ERECTED- BETWEEN. THE ELECTRONICS HARDS7AND~AND~THE AREA OF THE TWO CIRCULAR APRONSo TWO ADDITIONAL~CLUTTER SCREENS WERE IN THE SUPPORT AREA~o O~JE~WAS SHIELDING? A BUILDING AND ,THE, OTHER WAS ~SHIEL.DING A SMALL' HARDSTAND CONTAINING SEVERAL. PIECES OF ~EQUIPMENfi.. _ ANOTHER , CLUTTER. SCREEN HAb BEAN ERECTED IN FRONT OF A BUILDING NEAR THE `~ LARGE. ~GUYED~ TOWER NORTH OF THE', CIRCULAR APRONSo~ THIS SCREEN IS BETWEEN THE APRONS AND THE~BUTLbING~? A7 AREA B THE FLOORING FOR.. THE PLATFORM ATOP' THE THREE~mLEGGEDe ,GUYED.TOWER WAS INCOMP~ETEo A~SMALL.BUILDING~WAS .OBSERVED AT THE BOTTOM OF THE TOWER BETWEENrTHE THREE LEGSo EIGHT, VEHICLES/VANS WERE., ON A HARDSTAND ADJACENT~TO THE TOWER'. NO EQUIPMENT WAS AT SAM TRAINING SITE~A. 25X1 25X1 25X1 TW0 NEW-~TYPE~SA-3 [rAUNCHERSr EACH CONTAINING, FOUR MISSILESr WERE OBSERVED,. AT ,LAUNCH SLTE~.A.,IN T'HEp SA~3 LAUNCH AREA. FOUR LOW BLOW RADARS WERE IN THE SITE AREA? ~AT LEAST 29 NEW?TYPE 48-48~28N 045~43~-43E~ 25X1.1 TOP SECRET RUFF. Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 - - _ 25X1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/05: CIA-RDP78T04752A000500010001-1 TOP SECRET RUFF, I I 25X1 25X1 ?. TPIR 13 KNo9 MISSION 1205.3 SA-3 LAUNCHERS WERE A7 THE SAM MARSHALLING YARDo ALI. WERE UNOCCUPIED. KAPUSTIN YAR/VLADIM~IROVKAF MSI.~ TEST CTR STATUS:OPERATIONA~~ REMARKS,: ALL MAJOR COMPONENTS~OF THE'CENTER WERE OBSERVED THROUGH'HEAVY HAZE~a LAUNCH COMPLEXES E' AND H WERE. IDENTIFIABLE' ONLYo~ AT LAUNCH COMPLEX C~TWO TRANSPORTERSWERE~PARKED ON THE~SITE ACCESS, ROAD, OF~ THE. SOUTHERN?LAUNCH PAD OF, SITE 5C~. TNESE~ TW0 TRANSPORTERS ARE SIMILAR TO .THE TRANSPORTER PARKED ON THE' ,.. ... ,. LAUNCH, PAD.. ON , _ , , ., A, . LAUNCH, SITE. 2C- . H 2 5X1 MISSILE SERVICE/LAUNCH TOWER HAS BEEN:, DISMANTLED, 15X1 THE GROUND~SUPPORT EQUIPMENT OBSERVED .WAS ,STILL., ' ~ 25X1 LAUNCH SITE PRESENTo NO S~IGNIFYCANT ACTIVI~'Y WAS OBSERVED AT ?C. ., ..