FRYAZINO SCIENTIFIC RESEARCH INSTITUTE AND PLANT 160

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04563A000600010047-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
10
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 19, 2002
Sequence Number: 
47
Case Number: 
Publication Date: 
June 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04563A000600010047-0.pdf424.68 KB
Body: 
Approved For Release 2002/07/01 : CIA-RDP78TO4563A000600010047-0 TOP SECRET NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER BASIC IMAGERY INTERPRETATION REPORT FRYAZINO SCIENTIFIC RESEARCH INSTITUTE AND PLANT 160 25X1A COMMO/ELEC/RADAR R&D FACILITIES USSR JUNE 1910 Declass Review by NIMA/DOD Handle via Talent-Keyhole Channels Only TOP SECRET TCS-22162/70 RCA-20/0008/70 COPY NO 1.19 7 PAGES GROUP L EXCLUDED FROM AUTOMATIC DOWNGRADING AND DE54` rdV6d For Release 2002/07/01 : CIA-RDP78TO4563A000600010047-0 Approved For Release 2002/07/01 : CIA-RDP78T04563A000600010047-0 This document contains Information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States? It is to be seen only by personnel especially indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to TALENT?KE:YHOLE Control System. Approved For Release 2002/07/01 CIA-RDP78T04563A000600010047-0 Handle Via Approved For Release laB/OSFR TA 78T04563A00060001QO T=020/0008/70 Talent-KEYHOLE TCS-22162/70 Control System Only Fryazino Scientific Research Institute and Plant NA GEOGRAPHIC COORDINATES 55-58-01N 038-03-05E ACIC. USATC, Series 200, Sheet 0167-5, scale 1:200,000 ABSTRACT Fryazino Scientific Research Institute and Plant 160 is one of the major electronic research, development, and production complexes in the USSR. The complex consists of 20 major structures, 30 smaller buildings, and 23 utility buildings. An associated area adjacent to the main facility contains five major buildings and 15 smaller buildings. The complex and the associated area are enclosed by a security fence/wall with road and rail entrances. This report provides a basic description, a chronology, an annotated photograph, a line drawing, and mensural data on the installation. INTRODUCTION Fryazino Scientific Research Institute and Plant 160 (Figure 1) is located on the northern edge of Fryazino, approximately 12 nautical miles (nm) northeast of Moscow. Moscow/Shchelkovo Airfiel is located approximately 4.5 nm to the south. The institute incorporates an area of 314 acres and is a combined production and research facility. It is probably responsible for the design and development of electronic tubes and instruments applicable to commercial, military, and scientific programs. The institute is probably subordinate to the Ministry of the Radio Technical Industry and is one of the major electronic research, development, and production complexes in the USSR. 3B 0O` RESEARCH INSTITUTE AND PLANT 160.:- Railroad Road Handle Via Approved For Release 2PO03etREI -9rF8TO4563A00060001004T-0 Talent-KEYHOLE ontrol System only Handle Via Approved For Release 2PQWO CR?IP-RU?F8T04563A000600010R47A020/0008/70 Talent-KEYHOLE Control System Only TC S-22162/70 BASIC DESCRIPTION The Fryazino institute (Figures 2 and 3) comprises three functional areas (Areas I through III) and an associated area (Area IV). Area I contains the institute buildings first 25X1 D observed in KEYHOLE photography of including facilities such as administration and laboratory buildings, warehouses, shop buildings, and numerous utility buildings. Area II contains engineering buildings with several small ancillary buildings. 25X1 D Area III contains a possible test facility which occupies a large rectangular area in the 25X1 D northeastern section of the complex. This facility consists of a section of the trac, 25X1 D utility-type buildings are located along the three sections of track. A test tower 25X1 D I uis evident in the center of the test area. Although the precise function of this facility has not been determined, it could be used for electronic testing of systems developed or produced at the institute. Area IV is located on the east side of the complex. The function of this separately secured area is undetermined, but its location suggests a relationship with the institute. This area covers approximately 91 acres and contains one administration building, four laboratories, three shop buildings, one assembly building, six warehouses, and five utility structures. Chronology According to collateral information, the institute originated in 1946. It was built on a site previously occupied by a textile mill and a POW camp. The mill, remodeled in 1945-46 by POWs, served as the initial electronics laboratory of the institute complex.' 25X1 D -2 - Handle Via Approved For Release, p~/QZ1Q1E~Iq? NP8TO4563AO00600010047-Oraontrolient.KEYHOLE TO SEC C System Only Handle Via Approved For Release 2@?/0SHRE:TA*bFf8T04563A00060001A020/0008/70 Talent-KEYHOLE TCS-22162/70 Control System Only the Fryazino institute included four assembly buildings, at least two shop buildings, three warehouses, an administration building, at least three laboratory buildings, and numerous utility structures. The associated area (Area IV) consisted of four completed buildings, a laboratory, two warehouses, and a utility building. New construction consisted of a large assembly/engineering building (item 29, Figure 2) and a utility building (item 48) in Area I, and two engineering buildings (items 2 and 3) in Area II. In Area IV, construction had progressed very rapidly. The buildings constructed during this time consisted of two laboratories (items 81 and 86), the administration building (item 91), the assembly building (item 89), two warehouses (items 78 and 79), one shop building (item 74), and three utility buildings (items 82-84). Construction in Area I was limited during this time; two warehouses (items 30 and 31) were under construction in the west corner. A security fence/wall was erected around Area II, linking it with. Areas I and II. Construction was begun on the test tower located near the center of the possible electronics facility in Area III. In Area IV, a laboratory (item 75), a warehouse (item 76), and a utility building (item 80) were completed. 15 14 amomra 10 12 13 9 - 11 Road Security fence -w- Wall -- Railroad METERS AREA II 25LO//I 27 AREAI ~w f Transformer Yard Handle Via Approved For Release 2 7 TO4563A000600010047 Talent-KEYHOLE lVT C -'ICUI 1" Atrol System Only Handle Via Approved For Release 2qg D7S( .RT f- T04563A000600010 T79-20/0008/70 Talent-KEYHOLE Control System Only TCS-22162/70 25X1 D 25X1 D 25X1 D Construction on the warehouses in Area I has been completed. In Area III the test tower has also been completed, and two probable laboratory buildings (items 20 and 21). which had been observed near the track In Area IV a warehouse (item 77) n two snop nun dings (items 92 and have been Transportation services at the institute are excellent. A series of all-weather roads encompasses the complex and provides passage to and from the institute through six control points. The complex is also served by a spur of the electrified Moscow-Yaroslavl rail line which enters the institute at two points. The Moscow/Shchelkovo Airfield is probably the main airshipment center for the facility. The institute also includes a motor pool (item 71) located in the southern corner of the complex. A separately secured transformer yard at the western edge of the institute probably serves as a power source for the complex. The yard consists of a low and a high voltage area and four control buildings. The institute is secured by a fence/wall. Access is provided by five secured road entrances and two secured rail entrances. Guard towers are not observed. Tab le 1. Fryaaino scientific Research institute and Plant 160 (Keyed to Figure 3) constructed. The security fence/wall surrounding this area was erected Essential Services 1 Utility bldg 2 Engineering bldg 3 Engineering bldg 4 Engineering bldg 5 Engineering bldg 6 Engineering bldg 7 Engineering bldg 8 Engineering bldg 9 Warehouse 10 Laboratory 11 Warehouse 12 Utility bldg 13 Laboratory 14 Laboratory 15 Laboratory 16 Utility bldg 17 Utility bldg 18 Utility bldg 19 Storage tank 20 Prob laboratory bldg 21 Prob laboratory bldg 22 Utility bldg 23 Utility bldg 24 Shop bldg 25 Warehouse Handle Via Approved For Release,2,Qg21Jt ektTlK OFF78TO4563A dA10047-Qalent-KEYHOLE i Vr Control System Only Handle Via Approved For Release 2t/0$NRETAF8T04563A00060001(l@qA020/0008/70 Talent-KEYHOLE TCS-22162/70 Control System Only 25X1 26 Warehouse 27 Shop bldg 28 Laboratory 29 Assembly/engineering bldg a assembly b engineering 30 Warehouse 31 Warehouse 32 Warehouse 33a Warehouse b Warehouse 34 Warehouse 35 Warehouse 36 Shop bldg 37 Laboratory 38 Ste amplan t 39 Steamplant 40 Storage tanks (3) 41 Laboratory 42 Utility bldg 43a Engineering/shop bldg shop section Forced-draft cooling tower Laboratory 47 Admin bldg 48 -Utility bldg 49 Reception center 50 Utility bldg 51 Utility bldg 52 Utility bldg 53 Laboratory 54 Shop bldg 55 Utility bldg 56 Shop bldg 57 Shop bldg 58 Utility bldg 59 Utility bldg 60 Utility bldg Handle Via Approved For Release 21Ufp7 :IC~t- T04563A000600010047-0 Talent-KEYHOLE Control System Only Handle Via Approved For Release 2M 7SftRVf -"ff T04563A000600010WM-20/0008/70 Talent KEYHOLE TCS-22162/70 Control System Only 25X1 61 Storage tank 62a Warehouse b Warehouse 63 Utility bldg 64 Engineering bldg 65 Utility bldg 66 Utility bldg 67 Utility bldg 68 Utility bldg 69 Utility bldg 70 Utility bldg 7la Motor pool d 72 Utility bldg 73 Security bldg 74 Shop bldg 75 Laboratory 76 Warehouse 77 Warehouse 78, 79 Warehouses 80 Utility bldg 81 Laboratory 82 Utility bldg 83 Utility bldg 84 Utility bldg 85 Warehouse 86 Laboratory 87 Utility bldg 88 Warehouse 89 Assembly bldg 90 Laboratory 91 Admin bldg 92 Shop bldg 93 Shop bldg 6_ Handle Via Approved For Release / C I P78TO4563A000600010047-0ralent?KEYHOLE TOP SEC C F Control System only Handle Via Approved For Release 2 O&6(REk-kbFF8T04563A00060001A 2010008/70 Talent-KEYHOLE TCS-22162/70 Control System Only ACIC. USATC, Series 200, Sheet M0167-5, scale 1:200,000 1. CIA. S1 79-56, Scientific Research Institute 160 (NIP 160), Feb 56 (SECRET) REQUIREMENT NPIC Project 220707 Handle Via Approved For Release 2(111D~I 7 O4563A000600010047 nTalent-KEYHOLE -fpP 'J~~~C1 ?1CClrT? trot System Only Approved For Release 2002TUP1 SE TP78TO4563A000600010047-0 Approved For Release 2002/'11 SEDREqP78T04563A000600010047-0