SARY SHAGAN MISSILE TEST CENTER

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04563A000600010039-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
14
Document Creation Date: 
December 28, 2016
Document Release Date: 
May 6, 2005
Sequence Number: 
39
Case Number: 
Publication Date: 
June 1, 1970
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04563A000600010039-9.pdf3.15 MB
Body: 
25X1 Approved For Release 2005/06/08 : CIA-RDP78T04563A000600010039-STOP SECRET BASIC IMAGERY INTERPRETATION REPORT NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER SARY SHAAN MISCENTER MISSILE RANGES--SAM/AMM FACILITIES USSR JUNE 1910 25X1A TOP SECR 25X1 RCA-19/0024/70 COPY NO -1 1 9 11 PAGES A ~" ~W A fir" elease 2005/06/08 : CIA-RDP78TO4563A000600010039-9 25X1 Approved For Release 2005/06/08 : CIA-RDP78TO4563A000600010039-9 Next 4 Page(s) In Document Exempt Approved For Release 2005/06/08 : CIA-RDP78TO4563A000600010039-9 25X1 25X1A 25X1 C 25X1 D Appr~ TOP SECRETI ved For R ease - INSTALLATION OR ACTIVITY NAME Sary Shagan Missile Test Center UTMCOORDINATES GEOGRAPHIC COORDINATES T 46-11-05N 072-41-30E MAP REFERENCE AC IC . USATC 200, Sheets M02 45 -1HL, 2AL, 3AL, 7AL, AL, 9HL, 10HL, , l4HL 15HL 19AL, ~244-JAT- and 02 -16AL scale 1:200,000 (SECRET Significant activity at the Sary-Shagan Missile Test Center (SSMTC) during the reporting period included the installation of a second GALOSH-type launcher erector and initial construction preparation for two possible launch positions at launch complex F, the installation of an antenna atop TRY ADD building A at launch complex D, the installation of two probable GALOSH-type launcher erectors at launch complex D, and the construction of a second launch pad at launch complex C. This report on the SSMTC covers thel (period. 25X1 D It updates previous basic reports. References are included for the basic reports published during the report- ing period, and attention is directed to basic reports scheduled for publication on specific SSMTC installations. The report contains photographs of the unidentified activity east of the launch complex C support area, the suspect electronics facility, and the large crater observed near tracking facility 15. 25X1 D Sary-Shagar.L Missile Test Center (SSMTC)1,2 the largest and most instru- mented defensive missile test center in the Soviet Union, is located along the western shore of Lake Balkhash in the southern portion of Soviet central Asia, and extends from the lake front westward for approximately 275 nautical miles (nm). The area is relatively isolated and has a limited indigenous population. The area, is suited for missile testing by the nature of the climate and its relatively flat, desert-like terrain. Except for the salt flats, trafficabil- ity appears to be no problem. The terrain varies from salt flats to rocky outcroppings. Vegetation consists of grasses and shrubs, but a large portion of the range is barren. The average annual precipitation is approximately inches, and the average temperature ranges between 0 degrees and 30 degrees F during the winter and between 60 and 80 degrees F during the summer. The test center is served by rail, road, and air. The Mointy-Chu rail line is the only rail line serving the test center. An intricate network of a-11-weather roads and trails permits transportation from one facility to another within the test center. A primary airfield, whose longest runway is approxi- mately 2,926 meters (9,600 feet), is the main facility serving air traffic to and from the test center. Although evidence was available to support constructs of a missile test center at Sary-Sha.ga.n in the early 1950s, it was not until first photographic coverage of the test center was obtained (Figures an 2). BASIC DESCRIPTION HEADQUARTERS AND MAIN HOUSING AREA No significant change occurred during the reporting period. 25X1 25X1 25X1 25X1 Approved AMU X1 X1 25X1 TOP SECRET 25X1 roved For R ease - The area was covered by one pass of interpretable 25X1 D )holography during the reporting period. No significant changes occurred during the reporting period. The next basic report on this facility is scheduled for publication in the first quarter of fiscal year 1971- 25X1 D 25X1 D 25X1 D 25X1 D Explosives and Solid Propellant Storage & Handling Area No change in facilities has occurred. The robable GALOSH missile canister that had been observed on the wide apron RCA-19/002+/70 25X1 10d39-9 125X1 All seven of the GRIFFON missile sus- tainers, first identified appear to be present in the same location Liquid Propellant Storage & Handling Facility Both of the tank farms have been earth covered, and only one building remains externally under construction. The area has a general appearance of having been cleared of construction debris -- except for the immediate area around the fuel-loading building. A new coal pile near the heating plant could also indicate that the facility is nearing an operational status. SAM Support Facility No change has occurred within the fenced area of the facility. An open- ended revetment consisting of two nearly parallel earthen walls has been constructed just outside the southwest corner of the security fence. Uniden- tified vehicles, equipment, or crates are stacked opposite one end of this revetment. 25X1 D 25X1 D Industrial Area; Warehouse Facility; Housing Facility; Electronic Training Area; and Sary-Shagan Airfield No changes were observed in facilities. AIRFIELD SOUTHWEST (DIRT STRIP 1) No changes were observed in facilities. AIRFIELD SOUTH (DIRT STRIP 2) No change was observed at this 5,200-meter- (10,500-foot-) long graded- earth runway. No aircraft or equipment have ever been seen here, and it is doubtful if this facility has achieved an operational status. RAILROAD STATION, YARDS, AND SHOPS; CONSTRUCTION SUPPORT FACILITY No changes were observed in facilities. LAUNCH COMPLEX A Both of the SA-2 sites (launch sites 1 and 2) were observed to be occupied during the reporting period. Both of the SA-5 sites (launch sites 3 and 4+) were 25X1 D observed to be occupied 25X1 D 25X1 LAUNCH COMPLEX B The complex was covered during the reporting 25X1. period No change in aci i ies was observed. GALOSH canis- ters were in the launcher erectors at positions C-1 and C-2.5 Approved1PRaS sRET0 06/08: CIA-RDP78T04563A0006000 25X1 25X1 25X1 68'001 1 TOP SECRET RCA-190021+/70 25X1 pproved Fo 6000 0039-9 25X1 SAN Y-5 HAG AN MISSILE TEST o CENTER n. 74?00* Mointy D10-5 nary 1 :.ate Ain i',, k i', A N Fa 2 ., FIGURE 1. SARY-SHAGAN MISSILE TEST CENTER, USSR AW RADAR SITE- INITIAL SUPPORT LAUNCH AREA COMPLEX 010-5 SAM SITE / A26-2 f LIQUID PROPELLANT STORAGE AND HANDLING FACILITY HEADQUARTERS AND?MAIN?HOUSING AREA" `. R D RADAR FACILITY 1 {,HEN.HOUSE) . Significant construction activity Road Railroad ELECTRONICS ,FACILITY LAUNCH COMPLEX C UPPORT ? ~ UNID NT)FIED FACILITY"' tiNDER CONSTRUCTION 'aSAM SITE 81~ ", 1 o 1 2 3 4 5 NAIJTICAL MILES FIGURE 2. RANGEHEAD AREA, SARY-SHAGAN MISSILE TEST CENTER, USSR ApproaPo (JR&T 1005/06/08: CIA-RDP78T04563A00*001 Signiticant c n ruc ion activity Road --- Trail Railroad A Research and development radar facility ? Anti satelIite/space tracking radar facility ^ Tracking facility ? Launch complex O SA-5 SAM complex RAILROAD STATION YARDS AN0_ SHOPS 25X1 25X1 25X1 25X1 25X1 D TOP SECRET RCA-19/0024/70 25X1 ved For Rel are - 00100 9-9 01 complex. I I Significant comparisons are made with launch complex H at Kapus In ar a, imirovka Missile Test Center, which is a similar launch Significant construction continued at this newest R&D ABM complex. A large nearly circular, flat antenna was installed on a unique probable AZ-EL mount atop TRY ADD building A, two probable GALOSH-type erector launchers were installed in the launch area, and the excavations for the anchor points for a second probable large tower north of the launch area, were observed.7.,8 LAUNCH COMPLEX BO4-5 No change b served in facilities. Both launch sites were observed 25X1 D to be occupied Ithe only photography during the reporting perio . 25X1 D 25X1 D 25X1 25X1 D 25X1 D Construction of the complex continued to progress slowly the only significant change was the construction of partial revetments aroun launch positions C-5 and C-6. At he air warning facility, three o e 77UT 7,777.7 7771171, -1 y a small unidentified vehicle or piece of equipment Eleven of the 18 launch positions were observed to be a.rtia.lly revetted On the most recent photography the complex No significant change in facilities was observe . The northern portion of launch complex A contained an area of activity probably not SAM related but believed to be associated with ABM research and development. This area. has now been redesignated launch complex F.ea ch It contains the following facilities: (1) Two GALOSH-type launch positions, which were formerly designated launch positions 7A and 7B, are now redesignated launch positions lA and 1B of launch site 1. (3) Abandoned GRIFFON launch sites 5 and 6 and the associated elec- tronic site C. Of the five SA-2 SAM sites at SSMTC, one site, B22-2, appears to be nothing more than a star-configured SA-2 ground pattern formed by very light earth gr ea. ed so on all hoto ra. h since it was first 25X1 D observedi A second site, B21-2, has been unoccupied It remains unoccupied on the latest photography A third site, B19-2, was observed unoccu ied on the the site during the reporting period The remaining two sites, A26-2 and E06-2, have been observed occupied during the reporting period. ApprovedTFOPR&I Ea0 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 25X11) 25X1 25X1 25X1 RCA-19/0024/70 25X1 SAM TRAINING AREA This facility has appeared inactive and abandoned ANTIS ATELLITE/SPACE TRACKING RADAR FACILITY 0010 9-9 The control building for sweptback dual HEN HOUSE E is probably externally complete, and several rows of footings for the antenna buildings have been emplaced and backfilled. No significant changes occurred at dual HEN HOUSES A, B, C, and D or at the support facilities.13 No changes were observed in facilities. HKI 25X1 D 25X1 D No significant change in facilities occurred during the reporting period. A recent report 15 discusses the most recent status of the facility, including identification of several features made possible on large-scale photography acquired in the past The most recent NPIC basic report16 discusses changes at all the Sary- 25X1 Shagan tracking facilities through photography of The next 25X1 D NPIC basic report covering all the SSMTC trackin acl 1 ies is scheduled for publication in the second quarter of fiscal year No significant changes 25X1 D occurred during the reporting period. MICROWAVE FACILITIES AND COMMUNICATION FACILITIES No significant changes were observed in facilities. SUSPECT ELECTRONIC FACILITY A second trench was newly observed in the areal Figure 3), 25X1 D approximately 579 meters (1,900 feet) south and in-line with the first trench. This second trench is approximately 567 meters (1,860 feet) long. It is open along its entire length with the exception of several narrow probable vehicle crossing points. The first trench now appears to be completely backfilled. The road leadin toward the area from the main lakefront road has not had additional grading The status of the fenceline construction cannot be determined on small-sca e photo ra Only a small segment of the 4,800-acre area was observed to be fenced Work has continued in the area of unidentified activity just south of the suspect electronic facility at the intersection of the dog-leg road and the launch complex C launch area access road. Three buildings are externally com- plete, two buildings are under construction, and three probable building founda- tions are present. The association of this area with the suspect electronic facility or any other facility cannot be determined. 25X1 D Unidentified construction activit was of observed-in two areas east of the launch complex C support area (Figure 4). Neither 25X1 area of activity was present The area of greater activity is located between the main lakefront road and the shore of Lake Balkhash and is centered around 45-50-1ON 073-35-OOE. this area contained two buildings nearly externally complete, the largest two buildings with foundation and wall construction underway, woother ui ing foundations under construction, and 25X1 ApprovedTrP R&E 5/06/08: CIA-RDP78T04563A000600 5X1 5X1 App ma- mm RCA-19 0024+ 70 25X1 0100 9-9 z xi 25X1,D 25X1 FIGURE 3. SUSPECT ELECTRONICS FACILITY, SSMTC ApprolcGIo6&I 5I 4005/06/08: CIA-RDP78TO4563A000O Ml 25X1 25X1 ~ CF RCA-1 0024+ 0 25X1 rov1tf o00010 39-9 25X1 two probable buried tanks. The main road into the area. has been graded, includ- ing a section of loop road around the probable buried tanks. The second area of activity is located between the launch complex C support area, a. d the main lakefront road. It contains a building foundation a.pproxi- 2 5X1 mately and a second possible building foundation. A rectangular scar a.roun is area indicates that a fenceline is probably planned to secure the area.. 25X1 25X1 25X1 Approver REI0$5/06/08: CIA-RDP78TO4563A00060001 2 X1 2X1 25X Approved For Release 2005/06/08 : CIA-RDP78T04563A000600010039-9 FIGURE )i-. UNIDENTIFIED ACTIVITY OPPOSITE LAUNCH COMPLEX C SUPPORT AREA, SSMTC 25X1 D Approved For Release 2005/06/08 : CIA-RDP78T04563A000600010039-9 25X1 O 25X~ Ln rn t'1w 25X1 25X1 D Approved For Release 2005/06/08 : CIA-RDP78TO4563A000600010039-9 Approved For Release 2005/06/08 : CIA-RDP78TO4563A000600010039-9 25X1 Appr4 25X1 D 25X1 C yve kb 'lag 010 19/0024/7o 25X1 ZgX~ SAC. US Air Target Chart 200, Sheet M0245-lHL_ 4th ed. Oct 6S_ ~nalP T?2nn,000 ACIC. US Air Target Chart 200, Sheet 0245-2AL, 2d ed, May 61, scale 1:200,000 (SECRET) ACIC. US Air Target Chart 200, Sheet 0245-3AL, 2d ed, May 61, scale 1:200,000 (SECRET) ACIC. US Air Target Chart 200, Sheet 0245-7AL, 2d ed, May 61, scale 1:200,000 (SECRET) ACIC. US Air Target Chart 200, Sheet 0245-8AL, 2d ed, May 61, scale 1:200,000 (SECRET) ACIC. US Air Target Chart 200, Sheet M024 - HL 4th ed Nov 66, scale ,000 25X1 C (SECRET/No Foreign Dissem SAC. US Air Target Cfiart 200 Sheet M024 -10HL d ed, Jun 65, scale 1:200,000 25X1 C (SECRET/No Foreign Dissem ACIC. US Air Target Chart 200, Sheet 0245-13AL, 2d ed, May 61, scale 1:200,000 (SECRET) 25X1 C 25X1 C 25X1 D ACIC. US Air Target Chart 200, Sheet M0245-14HL. 5th ed. Nov 66 (SECRET/No Foreign Dissem ,000 ACIC. US Air Target Chart 200, Sheet M0245-15HL, 3d ed, Apr 66, scale 1:200,000 (SECRET/No Foreign Dissem SAC. US Air Target 200, Sheet 0245-19AL, 1st ed, Mar 60, scale 1:200,000 (CONFIDENTIAL) SAC. US Air Target Chart 200, Sheet 0244-1AL, 1st ed, Jun 59, scale 1:200,000 (CONFIDENTIAL) SAC. US Air Target Chart 200, Sheet 0237-16AL, 1st ed, Apr 60, scale 1:200,000 (SECRET) 25X1 25X1 Approvef .f f 5/06/08: CIA-RDP78T04563A000600 5X1 25X1 25X1 25X1 rovT PorS REeT2 010 A-19/0024/,70 25X1 Z5X1 1. NPIC. I RCA-19 002)1-/69, Sary-Shagan Missile Test Center USSR Aug 6 TOP SECRET 2. EPIC. RCA-19/0008/70, Sary-Shagan Missile Test Center USSR, Jan 70 (TOP SECRET 25X1 3. NPIC? PIM-017/70, SA-5 Missile Firing Launch Complex A Sary-Shagan MTC, USSR, Mar 70 (TOP SECRET PIN-028/70, Launch Complex--F,, Sary-Sha.ga.n Missile 25X1 4. EPIC. I --j RCA-19/0005/70, Sary-Shagan AMM Complex Zone A USSR, Apr 70 (TOP SECRET 25X1 5. EPIC. I BCA-19/0008/70, Sary-Shagan AMM Complex Zone B 25X1 25X1 USSR, Mar 70 (TOP SECRET 25X1 6. NPIC. RCA-19/0017/70, Sary-Shagan Launch Complex C, 25X1 USSR, Apr 70 (TOP SECRET 25X1 25X1 7. NPIC. RCA-19/0013/69, Launch Complex D, Sary-Shagan Missile Tes en er, USSR, Feb 70 (TOP -SECRET-1 I 25X1 25X1 8. EPIC. RCA-19/0004/70, Launch Complex D, Sary-Shagan 25X1 25X1 25X1 25X1 25X1 Missile Test Center, USSR, Apr 70 (TOP SECRET 25X1 9. EPIC. BCA-1 000 70 Sary-Shagan SAM Complex BO4-5 USSR, Mar 70 (TOP SECRET F 10. NPIC. BCA-19/0006/70, Sary-Shagan SAM Complex D10-5, USSR, Mar 70 CRET II 11. EPIC. PIR-Oll/70, Major Expansion Activity Launch Complex A, Sary-Shagan MTC, USSR, Feb 70 (TOP SECRET Test Center, USSR, Apr 70 (TOP SECRET 25X1 25X1 C 25X1 25X1 13. NPIC. Tracking Radar Foreign Dissem , i LN E L.v . ment Radar Facility 2, USSR, Jan 70 (TOP SECRET 25X1 15. NPIC. RCA-03 0033/70, Sary-Shagan ESV Tracking Facility USSR; Apr 70 (TOP SECRET 25X1 25X1 16. NPIC. RCA-19/0007/70, Tracking Facilities, Sary-Shagan 25X1 Missile Test Center, USSR, Jan 70 (TOP SECRET 25X1 COMIREX T05 EPIC Project 220668AA 25X1 Approve FGPr g!l?IPF 25X1 25X1 25X1 25X1 25X1 25X1 RCA-03/0036/70, Sary-Shagan Antisatellite/Space USSR Nov 69 (TOP SECRET 25X1 Sary-Shagan Research and Develop- RCA-03/0037/70 !T 1 2 5X1 Approved For Release 200:TUOGE[DP78T04563A000600010039-9 25X1 Approved For Release 2005/pp8S E$P78TO4563A000600010039-9 25X1