KARTALY ICBM COMPLEX DEPLOYED STRATEGIC SSM FACILITIES USSR JUNE 1969
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04563A000100010087-7
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
8
Document Creation Date:
December 28, 2016
Document Release Date:
February 28, 2005
Sequence Number:
87
Case Number:
Publication Date:
June 1, 1969
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T04563A000100010087-7.pdf | 302.88 KB |
Body:
ro
25X1
Approved For Release 2007/02/22LCIAR178T04563A000100010087R7c
A u1/0034/69
TOP SECRET
magery Interpretation Report
./34
0
./A
r
0
0
.30
01 Declassification by NGA/DoD
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
TOP SECRET GROUP I: EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
5 PAGES
NATIONAL
PHOTOGRAPHIC
INTERPRETATION
CENTER
25X1
KARTALY ICBM COMPLEX
DEPLOYED STRATEGIC SSM FACILITIES
USSR
JUNE 1969
COPY NO 113
25X1
25X1
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
15X1
Approve For Release 2007/02/2 63A000100010087-7
TOP SECRET RCA-01/0034/69
25X1
INSTALLATION OR ACTIVITY NAME
Kartaly ICBM Complex
COUNTRY
UR
ULM COORDINATES
NA
GEOGRAPIIIC COORDINATES
52-59-20N 060-31-40E
MAP REFERENCE
See below
LATEST IMAGERY iliFD
NEGATION DATE IT
NA
SAC.
USATC 200, Sheets M0164-17HT, & -ThT-TT 9 i Vinr Ag 1:200,000
(SECRET/
25X1
icale
SAC.
USATC 200, Sheet M0164-22HL, 2d ed. Aug 66. sea
e 1:200,000 (SECRET/
25X1
i
SAC.
USATC 200, Sheet M0164-23HL, 2d ed, May 67. scale
1:200,000 (SECRET/
25X1
ABSTRACT
25X1
the Kartaly ICBM
Complex consisted of 35 SS-9
launch sites
am) their supporting
facilities. Site construction
at this complex probably
started early
25X1
in Presently
24 launch sites are complete and 11 are under construction.
An in-
crease in site
construction time has been noted at some of the later sites.
Unusual
features at this complex are two dummy ICBM sites and a miniature mockup ICBM site.
This report, which updates published information on the Kartaly complex, contains
a map depicting site deployment and a tabulated chronology of the complex.
INTRODUCTION
The Kartaly ICBM Complex is in the west-central part of the steppe region, in the
Russian SFSR (Figure 1). The complex occupies an area of approximately 1,150 square
nautical miles (nm) around the town of Kartaly, and the nearest large city, Magnitogorsk,
is about 60 nm to the west-north-west. The launch facilities, consisting of 35 type IIIC
single-silo launch sites, completely encircle the town. The complex support facilities, a
headquarters command and control facility, and the rail-to-road transfer point with an
SS-9 training site are approximately 3 nm southwest of Kartaly.
The complex support facilities and rail-to-road transfer point are served by a spur
from an east-west rail line extending from Magnitogorsk and Akmolinsk through Kartaly.
A north-south line connects Kartaly with Chelyabinsk and Orsk. Both lines are double-
track and interconnected at Kartaly. A well-engineered road network which has been
constructed concurrently with the deployment of the launch sites connects the sites and
the supporting facilities.
The terrain in the region is well drained and gently rolling with elevations ranging
from 800 to 1,200 feet. Most of the land is used for agriculture; however, some to the
north and west of the town is lightly wooded. The steppe region is in the warmest part
of western Siberia, the temperatures ranging from an average of approximately 0? F
in January to about 68?F in July. Snow cover is normally limited to the period from
early November to mid-April.
The nearest SAM site is approximately 50 nm to the west-northwest, in the Magnito-
gorsk area. No airfields are in the vicinity of Kartaly.
This report updates and supersedes NPICI
BASIC DESCRIPTION
The Kartaly ICBM Complex is one of six ICBM complexes in the Soviet Union de-
ploying the SS-9 missile system. It consists of 35 SS-9 ICBM single-silo launch sites,
deployed in six groups (designated A through F), complex support facilities, a head-
quarters command and control facility, and a rail-to-road transfer point with a type IIIC
training site. Twenty-four of the launch sites are complete and 11 are under construction.
25X1
The first evidence of this complex was in (Table 1), when the complex sup-
port facilities and five launch sites of launch group A were observed.
TOP SECRET
1
APProved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
25X1
25X1
25X1
25X1
25X1
25X1
25X1
25X1
A000100010087-7
Approved For Iletease 2007/0
TOP SECRE
2/22 : CIA-RDP78T04563
60015 60030' 60045' 61?00'
RCA-01/0034/6E
53?15'
KARTALY
RAIL-TO- ROAD
TRANSFER
POINT
H EADQUARTERS
COMMAND AND
CONTROL
FACILITY
3A 2A fl5C
-52?45'
Complex road network
Dummy road
Railroad
Cable scar
Type IIIC SS-9 launch site
? Type IIIC SS-9 control site
0 Dummy launch site
NAUTICAL MILES
NPIC M-66133
FIGURE 1. LOCATION MAP
- 2 -
TOP SECRET
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
25X1
25X1
25X1
25X1
25X1
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
ed For Release 2007/02/2 - 3A00010001}QM0A/0034/69
TOP SECRET
Launch Facilities
Construction of launch group A is estimated to have started in
25X1 constructirty started on launch groups B and C. Launch groups and t were
started in nd group A was completed. In IIII launch group D was completed and
launch group F, the latest group, was begun. When last observed 'L group
E was not yet complete and group F contained only five sites in an early stage of con-
struction.
The first launch sites at the complex required 26 months to complete. However, two
sites in launch group E, which were started in I I and are now only in a
late stage of construction, are estimated to be completed in I 'of this year after a
period of approximately 30 months.
25X1 Two dummy SS-9 launch sites are north of launch group E. These sites (designated
A and B), constructed in the L J were the first dummy ICBM sites observed in
the Soviet Union.
Complex Support Facilities
The Kartaly complex support facilities 2 provide the administrative and logistic re-
quirements for this complex and are typical of those found at other SS-9 complexes. They
consist of a railhead and storage area with an adjoining barracks area and an administra-
tion and housing area.
The railhead and storage area shows no significant change. Materials for launch sites
still under construction are apparent along the rail sidings, and several multistory build-
ings are under construction in the administration and housing area.
Headquarters Command and Control
The headquarters command and control facility, 3 consisting of a sub-surface concrete
control bunker and two aboveground administration-type buildings, is now complete. An
antenna field with two fishbone arrays and two horizontal dipoles is adjacent to the
facility.
Rail-to-Road Transfer Point
The rail-to-road transfer point provides for the receipt, maintenance, inspection, and
distribution of missiles, warheads, and propellants. 4 All elements of the facility are
currently in use, and several buildings have recently been constructed in the facility.
Launch site 27X, which is used for training, is now complete. A miniature mockup of
an SS-9 launch site is located adjacent to site 27X. It is approximately one-fifth the
size of a normal SS-9 launch site and may function as a training aid providing an easy-
to-see overall layout of a launch site. It was first observed in 7tnd is not
thought to have any internal structure.
-4
TOP SECRET
Approved For Release 2007/02/22 : CIA-RDP781-0456Annninrin1nr10-7
25X1
25X1
25X1
25X1
25X-1
25X1
25X1
25X1
25X1
X1
25X1
25X1
APIJIU[ed For Relefbero2%faCk62
: CIA-RDP7b I u45
REFERENCES
53A000100010107.-S7
-11,c)pi,01/0034/69
25X1
25X1
25X1
MAPS OR CHARTS
SAC. US Air Target Chart, Series 200, Sheets M0164-17HL and 18 HL, 2d ed, Mar 66, scale 1:200,000
(SECRET
SAC. US Air Target Chart, Series 200, Sheet M0164-2211L, 2d ed, Aug 66, scale 1:200,000 (SECRET/
25X1
SAC. US Air Target Chart, Series 200, Sheet M0164-23FIL, 2d ed, May 67, scale 1:200,000 (SECRET/
25X1
DOCUMENTS
25X1
1. NPIC.
Kartaly ICBM Complex, USSR, Jan 68 (TOP SECRET
25X1
2. NPIC.
ll
Kartaly ICBM Complex, USSR, Complex Support Facility, Jan 68 (TOP
25X1
SECRE
25X1
3. NPIC. I
Soviet ICBM headquarters Command and Control Facilities, Dcc 68 (TOP
25X1
SECRET
25X1
4. NPIC, I I Rail-to-Road Transfer Points at SS-9 ICBM Complexes Oct 68 (TOP
25X1
SECRET
25X1
REQUIREMENT
COMIREX BR-A/002-69
NPIC .Project 210169
-5
TOP SECRET
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
25X1
25X1
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7
TOP SECRET
TOP SECRET
Approved For Release 2007/02/22 : CIA-RDP78T04563A000100010087-7