KH-4 MISSION 1109 IPIR NUMBER 17 OAK SUPPLEMENT PART XIII 5-23 MARCH 1970
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04562A000300130001-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
70
Document Creation Date:
November 17, 2016
Document Release Date:
August 4, 2000
Sequence Number:
1
Case Number:
Publication Date:
April 1, 1970
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T04562A000300130001-8.pdf | 2.37 MB |
Body:
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300MOMPET
NATIONAL PHOTOGRAPHIC
INTERPRETATION CENTER
PHOTOGRAPHIC INTERPRETATION REPORT
KH-4 MISSION 1109
IPIR NUMBER 17
OAK SUPPLEMENT PART XIII
5-23 MARCH 1970
Handle via TOP SECRET
Talent-Keyhole
Channels Only TCS-20119/70
APRIL 1970
COPY NO.2.07
69 PAGES
GROUP 1. EXCLUDED FROM
AUTOMATIC DOWNGRADING OAK-062/70
ApproVRIAPWRelease 2000/08/22 : CIA-RDP78T04562A000300130001-8
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
WARNING
This document contains Information affecting the national security of the United States within the meaning
of the espionage lows U. S. Code Title 18, Sections 793 and 794. Th. low prohibits its transmission or
the revelation of its contents in any manner to on unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive Information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining to TALENT-KEYHOLE Control System.
TARGET CATEGORIES
AND
ASSOCIATED NTP FUNCTIONAL AREAS (CODES)
1. STRATEGIC SSM
Deployed Strategic SSM Facilities (A)
2. MISSILE RANGES
Missile Ranges. Strategic SSM/Space Facilities (P)
Missile Ranges: Air- Launched Missile Facilities (0)
Missile Ranges: Naval -Launched Missile Facilities (R)
Missile Ranges: Tactical SSM Facilities (S)
Missile Ranges: SAM/AMM Facilities (T)
3. AIR DEFENSE MISSILES
Deployed AMM Facilities (81
Deployed SAM Facilities (0)
4. ELECTRONICS/COMMUNICATIONS
Deployed Communication/Electronic/Radar Facilities (C)
5. AIR
Air Base Facilities (E)
6. NAVAL
Naval Base Facilities In
7. GROUND
Ground Force Facilities (G)
8. TACTICAL SSM
Deployed Tactical SSM Facilities (H)
9. LOGISTICS
Military Logistics Facilities (K)
10. NUCLEAR ENERGY
Atomic Energy Facilities (0)
11. CBR
CBR Facilities (V)
12. INDUSTRY
Shategic Weapons Industrial Facilities (J)
General Purpose Weapons Industrial Facilities (L)
Non -Military Industrial Facilities (N)
Communication/Electronic/Radar R&D Facilities (U)
13. MISCELLANEOUS
Non-Military Logistics Facilities (M)
Miscellaneous/Unidentified Facilities (Z)
These thirteen target categories are compatible with the Functional Area of Imagery Interpretation established under the National
Tasking Plan. To enhance the analysis of readout on operationally associated targets. each target is reported relative to its primary functional
association (i.e.. missile lenge tracking facilities are reported under "MISSILE RANGES: fly-away airfields at aircrah plants are reported
under "INDUSTRY: airfield nuclear weapons storage facilities are reported under "AIR: etc.).
00 1 0 4 6 5 E
90937
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
Whim
lied For Release 200i
Control System Only
105,-20119f0) IPIR 17
KH,.44 MISSION 1109
t
cigl-RFFF78T04562A000300130001-8
TABLE OF CONTENTS
PAGE
PREFACE 1
MISSION HIGHLIGHTS 2
UNITED ARAB REPUBLIC
AIR BASE FACILITIES 3
NAVAL BASE FACILITIES 9
GROUND FORCE FACILITIES 10
25X6 DEPLOYED TACTICAL SSM FACILITIES 15
HUNGARY
GROUND FORCE FACILITIES
KOREA. NORTH
AIR DEFENSE MISSILES
GROUND FORCE FACILITIES
LOGISTICS
INDUSTRY
18
19
21
36
38
SOVIET UNION
DEPLOYED STRATEGIC SSM FACILITIES 39
AIR DEFENSE MISSILES 40
COMMO/ELEC/RADAR FACILITIES 42
AIR BASE FACILITIES 45
NAVAL BASE FACILITIES 54
GROUND FORCE FACILITIES 55
CBR FACILITIES 65
INDUSTRY 67
!?ii
Handle Via
Approved For Release 200005p2SEGOK9M8T04562A00030000tEy
TH:inedarptied For Release 20a
Control System Only
Tcs..,2010/70 IPIR 17
KH-.4 MISSION 1109
;
8ggE1-4314VP78T04562A000300130001-8
PREFACE
PREFACE
THIS IS THE THIRTEENTH OAK SUPPLEMENT REPORT ON MISSION 11090
FOR COMPLETE PREFACE SEE THE FIRST OAK SUPPLEMENT REPORT.
?
"
le otie?
Handle Via
Approved For Release 200,49p/RCWHIgFp'8T04562A000306400EtEy
25X1D
25X1D
25X1D
25X1D
neak0
tted For Release 20011a/HC.U1U078T04562A000300130001-8
Control System Only
TCS"20119/70 IPIR 17 HIGHLIGHTS
KH-.4 MISSION 1109
MISSION HIGHLIGHTS
USSR...CHINA,..MONGOLIA BORDER
GROUND FORCE ACTIVITY
A NEW STORAGE AREA IS UNDER CONSTRUCTION IN THE
TRANSBAIKAL MILITARY DISTRICT, 1 NAUTICAL MILE (NM) WEST OF
LAKE (OZER()) GUSINOYE AND 42 NM FROM THE USSR*"MONGOLIA BORDER.
THE INSTALLATION CONTAINS 42 LARGE STORAGE BUILDINGS AND 42
PROBABLE BUILDING EXCAVATIONS, A SUPPORT AREA, A POSSIBLE TENT
CAMP. AND A SEPARATE STORAGE AREA CONTAINING TWO BUILDINGS AND
16 POSSIBLE BUILDING EXCAVATIONS, IT IS DESIGNATED AS GUSINOYE
?ZERO STORAGE AREA NO ACTIVITY CAN BE DETECTED AT THIS SITE
ON PHOTOGRAPHY OF THE LATEST PREVIOUS COVERAGE
OF THE AREA.
AIR ACTIVITY
EXPANSION OF FACILITIES IS TAKING PLACE AT TAMBOVKA
AIRFIELD IN THE FAR EAST MILITARY DISTRICT OF THE USSR, 19
NAUTICAL MILES FROM THE USSR..CHINA BORDER, NORMALLY THIS FIELD
HAS REMAINED SNOW COVERED THROUGH THE WINTER MONTHS AND WAS
SNOW COVERED WHEN LAST SEEN IN
HOWEVER, THE SNOW IS BEING CLEARED FROM THE RUNWAY. AND
NEW FACILITIES ARE OBSERVED WHICH WERE NOT PRESENT WHEN THE
FIELD WAS LAST SEEN ON SNOW.,-FREE COVERAGE OF
PO L STORAGE FACILITIES HAVE BEEN EXPANDED, AND STACKS OF
MATERIAL ARE SEEN IN THE SUPPORT AREA, NO AIRCRAFT HAVE EVER
BEEN SEEN AT THIS FIELD, AND NONE IS DISCERNIBLE ON
Handle Via
Approved For Release 200,(518/gICR*-Mr8T04562A0003WAMMEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
ed For Release 2000/gcgA-RIV78T04562A000300130001-8
Centro system Only
TCS...20119/70 IPIR 17
KHu.4 MISSION 1109
SIGNIFICANT RESULTS
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
AL FAYYUM AIRFIELD 25X1A 29..33...25N 030..54..10E
STATUS: OPERATIONAL
REMARKS:
SURFACING OF THE NW/SE RUNWAY WITH BLACKTOP APPEARS TO BE
APPROXIMATELY 50 PERCENT COMPLETE. A NEW CROSSOVER LINK
TAXIWAY BETWEEN THE TWO RUNWAYS IS IN THE EARLY STAGES OF
CONSTRUCTION. A PROBABLY OCCUPIED EW RADAR SITE IS
APPROXIMATELY 1.524 METERS (5,000 FEET) SW OF THE CENTER OF THE
RUNWAY.
AIR ORDER OF BATTLE:
1 SMALL SWEPT-'WING 3 PROB HELICOPTERS
25X1A
AL RAHMANIY H AIRFIELD 3L02 -35N
STATUS:OPERATIONAL
REMARKS;
A PROBABLE AW RADAR SITE IS APPROXIMATELY 610 METERS (2,000
FEET) NNE OF THE CENTER OF THE RUNWAY. IT CONSISTS OF A
PROBABLE RADAR MOUND, TWO EARTH-MOUNDED DRIVE..IN BUILDINGS. AND
TWO REVETMENTS.
AIR ORDER OF BATTLE:
3 POSS SMALL AIRCRAFT
111111111111 _
Handle Via
Approved For Release 200q4W5ECRIAF-FRigpF8To4562A0003opolgOMEy
25X1D
25X1D
25X1D
25X1D
25X1D
4-,
=6@d For Release 200th
Control System Only
TCS0.20119/70 IPIR 17
KH-4 MISSION 1109
2 POSS SMALL SWEPTWING
gWAYP8T04562A000300130001-8
AS SALIHIYAH AIRFIELD 25X1A
STATUS OPERATIONAL
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
30,-47.0.55N 032.0020.20E
REMARKS:
CONSTRUCTION ACTIVITY CONTINUES IN THE NORTHERN HANGARETTE
AREA.
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
DUKHAYLAH AIRFIELD
NAC
STATUS OPERATIONAL
AIR ORDER OF BATTLE:
2 POSS HELICOPTERS
25X1A 31-07-48N 0294..480.03E
, '4
Handle Via
Approved For Release 2000MirgEarfW8T04562A00030 91#14=
25X1D
25X1D
25X1D
25X1D
25X1D
%41; via
ed For Release 2000/gcRIA:g8T04562A000300130001-8
Control system Only
TCS.*20119/70 IPIR 17
KH...4 MISSION 1109
25X1D
JI ANK IS AIRFIELD NEW
NAC
STATUS; OPERATIONAL
AIR ORDER OF BATTLE:
1 PROB BADGER
8 PROB SMALL DELTA-WING
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
25X1 030..11...35E
1 SMALL STRAIGHT-WING
WADI AL JANDALI AIRFIELD 25X1A 30...03*.02N
STATUS OPERATIONAL
REMARKS:
Fouri HANGARETTES ARE UNDER CONSTRUCTION AT THE SW END OF THE
NNE/SSW RUNWAY* THIS RUNWAY IS STILL IN AN EARLY STAGE OF
CONSTRUCTION*
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
WADI NATRUN AIRFIELD NORTHEAST 25X1A, 30..31..20N 030.033..00E
STATUS OPERATIONAL
5 Handle Via
Approved For Release 2oociii)fl4ECIZEFFROFF8To4562A0003oURNAIntiLiEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
Ha le Via
ipcwd For Release 2004E/gcgLICV78T04562A000300130001-8
Centro system Only
TCs-20119/70 IPIR 17
KH-4 MISSION 1109
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
REMARKS:
THE RUNWAYS ARE PROBABLY OPERATIONAL. CONSTRUCTION CONTINUES
ON THE 20 HANGARETTES REPORTED IN
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
OTHER RESULTS-NO APPARENT CHANGE
AL sSmAILIYAH AIRFIELD
NAC
sTATUs:oPERATIONAL
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
ASYuT AIRFIELD
NAC
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
25X1A30-35-40N 032-14-414E
25X1A27
10-52N 03 04.'46E
6 Handle Via
Approved For Release 200Cpap/WW-FRIVF8T04562A00030PaMILIEy
25X1D
25X1D
111.a leVia
ed For Release 2000/gc1-078T04562A000300130001-8
Control System Only
TcS-20119/70 IpIR 17
KH-4 MISSION 1.109
BILBAyS AIRFIELD
NAC
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
BILBAYS AIRFIELD 2
25X1D NAC
25X1D
25X1D
25X1D
25X1D
STATUS: OPERATIONAL
AIR ORDER OF. BATTLE:
NONE DISCERNIBLE
BIRmA AIRFIELD
MAC
STATUS; OPERATIONAL
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
PORT SAID AIRFIELD
MAC
STATUS; NOT.. OPERATIONAL
UNITED ARAB REPUBLIC
AIR BASE FACILITIES
25X1A
30-23-42N 03 35-54E
25X1A 0-25- oN 0 1 40-40E
25X1A 30-50-17N 0 560. 0E
25X1A 31-16-50N 032-14 31E
Handle Via
Approved For Release 2000,0,12NORK-FINIFF8T04562A000300461/14VotEy
Hanclie Via
gTaIPiPLed For Release 200MAMIrA-1078T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17 UNITED ARAB REPUBLIC
KH-4 MISSION 1109 AIR BASE FACILITIES
AIR ORDER OF BATTLE:
NONE PRESENT
25X1D
25X1D SAIYAH EL SHIRIF AIRFIELD 3i2O-5ONO3056?OE
25X1D
STATUS:UNKNOWN
AIR ORDER OF BATTLE:
NONE DISCERNIBLE
Handle Via
Approved For Release 2000r()IMENETIWT8T04562A0003001fliarrE
nly
25X1A
25X1D
25X1D
TaApproeted For Release 200
Handle Via
:Control System Only
TCS..20119/70 IP1R 17
MISSION 1109
91313M%-k-1078T04562A000300130001-8
UNITEP ARAB REPUBLIC
NAVAL BASE FACILITIES
OTHER RESULTS-N0 APPARENT CHANGE
AL ISKANOARIYAH MSL SPT FAC SHIPBORNE
NAC
STATUS:OPERATIONAL
MISSILE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1A 31-01-39N 0297.49..30E
Handle Via
i; VI .cf _pt:KfYffOLE
''Approved For Release 2r00 intECIZEZI-FRUIPP8T04562A000300451;UPflmEhnly
}ico,1%/Yed For Release 203A88gPETAW78T04562A000300130001-8
.aailt,,3,4
Control System Only
TC5-.20119/70 IPIR 17
KH-'I MISSION 1109
SIGNIFICANT RESULTS
UNI? TED ARAB REPUBLIC
GROUND FORCE FACILITIES
25X1D SUEZ CANAL25X1A SPECIAL AREA 1301 30-18?CON 032.33c..00E
25X1D
25X1D
25X1D
25X1D
STATUS:OCCUPIED 25X1A
REMARKS:
ARTILLERY POSITIONS, VEHICLE AND EQUIPMENT REVETMENTS, AAA
SITES, AND OTHER DEFENSIVE POSITIONS ARE OBSERVED ON THE
EGYPTIAN SIDE OF THE CANAL. SOME EVIDENCE OF BOMB DAMAGE IS
ALSO OBSERVED ON THE EGYPTIAN SIDE.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
OTHER RESULTS?NO APPARENT CHANGE
AL ISMAILIYAH MILITARY AREA
NAC
STATUS OCCUPIED
? GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
AL QAHIRAH ARMY BKS SCH AL HILMIYAH
NAC
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1A30,27.
25X1A
/N 0321.150WE
0 06'm5ON 031..1938E
Handle Via
iiirtrii-oiietr For Release 200Cfet/25/Ecilpf-1110178T04562A00030Q0?06VilitYKI;lEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
e - e
Handle Via
TaAprowed For Release 200;
Control System Only
TCS-'20119/70 IPIR 17
KH..44 MISSION 1109
25X1D
d.
gclgi-W78T04562A000300130001-8
UNITED ARAB REPUBLIC
GROUND FORCE FACILITIES
AL OAHIRAH OKS DIV HO TNG CEN HUCKSTEP 25X1 A30,08 145N
NAC
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
AL OANTARAH BKS WEST CAMP AWEISS
NAC
STATUS UNKNOWN
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
BUR SAID COASTAL DEFENSE SITE 2
STATUS: ABANDONED
25X1A
3 ..111/1..
1
26*6BE
31..15..00N 032... 7 40E
REMARKS:
NO EVIDENCE OF REVETMENTS OR TRACK ACTIVITY IS DISCERNIBLE IN
THE AREA@
BUR SAID PROB COASTAL DEFENSE SITE 1 25X1A 31.1.6...25N 032..17 00E
NAC
STATUS: UNKNOWN
1 7
11 Handle Via
Approved For Release 200Criap/4M4-1R9p178T04562A000306000
qcorriTtEy
25X1A
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
-langagbyted For Release 200;
Control System Only
TCS-20i3.9/70 IPIR 17
KH.4 MISSION 1109
918/HclaRigb8T04562A000300130001-8
MISSILE ORDER OF BATTLE:
NONE DISCERNIBLE
NASR TROOP CONC ISMALIA
NAC
STATUS: UNKNOWN
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
SUEZ CANAL SPECIAL AREA 0704
NAC
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE.
NONE DISCERNIBLE
SUEZ CANAL SPECIAL AREA 0708
NAC
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
UNITED ARAB REPUBLIC
GROUND FORCE FACILITIES
25X1A 30-35-15N 032-15.-35E
25X1A31.06.
ON 032,45-.00E
25X1/660..540.00N 032-15.-00
-
12 Handle Via
Approved For Release 2000RFSERIFTFRINST04562A00030Q 1404=
25X1D
25X1D
Hu
Tataktted For Release 20019fAcgirA-1078T04562A000300130001-8
Control System Only
ICS-20119/70 - IPIR 17 UNITED ARAB REPUBLIC
KH-4 MISSION 1109 GROUND FORCE FACILITIES
SUEZ CANAL SPECIAL AREA 0712
NAC
STATUS: UNKNOWN
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
SUEZ CANAL SPECIAL AREA 0716
25X1D NAC
25X1D
25X1D
25X1D
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1A 30.42.000N 032'"
**ODE
25X1A30,u.30...00N 032..15-00E
SUEZ CANAL SPECIAL AREA 1 04 25X1A30 0 ON 032-15..00E
NAC
STATUS UNKNOWN
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
13 Handle Via
_
Approved For Release 200uver2sEtilff-FMT8T04562A00030(aVilitYry
25X1D
25X1D
Makaged For Release 200;
Control System Only
TCS720119/70 "" IPIR 17
01,u,4 MISSION i109
Eaciglkill#78T04562A000300130001-8
SUEZ CANAL SPECIAL AREA 1305 ,
NAC
STATUS :OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NOW. DISCERNIBLE
UNITED ARAB REPUBLIC
GROUND FORCE FACILITIES
25X1A.
34 Handle Via
Approved For Release 2000104:12g6OROFFRNET8T04562A0003091atianLIEy
25X1D
25X1D
25X1D
25X1D
eVia
TalA yed For Release 20019E8gC:RgA078T04562A000300130001-8
Control System Only
TCS,.40119/70 IPIR 17
UNITED ARAB REPUBLIC
KH..4 MISSION 1109 DEPLOYED TACTICAL SSM FACILITIES
OTHER RESULTS...NO APPARENT CHANGE
, AL ISMAILIYAH SUSP TAC MSL STAG AREA A 30.?36..,//N 002?"06?/01E
NAC
25X1A
STATUS:UNKNOWN
MISSILE ORDER OF t3ATTLE:
NONE DISCERNIBLE
AL ISMAILIYAH SUSP TAC MSL STAG AREA B 304.43.*OON.03216"30E
NAC
25X1A
STATUS:UNKNOWN
MISSILE ORDER OF BATTLE:
NONE DISCERNIBLE
Handle Via
Tile_nt-KEYHOLE
Approved For Release 20001?472SE:GRFFIWT-8T04562A000300440Cialemgonly
25X6
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
Next 1 Page(s) In Document Exempt
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
IITMAggiyed For Release 20d -8
Control System Only
TCS20119/70 IP IR 17 HUNGARY
KH-4 MISSION 1109 GROUND FORCE FACILITIES
OTHER RESULTS-NO APPARENT CHANGE
0/8-45.42E
ESZTERGOM ARMY BARRACKS BELI ARTY 205 25X1A47
25X1D NAC
STATUS OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1D
18 Handle Via
Approved For Release n,0(t49p/4cA44-1RIFF8T04562A00030R104SMC
25X1D
25X1D
25X1D
25X1D
HanWelia_
Talftplermed For Release 2001N8Wiglik-1078T04562A000300130001-8
Control System Only
TcSr20119/7P,, IPIR 17KOREA,. NORTH
, _
KH..4 MISSION, 1109 AIR DEFENSE MISSILES
SIGNIFICANT RESULTS
HUNGNAM SAM SITE C22-2
NAC
STATUS:OCCUPIED
25X1A
39..28-50N 127.46..05E
REMARKS:
TWO OF THE SIX LAUNCH POSITIONS ARE OF UNDETERMINED OCCUPANCY.
SNOW HAS BEEN REMOVED FROM THE LAUNCH POSITIONS AND THE ACCESS
ROADS.
MISSILE ORDER OF BATTLE:
PROS LAUNCHERS (WITH 4
POSS MISSILES)
1 PROB FAN SONG RADAR
4 PROB LAUNCHERS 1 PROB RADAR
25X1D KANGS0-.UP SAM SUPPORT FACILITY
411
STATUS OPERATIONAL
25X1A
39.-00-20N 125....22.1+0E
PHYSICAL DESCRIPTION:
4,8 NM NW OF KANGS0?.UP,
THE ROAD...SERVED FACILITY CONSISTS OF THREE LARGE AND TWO SMALL
DRIVE...THROUGH BUILDINGS. NINE DRIVE-IN BUILDINGS. 11
STORAGE/SUPPORT BUILDINGS. AND ONE ADMINISTRATION BUILDING.
A BARRACKS AREA CONTAINING 24 BARRACKS, ONE ADMINISTRATION
19 Handle Via
Approved For Release 2000W2gEaleFFIRM8T04562A000309gAlmtdiEMOLE
felP0 n I y
25X1D
25X1D
25X1D
25X1D
25X1D
Mv(iapirgayedForRelease200TAgclaW78T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17
KH-4 MISSION 1109
KOREA, NORTH
AIR DEFENSE MISSILES
BUILDING, AND FOUR STORAGE/SUPPORT BUILDINGS IS IMMEDIATELY
SOUTH OF THE SUPPORT FACILITY,
MISSILE ORDER OF BATTLE:
NONE DISCERNIBLE
WONSAN SAM SITE A10-2
NAC
STATUS:OCCUPIED
MISSILE ORDER OF BATTLE:
25X1A 39-.08-40N 127.,35-45E
5 LAUNCHERS (2 WITH PROB 1 FAN SONG RADAR
MISSILES)
5 POSS LAUNCHERS 1 PROB FAN SONG RADAR
OTHER RESULTS-110 APPARENT CHANGE'
25X1D N MPO SAM SITE 824-2 25X1A 38-33-00N X25-O73 5E
25X1D
STATUS :ABANDONED
20 Handle Via
e!;Rpictv,p41 For Release 2000f(tfing6GRIFFFRIFITT04562A000300,414
T I tatiVa0n1.1 Ey
25X1D
25X1D
25X1D
25X1D
""VgavedForRelease20M8SiPUARRETP78T04562A000300130001-8
Talent.
Control System Only
TCS..20119/70 IPIR 17
KH..4 MISSION 1109
KOREA, NORTH
GROUND FORCE FACILITIES
SIGNIFICANT RESULTS
CHOM..MAUL HQ 83 INF REGT 4. ARMY BKS 38035N 126**47-B6E
STATUS:OCCUPIED 25X1A
PHYSICAL DESCRIPTION:
800 METERS (0,4 NM) NE OF CHOW.MAUL*
THE FACILITY CONSISTS OF 12 BARRACKS, EIGHT QUARTERS. TWO
ADMINISTRATION BUILDINGS, TWO PROBABLE MESSHALLS/ 12 STORAGE
BUILDINGS. AND SEVEN SUPPORT BUILDINGS.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
ICHON ARMY 8ARRACKS NE 1 25X1A 38..3018N 128-57..08E
STATUS; OCCUPIED
PHYSICAL DESCRIPTION:
3 NM ENE OF ICHON0
THE INSTALLATION CONSISTS OF ONE BARRACKS, TWO POSSIBLE
BARRACKS, ONE LARGE C.-SHAPED ADMINISTRATION BUILDING, ONE
POSSIBLE MESSHALL, AND SEVEN SUPPORT-TYPE BUILDINGS*
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
21 Handle Via
0)7TWRITC1 For ReleaReAPEMptajtMerINFF8T04562A00030P0140nt
25X1D
25X1D
ITTn
.,,gayed For Release 2001g1f8gAgirA-11478T04562A000300130001-8
Control System Only
TCS....20119/70..s IPIR 17
01.04 MISSION 1109
KAESONG ARMY BARRACKS 25X1A
STATUS: OCCUPIED
KOREA' NORTH
GROUND FORCE FACILITIES
37..58."00N
71'130E
PHYSICAL DESCRIPTION:
3.5 NM EAST OF KAESONG.
THE FACILITY CONSISTS OF 14 BARRACKS. ONE. Eu.SHAPEP
ADMINISTRATION BUILDING, AND APPROXIMATELY 30 STORAGE/SUPPORT
BUILDINGS.
GROUND .FORCE, ORDER OF BATTLE;
NONE DISCERNIBLE
25X1D KAESONG ARMY BKS A HQ 61114126..'31.".10E
STATUS:OCCUPIED 25X1A
PHYSICAL DESCRIPTION:
2.8 NM NW OF KAESONG.
THE FACILITY CONSISTS OF 20 BARRACKS, 97 QUARTERS, FIVE
ADMINISTRATION BUILDINGS, ONE MESSHALL, APPROXIMATELY 20
SUPPORT BUILDINGS. AND FOUR TUNNEL EXCAVATIONS.
GROUND FORCE ORDER OF BATTLE:
9 VEHICLES
25X1D
25X1D KAESONG ARMY BKS ARMISTICE COMMISSION 37..5706N 12640!.40E
STATUS: OCCUPIED
25X1A
PHYSICAL DESCRIPTION;
6.1 NM EAST OF KAESONG,
THE FACILITY CONSISTS OF 12 BARRACKS, ONE LARGE ADMINISTRATION
22 Handle Via
Approved For Release 2000M2SERISFFREM3T04562A00030Q1A4UNEy
,
0;:.1
25X1D
25X1D
25X1D
25X1D
25X1D
THaainetuiff4wed ForRelease20d9g8gf.RELEAS6T04562A000300130001-8
Control System Only
ICS...20119/70 IPIR 17 KOREA, NORTH
KHLi. MISSION 1109 GROUND FORCE FACILITIES
BUILDING. AND 20 STORAGE/SUPPORT BUILDINGS.
GROUND FORCE ORDER OF BATTLE:
4 VEHICLES
KAESONG HQ 1 INF REGT BKS 25X1A 37...57,55N 12634...55E
STATUS:OCCUPIED
PHYSICAL DESCRIPTION:
1.4 NM SW OF KAESONG.
THE FACILITY CONSISTS OF FOUR BARRACKS, ONE E.'SHAPED
ADMINISTRATION BUILDING, ONE AUDITORIUM, ONE MESSHALL, AND
SUPPORT BUILDINGS,
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
KAESONG HQ 6 ARTY REGT + ARMY BKS SE 37'.'56.?49N 12.6..36..01E
STATUS: OCCUPIED
25X1A
PHYSICAL DESCRIPTION:
3 NM SE OF KAESONG,
THE FACILITY CONSISTS OF SIX BARRACKS. 13 QUARTERS, ONE
ADMINISTRATION BUILDING. ONE Lq.SHAPED MESSHALL, THREE VEHICLE
SHEDS (ONE L*.SHAPED). APPROXIMATELY 13 SUPPORT BUILDINGS. AND
ONE SIXPOSITION AAA SITE.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
23 Handle Via
Talent-KEYHOLE
Approved For Release 2000/MAMINFROFT8T04562A00030QMOclieseonly
t. 2 i
HanNiihRwedForRelease2OCT9g8W.RRag78T04562A000300130001-8
Tal
Control System Only
TCS..20119/70 IPIR 17
KH.-4 MISSION 1109
KOREA. NORTH
GROUND FORCE FACILITIES
25X1 A
25X1 D KAESONG MIL INSTALLATION NORTHEAST 38..00..40N 1 6 39..20E
25X1 D
25X1 D
25X1 D
25X1 D
STATUS:OCCUPIED
PHYSICAL DESCRIPTION:
5 NM NE OF KAESONG,
THE FACILITY CONSISTS OF ONE BARRACKS, THREE SUPPORT BUILDINGS.
AND FOUR REVETTEU WEAPONS POSITIONS*
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
KAESONG PR HO 85 INF REG 4. STOR NNW 38..03..27N 126..30r26E
STATUS; OCCUPIED
25X1A
PHYSICAL DESCRIPTION:
6 NM NNW OF KAESONG*
THE FACILITY CONSISTS OF NINE BARRACKS. 12 QUARTERS, AND 23
STORAGE/SUPPORT BUILDINGS*
GROUNDFORCE ORDER OF BATTLE;
NONE DISCERNIBLE
KAN..CHON ARMY BKS KOCHONG..NI
STATUS OCCUPIED
25X1 A 37 SiN 1 6..25 4
PHYSICAL DESCRIPTION:
2 NM WNW OF KANCHON0
THE FACILITY CONSISTS OF 13 BARRACKS, ONE ADMINISTRATION
BUILDING. THREE'SUPPORt.BOILOXINGS, AND A VEHICLE MAINTENANCE
AREA WITH TWO SUPPORT BUILDINGS AND FIVE VEHICLE REVETMENTS*
24 Handle Via
Talent-KEYHOLE
Approved For Release 2000M122E:GRIFFFRUFF8T04562A000306114004141only
25X1D
25X1D
25X1D
25X1D
25X1D
Hand For Release 200TR8IC.g&-1078T04562A000300130001-8
Control System Only
TCS".20119/70 IPIR 17
KH...4 MISSION 1109
KOREA, NORTH
GROUND FORCE FACILITIES
GROUND FORCE ORDER OF BATTLE:
3 PROB TRACKED VEHICLES (1 1 PROS TRUCK
RE VETTED)
K sAN-DONG ARMY BKS WEST cLJURI 25X1A 3 ... 260?28...17E
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
5.4 NM SW OF KAESONG.
THE FACILITY CONSISTS OF TWO BARRACKS, FOUR QUARTERS. TWO
VEHICLE SHEDS, AND EIGHT SUPPORT BUILDINGS,
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
KUHWA-R STORAGE DEPOT NORTHEAST 25X1A 3807141N6533E12
STATUS OCCUPIED
PHYSICAL DESCRIPTION:
4.1 NM NE OF KUHWA-RI.
THE FACILITY CONSISTS OF TWO BARRACKS/QUARTERS, ONE VEHICLE
SHED, TWO SUPPORT BUILDINGS. ONE SIX-POSITION AAA SITE. AND
FOUR EXCAVATIONS FOR PROBABLE ARTILLERY POSITIONS.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
Ai
25 Handle Via
Approved For Release 2000104423E:ORFFIWIENT04562A00030QaMen#0
E Y OnliEy
25X1D
25X1D
25X1D
25X1D
ITIZW466te
d For Release 200TR8IC.WA-1078T04562A000300130001-8
Control System Only
ICS-20119/70 IPIR 17
KH.4 MISSION 1109
25X1D
KOREA. NORTH
GROUND FORCE FACILITIES
KUJONG.DONG HQ 17 ARTY REGT 4. ARMY BKS 38.000.02N 126...41.45E
STATUS:oCCUPIp 25X1A
PHYSICAL DESCRIPTION:
2.8 NM NORTH OF PANMUNJOM.
THE FACILITY CONSISTS OF NINE BARRACKS, 49 QUARTERS. ONE
C.SHAPED ADMINISTRATION BUILDING. ONE AUDITORIUM, AND 18
STORAGE/SUPPORT BUILDINGS,
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
KUMAM.GOL ARMY BARRACKS .1- STOR AREA 25X1A 37.54.00N t26.
STATUS; OCCUPIED
8
OE
PHYSICAL DESCRIPTION:
5 NM SE OF KAESONG.
THE AREA IS DISPERSED AROUND A SMALL HILL AND CONSISTS OF SIX
BARRACKS. 16 QUARTERS, APPROXIMATELY 12 SUPPORT BUILDINGS, FOUR
REVETTED LIGHT ARTILLERY POSITIONS, AND SIX PROBABLE MORTAR
POSITIONS.
GROUND FORCE ORDER OF BATTLE;
NONE DISCERNIBLE
26 Handle Via
Approved For Release 2000,1p29E:ORINFRZWT8T04562A00030Q1i64440
E Y OnllEy
25X1D
25X1D
25X1D
25X1D
Handle ViaDP SECUT,RUZE
TAppiraittEd For Release 2000L0/2L tAik-murt8T04562A000300130001-8
Cnuol System Only
TCS..20119/70 IPIR 17
KH...4 MISSION 1109
25X1A
POKKYE..RI ARMY BARRACKS EAST SONGMOL
STATUS; OCCUPIED
KOREA, NORTH
GROUND FORCE FACILITIES
38...27.103N i27u17im21E
REMARKS:
IMMEDIATELY NE OF THE BARRACKS AREA ARE FOUR REVETTED TANK
FIRING POSITIONS WITH TUNNEL ENTRANCES, ONE REVERSE SLOPE
TUNNEL ENTRANCE, TWO BARRACKS, FOUR SUPPORT BUILDINGS, AND
NUMEROUS VEHICLE REVETMENTS. THIS AREA HAS BEEN PREVIOUSLY
REPORTED AS THE POKKYE...RI MILITARY AREA,
GROUND FORCE ORDER OF BATTLE:
VEHICLES
PY NGMA...DONG ARMY BARRACKS
STATUS; OCCUPIED
25X1A
38..06....56N 1260.50...19E
PHYSICAL DESCRIPTION:
101 NM EAST OF PYONGMA...DONG,
THE FACILITY CONSISTS OF 13 BARRACKS, 14 QUARTERS, ONE
ADMINISTRATION BUILDING, ONE L..SHAPED MESSHALL, ONE VEHICLE
SHED, THREE STORAGE BUILDINGS, AND ONE SUPPORT BUILDING
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
t
27 Handle Via
Approved For Release 2000/(r2MR-94M8T04562A0003093#01anitEy
25X1D
25X1D
25X1D
25X1D
ApprorardForRelease2000T6IME.WRPLY#8T04562A000300130001-8
Handle Via
Control System Only
TCS-20119/70 IPIR 17
Klia.4 MISSION 1109
25X1D
SANGJOK TONG ARMY BARRACKS WEST
STATUS: OCCUPIED
25X1A
KOREA, NORTH
GROUND FORCE FACILITIES
3829'38N
27
REMARKS:
IMMEDIATELY SOUTH OF THE BARRACKS AREA ARE FOUR TUNNEL SERVED
VEHICLE REVETMENTS, ONE REVERSE SLOPE TUNNEL ENTRANCE, THREE
ADDITIONAL TUNNEL ENTRANCES, AND SIX SUPPORT BUILDINGS,
GROUND FORCE ORDER OF BATTLE:
4 CANVAS-,COVERED VEHICLES
SOWON-,DONG BKS HQ 8TH INF DIV 25X1A 38-04-12N 126LL12E
STATUS OCCUPIED
PHYSICAL DESCRIPTION:
ON THE WESTERN EDGE OF SOWOW*DONG,
I4,:wILITy CONSISTS OF FIVE SEPARATE AREAS,
46: Handle Via
Approved For Release 2000r(4/23E:ORIE4FIVRT8T04562A0003091404My
25X1D
25X1D
25X1D
opg
iSECIF
Taalidj"Ha rayed For Release 200c8IAA IA-Rakmur78T04562A000300130001-8
Control System Only
TCS..20119/70 IPIR 17
KH-4 MISSION 1109
KOREA, NORTH
GROUND FORCE FACILITIES
AREA A (UTM CT016161) CONSISTS OF NINE BARRACKS, ONE E..SHAPED.
ADMINISTRATION BUILDING, ONE MESSHALL, ONE AUDITORIUM, AND 11
SUPPORT BUILDINGS.
AREA B (CT009166) CONSISTS OF SEVEN BARRACKS, SEVEN QUARTERS,
ONE POSSIBLE MESSHALL, AND EIGHT SUPPORT BUILDINGS.
AREA C (CT020166) CONSISTS OF TWO BARRACKS AND 12 SUPPORT.
BUILDINGS.
AREA p (u024146) CONSISTS OF THREE BARRACKS AND FOUR SUPPORT
BUILDINGS.
AREA E (CT013140) CONSISTS OF 20 QUARTERS AND SIX SUPPORT
BUILDINGS.
MAP SOURCE REFERENCE:
AMS SERIES L752, SHEET 3122.-111
SOWON..DONG MILITARY BKS 4' STORAGE 38..06..00N 747..50E
;.4
25X1A
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
3.2 NM NE OF SOWONu.DONG,
THE FACILITY CONSISTS OF TWO BARRACKS, TEN QUARTERS, ONE
E..SHAPED ADMINISTRATION BUILDING, AND APPROXIMATELY NINE
SUPPORT BUILDINGS.
GROUND FORCE ORDER OF BATTLE;
NONE DISCERNIBLE
' 29 Handle Via
KEtHOLE
Approved For Release 2000V5p2gEMNRAFFT8T04562A00030Q1akinOonly
25X1D
25X1D
25X1D
25X1D
THainAlikamedForRelease200TAMCUU4678T04562A000300130001-8
Control System Only
TCS..20119/70 IPIR 17
KH-4 MISSION 1109
TAERYONG..NI ARMY BKS
STATUS; OCCUPIED
25X1A
KOREA. NORTH
GROUND FORCE FACILITIES
37'51'-37N 12E0.360.45E
PHYSICAL DESCRIPTION:
7.4 NM SE OF KAESONG.
THE FACILITY CONSISTS OF ONE BARRACKS, 20 QUARTERS. AND SEVEN
SUPPORT BUILDINGS,
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
TOGOL ARMY BKS HQ 48TH INF REGT 38?.07.*,40N 126..49..,40E
25X1A
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
IN THE NE QUADRANT OF TOGOL.
THE FACILITY CONSISTS OF 14 BARRACKS. FOUR QUARTERS, ONE
ADMINISTRATION BUILDING. ONE PROBABLE MESSHALL, THREE VEHICLE
SHEDS. SIX SUPPORT BUILDINGS, AND A SIX,POSITION AAA SITE.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
?, ZCV Handle Via
.HEY OLE
Approved For Release 2000M/213E:01WRZW8T04562A00030Wwerponly
25X1D
25X1D
25X1D
25X1D
25X1D
HmeA pd For Release 20031g/iP641-1W78T04562A000300130001-8
Tow
Control System Only
TCS...20119/70 IPIR 17
KH-.4 MISSION 1109
KOREA, NORTH
GROUND FORCE FACILITIES
25X1A
WA,..DONG ARMY BKS + HQ 15 INF DIV 38...11...42N 8..506730E
STATUS: OCCUPIED
PHYSICAL DESCRIPTION:
8.7 NM SOUTH OF TAEBUKPO..RI.
THE FACILITY CONSISTS OF 39 BARRACKS. TEN QUARTERS, ONE
HEADQUARTERS BUILDING, ONE AUDITORIUM. TWO 1-SHAPED MESSHALLS.
ONE H...SHAPED ADMINISTRATION BUILDING, SEVEN VEHICLE SHEDS. AND
FIVE SUPPORT BUILDINGS.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
BKS AREA + CD SITE
NAC
STATUS OCCUPIED
GROUND FORCE ORDER OF BATTLE:
1 REVETTED FA PIECE
25X1A38-*11.1-.29N 128-. 200E
3 VEHICLES
31 Handle Via
Approved For Release 2000refi2ga9R-Fiktpiff8T04562A00030QalidtaCILIEy
25X1D
25X1D
25X1D
25X1D
25X1D
Tan_dle AppeovedForRelease200MacK-EV78T04562A000300130001-8
Ha Via
Control System Only
TCS..20119/70 IPIR 17
KH..4 MISSION 1109 GROUND FORCE FACILITIES
KOREA, NORTH
YONGANG..NI STORAGE AREA NW
STATUS OCCUPIED
25X1A
37...54..,04N 26 49E
PHYSICAL DESCRIPTION:
1.9 NM WSW OF YONGANS..NI.
THE FACILITY CONSISTS OF THREE LARGE BARRACKS, ONE OTHER
BARRACKS, ONE ADMINISTRATION BUILDING, THREE QUARTERS, AND
SEVEN SUPPORT BUILDINGS.
GROUND FORCE oneR OF BATTLE:
3 REVETTED VEHICLES
OTHER RESULTS-NO APPARENT CHANGE
HAECHON...NI MILITARY AREA SW
NA
STATUS: OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
IC ON ARMY BARRACKS NE 2
NAC
STATUS: OCCUPIED
25X1A 39..,03..35N 12726iOOE
25X1A 38..3
OON 126-57-30E
Handle Via
Talent-KEYHOLE
Approved For Release 2000ide2SEGRKFNIFF8T04562A00030061,8012101eanly
25X1D
25X1D
25X1D
hulleVia
TaAPpmed For
Control System Only
TCS...20119/70
KH-4 MISSION
Release 200Sigac1-Prg78T04562A000300130001-8
IPIR 17 KOREA, NORTH
09 GROUND FORCE FACILITIES
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
ICHON ARMY BKS NE AND HQ 5TH INF DIV
NAC
STATUS:OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1A,
aS..30 14N 26..55,u.38E
KIYANG.NI BARRACKS AREA
25X1A 38 54..05N
12
30...5 E
25X1D
NAC
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
25X1D
KOMSUGAE ARMY BARRACKS
25X1A 38...F29..49N
127
24
NAC
25X1D
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
- 111lle Via
Talent-KEYHOLE
Approved For Release 200070e2Sfafig-Fitilfi8T04562A00030061,801301es8only
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
aagiep'a9Ng
d For Release 200MacigLRYFF78T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17
KH-4 MISSION 1109
KOREA? NORTH
GROUND FORCE FACILITIES
TOK-KOL HQ 4TH INF DIV ARMY BKS 25X1 A38-35-42N 127..17..16E
NAC
STATUS:OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
WON AN ARMY SKS 4. HO 29 ARTY REGT
NAC
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
WONSAN ARMY BKS HQ 53 INF REGT
NAC
STATUS: OCCUPIED
25X1A 39..07-35N 127 22..30E
2SX1A39.10201
2-35E
-3i Handle Via
proved For Release 20001N2SECCRUFitighT04562A00030014004151946only
'Or
25X1D
MagypdForRelease200M/WIEUN78T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17
KH...4 MISSION 1109
GROUND FORCE ORDER OF BATTLE;
NONE DISCERNIBLE
WONSAN HQ 7 PP DIV
NAC
25X1D
25X1D
25X1D
25X1D
STATUS OCCUPIED
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
WONSAN VEHICLE MAINTENANCE DPQ NW
NAC
STATUS:OPERATIONAL
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
KOREA, NORTH
GROUND FORCE FACILITIES
25X1- QI??9-1.0? N 127 5-b4.E
25X1A 39..09-,45N 1271! 0 E
- 35- - ?57P
Li4prQ,Vpd For Release 2b604"4
igt-06r110113T04562A00030Qacusystmonly
25X1D
25X1D
IlaudleVia
Taff;Mod For Release 20019g/HcRIMF78T04562A000300130001-8
Control System 010
TCS..20119/70 'FIR 17 KOREA. NORTH
KH...4 MISSION 1109 LOGISTICS
SIGNIFICANT RESULTS
CHONGJU RR YARDS AND SHOPS 25X1A 125,.12...50E
STATUS OPERATIONAL
PHYSICAL DESCRIPTION:
ON THE SOUTH EDGE OF CHONGJU.
THE YARD CONSISTS OF A TRACK CLASSIFICATION/HOLDING YARD AT
LEAST TEN TRACKS WIDE AND A REPAIR YARD AT LEAST FIVE TRACKS
WIDE. THE CLASSIFICATION/HOLDING YARD CONTAINS A PASSENGER
STATION, ONE WAREHOUSE, ONE SUPPORT BUILDING, AND TWO OPEN
FREIGHT PLATFORMS. THE REPAIR YARD CONTAINS A TURNTABLE, FOUR
RAIL-IN REPAIR/SERVICE BUILDINGS, AND TWO SUPPORT BUILDINGS.
A FORMER REPAIR/SERVICE FACILITY ON THE WEST EDGE.. OF THE YARDS.
APPEARS TO BE: A TRANSFORMER YARD FOR THE ELECTRIFIED RAIL LINE,
ACTIVITY IS LIGHT WITH THE YARD LESS THAN TEN PERCENT FILLED.
ASSOCIATED OBJECTS:
25 PIECES OF ROLLING STOCK
(AT LEAST)
25X1A
SAMDONG..NI RR CLF YARDS + -01E
25X1D
STATUS OPERATIONAL
PHYSICAL DESCRIPTION:
6 NM NNE OF SONGCHON AND 15 NM EAST OF CHASAN,
THE FACILITIES CONSIST OF A CLASSIFICATION YARD AT LEAST 18
TRACKS WIDE, A PASSENGER STATION, SEVEN STORAGE/SUPPORT
BUILDINGS, A REP4RijARD AT kosT FIVE TRACKS WIDE WITH A
,TURNTABLE, A CAR REPAIR 6U1LDING, TWO SHOPS/SUPPORT BUILDINGS,
36 Handle Via
Approved For Release 200170inECREir-FRUPF8T04562A00030PoitatirEy
25X1D
25X1D
25X1D
Handle ViaaE.CF,T
stefsinlor Release 2000Tu w2z . 8T04562A000300130001 -8
TcoMTry
TCS-20119/70 IP/R 17 KOREA, NORTH
KH-4 MISSION 1109 LOGISTICS
EIt,HT STORAGE/SUPPORT BUILDINGS. AND AN ASSOCIATED THREE-TRACK
SIDING WITH APPROXIMATELY 12 OTHER BUILDINGS.
ACTIVITY IS LIGHT WITH THE YARDS 25 PERCENT FILLED.
SINANJU RAILROAD YARDS
NAC
STATUS: OPERATIONAL
25X1439-35-54N 125-.36.0,18E
REMARKS:
ACTIVITY IS LIGHT WITH THE YARD LESS THAN 10 PERCENT FILLED.
vt.
Handle Via
37 Ta e
Approved For Release 2000162&EGRIKFRItiff8T04562A0003006130001efeenly
25X1D
25X1D
25X1D
25X1D
?
Handle Via
ed For Release 20011/8g/gcN-IEV78T04562A000300130001-8
Control System Only
TCS,..20119/70 IPIR 17 KOREA. NORTH
KH-4 MISSION 1109 INDUSTRY
SIGNIFICANT RESULTS
25X1A
PYONGYANG STEEL PLANT KANGSON
STATUS OPERATIONAL
38-55-17N 125,..35..'.00E
PHYSICAL DESCRIPTION:
ON THE SE EDGE OF KANGSON.
THE RAIL..., ROAD.'., AND WATER-SERVED PLANT CONSISTS OF TWO
ELECTRIC FURNACE BUILDINGS. TWO ROLLING MILLS. ONE LARGE
MONITOR-ROOFED FABRICATION-TYPE BUILDING, ONE FINISHING MILL.
ONE PRODUCER GAS PLANT. ONE AIR SEPARATION BUILDING, TWO
PROBABLE FOUNDRIES, A WATER TREATMENT FACILITY WITH TWO COOLING
TOWERS (ONE UNDER CONSTRUCTION), ONE TRANSSHIPMENT BUILDING, A
TRANSFORMER YARD, OPEN STORAGE, AND NUMEROUS SUPPORT BUILDINGS.
OTHER RESULTS-NO APPARENT CHANGE
CHAEDONG...NODONGJAGU PET PRD STR PUG
NAC
STATUS: OPERATIONAL
25X1A39-32.^30N 128-.17...08E
38 TaienHttlYe Viaff
Approved For Release 2000T021ECCRIUFRUFf8T04562A00030016013aleanly
25X1D
25X1D
ITIN44awedForRelease200M/gclaW78T04562A000300130001-8
Control System Only
TCS..20119/70 IPIR 17 SOVIET UNION
KH...4 MISSION 1109 DEPLOYED STRATEGIC SSM FACILITIES
SIGNIFICANT RESULTS
YOSHKAR 25X1A..OLA ICBM COMPLEX 56-310.30N 0148-.10..,30E
STATUS OPERATIONAL
REMARKS:
ALL KNOWN ELEMENTS OF THE COMPLEX ARE INTERPRETABLE, INCLUDING
THE FIVE NEWLY IDENTIFIED LAUNCH SITES AND THE NEWLY IDENTIFIED
LAUNCH CONTROL FACILITY WHICH WERE REPORTED IN THE OAK. THREE
LAUNCH SITES. 62E. 63E, AND 64E. HAVE NOW BEEN REASSIGNED TO
LAUNCH GROUP F. LAUNCH GROUP E NOW CONSISTS OF LAUNCH SITES
56E...61E, 65E, AND 72E...74E, AND LAUNCH GROUP F NOW CONSISTS OF
LAUNCH SITES 62F..64F, 66F...71F, AND 75F,
AN 55...7 MISSILE ON ITS TRANSPORTER IN FRONT OF THE LEFT
MISSILE...READY BUILDING AT LAUNCH SITE 3 IS THE ONLY ACTIVITY
OBSERVED AT THE SS...7 SITES.' IN LAUNCH GROUP Bt THE LAUNCH
CONTROL FACILITY AND LAUNCH SITES 235, 255. 278. 28B. 308, 31B.
AND 326 ARE NOW COMPLETE, COMPLETING THE GROUP, IN LAUNCH
GROUP Ct LAUNCH SITES 48C. 54C, AND 55C ARE NOW IN A LATE STAGE
OF CONSTRUCTION, WHILE SITES 49C AND 50C ARE IN AN UNDETERMINED
STAGE, IN LAUNCH GROUP D. SITES 37Dt 39D, 41Dt 44D, AND 510
ARE IN AN UNDETERMINED STAGE, IN LAUNCH GROUP Et SITES 56E,
57E. 58E, AND 59E ARE NOW IN THE MIDSTAGE AND 65E IS
UNDETERMINED. IN LAUNCH GROUP Ft SITES 69F AND 71F ARE NOW IN
THE MIOSTAGE, AND 62Ft 63Ft AND 68F ARE UNDETERMINED, FOUR
AREAS ARE NOW DISCERNED IN THE SS-13 PORTION OF THE
RAIL...TO...ROAD TRANSFER POINT, THEY ARE A MISSILE RIM AREA, A
GROUND SUPPORT EQUIPMENT AREA, A PROBABLE STORAGE AREA, AND A
TRAINING SITE,
17,
4 4, Ad 9
Handle Via
Talent-KEYHOLE
Approved For Release 2000TICA22Eaglaigir8T04562A000300/400411046only
le Via
HTaandsNed ForRelease200TRACW4-1078T04562A000300130001-8
Control System Only
TCS...20119/70 'FIR 17 SOVIET UNION
KH..4 MISSION 1109 AIR DEFENSE MISSILES
SIGNIFICANT RESULTS
25X1D KADUY SAM COMPLEX B30..5 25X1A
25X1D
25X1D
25X1D
25X1D
25X1D
STATUS; OCCUPIED
59...18..13N 0 8...47.12SE
REMARKS:
THE COMPLEX IS IN THE VERY LATE STAGES OF CONSTRUCTION.
MISSILE...READY BUILDINGS OR SHELTERS ARE OBSERVED AT LAUNCH
POSITIONS Al, B1.0.561 C2, AND C5* EARTH..COVERED
BUILDINGS AT SITE CONTROL CENTERS A AND B ARE COMPLETE,
CONSTRUCTION CONTINUES AT SITE CONTROL CENTER C. LAUNCHERS ARE
IN POSITION AT ALL 18 LAUNCH POINTS, THE TRACKING AND GUIDANCE
FACILITY IS COMPLETE AND OCCUPIED. NO CHANGE IS OBSERVED IN
THE MISSILE-HANDLING FACILITY* A FOUR-SECTION LIQUID WASTE
TREATMENT BASIN BETWEEN THE MISSILE-HANDLING FACILITY AND THE
KOLP RIVER HAS BEEN COMPLETED SINCE
IT IS CONNECTED TO THE SUPPORT FACILITY BY TWO GROUND SCARS*
CONSTRUCTION CONTINUES AT THE SUPPORT FACILITY,
MISSILE ORDER OF BATTLE:
... LAUNCH AREA
18 LAUNCHERS
KAZAN ABM/ SA-5 SEARCH AREA
STATUS; UNDER CONSTRUCTION
25X1A
REMARKS:
AN SA-5 INSTALLATION (KAZAN SAM COMPLEX B06uP5,
IS IN AN EARLY STAGE OF CONSTRUCTION 13 NM NE OF KAZAN AT
55..54740N 049..24...50E.
25X1A
049...08..//E
40 Handle Via
Approved For Release 2000/NIZEORKFINT8T04562A0003006146@ing
25X1D
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
THaagbaribypdForRelease200;
Control System Only
TCS'.20119/70 IPIR 17
KH-4 MISSION 1109
d.
gcla-Ftigh8T04562A000300130001-8
SOVIET UNION
COMMO/ELEC/RADAR FACILITIES
SI NIFICANT RESULTS
KARGOPOL MICROWAVE FACILITY 25X1A
25X1D
STATUS; OPERATIONAL
038.#50..19E
PHYSICAL DESCRIPTION:
6 NM NW OF KARGOPOLo THIS FACILITY CONSISTS OF A LATTICE
MICROWAVE TOWER WITH THREE ASSOCIATED BUILDINGS, THE SMALL
SCALE OF THE PHOTOGRAPHY PRECLUDES IDENTIFICATION OF ANTENNA
TYPE AND ORIENTATION.
25X1D
25X1D KASHIN MICROWAVE FACILITY 25X1A
25X1D
25X1D
25X1D
STATUS:OPERATIONAL
2
N 037..35...15E
PHYSICAL DESCRIPTION:
ON THE WESTERN EDGE OF KASHIN? THIS FENCED INSTALLATION
CONSISTS OF ONE MICROWAVE TOWER AND A CONTROL BUILDING. THE
SMALL.,SCALE OF THE PHOTOGRAPHY PRECLUDES IDENTIFICATION OF THE
ANTENNA ELEMENTS AND THEIR ORIENTATION.
KAZAN FIX FOUR FACILITY 25X1A
STATUS OPERATIONAL
55.4+5...4.0N 049...15.10E
PHYSICAL DESCRIPTION:
5.5 NM SE OF KAZAN* THIS FACILITY CONSISTS OF ONE FIX FOUR
ANTENNA IN A SECURED AREA.
Handle Via
Approved For Release 200filep/4c01-likIBIFF8T04562A00030PAMMLIEy
HanWear
Tal oted For Release 200 30001-8
Control System Only
TCS..20119/70 IPIR 17
KH.,4 MISSION 1109
K1MRY AW RADAR FACILITY 25X1A
25X1D
25X1D
25X1D
25X1D
t
STATUS: OPERATIONAL
SOVIET UNION
COMMO/ELEC/RADAR FACILITIES
56*49...25N
PHYSICAL DESCRIPTION:
3.1 NM SOUTH OF KIMRY* THIS INSTALLATION IS SINGLE FENCED AND
CONSISTS OF TWO OCCUPIED RADAR MOUNDS, ONE LARGE SUPPORT
BUILDING, AND A PROBABLE SMALL SUPPORT BUILDING*
ELECTRONIC ORDER OF BATTLE:
I PROB BAR LOCK
1 PROB ROCK CAKE OR STONE
CAKE
ASSOCIATED OBJECTS:
10 VEHICLES OR PIECES OF
EQUIPMENT (AT LEAST)
NOVOSIBIRSK RDO COMP STA MATVEYEVSKIY 54..5605N 083*.060..10E
STATUS: OPERATIONAL
25X1A
PHYSICAL DESCRIPTION:
9 NM SE OF NOVOSIBIRSK* THIS HF COMMUNICATIONS FACILITY
CONSISTS OF AT LEAST FIVE FISHBONE RECEIVING ANTENNAS. TWO
CONTROL BUILDINGS, ONE VEHICLE STORAGE BUILDING. 11 SUPPORT
BUILDINGS, AND A MOTOR POOL,
ASSOCIATED OBJECTS:
10 VEHICLES (AT LEAST)
43 Handle Via
,
Approved For Release 200919p/M044-1RUFF8T04562A00030611001311-1Ey
25X1D
25X1D
TApprovedForRelease200CT/98/252E:8Mg8T04562A000300130001-8
HanMe Via
Control System Only
TCS.0'20119/70 IPIR 17
KH..4 MISSION 1109
SOVIET UNION
COMMO/ELEC/ ADAR FACILITIES
VLADIMIR HF COMMO FACILITY 25X1A 54.0,15N 039-.43-.50E
STATUS: OPERATIONAL
PHYSICAL DESCRIPTION:
13 NM WNW OF VLADIMIR. THIS SECURED INSTALLATION IS IN A
WOODED AREA AND CONSISTS OF A CONTROL BUNKER. FOUR PROBABLE
DOUBLE RHOMBICS (ONE DAY/NIGHT PAIR), AND A SMALL SUPPORT AREA
CONTAINING APPROXIMATELY 11 BUILDINGS.
4.14 Handle Via
Approved For Relea-e'2(ittiCifitita4k-FEWT8T04562A000309ARitagn`iEy
ed For Release 200M/WI1AIIYFF78T04562A000300130001-8
Control System Only
TCS...20119/70 IPIR 17 SOVIET UNION
KH..4 MISSION 1109 AIR BASE FACILITIES
SIGNIFICANT RESULTS
ANISOVO GORO 1 HCHL AIRFIELD
25X1D NAC
STATUS OPERATIONAL
AIR ORDER OF BATTLE:
44 BADGER
25X1D
25X1D
25X1D
25X1D
25X1A
BAKANAS AIRFIELD
STATUS; OPERATIONAL
25X1A
54..13..30N 034...22..12E
44..49...10N 076..15..30E
PHYSICAL DESCRIPTION;
1 NM NW OF BAKANASe THIS IS A TRIANGULAR...SHAPED, NATURAL
SURFACE, SERVICEABLE LANDING AREA MEASURING APPROXIMATELY 1,524
METERS (5.000 FEET) ON EACH OF THE THREE SIDES, FACILITIES
INCLUDE ONE SUPPORT BUILDING,
AIR ORDER OF BATTLE:
1 COLT
CHUGUYEV AIRFIELD
STATUS: OPERATIONAL
25X1A
49..50..18N 036'..38.'32E
REMARKS:
A LARGE PROBABLE ARCH...ROOFED HANGAR HAS BEEN CONSTRUCTED IN THE
AIRCRAFT STORAGE AND MAINTENANCE AREA,
AIR ORDER OF BATTLE:
1 PROB CRATE
2 CAB
3 PROR COLT
167 SMALL
SWEPT/STRAIGHT..WING (AT
LEAST)
45 Handle Via
Approved For Release 200111(91MCM-Rpff78T04562A00030MACUy
THaadAerYRayed ForRelease20M8WPITAR478T04562A000300130001-8
Control System Only
TCS-20119/7A WM 17
KH.-4 MISSION 1109
SOVIET UNION
AIR EASE FACILITIES
69 SMALL SWEPT WING 20 SMALL STRAIGHT-WING
25X1D
UOBRYNSKOYE AIRFIELD
NAC
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
STATUS OPERATIONAL
AIR ORDER OF BATTLE:
1 PROB CA
25X1A156._4._
14 43N 040-35-28E
MALL SWEPT-WING
1 CAB 20 SMALL SWEPT/0ELTAWING
22 SMALL SWEPT/DELTA-WING
(AT LEAST)
02HANKOY AIRFIELD
NAC
STATuS:oPERATIONAL
25X1A 45-41-58N 034-254.15E
REMARKS:
THE COUNT OF 22 CAT/CUB REPRESENTS A DECREASE OF 12 FROM THE
NORMAL COUNT OF 34.
46 Handle Via
Approved For Release 200N913/4014-10F178T04562A00030910MtEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
TH:20E9j/edForRelease201106SPETABlia78T04562A000300130001-8
Control System Only
TCS-.40119/7()_.. IPIR 17
KM-4 MISSION 1109
AIR ORDER OF BATTLE:
22 CAT/CUB
GVARDEYSKOYE AIRFIELD
NAC
STATUS: OPERATIONAL
AIR ORDER OF BATTLE:
2b BADGER
KALININ BOMBING RANGE
STATUS: OPERATIONAL
25X1A
SOVIET UNION
? AIR BASE FACILITIES
25X1A145.07 -.10N 033-58-.38E
4 POSS CAT/CUB/CAMP
57-,10- ON 035-580.35E
PHYSICAL DESCRIPTION:
19.4 NM NORTH OF KALININ. THIS BOMBING RANGE IS UNSECURED AND
CONSISTS OF A SIMULATED AIRFIELD WITH 14 AIRCRAFT REVETMENTS,
TEN MOCKUP AIRCRAFT (TWO ON THE RUNWAY AND EIGHT IN THE
REVETMENTS)? TWO CIRCLED CROSS AIMING POINTS, EIGHT CIRCULAR
TARGET MARKERS, AND NUMEROUS STRAFING TARGETS.
KOSTROMA AIRFIELD
NAC
STATUS: OPERATIONAL
25X1A
57'+7'53N 041-010.10E
47 Handle Via
AitSr'okied For Release 200Nap/4aRIF-IROFF8T04562A00030afaiffry
25X1D
25X1D
25X1D
25X1D
25X1D
THaainedakintedForRelease20M8gATAWD78T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17
KH...4 MISSION 1109
REMARKS:
THE RUNWAY HAS BEEN CLEARED OF SNOW.
AIR ORDER OF BATTLE:
PROB COLT
110 SMALL SWEPT/DELTA-WING
(APPROXIMATELY)
3 LIGHT STRAIGHT-WING
90 SMALL SWEPT/DELTA...WING
(APPROXIMATELY)
LENINGRAD AIRFIELD
NAC
STATUS:OP RATIONAL
AIR ORDER OF BATTLE:
1 CRUSTY
8 CAMEL
3 COOKPOT
SOVIET UNION
AIR BASE FACILITIES
7 SMALL STRA GHT-WING (AT
LEAST)
'459-Lt
-06N 03Ot7LE
11 COOT
9 CRATE
1 LIGHT STRAIGHT-WING
48 Handle Via
Approved For Release 200C110p/RCHIHRIgpF8T04562A00030(1
ibeimmy4onLIEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
cif8MclIT0078T04562A000300130001-8
TaifiPPCIONed For Release 200-6
Han(le Via
Control System Only
i'Sm"*20119/70 IPIR 17
KH-4 MISSION ?109
SOVIET UNION
AIR BASE FACILITIES
25X1A
LENINGRAD/LEVASHEVO AIRFIELD 60-05-16N 030-.11..34E
STATUS OPERATIONAL
REMARKS:
THE RUNWAY HAS BEEN CLEARED OF SNOW.
AIR ORDER OF BATTLE:
1 PROB STRAIGHT-WING (AT
LEAST)
MOSCOW/MONO? AIRFIELD
NAC
STATUS:OPERATIONAL
AIR ORDER OF BATTLE:
1 BOUNDER
1 PROB BLINDER
1 BADGER
1 BULL
1 COKE
1 BOUNDER
1 BLINDER
2 BADGER
1 BULL
1 CAT/CUB
25X1N5..5020N 03
1 CAB
1 PROB HOOK
2 LIGHT STRAIGHT-WING
7 SMALL SWEPT/DELTA-WING
1 CRATE
1 CAB
1 PROB HOOK
8 SMALL SWEPT/DELTA-WING
'10'.00E
49 Handle Via
Approved For Release 2000W2SE:ORIFTWERT04562A00030Q141,020tEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
TaAppieuedForRelease2000 /g.KLIEVT8T04562A000300130001-8
Handle Via
Control System Only
TCS20119/70 IPIR 17
KH-4 MISSION 1109
POLTAVA AIRFIELD
NAC
STATUS OPERATIONAL
AIR ORDER OF BATTLE:
57 BADGER
3 CAB
RO TOV AIRFIELD NORTHWEST
NAC
STATUS OPERATIONAL
REMARKS:
THE 77 SMALL SWEPT'-WING REPRESENT AN. INCREASE OF 23 SINCE
AND AN INCREASE OF 53 SINCE (MISSION
3. COLT
SOVIET UNION
AIR BASE FACILITIES
25X1A49-37-,38N 0 4 9017E
25X1A
Lrmyilai'- 6-46,..38*. 2E
25X1D
AIR ORDER OF BATTLE:
2
COKE
77
SMALL SWEPT-WING
3
CRATE
4
SMALL STRAIGHT-wING
4
CAB
2
SMALL PROB AIRCRAFT
1.
CLOD
SAKI AIRFIELD
NAC
STATUS:OPERATIONAL
AIR ORDER OF BATTLE:
24 MEDIUM SWEPT-WING (AT
LEAST)
25X1D
25X1A L50532N 033-.36 18E
4 LIGHT STRAIOHT-W/NO (AT
LEAST)
56 Handle Via
Approved For Release 200CPDP/SECIM-FRUPV8T04562A00030R4NtigUy
25X1D
25X1D
25X1D
25X1D
25X1D
TaApreicoredForRelease2000/g.ga:#78T04562A000300130001-8
Handle Via C
Control System Only
TCS..20119/70 ., IPIR 17
KH,..,4 MISSION 1109
25X1D
SESHCHA AIRFIELD
SOVIET UNION
AIR BASE FACILITIES
25X1A,
-o3,.,4255N 033 ..42E
NAC
STATUS:OPERATIONAL
REMARKS:
THIS IS A DECREASE OF SEVEN CAT/CUB SINCE
AIR ORDER OF BATTLE:
23 CAT/CUU
SiiiiiiiiiiiliFIELD
NAC
STATUS OPERATIONAL
? AIR ORDER OF BATTLE:
10 POSS AIRCRAFT
(APPROXIMATELY)
25X1D TAMBOVKA AIRFIELD
STATUS: OPERATIONAL
25X1A
25X1D
25X1A 59. 7E
50...0800N 2 ...04 OE
PHYSICAL DESCRIPTION:
A 4,415 X 130-METER (14,485 X 426-FOOT) NNW/SSE GRADED*EARTH
RUNWAY WITH A PARALLEL TAXIWAY, TWO END-CONNECTING LINKS, AND
ONE CROSSOVER LINK. THE POL STORAGE FACILITY NEAR THE SSE END
OF THE. PARALLEL TAXIWAY CONTAINS TEN POL STORAGE REVETMENTS,
Ik!HO'RIZONTAL TANKS ARE OBSERVED IN EACH REVETMENT. A SUPPORT
AREA BETWEEN THE TAXIWAY AND THE POL STORAGE AREA CONTAINS ONE
51 Handle Via
Approved For Release 200C1701MCRE4-FRIEWF8T04562A000309434NatEy
25X1D
25X1D
25X1D
25X1D
25X1D
25X1D
Approved ForRelease2OOMPK-CV78T04562A000300130001-8
Handle Via
%
Control System Only
TCS-20119/70 IPIR 17
KH-4 MISSION 1109
SOVIET UNION
AIR BASE FACILITIES
BARRACKS-TYPE BUILDING AND THREE STORAGE OR SUPPORT BUILDINGS.
STACKS OF MATERIAL ARE IN OPEN STORAGE IN THE SUPPORT AREA. A
SECoND PO4 STORAGE AREA SOUTH OF THE SUPPORT AREA CONTAINS TWO
HORIZONTAL POL TANK STORAGE REVETMENTS. PROBABLE NAVIGATIONAL
AIDS ARE OBSERVED BETWEEN THE RUNWAY AND TAXIWAY AT THE SSE
ENO. THE RUNWAY IS BEING CLEARED OF SNOW.
AIR ORDER OF BATTLE;
NONE DISCERNIBLE
VESELOYE AIRFIELD
NAC
STATUS; OPERATIONAL
AIR ORDER OF BATTLE:
25 BADGER
1 CAMEL
yAROSLAVL/TUNOSHNOYE AIRFIELD
NAC
STATUS :OPERATIONAL
AIR ORDER OF BATTLE:
38 SMALL SWEPT/DELTA-WING
(AT LEAST)
2 COLT
-L52.
25X1A45-34-46N 4-16-54E
25X1A 57-33-35N O4OO9.16l0
SMALL STRAIGHT-WING
Handle Via
Approved For Release itNigmfeliEy
25X1D
25X1D
TIAmtedForRelease200125fcAl-W8T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17 SOVIET UNION
KH-4 MISSION 1109 AIR BASE FACILITIES
25X1D
ZAP0ROZHYE AIRFIELD EAST
STATUS OPERATIONAL
25X1A
47-5 -04N 035-18-41E
REMARKS:
THE PARKING APRON AT THE CIVIL TERMINAL APPEARS To BE COMPLETE.
THE COUNT OF NINE CAT/CUB IS 15 TO 20 BELOW NORMAL.
AIR ORDER OF BATTLE:
32 pROB FIREBAR-TYPE
AIRCRAFT
1 CoOKPOT
9 CAT/CUB
4 COKE
1 CRATE
ASSOCIATED OBJECTS:
4 SMALL SWEPTWING
STATIC DISPLAY)
53
3 PROB CRATE
3 CAB
12 COLT
4 SMALL STRAIGHT-WING
1 SMALL AIRCRAFT
Handle Via
Approved For Release
0 yitritEy
Handle Via
Awed For Release 200M252EFMAW8T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17
xH-4 MISSION 1109
SIGNIFICANT RESULTS
25X1D LOM0N0S0V PORT FACILITIES
NAC
25X1D
STATUS:OCCUPIED
NAVAL ORDER OF BATTLE:
10 SHIPS (APPROXIMATELY)
SOVIET UNION
NAVAL BASE FACILITIES
25X1A 59-55-37N
029
14,6-32E
Handle Via
Approved For Release 20OCKNIZSENETFRIgify8T04562A00030QAMMEy
25X1D
25X1D
Handle Via 11)12,4EC.R ET AMEE
TAppromod For Release 2000/uoiLL : t.4m-mur t 8T04562A000300130001-8
Control System Only
TCS-20119/70 IPIR 17 SOVIET UNION
KH-4 MISSION 1109 GROUND FORCE FACILITIES
SIGNIFICANT RESULTS
BUSSE BORDER SECURITY POST 25X1A
STATUS OCCUPIED
45-.36-50N 133-.28..30E
PHYSICAL DESCRIPTION:
500 METERS (1,(40 FEET) EAST OF THE USSR-CHINA USSURI RIVER
BORDER AT BUSSE. THIS INSTALLATION HAS PERIMETER DEFENSES AND
CONTAINS ONE BARRACKS, ONE PROBABLE SUPPORT BUILDING, AND THREE
UTILITY SIDS.
GUSINOYE ()ZERO STORAGE AREA 51-06,-00N 106..44-00E
25X1D 25X1A
25X1D
25X1D
STATUS:UNDER CONSTRUCTION
PHYSICAL DESCRIPTION:
1 NM WEST OF LAKE GUSINOYE. THIS DOUBLE-SECURED AREA CONTAINS
42 LARGE STORAGE STORAGE BUILDINGS AND 42 PROBABLE BUILDING
EXCAVATIONS. A SECOND STORAGE AREA APPROXIMATELY 0.5 NM TO THE
SOUTH CONTAINS 16 POSSIBLE BUILDING EXCAVATIONS AND TWO
BUILDINGS. A SUPPORT AREA BETWEEN THE TWO, STORAGE AREAS
CONTAINS 14 BUILDINGS IN VARYING STAGES OF CONSTRUCTION AND A
POSSIBLE TENT CAMP,
KAIIRLAGAN BORDER SECURITY POST EAST 43,,,40?.25N 080-3005E
STATUS OCCUPIED
25X1A
?
55 Handle Via
Approved For Release 2000/(W7SENKR11211118T04562A000309aVagginiEy
25X1D
25X1D
25X1D
25X1D
Handle Via
TaApproored For Release 2000/g. g-&1:1V78T04562A000300130001-8
Control System Only
TOS720119/70 IPIR 17 SOVIET UNION
KH.4 MISSION 1109 GROUND FORCE FACILITIES
PHYSICAL DESCRIPTION:
3.2 NM WEST OF THE USSR-.CHINA BORDER, THIS SECURED FACILITY
HAS PERIMETER DEFENSES AND CONTAINS ONE L7SHAPED BARRACKS. TWO
SUPPORT BUILDINGS. TWO SUPPORT OR STORAGE BUILDINGS, AND ONE
UTILITY SHED. A POSSIBLE HELIPAD IS APPROXIMATELY 300 METERS
(985 FEET) WEST OF THE INSTALLATION,
GROUND FORCE ORDER OF BATTLE:
5 VEHICLES OR PIECES OF
EQUIPMENT IAT LEAST)
KAIIRLAGAN BORDER SECURITY POST NORTH 43...50*.50N 08031...00E
STATUS OCCUPIED
25X1A
PHYSICAL DESCRIPTION:
I NM WEST OF THE USSR-CHINA BORDER. THIS SECURED
PERIMETER DEFENSES AND CONTAINS ONE BARRACKS, ONE
BUILDING, THREE STORAGE OR SUPPORT BUILDINGS, AND
SHED, A DEPENDENTS HOUSING AREA WITH NINE FAMILY
100 METERS (329 FEET) TO THE NORTH,
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
FACILITY HAS
SUPPORT
ONE UTILITY
DWELLINGS IS
KAIIRLAGAN BORDER SECURITY POST SOUTH 43..41..30N 080-3'+-20E
STATUS:OCCUPIED
25X1A
PHYSICAL DESCRIPTION:
2.2 NM wesT OF THE USSR-CHINA BORDER. THIS SECURED FACILITY
HAS PERIMETER DEFENSES AND CONTAINS ONE BARRACKS, FIVE SUPPORT
BUILDINGS. AND ONE STORAGE SHED, FIVE STORAGE OR SUPPORT
BUILDINGS ARE OUTSIDE THE SECURED AREA.
56 Handle Via
?
Approved For Relea'S' pr-RWT8T04562A00030QatiVantiEy
Handle Via
TaPPd For Release 200W8/?iC.Iglik-F078T04562A000300130001-8
Control System Only
TCS-20119/70 IpIR 17
KH,-,4 MISSION 1109
GROUND FORCE ORDER OF BATTLE:
5 VEHICLES OR PIECES OF
EQUIPMENT
25X1D
25X1D KA LININ ARMY BARRACKS AL 10
NAC
STATUS:OCCUpIED
GROUND FORCE ORDER OF BATTLE:
130 VEHICLES AND PIECES OF
EQUIPMENT (AT LEAST)
25X1D
KALININ ARMY BARRACKS VOLGA AL 8
25X1D NAC
STATUS: OCCUPIED
25X1D
25X1D
GROUND FORCE ORDER OF BATTLE:
200 VEHICLES AND PIECES OF
EQUIPMENT (AT LEAST)
KALININ ARMY BKS NW AL 6
NAC
STATUS:OCCUPIED
GROUND FORCE ORDER OF BATTLE:
10 VEHICLES AND PIECES OF
EQUIPMENT (AT LEAST)
,
SOVIET UNION
GROUND FORCE FACILITIES
25X1A 56.050-30N 035..47r25E
25X1A56.?51,..1.9N 035-,50..11E
25X1A
56.052..17N 035-.521b04E
:57 Handle Via
Approved For Release.20011400.culer?,foruz tar-www1IFF8T04562A000300400anliEy
25X1D
25X1D
25X1D
25X1D
25X1D
Hangie-t?..
TameQi)ted For Release 200TN8AV.IWA-1E178T04562A000300130001-8
Control System Only
TCS-.20119/70 IPIR 17
KH.04 MISSION 1109
25X1D
K RACHEV AMMUNITION DEPOT NORTH PUG
NAC
STATUS:OCCUPIED
ASSOCIATED OBJECTS:
7 RAILCARS (AT LEAST)
SOVIET UNION
GROUND FORCE FACILITIES
25X1A53.080..35N 034.?57....08E
KASTOBE BORDER SECURITY POST 42?.50...10N O8O21OOE
25X1A
STATUS; OCCUPIED
PHYSICAL DESCRIPTION:
740 METERS (2,428 FEET) NORTH OF THE USSR-CHINA BORDER. THIS
SECURED FACILITY HAS PERIMETER DEFENSES AND CONTAINS ONE
BARRACKS, ONE SUPPORT BUILDING, AND AT LEAST TWO SUPPORT OR
STORAGE BUILDINGS.
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
KOLZHAT BORDER SECURITY POST SE 25X1A
STATUS:OCCUPIED
43.,.29.?30N
PHYSICAL DESCRIPTION:
3.3 NM WEST OF KOLZHAT, THIS SECURED FACILITY HAS EXTENSIVE:
PERIMETER DEFENSES AND CONTAINS ONE BARRACKS, ONE SUPPORT
BUILDING, AND FOUR SUPPORT OR STORAGE BUILDINGS.
. Handle Via
Approved For Release 200 ellOPI2A CREAT-FRINF8To4562A0003o6u4MV,V,`,.,Ey
25X1D
25X1D
25X1D
25X1D
25X1D
Ha ed For Release 200M/iick41-1RF78T04562A000300130001-8
Control System Only
TCS...20119/70 IPIR 17
Kii4 MISSION 1109
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
SOVIET UNION
GROUND FORCE FACILITIES
KONOTOP ARMY BARRACKS AL 1 25X1,k
ul-.14.41N
NAC
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
60 VEHICLES OR PIECES OF
EQUIPMENT (AT LEAST)
KONOTOP TRAINING AREA BATURIN
NAC
STATUS: OCCUPIED
25X1A51.,18.,/iN 032.52,./fE
REMARKS:
TRACK ACTIVITY IS OBSERVED AT THE TANK FIRING RANGE.
GROUND FORCE ORDER OF BATTLE
NONE DISCERNIBLE
25X1D KOZELSK ARMY BARRACKS AL 1
NAC
STATUS OCCUPIED
GROUND FORCE ORDER OF BATTLE:
15 VEHICLES OR PIECES OF
25X1A
54-.02-.22N 0 5?46-.32E
Handle Via
? 1%0
AperfM0 .For Release,200upolugEAAFFRWT04562A00030Q 14044tCy
TaAprateoredForRelease200Ma.K-Rig78T04562A000300130001-8
Handle Via
Control System Only
TCS-20119/70 IPIR 17
KH-4 MISSION 1109
25X1D
25X1D
25X1D
25X1D
_25X1D
25X1D
EQUIPMENT (AT LEAST)
SOVIET UNION
GROUND FORCE FACILITIES
KRASNOYARSKOYE BORDER SECURITY POST 45..52..05N
STATUS OCCUPIED
25X1A
5
50E
PHYSICAL DESCRIPTION:
500 METERS (1,640 FEET) EAST OF THE USSR..CHINA USSURI RIVER
BORDER AND 2.3 NM WEST OF LAZO, THIS INSTALLATION HAS
PERIMETER DEFENSES AND CONSISTS OF ONE BARRACKS. TWO STORAGE OR
SUPPORT BUILDINGS, AND ONE UTILITY SHED.
KRIVOY ROG ARMY BARRACKS AL 1
NAC
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
100 VEHICLES OR PIECES OF
EQUIPMENT (AT LEAST)
LU NY ARMY BARRACKS SULA RIVER AL i
NAC
STATUS:OCCUPIE
Aft
LI
25X1A47. 3.3 3. . 5E
25X1A50.0
-.19N 033-.01..27E
60 Handle Via
Approved For Release 2000r(W2MRINOTT8T04562A00030QAialanilEy
Handle Via
Talfimmed For Release 20011a/ii .%1N-W78T04562A000300130001-8
Control System Only
TCS..20119/70 INA 17
KH..4 MISSION 1109
GROUND FORCE ORDER OF BATTLE;
10 VEHICLES OR PIECES OF
EQUIPMENT (AT LEAST)
25X1D
MELITOPOL ARMY BARRACKS AL 1
25X1D NAC
STATUS OCCUPIED
GROUND FORCE ORDER OF BATTLE;
100 VEHICLES OR PIECES OF
EQUIPMENT (AT LEAST)
25X1D
NAROFOMLNSK ARMY BKS NORTH AL 1
25X1D NAC
STATUS: OCCUPIED
GROUND FORCE ORDER OF .BATTLE:
500 VEHICLES AND PIECES OF
EQUIPMENT (APPROXIMATELY)
25X1D
SOVIET UNION
GROUND FORCE FACILITIES
25X1A146...56-.// 035..25 //E
25X1A55..24.??41N 036 4 27E
NOVOMIKHAYLOVKA BORDER SECURITY POST 45 03..10N 132 514.'20E
25X1D 25X1A
STATUS OCCUPIED
PHYSICAL DESCRIPTION:
400 METERS (1.312 FEET) SOUTH OF THE USSR4..CHINA BORDER ON THE
EAST SIDE OF LAKE kcHANKA!r, THIS INSTALLATION CONSISTS OF ONE
BARRACKS, ONE PROBABLE SUPPORT 'BUILDING, THREE STORAGE OR
SUPPORT BUILDINGS, AND ONE UTILITY SHED,
61 Handle Via
Approved For Release 200CM2SECIMIFfiglrf8T04562A000309AgaginiEy
25X1D
25X1D
25X1D
25X1D
25X1D
"Taan1emedForRelease2001fithaCREifkalif78T04562A000300130001-8
Control System Only
TCS..20119/70 IPIR 17
KH.44 MISSION 1109
25X1D
NOVOMOSKOVSK AAA BARRACKS NORTH AL 2
NAC
,o'ATUS-7,OCCUPIED
.:ROUND FORCE ORDER OF BATTLE:
75 VEHICLES (AT LEAST)
OLGINO BORDER SECURITY POST 25X1A
STATUS OCCUPIED
SOVIET UNION
GROUND FORCE FACILITIES
25X1A48..39..440N 035?.14,^20E
52..53w.40N 125.."4500E
PHYSICAL DESCRIPTION:
600 METERS (1.968 FEET) NORTH OF THE USSR..CHINA AMUR RIVER
BORDER AT OLGINO. THIS SECURED INSTALLATION CONSISTS OF ONE
BARRACKS, ONE PROBABLE SUPPORT BUILDING, FOUR STORAGE OR
SUPPORT BUILDINGS. AND FOUR UTILITY SHEDS.
POMPEYEVKA BORDER SECURITY POST 48?2011.0N 130?*49^10E
STATUS; OCCUPIED
25X1A
PHYSICAL DESCRIPTION:
600 METERS (10968 FEET) NE OF USSR..CHINA AMUR RIVER BORDER AT
POMPEYLVKA. THIS INSTALLATION CONSISTS OF ONE BARRACKS, ONE
PROBABLE SUPPORT'BUILDING. ONE STORAGE OR SUPPORT BUILDING. TWO
UTILITY SHEDS, AND A MOTOR PARK.
GROUND FORCE ORDER OF BATTLE:
10 VEHICLES (AT LEAST)
?,4
- 62
Approved For Release 2001418/gIc
AI
Handle Via
4t-781-04562A00031:19Arant
%ZIA-
tatted For Release 200 /iiciglk-1078T04562A000300130001-8
Control System Only
TCS-40119/70 IPIR 17 SOVIET UNION
KH-4 MISSION 1,109 GROUND FORCE FACILITIES
25X1D
TULA AMMO DEPOT KHOMYAKOVO SOUTHWEST
25X1D NAC
STATUS; OCCUPIED
GROUND FORCE ORDER OF BATTLE:
25 VEHICLES OR PIECES OF
EQUIPMENT (AT LEAST)
25X1D
TULA APY BARRACKS KOSTROVO AL 6
25X1D NAC
STATUS:OCCUPIED
GROUND FORCE ORDER OF BATTLE:
40 VEHICLES OR PIECES OF
EQUIPMENT (APPROXIMATELY)
25X1D
TULA ARTILLERY OCS
25X1D NAC
25X1D
STATUS OPERATIONAL
GROUND FORCE ORDER OF BATTLE:
30 VEHICLES AND PIECES OF
EQUIPMENT (APPROXIMATELY)
25X1A -
54-16-471\1- 03735-40E
25X1A 54?23-59N 037..29-020E
25X1 DA-4-10440N O37u.355OE
?
t63
Handle Via
Approved For Release 2000W2SEalpflifpfr8T04562A00030Q aoltieEry
TaApprEntedForRelease200Racgi-U78T04562A000300130001-8
Handle Via
Control System Only
TCS'..'20119/70 IPIR 17
KH...4 MISSION 1109 GROUND FORCE FACILITIES
SOVIET UNION
25X1D TULA TRAINING AREA NORTH 2 25X1P54**15.?'ION 037.s44
NAG
25X1D
25X1D
25X1D
STATUS:OPERATIONAL?
GROUND FORCE ORDER OF BATTLE:
10 VEHICLES AND PIECES OF
EQUIPMENT (AT LEAST)
YESEKARTKAN dORDER SECURITY POST NE 431 .'30N 080.N35...40E
tc.e
SIATUS:OCCUPIEE
25X1A
PHYSICAL DESCRIPTION:
8.7 NM NW OF THE USSR-CHINA BORDER, THIS SECURE() FACILITY HAS
PERIMETER DEPENSES AND CONTAINS ONE BARRACKS, FOUR SUPPORT
BUILDINGS. AND ONE UTILITY SHEDS
GROUND FORCE ORDER OF BATTLE:
NONE DISCERNIBLE
64 Handle Via
Approved For Release 2-e0Cf4W2SENFORIgiff8T04562A00030Qabt*SaftEy
25X2
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
Next 1 Page(s) In Document Exempt
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
HTaani dle Via
Aippriayed For Release 200TAW.qirAWc178T04562A000300130001-8
Control System Only
TCS?.20119/70 IPIR 17 SOVIET UNION
KH...4 MISSION 1109 INDUSTRY
SIGNIFICANT RESULT
4
25X1D OREKHOVO ZUYEVO PLASTICS P KARBOLIT
?
25X1D
25X1A
STATUS UNKNOWN
55*,480.00N 038759700E
REMARKS:
AN INDUSTRIAL PLANT AT 554839N 0385932E MAY BE OREKHOVO ZUYEVO
PLASTICS PLANT KARBOLIT, BUT THE POOR :INTERPRETABILITY AND
SMALL SCALE OF THE PHOTOGRAPHY PRECLUDE IDENTIFICATION OF THE
PLANT AS A PLASTICS PLANT.
25X1D ROVNO NITROGEN FERTILIZER PLANT 50.w37'.'50N 026..10'.20E
STATUS :UNKNOWN 25X1A
25X1D
REMARKS:
THERE IS NO FERTILIZER PLANT AT THE REFERENCED COORDINATES. THE
POOR INTERPRETABILITY OF THE PHOTOGRAPHY PREVENTS
IDENTIFICATION OF ANYTHING IN THE SURROUNDING AREA.
67 Handle Via
E
Approved For Release 2POROP/25ECRFFFRUPF8T04562A00030944011mYttly
25X1D
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
Approved For Release 2000/08/22 : CIA-RDP78T04562A000300130001-8
Approved For Release 2000/13032S.EBBURDP78T04562A000300130001-8
0 0 1046352
Approved For Release 2000/M2SECRODP78T04562A00030019109416%7