IT IS REQUESTED THAT SUBJECT OF BINARY CLOCK MALFUNCTIONS BE INCLUDED ON THE AGENDA FOR THE SETD MEETING

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05700A000500230005-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 1, 2007
Sequence Number: 
5
Case Number: 
Publication Date: 
December 1, 1962
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B05700A000500230005-3.pdf85.54 KB
Body: 
Approved For Release 2007/11/01: CIA-RDP78BO570OA000500230005-3 T 0PSEC_RET PRITY(_ CORONA ATTENTION DEC 2 196 0 7JO 1. IT IS REQUESTED THAT SUBJECT OF BINARY CLOCK MALFUNCTIONS BE INCLUDED ON THE AGENDA FOR THE SETD MEETING OF 5 DECEMBER. 2. OUTLINED BELOW IS A SUMMARY OF BINARY CLOCK MALFUNCTIONS AND INCLUDING OUTGOING CABLES DISCUSSING EACH SPECIFIC 2)S? MISSION 9047 (I) LIGHT NO 18 FAILED THROUGHOUT THE MISSION ON THE A FORWARD CAMERP CAUSING GROSS ERRORS OF 131.072 SECONDS IN APPROXIMATELY ONE-HALF THE FRAMES. c~7 m n (2) LIGHTS NO 13 AND 14 WERE APPARENTLY CROSS WIRED r. CAUSING CONSISTENT ERRORS OF 4.096 SECONDS IN APPROXIMATELY ONE-HALF THE FRAMES ON THE FORWARD CAMERA. (3.) THE DENSITY OF THE LIGHTS WAS GOOD FOR READING AND REMAINED CONSTANT. (4) REFERENCE CABLE 0243) MISSION 9045 V\oAi ABU ~~~~~ca 25X1 THE BINARY CLOCK MALFUNCTIONED AT NUMEROUS TIMES AS REPORTED Approved For Release 2007/11/01: CIA-RDP78BO570OA000500230005-3 Approved For Release 2007/11/01: CIA-RDP78BO570OA000500230005-3 I IN CABLESI 0082 AND 0102. THESE ERRORS WERE GROSS IN NATURE AND USUALLY INVOLVED MULTIPLE LIGHT ERRORS. M ISSI ON 9044 NO MAJOR ERRORS IN THIS MISSION HOWEVER THE DENSITY DIFFERENCES BETWEEN DIFFERENT LIGHTS MADE IT EXTREMELY DIFFICULT FOR THE PHOTO READER TO READ THE DATA BLOCKS. MISSION 9043 THE MAJOR DIFFICULTY HERE ALSO WAS IN THE READING OF THE DATA BLOCKS WITH DIFFERENT DENSITYS IN THE DIFFERENT BINARY BIT POSITIONS. MISSION 9041 (1) LIGHT NO 15 (16.384 SECONDS) FAILED THROUGHOUT ON THE FORWARD CAMERA. (2) LIGHT NO 23 (4194.304 SECONDS) FAILED THROUGHOUT ON THE FORWARD C AME Rid. (3) LIGHT NO 19 (262.144 SECONDS) FAILED THROUGHOUT AFTER FRAME NO 1 OF PASS A50. (4) NUMEROUS DENSITY PROBLEMS OUTLINED I OF 25X1 12 SEPTEMBER 1962. (3) PROBLEMS INVOLVING 9040, 9039, 9038 AND 9037 ARE ALSO 25X1 DISCUSSED IN REFERENCEI ~ THESE PROBLEMS INVOLVE LIGHT FAILURES, LIGHT DENSITYS, AND CLOCK FAILURES MUCH LIKE THOSE ABOVE. (6) REFERENCE OF 12 SEPTEMBER 1962. 25X1 T 0 P S E C R E T Approved For Release 2007/11/01: CIA-RDP78BO570OA000500230005-3