ADDITIONAL COSTS TO CONTRACT NUMBER((Sanitized)(ADVANCED STEREO RHOMBOIDS)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000800080022-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
November 18, 2003
Sequence Number:
22
Case Number:
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 104.42 KB |
Body:
25XL
f pproved For Relea
tif :I CIA-RDP78 BQ,5171 A000800080022-0
25X1
25X1
( .:gin d Sterec
1. This me torandum requests approval for the commitment of
additional funds from past year funds for an existing contract. The
specific request is stated in Paragraph 5.
Director, National Pb.otographic Interpretation Center
Additional Costs to Contract Nber .0? 20,
25X1
Declas
Revie by
NIMA/ OD
2. In Fiscal. Year 1968, ma contracted with
25 1 for the development of an Advanced Stereo Rbom under
25 1 one su tact for n August 1968, amendments were
25 1 node to the contract adding I for a total fitment to date of
25X1 This instrument will a the PI to utilize either the
Zoom 70 or Zoom 240 stereoscopes in the microstereOscopic mode thereby
achieving greater image quality than previously available. It viml
also have the capability of permitting binocular viewing though each
rhomboid optical path.
3. The primary requirement for this instrument is for exploiting
stereoscopic imagery. This system is complete3 vex in that it
can be used advantageously with the present RH and systems. The
system offers a range of magnifications combined with a large stereo
separation capability never before achieved in the instrument of this
type. This will permit the PI to view the stereo images across the
two rolls of KH at magnifications from 7X to 9CX. Additionally,
will emit him to adequately view the roll film stereo images
25X1 Thew system is being designed to be used
in conjunction with ex s ng and future light tables. In addition,
this is the o instruutent which would permit stereo viewing, on a
light table,
25X1 I I Accordingly, I and have u a g
and FY 70 procurement funds for them. In order for them to commit funds
in F! 69, this prototype must be completed and delivered as soon as
possible. Hence, it is extremely important that the prototype construc-
tion proceed as soon as possible so that there is no slippage in the
delivery schedule.
pproved For Releas 8f 3/121 IrCA-RDP78B05171P
25X1
25X1
25X1
25X1
25X1 Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800080022-0
Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800080022-0