ADDITIONAL COSTS TO CONTRACT NUMBER((Sanitized)(ADVANCED STEREO RHOMBOIDS)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000800080022-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 18, 2003
Sequence Number: 
22
Case Number: 
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000800080022-0.pdf104.42 KB
Body: 
25XL f pproved For Relea tif :I CIA-RDP78 BQ,5171 A000800080022-0 25X1 25X1 ( .:gin d Sterec 1. This me torandum requests approval for the commitment of additional funds from past year funds for an existing contract. The specific request is stated in Paragraph 5. Director, National Pb.otographic Interpretation Center Additional Costs to Contract Nber .0? 20, 25X1 Declas Revie by NIMA/ OD 2. In Fiscal. Year 1968, ma contracted with 25 1 for the development of an Advanced Stereo Rbom under 25 1 one su tact for n August 1968, amendments were 25 1 node to the contract adding I for a total fitment to date of 25X1 This instrument will a the PI to utilize either the Zoom 70 or Zoom 240 stereoscopes in the microstereOscopic mode thereby achieving greater image quality than previously available. It viml also have the capability of permitting binocular viewing though each rhomboid optical path. 3. The primary requirement for this instrument is for exploiting stereoscopic imagery. This system is complete3 vex in that it can be used advantageously with the present RH and systems. The system offers a range of magnifications combined with a large stereo separation capability never before achieved in the instrument of this type. This will permit the PI to view the stereo images across the two rolls of KH at magnifications from 7X to 9CX. Additionally, will emit him to adequately view the roll film stereo images 25X1 Thew system is being designed to be used in conjunction with ex s ng and future light tables. In addition, this is the o instruutent which would permit stereo viewing, on a light table, 25X1 I I Accordingly, I and have u a g and FY 70 procurement funds for them. In order for them to commit funds in F! 69, this prototype must be completed and delivered as soon as possible. Hence, it is extremely important that the prototype construc- tion proceed as soon as possible so that there is no slippage in the delivery schedule. pproved For Releas 8f 3/121 IrCA-RDP78B05171P 25X1 25X1 25X1 25X1 25X1 Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800080022-0 Approved For Release 2003/12/19 : CIA-RDP78BO5171A000800080022-0