PROCEEDINGS OF THE TICOF COMMITTEE, 6 JUNE 1969
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000800070040-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
November 17, 2003
Sequence Number:
40
Case Number:
Publication Date:
June 11, 1969
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 132.93 KB |
Body:
Approved For Relea2003/12/19: CIA-RDP78B05171A000800070040-1
SECRET
QRAN ?7M FORT RECORD
strav"LAM
N TC/` &G/DM)-1661-69
IS June 1969
in order to continue
in IEG/WG 3 (rooms 3S 71 -L
2? reviewed the status of equipment to be included in the
use 11 ICUP. The following hardware is expected to be ready for pre-
. iuar testing on or before 1 Julys (1) Mm 4 light table; (1) Zoom
940; (1) Dynasoom; (2) signal conditioners; (2) remote response console
Prototypes; (2) video observation systems; (2) audio communication systems;
12) Activity coding Panels.
25X1
25X1
y revie
d PSG
'
we
/
AID efforts in rewriting
the
basic v+ e Reduction and Analysis programs for in-house use. The
tragic analytic nMndM...... < - u - _- _ _ _ . - . -
h
o b
_ __ _ __
_;C-
e %wV; very ed by iv .tune. Additional
--hours will be required, to execute minor alterations to the programs in
order to accpuumdste changes in microscope XY sensor position. Manpower eistimste as tesare
thi red too~rewrite,two existing supplementary programs, as well
rd p
o
h
r
-j w A acs
e remote response console
ill
shortly. Lack of these programs will in no way
preliminary data collection. 25X1
4. ~ I reannri-e%A Ft,.,a 4.u- Ai --A,, -
urauxurzng tight table
,could P0981 04 be prepared for inclusion in TICCF by .1 August, Pending the
system's passing ft fiTlIT ri1GAYf4xiw ....~3??._L2 __- .. _ _
the TICOF agu.3. ctent. hez.a responsible for calibrating
requested that th
e committee members, especially Mr.
and consider the feasibility of investi
atin
i
?"`~' "
g
g v
a
e open oA use of one of two existing re with base li
ne mensuration data to be obtained on the Dig System.
6 agreed to furni with a
in ord r tnat appropriate sensors may
be s. ed.
Approved For Release 2'UU3112/19 : CI
Declass Review by NIMA/DOD
+~!P7` 6000800070040-1
SECR
Approved For Releag,2003/12/19: CIA- RP78B05171A000O 070040-1
BJECT : Proceedings of the TICOF Committee, 6 June 1969
requested that I and consider
the poss y of requiring at least one TIC su Ject to conduct a chrono
logical study in the event that one does not otherwise arise. A further
request eras made that the monitors be properly Porwarned by the subjects
when they intend to produce ,,nd/or utilize film chips. Both requests stem
from Center management concern regarding the advantages and disadvantages
of various film formats.
t #as weed that formal requests for three TICOF monitors
one
,
each from 9G, TSSG, and PSG, would be undertaken the week of 9 June.
Monitor training is scheduled for the week of 23 June.
9. The photo interpreter subjects and their immediate supervisors
scheduled to be briefed on TICOF the week of 9 June.
TBUGIDED
Distribution:
Original - Route % File
-IEG
2 - TSSG/ESD
2_ G/Arn
2 TSSG/DED
NPIC/TSSG/DED (11 June 1969)
25X1
25X1
Approved For Release 2003/12/1 ~i P78B05171A000800070040-1