CONTRACT VISIT TO CUSTOMER FACILITY 6, 7 MAY 1970
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000500020028-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
September 21, 2005
Sequence Number:
28
Case Number:
Publication Date:
May 8, 1970
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 56.46 KB |
Body:
Approved For Release 2005/11/21 : CIA-RDP78BO5171A000500020028-3
May 8, 1970
To:
From:
Subject:
Contract Visit to Customer Facility
6, 7 May 1970
STAT
This activity summary is written for the two day visit,
STAT
STAT
6,7 May 1970, at the The activity during STAT
STAT
STAT
these two days was completely applied to laboratory work. No
lecture period was held, and the lecture prepared for the morning
of May 6 will be delivered on May 11. The details of this visit
to the are contained in the laboratory
notebook 2201201-LN#1. Copies of the notebook notations
will be delivered to the contract monitor at the end of each
month. However, directives for continued. laboratory effort
by lab personnel were generated and left with the contract
monitor: A copy of the directives dated May 7 is attached to
this summary.
During the two days being reported here initial refine-
ments of the interferometer and coherent processor were made,
providing a means to operate both systems on a preliminary basis.
Thus an inverse hologram detection filter was fabricated on the
interferometer and detection filtering was performed with the
processor. This initial run through the system was performed to
Declassification Review by NGA/DoD
Approved For Release 2005/11/21 : CIA-RDP78BO5171A000500020028-3
STAT
Approved For Release 2005/11/21 : CIA-RDP78BO5171A000500020028-3
0
define operating procedures. Preliminary results were obtained
and photographs of the detection filtering outputs are available
in the laboratory notebook.
The next visit is scheduled for 11-13 May 1970.
STAT
is scheduled for 11, 12 May and for 12, 13 May. Continued STAT
effort will be directed to the hologram detection system as directed
on the attached schedule. Effort will also be applied to target
generation for pictorial display of results.
PSc/c
Attachment
Approved For. Release 2 - 71A000500020028-3 STAT