25X1 j ARNxq:-: CIA-RD Contract Administration and Settlement Branch, PD/OL Optical Image Manipulation TIIE CONTRACTOR IS ON SCHEDULE 1XI YES HASAN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? [] YES ( ] NO (If yes, give deiails on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? (If yes, indicate items, quantity, and cost on reverse side.) IS THIS AN INCENTIVE CONTRACT IF YES. CHECK TYPE 25X Lai N O PONT FACT N) TILE 0500020016-6 T,* DATE 19 May 1970 INSPECTION REPORT NO. (If final, so state) #I ESTIMATED COMPLETION DATE 19 April 1971 LI YES THE CONT ACTOR WILL PROBABLY REMAIN WITIIIN ALLOCATED FUNDS YES 0 NO IF ANSWER IS "NO" ADVISE RLC? OMMENDATION AND/OR ACTION OF SPONSORING OfF ICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- DITIONAL [UNDS INVOLVED. INCENTIVES C2f N 0 NOTE: USE REVERSE SIDE FOR CENT OF FUNDS EXPENDED - 5% (estimated) El OUTSTANDING 0 EXCELLENT Ej VERY GOOD IF OVERALL PERFORMANCE REASONS ON REVERSE SIDE. 1:1 CONTINUE RECOMMENDED ACTION C.:1 Declassification Review by NGA/DoD 0 CLOSE OUT WITIIHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE. OTHER (Specify) IF THIS IS A FINAL. REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOVIING: PROTOTYPES DRAWINGS AND SPECIFICATIONS PRODUCTION AND/OR OTHER END ITEMS DATE OF LAST CONTACT WITH CONTRACTOR I 0 Ma-,T I Q70 APPLY X MANUALS X _I. FINAL REPORT It SPECIAL TOOLING 1z67 I PNEYIOUS L I . 21 NAT 0..DITI ON 4. 11 ABOVE AVERAGE 7. 5. 11:11 AVERAGE ~ + 6 . 1 :1 OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM SECRET DOES NOT APPLY I l :i [ ( K 1. I Ui' COI;"IDENTIraL Approved For Release 2005/11/21: CIA-RDP7 B05171AOOb6OVION0'I`-6 r r1 Iiit`C t_+:z j! NARRATIVE REPORT ' 0 INTER 111 [- FINAL 1. Since the inception of the contract four meetings/work sessions have been held at These have proved most effective with a considerable amount of work being accomplished. 2. Progress to date has consisted. of setting up the interferometer and correctly aligning it for use in generating holographic detection filters, generating a set of filters for simple geometries and testing the filters on the coherent processor.. 3. Some smeared line copy imagery has been generated and during the next week this image will be processed to remove these effects. TOTAL AUTHOPIZF,D FUNDS: Original Contract - No Changes in Scope No Overrun .a_ Approved For Release 2005/11/21 : CIA-RDP78BO5171A000500020016-6 UMCL.ASS IF i ED~ XCOMF I DEP9T I /tL ~~~~~ 25X