TEST PLAN FOR THE(Sanitized) MLT 1540 LIGHT TABLE - PRE-PRODUCTION MODEL
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000400030092-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
June 7, 2005
Sequence Number:
92
Case Number:
Publication Date:
September 1, 1970
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 168.53 KB |
Body:
Approved Release46'6 06I2J ~ ' IA-RDP78B0,1A000400030092-9
S003S~
TSG/ESD/TEB-027/70
1 September 1970.
MEMORANDUM FOR: See Distribution
SUBJECT : Test Plan for the Q MLT 1540 Light Table -
Pre-Production Model
1. The attached test plan is forwarded for your information and
planning purposes.
2. Your comments-on this test plan will be appreciated.
Attachment:
as stated above
Distribution:
1
- NPIC/TSG/RED/SDB
1
- NPIC/TSG/PPS (through Ch/TSG)
1
- NPIC/IEG/0I?
. 1
- DDI/IAS
1
- DIAAP-9
1
- Arrr{ r/SPAR
1
- NPIC/TSG/ESD/EPB
2
- NPIC/TSG/ESD/TEB
NPIC/TSG/ESD/TEB
Approved For Release 2005/0~:v4~ ~B05171A000400030092-9
I?` cNau~ i
Excluded trim aut:;al
lewntrad5. tad
declassltlcatian
Approved 0Release 2005/b6123-: CIA-RDP78BO 1A000400030092-9
5X1
~~ MLT 1540 Light Table - Pre-Production Model
Ref. Test & Evaluation Report -
Mod II (NPIC/R-4670)
1.1 The.first production model of the QMLT 1540 Light Table is scheduled 25)
to arrive on or about 1 October 1970. This table is the culmination of
18 months of development, testing, and re-work. It is to be the standard
for the table procurement package of 389 tables. As stated in the
contract, "All instruments delivered under this Contract shall also meet or
exceed the requirements of this specification i.e., Technical Requirements
for the Production of the 1540 Split-Format Light 25
Table and Mount for Various Micros ereoscopes or performance of the
accepted pre-production model."
1.2 It is important that this table be given a thorough testing,
especially in regard to those features which were unacceptable when last
tested (see reference). This will insure that the tables delivered will
meet the high expectations of the community for this equipment.
2. Performance Testing
2.1 Those features which were found unacceptable in the April testing
will be tested individually to insure that they have been modified and are
in good order.
2.2 The testing of these features will be documented in a report supple-
mentary to that written on-the April test series.
3. Operational Inspection
3.1 In order to further assure PI compatability with this item, the
operating divisions will be asked to participate in a very brief operational
inspection. By this'method, the changes in the item which meet performance
specifications but are not operationally suitable can be corrected.
3.2 The operational components which participated in the April evaluation
of the prototype will be asked to participate. Each component will be given
4 hours with the unit in the individual'component's area. It must be
understood at the outset that only 2 classes of changes can be accomplished
at this time: 1) Changes without which the light tables cannot be effectively
used, or 2) Minor changes which can be accommodated without appreciable
delay of production schedule.
1540 Split-Format Light Table 20
Approved For Release 2005/06/20O I-BE171A000400030092-9
Approved 40 Release 2005/06/23 CIA- A000400030092-9
4. Acceptance Test Procedures
4.1 Equipment Performance Branch, ESD will be requested to assist TEB in
formulating Acceptance Test Procedures for use on all incoming production
units. This work must be accomplished prior to delivery of the first unit.
4.2 The pre-production unit will be used as a test bed for these procedures
to insure efficiency of the testing and rapid delivery of the accepted
units to the operating components.
4.3 The, pre-production model will be a completely motorized unit, as
specified for IEG/NPIC. There are two other configurations which will be
delivered to NPIC for DIAAP-9 and SPAD. NPIC will perform acceptance
testing on these units, using the standard procedures (where applicable)
and the contractural specifications for these components which differ from
the pre-production configuration.
5. Scheduling
5.1 The attached schedule has been coordinated within TSG and with the
operating components. The actual delivery date is unknown at this time,
therefore elapsed time from arrival, and not dates, are used.
5.2 If deviations from the schedule are required, this should be
coordinated with TEB. All affected components will be notified in this
eventuality.
Prepared by
Approved by
Approved For Release 2005/06j2 :-CIA-RDP78B05171A000400030092-9
25
QN-10FN' ;t
Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030092-9
l1/+//r 417 R/YA4,
1 /'/--P,CC 7/0 N
rYCCEPT4 NCE
TST S1 iK~ DOS/N
L.4 Y
~
?
. ~ t
4
~ 4
f
j ~ I
Approved For Release 2005/06/23 : CIA-RDP78B05171A000400030092-9
25X1 Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030092-9
Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030092-9