MEETING WITH TSG/ESD [] CONCERNING TESTING AND DELIVERY OF 1540 LIGHT TABLES

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000400030091-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 7, 2005
Sequence Number: 
91
Case Number: 
Publication Date: 
September 1, 1970
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000400030091-0.pdf149.25 KB
Body: 
ILLEGIB Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030091-0 Next 2 Page(s) In Document Exempt Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030091-0 25X1 25X1 25X1 Approved For leasq~ CIA-RDP78B0517 00400030091-0 'VEST PLAN MLT 1540 Light Table - Pre-Production Model ILF Ref. Test & Evaluation Report I- F--]1540ISplit-Format Light Table Mod II (NPIC/R-46/70) 1. Introduction 1.1 The first production model \of the IIMLT 1540 Light Table is scheduled 25X1 to arrive on or about 1 October 970, This table is the culmination of 18 months of development, testi , and re-work. It is to be the standard for the table procurement packag of 389 tables. As stated in the .contract., "All instruments deliv red under this Contract shall also meet or exceed the requirements of this specification (i.e., Technical Requirements for the Production of the 1540 Split-Format Light Table and. Mount for Various icros?ereoscopes or performance of the accepted 'pre-production model." 1.2 It~is important that this table be.given a thorough testing, ail especially in regard to those featureswhich were unacceptable when last tested ('see reference). This will insure that the tables delivered will meet the high expectations of the community for this equipment. 2. Performance Testing 2.1 Thgse features which were found unacceptable in the April testing, will be -tested individually to insure that they have been modified and are in good order. 2.2 The testing of these features will be documented ina report 'supple- mentary to that written on the April test series. 3. Operational Inspection 3.1 In order to rther assure PI compatability with this item, the operating divisions will be asked to participate in a very brief operational inspection. By this method, the changes in the item which meet performance specifications but are not operationally suitable can be corrected. 3.2 The operational components which participated in the April evaluation of the prototype will be asked to participate. Each component will be given 4 hours with the unit in the individual component's area. It must be understood at the outset that only 2 classes of changes can be' accomplished at this time: 1) Changes without which the light tables cannot be effectively used, or 2) Minor changes which can be accommodated without appreciable delay of production schedule. Declass Review by NGA/DoD CONFIDENTIAL Approved For Release 2005/06/23 : CIA-RDP78B05171A000400030091-0 Approved Folea ,O 5t TIAI~-RDP78BO517700400030091-0 4. Acceptance Test Procedures 4.1 Equipment Performance Branch, ESD will be requested to- assist TEB in formulating Acceptance Test Procedures for use on all incoming production units. This work must be accomplished prior to delivery of the first unit. 4.2 The pre-production unit will be used as a test bed for these procedures to insure efficiency of the testing and rapid delivery of the accepted units to the operating components. 4.3 The pre-production model will bee a completely motorized unit, as specified for IEG/NPIC. There are two other configurations which will be delivered to NPIC for DIAAP-9 and SPAR. NPIC will perform acceptance testing on these units, using the standard procedures (where applicable) and the contractural specifications for these components which differ from the pre-production configuration. 5. Scheduling 5.1 The attached schedule has been coordinated within TSG and with the operating components. The actual delivery date is unknown at this time, therefore elapsed time from arrival, and not dates, are used. 5.2 If deviations from the schedule are required, this should be coordinated with TEB. All affected components will be notified in this eventuality. Prepared by Approved by Approved For Relea($ 2\Q 2. I ,.((``IA-RDP78BO5171A000400030091 6 i i/iYt~ lil Approved For Release 2005/06123 : CIA-RDP78BO5171A0004000300 ccEPrh ivice 1'575 7 S//ti KE-Dc'iN (WOI'K1ejq 27a~-s) DAY Approved For Release 2005/06/23 :.CIA-RDP78B05171A000400030091-0