CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000400010050-7
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
June 2, 2005
Sequence Number:
50
Case Number:
Publication Date:
June 1, 1970
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B05171A000400010050-7.pdf | 96.41 KB |
Body:
Approved :CIA-RD
For
CCPIIRACT Ie~00~5(Qf/~
F1
f$0~1~' 004000100150 f1
DATE
t 0:
I June 1970
INSPECTION REPORT NO. (If final, so state)
6
ESTIMATED COMPLETION DATE
~-- i-~---~'-
30 June 1970
-
NAME OF CONTRACTOR
NGA review(s) completed.
T'iPC OF COMMODITY OR SERVICE
Imagery Experimentation Support
THE CONTRACTOR IS ON SCHEDULE
L
THE CONTRACTOR WILL
L PROBABLY REMAIN WITHIN ALLOCATED
YES
~
N,
FUN D S k'~t YES L.0 IF ANSWER IS "NO" ADVISE REC.
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE
ON
,
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF
AD-
j0
DITIONAL FUNDS INVOLVED.
FF.R CENT OF FUNDS EXPENDED
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTPACTON
DURING THE PERIOD? E3 YES 0 No (If yes, give details on reverse side.) Bi-monthly StatusPepo:
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? D YES CtVI No
(I( yes, indicate items, quantity, and cost on reverse side.) L. -f
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0 YES UNO
NOTE:
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
`FEND PERFORMANCE DEL I VE HY
COST
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
-
I.
[j OUTSTANDING 4. ABOVE AVERAGE 7. El l UNSATISFACTORY
[
???-
2. El EXCELLENT 5. ! 1 AVERAGE
t.
3.j VERY GOOD 6.
U MINIMUM ACCEPTABLE
~
~
??
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
OMMENDED ACTION
__ RE
_
C
g1X1 CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING
~--~
h??'~ SATISFACTORY PERFORMANCE
El CLOSE OUT OTHER (Specify)
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
2
5X 1
PRODUCTION AND/OR OTHER
SPECIAL. TOOLING
-
-
END ITEMS
--- -
OTHER GOVERNMENT PROPERTY
-----
-
12- 67 18'EflW or( p$gf - ; - I Dl Rj f] S
hlq 00010050
nITION
ID S1 GREY i..J `CO iDEP,TIAL
- - -
-.PrWaved
O(3?:i4=?RBP9
HARTMTiVE REPORT
0 FINAL
I
is continuing its role supporting the Human Factors Research
Ground Order of Battle Study preparation. During this reporting period.,
assxs'yance has been lent to the photogranhip llection effort at
In addition, continued
coordination has been required with the image processing effort in order
to! assure proper manipulation of the study's stimulus materials.
Funds Committed - Original Contract -
0
4g~~-~ (.. UNC LASS 1 F ! EEC
25X1
25X
^ W LAlppggngq0 For Release