CONRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B05171A000400010021-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
June 2, 2005
Sequence Number:
21
Case Number:
Publication Date:
September 13, 1970
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B05171A000400010021-9.pdf | 109.09 KB |
Body:
S :CRET .u nn rn, rI I-or 2 Q 1 '
CONTRACT IIISPECI ION REPORT
" l1hK'f78BO5171A00040001d0- 1U,9GL~IS > 1E-
CGJTRACI NO. TASK NO.
6
TO:
DATE
13 August 1970
Contract Administration
and
INSPECTION REPORT NO. (If final, so sta e)
Settlement Branch
STIMATED COMPLETION DATE
30 June 1970
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
Imagery Experimentation
Support NGA review(s) completed.
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
YES ^
FUNDS IN YES 0 NO IF ANSWER IS "NO" ADVISE REC-
NO
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE
ON
.
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED - 10 0%
-
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED - 9 8%
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM.BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ? YES ^ NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN
DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES Q NO
(If yes, indicate items, quantity, and cost on reverse side.)4
INCENTIVES
IS THIS AN INCENTIVE CONTRACT U YES
NO
NOTE:
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
RD ^ PERFORMANCE ^
COST UI
DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
FEE
OVERALL PERFORMANCE OF CONTRACTOR
1. ^ OUTSTANDING 4. ^
ABOVE AVERAGE 7. ? UNSATISFACTORY
2. ^ EXCELLENT 5. ^
AVERAGE
3. ? VERY GOOD b.. ^
MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACT
OR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION
^ CONTINUE AS PROGRAMMED
^ WITHHOLD PAYMENT PENDING
S ATISFACTORY PERFORMANCE
p CLOSE OUT
OTHER (Specify)
1:1
IF THIS IS A FINAL REPORT PUT COMM
ENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS
UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
APPLICABLE, THE FOLLOWING:
ITEM
REC
D
DOES NOT
ITEM
RECD
DOES NOT
'
APPLY
APPLY
PROTOTYPES
X
MANUALS
X
DRAWINGS AND SPECIFICATIONS
X
FINAL REPORT
X
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
X
END
T
I
EMS
X
OTHER GOVERNMENT PROPERTY
X
12-67 1897 PREVIOUS El UNCLASSIFIED
EDITION
^ CONFIDENTIAL [ SECRET
Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400010021-9
25X1
[] INTERIM 13FINAL
1. Work under this FY-70 contract has been completed. Major
tasks accomplished included the following:
a) Support tol during
its study for NPIC of Photographic and Line-Scan imagery
25>1 Exploitation; provided controlled photography
of target models, developed PI keys, and administered the
study itself.
b) Coordination of flight testing by of
25>1 an 0 camera to be used to collect real target imagery for
an NPIC/HFR study of Ground Order of Battle Resolution;
precisely controlled photographic 'acquisition was necessary
to meet the resolution simulation requirements of the study.
c) Coordination of the final photographic collection
activities in support of the GOB Study; imagery of
25~
25
254
25
25
collected ground truth on
the imaged targets and assiste in overflight
operations.
d) Support to during its controlled manipu-
lation of the original acquired imager fulfilled
the primary liaison role between study requirements and
Approved For ReIea 0O5I0i6]23f k ILA-RDP78B05171A00040h{10 i0U2~49S I F I I !?
imagery processing effort.
2. local research support and miscellaneous
services rendered proved effective and timely during FY-70.
Overall performance for the contract period is rated as Very Good.
3. All deliverable items have been received from the
contractor.
25X1
25X1
25X1
25X1
25X1
25X1