SYSTEM PLANNING FOR FUTURE IMAGE EXPLOITATION BY THE NPIC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002900030011-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 26, 2005
Sequence Number: 
11
Case Number: 
Publication Date: 
September 23, 1965
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002900030011-7.pdf242.03 KB
Body: 
12240RANDUM FCRi Executive Director, NPIC Declass Review by NCA - - SUBJECTS System Planning for Future Image Exploitation by the EPIC or plans offers useful ideas, each in limited in its scope iwd lacking in comprehension of the total requirement. automation program for the NPIC. Although each of the various propo::,ls designs. Among these are the CSD Target Information Profile proposal, the P&DS Chip System, the PSD automated - f :;lm handling d t a ..plea; . and a ._, proposal by IPD to have a private contractor carry out all phases of an 1. There currently are in existence within the NPIC various studies, proposals and recommendations concerning information handing and system system keyed to. the IBM 1401 has become overloaded and is not capable of absorbing future increased inputs. In addition there is some evidence that 2. The above proposals underscore the urgent requirement of the NPIC to review and revise its entire information processing system. The current present equipment is not utilized completely and to its mexbum effective-. 4. It-is imperative that a single effort be initiated immediately to review the requirements of the EPIC both for current and future needs for- an advanced automated information handling system. interpretation element should have strong representation during this'deri:g-: program for system analysis and development should be designed to provide primary support to the NPIC national. PI support mission, and the photo - 3. There is some doubt that the aforementioned proposals are centereL.. upon the total requirements of the photo interpreter of the NPIC. Any a. This review and resulting system design and Impleraen? assigned full time to this priority tack and provided unlimited tation should be conducted by experienced in-house personnel assets and support to accomplish their task. They should be able of an outside study group, b. Current:.studies and proposals referred to in paragraph 1 above should be deferred until considered by this planning group._ c. It should be noted that a primary requirement is to produce a system as soon as practical. Thus-it should stay with- in the state-of-the-art and utilize off-the-shelf'hardware - wherever possible. Further, the system should be flexible Approved F:or'l ele;2i e~,QQ 1 : CIA-RDP78BO47.7OA;OU29'000 SECS l wNl U N Gn Approved Releasii 1 : CIA-RDP78BO OA002900030011-7 To confirm, modify and/.or establish the Comprehensive System Plan for future image exploitation by, the NPIC. rioi,ity Task: Establish NPIC current and future'needs for an advanced ti 14--.. . autom t d i a e f n orrLa on Other Tasks to be Acconalishedi a Estimate Requirements to be satisfied. b Determine NPIC products to be produced. o Determine NPIC present and future prgquction processes. 1 Determine present and future Interpretation and Mensuration processes. 2, Determine present, and future Collateral and data base support systems. 2 Determine present and future automated .information handling system support. a. The following mission assignment for the special NPIC a to the interpretation process. to the mensuration process. c to the Collateral and Data' Base- SUBJECTi System Planning for Future Image Exploitation by the EPIC 5. The system analysis for an advanced automatic information handling system, so far discussed in this paper, is only one phase of 'the system planning for future image exploitation that should be accomplished. Determine present and future Graphic and,'. Editorial Support, Systems. Determine present and future Publication Systems. b. It is.imperative that this planning be accomplished by personnel relieved of theii normal tasks and responsibilities if we are to complato this'study in a reasonable length of time. Approved For. Rel Approved Release 2005/11/21: CIA-RDP78 7OA002900030011-7 SUSTCT: System Planning for Ft turo Image Exploitation by the NPIC Chief, Planning, Group: Photo Int?rpreter/Ar:alyst Collateral Support Information Automation Editorial and Graphics Production Support Technical Intelligence Ori; Exec Dir/NPIC Most of the special studies bein3 chaired by the Assistant for Administration and also mo:;t of the development contracts beinrz comprehensive system plan for future image exploitation by the "soft" in their basis - due to the lack of an up-to-date, ietDy tae A3aistanttfor Plans and Development are som?what . ar1u. it is suggested that the group be composed as follows: 1 - Den/Dir/NPIC 1 - Tech Adv/NNPIC 1 - Asst for Ops/ }PIC 1 - Asst for Aclmin/NPIC 2 + Asst for PA/NPIC ' Approved Foi 05/11/21.::'CIA-RDP78BQ4~70A00'2900030011.-7-