CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002900020095-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 30, 2005
Sequence Number: 
95
Case Number: 
Publication Date: 
November 5, 1964
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002900020095-6.pdf53.46 KB
Body: 
RET CONTRAC T NO. . TASK NO. INSPEC ION REPORT TO: DATE 5 Nov 64 ENGINEERING SECTION/CB/PD/OL INSPECTION REPORT NO. (If final, so state) 3 ESTIMATED COMPLETION DATE 30 June 1965 NAME OF CONTRACTOR I Declass Review by NGA. TYPE OF COMMODITY OR SERVICE Technical Services THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED a YES ^ NO FUNDS ? YES 0 NO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE O . N REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI- PER CENT OF WORK COMPLETED TIONAL FUNDS INVOLVED. IONAL FUNDS INVOLVED. HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING'THE PERIOD? EX] YES a NO (If yes, give details on reverse side.) Reports. HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? El YES NO (If yes, indicate items, quantity, and cost on revere sside.) OVERALL PERFORMA NCE OF CONTRACTOR ?. ^ OUTSTANDING 3. ABOVE AVERAGE 5 . ^ BELOW AVERAGE 7. [] UNSATISFACTORY 2. fJ EXCELLENT 4. ^ AVERAGE 6. . El BARELY ADEQUATE OVERALL PERFORMANCE OF CONTRACTOR IS UNSATIS FACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. RECOMMEN DED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING ^ SATISFACTORY PERFORMANCE TERMINATE OTHER (Specify) ^ IF TERMINATION IS RECOMMENDED OR IF THIS IS A F- INAL-~REPORT ATTACH COMMENTS IN NARRATIVE FORM ON TRACT HAVE BEEN RECEIVED. CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOT."ES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF _AST :ONTACT WITH CONTRACTOR 17 Oct. 64 SIG DIVISION P&D S INS SIGNATURE OF APPROVER FORM 6.64 REA, Rproved For Release 2005/11/21 g ~ DP78 5 MA _EFEPA A AA 0020095-6 (12-36) d In Excluded from aalo led n,otic downgrading and decIeuifkot on -