CONTRACT(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002800030025-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 3, 2005
Sequence Number: 
25
Case Number: 
Publication Date: 
February 8, 1966
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002800030025-3.pdf161.09 KB
Body: 
Approved For Release 2005/06/23 : CIA-RDP78BO477OA002800030025-3 P5X1 Originato Chief (I:3S) (SSE; ("PS) ype Rough 3 Originator tor checking Chief (ISS) (sSS) rra Deputy Chief r 5):S Chief . 1M Ass (4 Gt' k6d;:Z 1-5 ,D,riginator Section Chief Project i ucff ~7 ft-~- 0 3 FEB 1966 ini fii is Dat4 FEB 1966 Date ... Initi=ls Date IrLiti. ls~~_Date `d .L.m.L :1 ate. m it4 1 ~vA.....taa . Initi is Date / / I. Return slip to show item hay '.eft DB. Declass Review by NGA. Approved For Release 2005/06/23 CIA-RDP78BO477OA002800030025-3 Approve r Release 2QJ1K123 . ci 8 r70A002800030025-3 Be 1. In conference 28 January 1966 between NPIC/P&DS/D/6- 8 February 1966 lof this office, it was agreed that the following would be the immediate or interim objectives of this project;-,that the long range objectives would remain as stated in the contract, butAeffort for the current contract period would be concentrated on attaining the below stated interim a. A neutral gray D maximum of 2.0 density and be nearly uniform across the flexible film of 4x5 inch sheet size having a a V>minimum of 0.10. The minimum density to visible . . $'.?I9 C f" / U yy~ . b. High contrast resolution to be 200 line pairs per mm. L.- c. Latitude to include at least eleven steps of a twenty-one r 'V- P P step gray scaleetablet. d. Speed or sensitivity of the material to light to be such that a fully exposed target may be obtained in not more than 30 seconds with a maximum power of not more than 1100 watts, preferably approaching the ultra-violet end of kkxx the spectrum. e. Contrast control should be the equivalent of photographic gamma of l.0to 2.0 f. Storage - It is desirable that the material have the capability of one years storage prior to exposure and at least six months storage after exposure and fixing without undue loss of image. Approved For RelerDW I :NTMtDP78B04770A002800030025-3 77 Approver Release 2005106%23':6I74~#2 P7847OA002800030025-3 g. Fixing time should be as short as possible but not over one minute. h. The image should suffer no appreciable degradation during normal methods of use such as in viewers and by projection. Distribution: Original - Project File/DB (#997073) 1 - Chrono/DB Approved For Release l~ 1 n8BO477OA002800030025-3 JIM 25 - D R A -Approved FWelease 2005/06/23 : CIA-RDP78B04 A002800030025-3 7 December 1965 1. On 1 December 1965 the undersigned and history and progress on Project No. 997073 - Non-reversable Color for the purpose of reviewing the y i Recording Study - Contract was represented by l 25 25 25 ontract Administrator; 2 5 Contact was also made with 1who did not attend the technical discussions. 2. The terminology (Phase II) used to identify this protion of the program is a miss-normer, this is really an extention of the applied research carried out under the previous contract intended to include the development of an operational product. Much of the effort under this new contract has been concentrated on increasing the speed oflxxnxitik?x sensitivity of the material, and it now appears that the introduction of a chemical chain-reaction may indeed be possible; but, to date the relative ASA speed is still in the order of 10-2 or 10, with quantum efficiencies of considerable less than one. It further appears that the attainment of high densities in this material will only be attained at a sacrifice in minimum density. There is little or no effort being applied to the other development objectives, such as density, "gamma" or resolution because these will be effected by changes in formulation to obtain an increase in speed or sensitivity. Depending upon the ultimate use of the developed product this may not be the proper approach. 25 Approved For Release 2005/06/23 : CIA-RDP78BO477OA002800030025-3 Approved Release 2005/06/23: CIA-RDP78B000A002800030025-3 3. The existing objectives call for a D maximum of 31.0 and D minimum of 0.05 and a speed of ASA 0.1. Although the development is far from these goals it has progressed to the point where it could well be used to meet some of our rapid access print requirements. This aspect of possible immediate use of the material through relaxing some of the technical require- ments was discussed to a considerable degree with and they indicated they would be happy to visit with us in Washington to further pursue this approach. 4. Recommendations: a. A staff conference should be held to review the technical objectives of this development with the idea in mind that, for some applications, it may be possible to relax some of the requirements. If this appears logical a meeting should then be held with to firm up new criteria to obtain a practical utilization of this product at the earliest possible time. Perhaps with long range research for the more difficult apsects continuing on low priority. 25 25 25 Approved For Release 2005/06/23 : CIA-RDP78BO477OA002800030025-3