CONTRACT INSPECTION REPORT EQUIPMENT AND STUDIES (SERIES OF PROJECTS UNDER OUR CONTRACT)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002400040025-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 27, 2005
Sequence Number: 
25
Case Number: 
Publication Date: 
February 2, 1966
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002400040025-6.pdf154.36 KB
Body: 
Li SEcRET f- 't /C -Z U GONt IUEN I IAL I / / /' f r LJ UN(;LASJ 11- It[) CONTRACT NO. TASK NO CONTRACA00WMU F 7@U-6 2005/06/C6 70A 02400040025-6 TO: DATE 2 February 1966 CONTRACT ADMINISTRATION & SETTLEMENT INSPECTION REPORT NO. (If firli, so state) BRANCH/PD/OL ESTIMATED COMPLETION DATE Indefinite NAME OF CONTRACTOR Declass, Review by NGA. TYPE OF COMMODITY OR SERVICE Equipment and Studies (Series of Projects under our contract) THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED ? YE El NO FUNDS YES 0 N0 IF ANSWER IS 11 NO" ADVISE REC- S OMMENDA ON AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED HAS AN INTERIM REPORT. FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? a YES 0 N0 (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? [] YES ? NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES' IS THIS AN INCENTIVE CONTRACT 0 YES Z] NO NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. 0 COST 0 PERFORMANCE DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR I. OUTSTANDING S. ^ ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. UNSATISFACTORY 2. a EXCELLENT 4. ^' AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. , described on reverSe. Series of projects . RECOMMENDED ACTION ? CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE EJ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR SIGNATURE OF INSPE TOR DIVISION INSPECTOR'S EXTENSION SIGNATURE OF APPROVER 10R- 65 1897 EDITIONS App o ~j- l 2005/06/0 c t 1~A ~,~6770A002 U 6 (12-36) 25X1 NARRATIVE V0RT INTEr ..-~ nn FINAL Approved For Release 2005/06/06 : IA-RD 8B04770A002400040025-6 PAR 207 "Definitive Study of Contact Printers." Final Report due in February. Proceeding satisfactorily. PAR 202/.224 "Briefing Print Enlarger." Breadboard and tests in final stage. Have waived the final report in order to construct the Prototype which has been authorized as PAR 243. This project is considered outstanding. PAR 211 "Microdensitometer Study of Effects of Processing." Final Report received on 1 November 1965. Evaluation completed on 31 January. Considered Unsatisfactory. PAR 212 "Color Acquisition System Review Study." Final Report was received 1 November. Evaluation completed 31 January. Considered Barely Adequate. PAR 213 "Color Reproduction Systems Review." Final Report was; evaluated on 28 December 1965. Considered Below Average. PAR 216 "Laser Photographic Exposure." Evaluation of Final Report was completed on 29 October 1965. Considered Unsatisfactory. PAR 217 "Optimization of Lasers." Final Report was received on 1 Nov. 1965. Evaluation was completed on 18 January 1966. Considered Unsatisfactory. PAR 233 "Zoom Projection Lens." Work has just begun. Visited 3.1 January and 1 February 1966. Proceeding satisfactorily. PAR 242A "Color Demonstration Materials." Proceeding satisfactorily. PAR 243 "Briefing Print Enlarger Prototype." Commenced this project in January 1966. Great expectations! COMMENTS: PAR 211, PAR 212, PAR 213, PAR 216 and PAR 217 all a ear to be challenges not met by this particular division They probably should not have been assigned as projects since so little has been given in return. Recommend we notify =of general poor quality of research and reporting, then close out these particular projects as "water under the bridge". Note: PARs 214 and 215 were delivered and installed in NPIC in October/November 1965. They are still undergoing experimental operations although the PARs are completed. 25X1 25X1 25X1 ^ UNCLAS5 IF IED pproved For Release`2b&5/D6I06N CIi~RDP78B04770A00240004002510 SECRET Approved For Release 2005/06/06 : CIA-RDP78BO477OA00240004Q October 1985 During your visit here on 29 c epteaber, I promised to check on one item concerning PAR 213 and to provide our appraisal and decision to you. Concerning a follow-on and your recommendation for study of stereo proection techniques for use in briefing, we do not desire a proposal. This item falls pretty generally into the same catagory as that of our -cnswer on PAR 227. Much more needs to be known on haw, when and where color will be utilized, and the size and type of materials that will be used, before we will seek proposals for color viewing equipment. We realize that in time we will become increasingly preoccupied with Items similar to this and with other color film problem areas. The conclusions and recommendations contained in the final report of PAR 213 are now being studied, along with other related technological materials. We hope to soon be able to determine those areas where our early efforts and expenditures could best apply in the exploitation of color. We plan to comment upon each of your recommendations listed in PAR 213. i neerely, Approved For Release 2005106/06i:. CIA-RDP78B04770A002400040025-6