CONTRACT INSPECTION REPORT EQUIPMENT AND STUDIES (SERIES OF PROJECTS UNDER OUR CONTRACT)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A002400040025-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
April 27, 2005
Sequence Number:
25
Case Number:
Publication Date:
February 2, 1966
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B04770A002400040025-6.pdf | 154.36 KB |
Body:
Li SEcRET f- 't /C -Z U GONt IUEN I IAL I / / /' f r LJ UN(;LASJ 11- It[)
CONTRACT NO. TASK NO
CONTRACA00WMU F 7@U-6 2005/06/C6 70A 02400040025-6
TO:
DATE
2 February 1966
CONTRACT ADMINISTRATION & SETTLEMENT
INSPECTION REPORT NO. (If firli, so state)
BRANCH/PD/OL
ESTIMATED COMPLETION DATE
Indefinite
NAME OF CONTRACTOR
Declass, Review by NGA.
TYPE OF COMMODITY OR SERVICE
Equipment and Studies (Series of Projects under our contract)
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
? YE
El NO
FUNDS YES 0 N0 IF ANSWER IS 11 NO" ADVISE REC-
S
OMMENDA ON AND/OR ACTION OF SPONSORING OFFICE, ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED
HAS AN INTERIM REPORT. FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? a YES 0 N0 (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? [] YES ? NO
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES'
IS THIS AN INCENTIVE CONTRACT 0 YES Z] NO
NOTE:
IF YES, CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
0 COST 0 PERFORMANCE DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
I. OUTSTANDING S. ^ ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. UNSATISFACTORY
2. a EXCELLENT 4. ^' AVERAGE 6. ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
, described on reverSe.
Series of projects
.
RECOMMENDED ACTION
? CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE EJ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
SIGNATURE OF INSPE TOR
DIVISION
INSPECTOR'S EXTENSION
SIGNATURE OF APPROVER
10R- 65 1897 EDITIONS App o ~j- l 2005/06/0 c t 1~A ~,~6770A002 U 6 (12-36)
25X1
NARRATIVE V0RT INTEr ..-~ nn FINAL
Approved For Release 2005/06/06 : IA-RD 8B04770A002400040025-6
PAR 207 "Definitive Study of Contact Printers." Final Report due in
February. Proceeding satisfactorily.
PAR 202/.224 "Briefing Print Enlarger." Breadboard and tests in final
stage. Have waived the final report in order to construct the
Prototype which has been authorized as PAR 243. This project is
considered outstanding.
PAR 211 "Microdensitometer Study of Effects of Processing." Final Report
received on 1 November 1965. Evaluation completed on 31 January.
Considered Unsatisfactory.
PAR 212 "Color Acquisition System Review Study." Final Report was
received 1 November. Evaluation completed 31 January. Considered
Barely Adequate.
PAR 213 "Color Reproduction Systems Review." Final Report was; evaluated
on 28 December 1965. Considered Below Average.
PAR 216 "Laser Photographic Exposure." Evaluation of Final Report was
completed on 29 October 1965. Considered Unsatisfactory.
PAR 217 "Optimization of Lasers." Final Report was received on 1 Nov. 1965.
Evaluation was completed on 18 January 1966. Considered Unsatisfactory.
PAR 233 "Zoom Projection Lens." Work has just begun. Visited
3.1 January and 1 February 1966. Proceeding satisfactorily.
PAR 242A "Color Demonstration Materials." Proceeding satisfactorily.
PAR 243 "Briefing Print Enlarger Prototype." Commenced this project in
January 1966. Great expectations!
COMMENTS:
PAR 211, PAR 212, PAR 213, PAR 216 and PAR 217 all a ear to be
challenges not met by this particular division They probably
should not have been assigned as projects since so little has
been given in return. Recommend we notify =of general poor quality
of research and reporting, then close out these particular projects
as "water under the bridge".
Note: PARs 214 and 215 were delivered and installed in NPIC in
October/November 1965. They are still undergoing experimental
operations although the PARs are completed.
25X1
25X1
25X1
^ UNCLAS5 IF IED
pproved For Release`2b&5/D6I06N CIi~RDP78B04770A00240004002510 SECRET
Approved For Release 2005/06/06 : CIA-RDP78BO477OA00240004Q
October 1985
During your visit here on 29 c epteaber, I promised to check on one
item concerning PAR 213 and to provide our appraisal and decision to
you. Concerning a follow-on and your recommendation for study of stereo
proection techniques for use in briefing, we do not desire a proposal.
This item falls pretty generally into the same catagory as that of our
-cnswer on PAR 227. Much more needs to be known on haw, when and where
color will be utilized, and the size and type of materials that will be
used, before we will seek proposals for color viewing equipment. We
realize that in time we will become increasingly preoccupied with Items
similar to this and with other color film problem areas.
The conclusions and recommendations contained in the final report
of PAR 213 are now being studied, along with other related technological
materials. We hope to soon be able to determine those areas where our
early efforts and expenditures could best apply in the exploitation of
color. We plan to comment upon each of your recommendations listed in
PAR 213.
i neerely,
Approved For Release 2005106/06i:. CIA-RDP78B04770A002400040025-6