CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A002000030016-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 9, 2002
Sequence Number: 
16
Case Number: 
Publication Date: 
October 14, 1966
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A002000030016-1.pdf139.25 KB
Body: 
El SECRET 99612-6 CONFIDENTIAL UNCLASSIFIED Approved F ? telease 2003/06/11 : CIA-RDIRR8-1304770A0020000804118A CONTRACT INSPECTION REPORT 'NINO, 2c TO: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE jI CkAober 1966 INSPECTION REPORT NO. (If final, so state)i 3 (PINQ i ESTIMATED COMPLETION DATE ; 31 .,..ucuat i'66 NAME OF CONTRACTOR Declass Review by TYPE OF COMMODITY OR SERVICE litMVEre ,AltDmiitic Foc?ing Syatem THE CONTRACTOR IS r. ON SCHEDULE YES NO THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS laYEs 0 NO IF ANSWER IS "NO" ADVISE REC. OMMENDATION AND/OR ACTION OF SPONSORING OFFCCE. ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED - ..11:K 1 PER CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT.FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CON,TRACTOR DURING THE PERIOD? DYES No (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES (If yes, indicate items, quantity, and cost on reverse side.) . L N. INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES 0 NO IF YES. CHECK TYPE 0 COST ? rEirD ? PERFORMANCE II DELIVERY NOTE: USE REVERSE SIDE FOR COMMENTS, FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1. OUTSTANDING 4. ABOVE AVERAGE 7. U UNSATISFACTORY 2. EXCELLENT 5. D AVERAGE 3.UJ VERY GOOD 6, MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION FORM RECEIVED. WTERMINATE CONTINUE AS PROGRAMMED UJ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM RECD DOES NOT APPLY , ITEM RECD DOES NOT APPL/4 PROTOTYPES X MANUALS A , DRAWINGS ANDAND SPECIFICATIONS X FINAL REPORT ? PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR :WptL.. '''' -7* 196( SIGNATURE OF INSPECTOR DIVISION 2 INSPECTC Approved For Release 2003/06/11 : CIA- s P78604770A002000030016-1 FORMUSE 8-66 1897 PREVIOUS EDITION UNCLASSIFIED El CONFIDENTIAL 0 SECRET 112-361 0 SECRET CONFIDENTIAL 0 UNCLASSIFIED' ApprovROFFrarryfiete,03/06/11 : CIA-R DP78B04770A002000030016-k, u INTERIM U FINAL Eight copies of the Final Teceinical Rerort have been nel the contract 1Als been completed. COMMENTS: (I) Various tocLiliques ror automatic foeua detectiol correction oere reviewed for application to rear-projection rIJ:eter operetin6 in a scanning mode. The tecanique selected nor detaii.ell theoretical and expe-Ameal;al atudy automatically deteets t!:le sheer- seas of focue or an exteraialy cc -crated pattern that is projected onto the film and re-imaged extemaly by the same ?Elea1 projcetion syatem W1,03C focus ia being controlled. (2) The reaulta presented in te final report are an excellent b4LIIVAI between experimental data and thearlytical analysis. TIvl contractor conducted 4 well organized 'program which was finished within the alloted time and funds, The theoretical and experiMental reaults eppear to justify the engineering design and inatallatin of protot,Ape focus-detection system in an e3i5tin3 rear-projectiem viewer or the development of u reaeibility model to obtain oper,fnc limits and solution of poccible servo preblems. Ir:44 (3) The contractor's overall performouce was good. ;'; mintnum of equipment was judieiouely used in a wide runge of exnerimente to measure the focus-detection system response caracteristics. 1 certify that U deliverable iteos (8 copies oV the Final Tccimicia Report) have been received. There is 4 small amount of residual equipment (lenses, mirrors, and minor hardware items) that Should be retained by the eontractor for possible use 43 WE in tty event that a followon contract is deeired. Development Brun&I, POOS 2 r Release-2003/461-1-1-;-CIA.RQUaBLLIZ 0 UNCLASSIFIED444007 CONFIDENTIAL SECRET X1