MICRODENSITOMETER MODIFICATIONS (SCAN CONTROLLER)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04770A001400070010-0
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
February 8, 2005
Sequence Number:
10
Case Number:
Publication Date:
August 28, 1969
Content Type:
FORM
File:
Attachment | Size |
---|---|
CIA-RDP78B04770A001400070010-0.pdf | 89.5 KB |
Body:
[:]SECRET
Approv _1
RRA
CONTRACT INSPECTION REPORT
.
TO:
DATE
CONTRACT ADMINISTRATION & SETTLEMENT
28 August 1969
BRANCH/PD/OL
INSPECTION REPORT NO. (If final, so state)
ESTIMATED COMPLETION DATE
-
30 September 1969
,_s_-._-- -
NAME OF CONTRACTOR
Declass Review by NGA.
F
TYPE
r_7 M D Y R SERVICE -
Microdensitometer Modifications (Scan Controller)
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
a YES
FUNDS D YES 0 NO IF ANSWER IS ,.NO? ADVISE REC-
No
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE
ON
.
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED -
6o
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED - 60
HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? [] YES E] NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? a YES NO
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0 YES aNO
NOTE
IF YES. CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
COST O AWARD 0 PERFORMANCE 0 DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
A
OVERALL PERFORMANCE OF CONTRACTOR
I OUTSTANDING 4. ABOVE AVERAGE 7. 1:1 UNSATISFACTORY
2. EXCELLENT S. IKXI AVERAGE
rr~
JJ
3. VERY GOOD 6,
Q
MINIMUM ACCEPTABLE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
REASONS ON REVERSE SIDE.
RECOMMENDED ACTION
CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING
.
SATISFACTORY PERFORMANCE
? CLOSE OUT OTHER (Specify)
IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE
APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
28 August 1969
FORM USEH~_I__
12-67 1897 PREVIOUS
EDITION
5X1
CONF IDENTIAUNCLASSI"ICD
? CONFIDENTIAL
[] SECRET
^ SECRET ed For Release*2805/CROQUPDRMMS04770A00140 0010 UNCLASSIFIED
NARRATIVE REPORT
The Contractor visited this government facility in July to determine
packaging requirements for the modification. At this meeting, the general
operation of the scan controller was discussed and it became obvious that
the contractor had, overlooked a few details (although they were written into
the contract). The contractor therefore had to redesign the controller.
At this time the contractor has completed most of the new designs and
has ordered and received many of the components. The contractor estimates he
will require a one month time extension to complete the contract. The total
amount of funds committed to this fixed price contract is
5X1
El UNCLASS I F I D 70A001400070010-0
CONFIDENTIAL ^ SECRET