MICRODENSITOMETER MODIFICATIONS (SCAN CONTROLLER)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001400070010-0
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 8, 2005
Sequence Number: 
10
Case Number: 
Publication Date: 
August 28, 1969
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001400070010-0.pdf89.5 KB
Body: 
[:]SECRET Approv _1 RRA CONTRACT INSPECTION REPORT . TO: DATE CONTRACT ADMINISTRATION & SETTLEMENT 28 August 1969 BRANCH/PD/OL INSPECTION REPORT NO. (If final, so state) ESTIMATED COMPLETION DATE - 30 September 1969 ,_s_-._-- - NAME OF CONTRACTOR Declass Review by NGA. F TYPE r_7 M D Y R SERVICE - Microdensitometer Modifications (Scan Controller) THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED a YES FUNDS D YES 0 NO IF ANSWER IS ,.NO? ADVISE REC- No OMMENDATION AND/OR ACTION OF SPONSORING OFFICE ON . REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED - 6o DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - 60 HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? [] YES E] NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? a YES NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES aNO NOTE IF YES. CHECK TYPE USE REVERSE SIDE FOR COMMENTS. COST O AWARD 0 PERFORMANCE 0 DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. A OVERALL PERFORMANCE OF CONTRACTOR I OUTSTANDING 4. ABOVE AVERAGE 7. 1:1 UNSATISFACTORY 2. EXCELLENT S. IKXI AVERAGE rr~ JJ 3. VERY GOOD 6, Q MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING . SATISFACTORY PERFORMANCE ? CLOSE OUT OTHER (Specify) IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 28 August 1969 FORM USEH~_I__ 12-67 1897 PREVIOUS EDITION 5X1 CONF IDENTIAUNCLASSI"ICD ? CONFIDENTIAL [] SECRET ^ SECRET ed For Release*2805/CROQUPDRMMS04770A00140 0010 UNCLASSIFIED NARRATIVE REPORT The Contractor visited this government facility in July to determine packaging requirements for the modification. At this meeting, the general operation of the scan controller was discussed and it became obvious that the contractor had, overlooked a few details (although they were written into the contract). The contractor therefore had to redesign the controller. At this time the contractor has completed most of the new designs and has ordered and received many of the components. The contractor estimates he will require a one month time extension to complete the contract. The total amount of funds committed to this fixed price contract is 5X1 El UNCLASS I F I D 70A001400070010-0 CONFIDENTIAL ^ SECRET