(Sanitized) PROGRESS REPORT - FEBRUARY 66 PROJECTS NO. 552 AND 552A

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002900040063-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 25, 2002
Sequence Number: 
63
Case Number: 
Publication Date: 
March 16, 1966
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002900040063-8.pdf147.67 KB
Body: 
STAT STAT Appro oelea e 310 /28: CIA-RDP7 9 Progress Report - February 66 Projects No. 552 and 552A Gentlemen, Enclosed are three (3) copies of Progress Report on Projects 552 and 552A for the period February 1966. Very truly yours, STAT STAT Declass Review by NIMA/DOD STAT LB/de Enc: (3) P.R. Cert. #205639 n~ n ~Q oAp.~2rom&OAEi@k RQIRRl2Q 331Qs1/9t~SEA Wf?a 7AaA@99,90QQAQQNaAG STAT d 3TAT PROGRESS REPORT For VERSATILE, HIGH PRECISION STEREO POINT TRANSFER. DEVICE Period Covered: February 1966 Dated: 14 March 1966 Job No.: #552, #552A Document No.: OD-284 STAT Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040063-8 STAT PROGRESS REPORT For VERSATILE, HIGH PRECISION STEREO POINT TRANSFER DEVICE Progress Report 552 & 552A for February 1966 Work'during February consisted of completing assembly and,adjustment motions and commencing system debugging on the Point Transfer Device. Optics and mechanisms are all operating, but require miscellaneous work to clean up system for acceptance checkout. OBJECTIVE ASSEMBLIES Both objective assemblies installed and all objective and system optical adjustments completed. Recently reworked beam,splitters and lasers were installed and successfully marked film. However, some debugging still needed because output of laser declined after a few days use to a less than desirable level for consistent marking quality. Laser reticle drive electronics modification is almost complete. New reticle indexing device is somewhat slower, but appears to handle load well. Laser alignment is now being checked by a short length of rigid fiber optics replacing the crystal, but some further im- provement is seen to observe image accurately. The sole adjust- ment to be made and monitored is a prism above each laser head where an accurate image brightness and symmetry maxima has to be obtained to utilize all of laser output possible. The previously completed adjustment of the beam splitter established the optical axis through the laser relay lens and with it focus of the retical station. Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040063-8 STAT Laser output of 3 joules is seen necessary for reasonably good film marks and is highly dependent on the cavity finish, laser crystal temperatures, lamp condition and capacitor bank charge. The silver plating of the cavity became easily tarnished and has been refinished several times during the.last month. A solution here seems to be a basically more reflective finish such as an evaporated aluminum film as used on front surface mirrors. Laser head cooling means appears to be inadequate for rapid re- cycling for maximum output. Enlarging cooling air inlet and out- let ports of laser head may help this deficiency. For the lamp condition status, we have not kept record of shots taken, there- fore, we have no idea of lamp life for required output. The capacitor bank charge time for maximum possible output is around 20 seconds. Although capacitors are fully charged,. full impulse is not always seen at the lamp. Insulation faults in the wiring and connectors are suspect, but are normally difficult to detect because they lack visible effects and losses are intermittent. We are replacing some capacitors in one laser power supply to eliminate large leakage currents seen in several units, preventing full charge from being obtained. The above problems, as well as completion of laser retical drive are being worked on and are ex- pected to be improved in March. ENCODER - COUNTER SUBSYSTEM The switch assembly and debugging is complete with all counters and encoders operating properly. Final cabinet is ex- pected in March and may be received for shipment with system. System tests have to be completed when system debugging is under- way. Approved For Release 2003/01-t28-: CIA-RDP78B04747A002900040063-8 STAT Approved For Release 200310 1128 552 OD-284 Work for Next Period 1) Complete system debugging on 552 #101 in preparation for customer acceptance. Advance, where possible on assembly and debugging on remaining 552A systems. Attachments 1) Financial Report 2) Customer Visit Notes, Document 552A - CD-128 dated 24 February 1966. Approved For Release 2003/01/38: CIA-RDP78B04747A002900040063-8