(Sanitized) PROGRESS REPORT, NOVEMBER 1966 - PROJECTS 552 AND 552A
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A002900040054-8
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
November 25, 2002
Sequence Number:
54
Case Number:
Publication Date:
January 4, 1967
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A002900040054-8.pdf | 72.67 KB |
Body:
STAT
Approved For Rel
4 January 1967
I - 4D-315
LHBsaw
STAT Subjects Progress Report
over er 1956 - Projects
Enclosed are three (3) copies of
Progress Report on Projects for the period
November 1966.
Very truly yours,
STAT
25X1
25X1
STAT
25X1
STAT
LK8 aw
Enc. (3) P.R.
Declass Review by
NIMA/DOD
ase 2003/01/28 : CIA-RDP78B 4470 29454 8
Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040054-8
STAT
Approved or Release - -
PROGRESS REPORT
For
25X1
I for November 1966
Period Covered: November 1966
Dated: December 12, 1966
Job No.: 552/552A
Document No.: OD - 313
Approved For Release 2003/01/28 : CIA-RDP78B04747A002900040054-8
STAT
25X1
FOR OCTOBER 1966
The following has been the work on these systems:
25X1
25X1
25X1
No action has'been taken on proposed methods for measure-
ment improvement.
#102
No action has been taken on proposed attack on scanning
drive problem. Other work to check over optics remains to be done
in a service cell.
103
Customer has informed us of repeated failures in scanning
drive with relation to length of "on" time where acceptable operation
after 3 to 4 hours of "warm up". Other times instrument required
no such preparation for use. A service call will be made early in
December to trace this problem out.
25X1 104
Work has advanced on image alternator, film drive and
system adjustment and debugging. Image alternator is wored and
electrically operable. Wires for power input have to be installed
into existing harness and transformer supplying power has to be
installed. Detailing of film drive components has been nearly com-
pleted with many parts already for assembly. Electrical harness
conversion is underway to bring power into film drive motor amplif-
iers and,to writing. The electrical work wily continue during.
December as well as other 'system electrical work in scanning drive.
Optical adjustments should be completed in December leaving film
drive modification and system debugging left for late December and
January.
;clo$. &rvve8 =0A1e28?WSt28 : CIA-RDP78BO4747AO02900040054-8