CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002900010013-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
20
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 15, 2001
Sequence Number: 
13
Case Number: 
Publication Date: 
June 16, 1967
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002900010013-6.pdf872.42 KB
Body: 
25X1A 25X1A 0 SECRET CONFIDENTIAL 0 UNCLASSIFIED " coftippArregiorrEktriciAsikepM01/02 : 1A CIA-RDP78604 25X CONTRACT NO. 47 0029000 WWW. .......-6 TO: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE 16 June 1967 INSPECTION REPORT NO. (If final, so state ESTIMA MPLETION DATE NAME OF CONTRACTOR TYP REVIEW by A/Dfl DECLASS Pora1 Stereo Viewer Brathtbilfin THE CONTRACTOR IS ON SCHEDULE TH Cr?ACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED IS "NO" ADVISE REC- OF SPONSORING OFFICE, ON INDICATE MAGNITUDE OF AD- 1111 NO YES (i) FUNDS AYES III NO IF ANSWER DMMENDA N AND/OR ACTION REVERSE HEREOF. IF KNOWN, DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED - PER CENT OF FUNDS EXPENDED ? (NO information available) HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR NO (If yes, give details on reverse side.) Y BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES NO and cost on reverse side.) DURING THE PERIOD? II YES HAS GOVERNMENT-OWNED PROP (If yes, indicate items, quantity, INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES IF YES. CHECK TYPE (iENO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. II COST 0 AWARD PERFORMANCE II DELIVERY .EE, 1111 OVERALL PERFORMANCE OF CONTRACTOR 1. OUTSTANDING 4. 2.El EXCELLENT 3, VERY GOOD IF OVERALL PERFORMANCE OF CONTRACTOR REASONS ON REVERSE SIDE. ABOVE 5.El AVERAGE AVERAGE 7.El UNSATISFACTORY ACCEPTABLE IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE 6, r MINIMUM RECOMMENDED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE TERMINATE OTHER (Specify) rftruga Contract Close.. , IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE Cat FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT APPLY , ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS X DRAWINGS AND SPECIFICATIONS X FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS X SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR DIVISION TDSMFIC ..... ..... ...... SIGNATURE OF APPROVER PePePt9.....???????????????????295% FORMs, upoprovea zuuziu uui . tAiin=u uuuulu..1-b 8-66 6,97 PREVIOUS EDITION UNCLASSIFIED LA CONFIDENTIAL u SECRET (12-36) 25X1A 0 SECRET 0 CONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2002/01/02 : CIA- DP78604747A002900010013-6 NARRATIVE REPORT I 0 INTERIM fa FINAL 1. The Panoramic Stereo Viewer Prototype has been tested and operated under simulated operational conditions. Although the original concept was good, the prototype showed that the problems involved in implementing the concept are greater than can be justified by the possible advantages of the viewe over current techniques. 2. From a strictly technical standpoint the following descrepencies were noted on the prototype. a. The film has a tendency to slip over the glass drums 'specially when starting or stopping and when using 70mmwidth film. This is a de- sign problem, and it precludes the effective use of the coupled. X drive mode as well as the desired X manual drive. b. The coupled drives only allow the two rolls of film to be trans- ported in the same direction. Most panoramic photography is of the type which requires the two rolls to be transportel in opposite directions. This WAS an oversight in designing the specifications for the viewer. c. The relay switches do not perform satisfactorily. The Y drives do not change dire:IL-1km when the joystick is moved quickly. The left Y drive occasionally does not work at all. d. The manual hand Wheels are imornmallently located. The manual drive on the right Y also drives the left Y on occasions The manual drive on the left X will not drive in the coupled mode. e. The left optics system cannot be focused at the highest mag- nification. The rotational primes are mounted loosely and can jiggle about when adjusted. 34 The prototype shows no more than average workmanship and average or poorer engineering design. I, therefore, rate the performance of the con- tractor as minimum acceptable. 4. I certify that all deliverable items under the received. act have been Approved For Release 2002/01/02 : CIA-RDP78B0402900010013-6 UNCLASSIFIED CONFIDENTIAL DSECRET 25X1A 25X1A 0 SECRET CONFIDENTIAL UNCLASSIFIED cOftA9KeYeill,f?r-eFiWikep0Ftlt01/02 : CIA-RDP114WA002900010013-6 :sow CONTRACT NO. TASK NO. 5 25 TO: CONTRACT ADMINISTFtATION & SETTLEMENT BRANCH/PD/OL DATE iNsM7AVIRAIIITo. 1/ final, so state ESTIMAWID COMPLETION DATE I lab2dia17 1967 NAME OF CONTRACTOR TYPE OF Panoramic Stereo Ulmer Prototype THE CONTRACTOR IS ON SCHEDULE YES NO ci] THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS V YES 0 NO IF ANSWER IS "NO" ADVISE REC - OMMENDA ON AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD. DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED ? ,16 PER CENT OF FUNDS EXPENDED ? (glee reverse HAS AN INTERIM REPORT. FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR (If yes, give details on reverse side.) Y BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES fp NO and cost on reverse side.) DURING THE PERIOD? ll YESNo A HAS GOVERNMENT-OWNED PRO (If yes, indicate items, quantity, INCENTIVES IS THIS AN INCENTIVE CONTRACT IF YES, CHECK TYPE 0 YES NO 0 DELIVERY NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. 0 COST 0 rEi:RD 111 PERFORMANCE OVERALL PERFORMANCE OF CONTRACTOR 1. OUTSTANDING 4. ABOVE AVERAGE 7. UNSATISFACTORY 2. EXCELLENT 5. 0 AVERAGE 3. VERY GOOD 6, MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ci CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE TERMINATE OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM RECD DOES NOT APPLY ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVE.RNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR SIGNATURE OF INSPECTOR INSPE: A DIVISION TDB 25X FORM 8-66 1297 PREVIOUS. - UNC LASS IF I ED EDITION CONFIDENTIAL ECRET (12-36) 0 SECRET CONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2002/01/02 : CIA-RDP78604747A002900010013-6 NARRATIVE REPORT 0 INTERIM 0 FINAL Acceptance testing and operational evaluation eontinues. No new information as to percent of fends expended has been received tne the contractor, although promised tvo month, ago. Approved F lorz5elease 2002/01/02 : CIA-RDP78130474*002900010013-6 UNCLASS IF IED CONF IDENT IAL DSECRET 25X1A 25X1A 0 SECRET fl CONF I DENT mom) UNCLASSIFIED ................ e fiNrSZFEtpl %SR 0196R0 I /02 : CIA c 0#fffer CONTRACT NO. ..J -71111047 A002900010013-6 25X1A TASK NO. 5 To: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE ID November 1966 INSPECTION REPORT NO. (If final, so state) 38 ESTIMATED COMPLETION DATE 15 December 1966 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE C Viewer Prototyp THE CONTRACTOR IS ON SCHEDULE YES til NO THE CONT ACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS au YES ONO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED - 50? PER CENT OF FUNDS EXPENDED ? (see reverse side) HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR' DURING THE PERIOD? YES gg No (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? 0 YES (If yes, indicate items, quantity, and cost on reverse side.) 3 NO I NCENT I VES IS THIS AN INCENTIVE CONTRACT El IF YES, CHECK TYPE 0 COST 0 rEirD 0 PERFORMANCE YES NO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. M DELIVERY OVERALL PERFORMANCE OF CONTRACTOR I. OUTSTANDING 4. 2. EXCELLENT 3,fJ VERY GOOD IF OVERALL PERFORMANCE OF CONTRACTOR REASONS ON REVERSE SIDE. ABOVE AVERAGE 7. UNSATISFACTORY ACCEPTABLE IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE 5. ri AVERAGE 6, MINIMUM RECOMMENDED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE El OTHER (Specify) OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN APPLICABLE. THE FOLLOWING: TERMINATE IF TERMINATION IS RECOMMENDED FORM ON CONTRACTOR'S PERFORMANCE RECEIVED. THESE INCLUDE. WHERE ITEM REC'D DOES NOT APPLY ' ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 3 NovaWber 1956 SIGNATURE OF INSPECTOR DIVISION B INSPE SIG 25X1/ . - FORM 8-66 1897 PREVIOUS 0 UNCLASSIFIED [F] CONFIDENTIAL sECRET (12-36) EDITION 25X1A 0 SECRET g CONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2002/01/02 : CIA-R P781304747A002900010013-6 NARRATIVE REPORT Ia INTERIM FINAL 1, On 2.3 November 1966, replaced the two damaged fiber blevel gears with two more of the same mate. In addition the gear shafts were mounted more firmly und pinned. Acceptance testing is again under way; so far, no damage to the gears is in evidence, 2. In regard to the vestion of funds expended . no documentia accounting has been provided - ouly the verbal statement that "just about all cost funds have been expended." Approved Fqr Release 2002/01/02 : CIA-RDP78B04747A002900010013-6 0 UNCLASSIFIED OD CONFIDENTIAL OSECRET 25X1A 25X1A 0 SECRET liENT I A L 0 UNCLASSIFIED Approved F%Release 2002/01/02: CI CONTRACT I NS PECT ION REPORT REP77313047.4A00290001?101e-6 25X1A TO: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DA ._.....,A,A, IN;m5715ErTrelstririmrr-r/f final, so state S ATED COMPLETION DATE NAME OF CONTRACTOR -W-111/"WllbeP"1"66S TYPE OF THE CONTRXtibledWReSeAllitiAl THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED 9 YES El NO IF ANSWER IS "NO" ADVISE REC. OMMENDA ON AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD. OITIONAL FUNDS INVOLVED. IIFUNDS YES NO PER CENT OF WORK COMPLETED ? PER CENT OF FUNDS EXPENDED ? 3ise Revorue HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? YES NO (If yes, give details on reverse side.) 9 HAS GOVERNMENT-0 ED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES [0 NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT DYES IF YES. CHECK TYPE NO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. II COST 0 ig:RD PERFORMANCE 111 DELIVERY 0 OVERALL PERFORMANCE OF CONTRACTOR OUTSTANDING 4.El ABOVE AVERAGE 7. UNSATISFACTORY 5. AVERAGE 6, MINIMUM ACCEPTABLE IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE 2. 111 EXCELLENT 3. VERY GOOD IF OVERALL PERFORMANCE OF CONTRACTOR REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ElTERMINATE OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM ?REC'D DOES NOT APPLY , ITEM REC'D DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR C4 ' Unbar 3.-e6( ? SIGNATURE OF IN PECTOR DIVISION 1? At tt 3 INSPECT. Release 2002/01/02: CIA-RDP78B04747A0029000 SIGNATURE OF APPROVER 10013-fl FORMUSE 8-66 1897 PREVIOUS EDITION UNCLASSIFIED CO CONFIDENTIAL 0 SECRET 112?36) 25X1A Li SECRET UCONFIDENTIAL CI UNCLASSIFIED ApprovogfttNeRppolpp2/01/02 : CIA-RiP78BiyilthyrtF900010013-15 F I NAL 14 The e4i of todamaged transport ay ant planned for 1042 04 by a strike in the plant al: the vehdorxp1rin t xacent fiber gear, Tno reaiou,4. eu received and la being held for possible Three oopies of the "Ina Ilekort were . Tt.? covwriks tletter ataLea urt "the te,ft This sill not be sos until the final acceptance test resume t of funds expended - rem red by Developer/A expended 40 giresuou?bli 25' Tht. trait ?I...X.TIAC,Crill:r 25' office h.41 isted arid Approvcd For ROCO3C 2002/0A/02 : CIA RID12468647-47A002000010013 6 0 UNCLASSIFIED LC0NFIDENTIAL -NNW' 0 SECRET 1A 1A 25X1A 25X1A SECRET 99700.2 CONFIDENTIAL UNCLASSIFIED Approvetl-Forgs1 III ? ? ? '. CONTRACT INSPECT ION REPORT ? 0 RA .?. .... NO 25X1A TASK NO. To: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE 8 July 1966 INSPECTION REPORT NO. (If final, so state 36 ESTIMATED COMPLETION DATE 31 August 1966 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE PnozDic 3teeo Viewer Prototype THE CONTRACTOR IS ON SCHEDULE THE CONMACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED IS "NO" ADVISE REC- OF SPONSORING OFFICE, ON INDICATE MAGNITUDE OF AD- YE 1111S r NO FUNDS 0 YES El NO IF ANSWER OMMENDATION AND/OR ACTION REVERSE HEREOF. IF KNOWN. DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED ? PER CENT OF FUNDS EXPENDED ? HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED DURING THE PERIOD? ag YES 0 N? (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? (If yes, indicate items, quantity, and cost on reverse side.) FROM THE CONTRACTOR cl NO 11 YES INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES IF YES, CHECK TYPE dr7---- NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. III COST 0 PERFORMANCE M DELIVERY OVERALL PERFORMANCE OF CONTRACTOR I.fJ OUTSTANDING 3. 2. EXCELLENT IF OVERALL PERFORMANCE OF CONTRACTOR REVERSE SIDE. ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY 6. BARELY ADEQUATE IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON 4. AVERAGE RECOMMENDED ACTION WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE OTHER (Specify) OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN APPLICABLE. THE FOLLOWING: X CONTINUE AS PROGRAMMED Over fJTERMINATE IF TERMINATION IS RECOMMENDED FORM ON CONTRACTOR'S PERFORMANCE RECEIVED. THESE INCLUDE, WHERE ITEM RECD DOES NOT APPLY ITEM REC'D DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 5 Jul 1966 SIGNA INSPE, DIVISION P &De SI 1 25X1A FORM USE 10.651 897 PREVIOUS EDITION 0 UNCLASSIFIED Ell CONFIDENTIAL 0 SECRET (12-36) 25X1A 25X1A 0 SECRET CONFIDENTIAL 0 UNCLASSIFIED ApprovgAIRW.Rieweipp2/01/02 : CIA-RI P78B 47A002900010013-5_ INTERIM Ul FINAL 1, On 1 July 1966 three (3) copies of the Instruction (Operation and Maintenance) Manual were delivered by hand to the undersigned, for which two co ie of 4 Woorandum Receipt were forwarded to has been instructed to forward the Residual Inventory to the aepropriate. warehouse . I will be informed won its arrival. The Final Report is still in preparation at 2, The film transport malfunction previously reported has been tentatively analysed as resulting from a loose drive shaft and exceeeive backlash on several gearai Replacements for the damaged fiber gears have been ordered and are expected at =about 1 August 1966. Due to paent vacation and annual leave for the undersigned, repair of the drive system is scheduled for 10-12 August 1966. Hppefully, acceptance testing mill resume the following week. 25X1A 25X1A Approved ForRelpasp 2002/01/02 ? CIA-RnP7RR04747Aa07900010013-A 1:3 SECRET UNCLASS IF IED C ON F IDE NT I A L 25X1A 25X1A 0 SECRET 99700-2 CON DENT I ALLi UNC LA SS (F I ED so VM?I lime -- CONTRACT INSPECTION REPORT CONTRACT NO. . 25X1A TASK NO. TO: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE 6 ilune 1966 INSPECTION REPORT NO. (If final, so state 35 ( ESTIMATED COMPLETION DATE 8 July 1966 NAME OF CONTRACTOR Pototye TYPE OF COMMODITY OR SERVICE ?mocie Stwea Viewer THE CONTRACTOR IS ON SCHEDULE YES (1g NO THE CONILACTOR WILL PROBABLY REMAIN ?WITHIN ALLOCATED FUNDS OYES 0 NO IF ANSWER IS NO ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED - PER CENT OF FUNDS EXPENDED ? '0. '" HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? YES al NO Cif yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES ill NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES' IS THIS AN INCENTIVE CONTRACT M YES " NO ...., NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. IF YES, CHECK TYPE 0 COST 0 PERFORMANCE 11 DELIVERY OVERALL PERFORMANCE OF CONTRACTOR I. OUTSTANDING 3. 2. EXCELLENT IF OVERALL PERFORMANCE OF CONTRACTOR REVERSE SIDE. ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY 6. BARELY ADEQUATE IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON 4. AVERAGE RECOMMENDED ACTION CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING Nur) EJ SATISFACTORY PERFORMANCE OTHER (Specify) OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN APPLICABLE, THE FOLLOWING: TERMINATE IF TERMINATION IS'RECOMMENDED FORM ON CONTRACTOR'S PERFORMANCE RECEIVED. THESE INCLUDE. WHERE ITEM REC'D DOES NOT APPLY ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT ' PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WI_Til CONTRACTOR 2 Atm 1,966 SIGNATURE OF INSPECTOR DIVISION INSPECTOR ease 2002/01/02 : CIA- 25X1A FORM USE 10.65 1897 PREVIOUS EDITION 0 UNCLASSIFIED CONFIDENTIAL El SECRET (12-36) 25X1A OSECRET OCONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2002/01/02 : CIA-RDP78604747A002900010013-6 NARRATIVE REPORT I3 INTERIM 0 FINAL onal iteas to be delivered; ? Rinal Revert; being prepared Opeiwition &Maintenance Manual: completed; being forwarded ? Residual Inventory List; being prepared; will be forward w/actual residual items. During acceptance tests on the instrument in the month ,of May, various problems arose, chief of which was the wearing and breakage of two fiber bevel geurs in the film transport systems. The loft system is now inoperative and the right is about to become so. Apparently there in an aliganent problem in certain mechanical linkages, since two other fiber gears show no signs of wear. 11111411 arrange to send personnel to analyte and Correct the problem* Delivery of new fiber gears will take at least three (3) weeks. Further acceptance testing will await such corrective action. A S. rov - ? FffwmiRna7,47Ann2enneinni1J; 1:1 CONF IDENT IAL 0 SECRET II I 0 UNCLASSIFIED 25X1A 25X1A 0 SECRET - 99706-2 CONF DENT I A L UNCLASSIFIED CONTRACT INSPECT ION REPORT CONTRA T NO. ... .. . TASK NO. TO: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE 13 tiPra INSPECTION REPORT NO. (If final, so state) ESTIMATED COMPLETION DATE 31 atr 1566 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Panoramic Stereo Viewer Prototype THE CONTRACTOR IS ON SCHEDULE YES NO EA THE CON ACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED ,, ANSWER IS NO ADVISE REC- OF SPONSORING OFFICE. ON INDICATE MAGNITUDE OF AD- FUNDS ig YES III NO IF OMMENDATION AND/OR ACTION REVERSE HEREOF. IF KNOWN, DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED - 5(4/ PER CENT OF FUNDS EXPENDED? - HAS AN INTERIM REPORT, Fl L REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR %me DURING THE PERIOD? 0 YES No (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES Ei5 NO (If yes, indicate items, quantity, and cost on reverse side,) I NCENT I VES' IS THIS AN INCENTIVE CONTRACT DYES IF YES. CHECK TYPE rz NO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. II COST ' 0 PERFORMANCE M DELIVERY OVERALL PERFORMANCE OF CONTRACTOR 1. OUTSTANDING 3.EJ ABOVE AVERAGE S. BELOW AVERAGE 7.JJ UNSATISFACTORY 6. BARELY ADEQUATE IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON 2. EXCELLENT IF OVERALL PERFORMANCE OF CONTRACTOR REVERSE SIDE. 4' L AVERAGE RECOMMENDED ACTION 0 WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 0 OTHER (Specify) OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN APPLICABLE. THE FOLLOWING: rCONTINUE AS PROGRAMMED TERMINATE IF TERMINATION IS RECOMMENDED FORM ON CONTRACTOR'S PERFORMANCE RECEIVED. THESE INCLUDE, WHERE ITEM RECD DOES NOT APPLY ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CON:IT:ACTOR 13 April, 1966 SIGNATURE OF INSPECTOR INSPECTOR'S . 2002/01/02: DIVISION MODS 25X1A SIGNelease IA- FORMin USE 10.65 11097 PREVIOUS EDITION UNCLASSIFIED CONFIDENTIAL Ei SECRET (12-36) 25X1A 25X1A 0 SECRET CONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2002/01/02 : CIA-RDP78604747A002900010013-6 NARRATIVE REPORT pg INTERIM 0 FINAL According to the contract provisions, there are several additional items to be delivered, includingt l. Mal Report 24 Operation and Maintenance Manual 3. Residual Inventory List. Among residual hardware left at the plant are two extra cylindrical glass flint stages, one of which is in need of polishing Ct 13 April 1566, indicated that the OM Manual will be forwarded in 2.3 weeks, Ile or will call back by 13 April 1966 concerning the other items'. Approved For Release 2002/01/02 : CIA-IRDP78B04747A13029non1on1n-A `Irit UNCLASS IF I ED 04d IJ CONFIDENTIAL E] SECRET 25X1A 25X1A 25X1A 0 SECRET CONE DENT I AL ?c U CLASS I F I ED F... -Sep ST-. ? ?. . ... CONTRACT INSPECT ION REPORT CONTRACT NO. TASK NO. ; TO: CONTRACT ADMIN I STRATI ON & SETTLEMENT BRANCH/ PD/ OL DATE 3 February 196 INSPECTION REPORT NO. (If final, so state 33 ESTIMATED COMPLETION DATE (Over) Delivered i D. 1965 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Panoramic Stereo Viewer Prototype THE CONTRACTOR IS ON SCHEDULE YES NO (Over) THE CONMACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS UYES 0 NO IF ANSWER IS "NO ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. PER CENT OF WORK COMPLETED 1OO CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? [2fYEs 0 NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES r-, NO (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT III YES ETNO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. IF YES, CHECK TYPE 0 COST 0 PERFORMANCE 0 DELIVERY OVERALL PERFORMANCE OF CONTRACTOR I. OUTSTANDING 3. ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY 4. El, AVERAGE 6. BARELY ADEQUATE IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON 2. EXCELLENT IF OVERALL PERFORMANCE OF CONTRACTOR REVERSE SIDE. RECOMMENDED ACT ION OCCONTINUE AS PROGRAMMED 0 WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE TERMINATE 0 OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM REC'D DOES NOT APPLY ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAa lytwighltipiFIAIFAcroR SIGNATURE OF INSPE DIVISION P & D S INSPECTOR'S EXTENSI A 2 : SIGNATURE OF APPROVER CIA-RDP78604747A002900010013-6 FORM USE 10.65 I 897 PREVIOUS EDITION 0 UNCLASSIFIED ES CONF I DENT I AL El SECRET (12-36) OSECRET [J CONFIDENTIAL ['UNCLASSIFIED AppurrFvRfirse2002/01/02 : CI 4RDP78604747A002900010013-6 NARRATIVE or Q INTERIM 0 FINAL The viewer vas delivered in Decamber. Two uminum guides for alide levers, that manipulated &meter sens1r1,7 nrrs on the film reels, were damaged. is replacing these but until this is done an evaluation of the instrument cannot be completed. Approved For Release 2002/01/02 : CIA-RDP78B04747?0,A000,2900010013-6 OSECRET OUNCLASSIFIED limm"/ [29 CONFIDENTIAL 25X1A 25X1A SECRET CONFIDENT I AL 0' UNCLASSIFIED . . ... . . .. . . CONTRACT INSPECTION REPORT . , CONTRACT NO. 25X1A TASK NO. 5 TO: CONTRACT ADMINISTRATION & SETTLEMENT BRANCH/PD/OL DATE 1 December 1965 INSPECTION REPORT NO. (If final, so state 32 ESTIMATED COMPLETION DATE 15 Decestber 1965 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Panoramic Stereo Viewer Prototype THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS 30 YES 0 NO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD DITIONAL FUNDS INVOLVED. .' YES 11 NO PER CENT OF WORK COMPLETED - 9/4 PR CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR Oil DURING THE PERIOD? YES DINO (If yes, give details on reverse side) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES (If yes, indicate items, quantity, and cost on reverse side.) in NO INCENTIVES' IS THIS AN INCENTIVE CONTRACT IF YES, CHECK TYPE 0 COST 0 PERFORMANCE 0 YES in NO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. 111 DELIVERY OVERALL PERFORMANCE OF CONTRACTOR 1. OUTSTANDING 3. ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY 6. BARELY ADEQUATE IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON 2. EXCELLENT 4. AVERAGE IF OVERALL PERFORMANCE OF CONTRACTOR REVERSE SIDE. RECOMMENDED ACTION 0 WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 0 OTHER (Specify) OR IF THIS IS A FINAL REPORT PU/iCOMMENTS ON REVERSE IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN APPLICABLE. THE FOLLOWING: ti CONTINUE AS PROGRAMMED TERMINATE IF TERMINATION IS RECOMMENDED FORM ON CONTRACTOR'S PERFORMANCE RECEIVED. THESE INCLUDE, WHERE ITEM . RECD DOES NOT APPLY ITEM. RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 24 liove,.. SIGNATURE OF INSPEC INSPECTOR'S EXTENSI Ap DIVISION P&DS 25X1A S CI FORM USE 10-65 1897 PREVIOUS EDITION 0 UNCLASSIFIED CONF I DENT IAL ECRET (12-36) 25X1 A 25X1A 0 SECRET CONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2002/01/02 : Cl-RDP7 B04747A002900010013-6 INTERIM 0 FINAL NARRATIVE REPORT The instrument was scheduled to be delivered during November. However, discovered that an operator could possibly damage the drive melanin% by using the jcrystick controls improperly. This danger can be removed very easil3r and 25X1A has ordered the required parts required to accomplish this. It is estimated that the instrument will be ready for shipment by 17 December. A roved For Release 2002/01/02 : CIA-RDP781304747AZ02900010013-6 UNCLASS IF IED lab"' CONF IDENT IAL 0 SECRET 25X1A 25X1A 0 SECRET CONF DENT IAL UNCLASS I F I ED A111 overl-Furlirjams-Er2ee2te1MIMMW4pai29-0001111990-.8 CONTRACT INSPECT ION REPORT 2 25X1A TO: ENGINEERING SECTION/CB/PD/OL DATE 25 October 1.965 INSPECTION REPORT NO. (If final, so state 6 ESTIMATED COMPLETION DATE (Over) NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Panoramic Stereo newer Prototype THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS gi YES 0 NO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD DITIONAL FUNDS INVOLVED. II YES El NO PER CENT OF WORK COMPLETED - "cog PER CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PER YES No (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES (If yes, indicate items, quantity, and cost on reverse side.) 1 NO INCENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES IF YES, CHECK TYPE El NO NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. 0 COST II PERFORMANCE II DELIVERY OVERALL PERFORMANCE OF CONTRACTOR 1. OUTSTANDING 3. 2. EXCELLENT 4. IF OVERALL PERFORMANCE OF CONTRACTOR REVERSE SIDE. ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY 6. BARELY ADEQUATE IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON - ri AVERAGE RECOMMENDED ACTION WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE OTHER (Specify) OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN APPLICABLE. THE FOLLOWING: ri CONTINUE AS PROGRAMMED TERMINATE IF TERMINATION IS RECOMMENDED FORM ON CONTRACTOR'S PERFORMANCE RECEIVED. THESE INCLUDE. WHERE ITEM RECD DOES NOT APPLY ITEM RECD DOES NOT APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER END ITEMS SPECIAL TOOLING OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR 20 October 1965 , SIGNATURE !SION P & D S INSPECTOR' NATURE OF APPROVER P78604747A002900010013-6 FORM USE 10.64 1897 PREVIOUSEDITION UNCLASSIFIED CONFIDENTIAL 0 SECRET (12-36) 25X1A Nos\ 0 SECRET ID CONFIDENTIAL 0 UNCLASSIFIED Approved For Release 2Q02/01/02 : CIA-R NARRATIVE REPORI DP78B0747A0029000100134. INTERIM u FINAL This strument was inspected on 20 October 1965. It has been accepted as a prototype and delivery rill be made in epproximateky two weeks. In order to prevent possible damage to the vi t are being rade to have delivery rade directly to The final report on this project rill be written after e gement is delivered. Approved For Release 2002/01/02 : CIA-1312URRna7a7tomprinninni-4_6 UNCLASSIFIED IF I ED %wad nN CONFIDENTIAL ['SECRET