PROGRESS REPORT FOR VERSATILE, HIGH PRECISION STEREO POINT TRANSFER DEVICE

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002200010027-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 22, 2006
Sequence Number: 
27
Case Number: 
Publication Date: 
January 17, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002200010027-8.pdf159.46 KB
Body: 
PROGRESS REPORT For VERSATILE, HIGH PRECISION STEREO POINT TRANSFER DEVICE Period Covered: December 1965 Dated: 17 January 1966 Job No.: #552, #552A Document No.: OD-276 DDR-DUPE Approved For Release 2006/06/22 : CIA-RDP78B04747AO02200010027-8 Approved For Release 2006/06/22 : CIA-RDP78B04747A002200010027-8 Progress Report 552 & 552A for December 1965 This month's work has been centered in studying, re- designing, and reworking the laser optics and fabrication com- ponents for Encoder and installation in the Point Transfer Device. Stereo Viewer #552A, Serial No. 102, was delivered and installed early in December. OBJECTIVE ASSEMBLIES The problems of image color and marking size is the effort here. To improve image color the present dichroic beam splitter is being reworked with neutral coating of near 50%-50% reflection and transmission properties. Although this approach will reduce visual and laser image brightness by 30%, color bal- ance of visual image will be most effectively preserved. To compensate for laser optical path losses mark image size will be reduced 30%. The motions to change laser wavelength had several unknowns in image color and marking effects bringing further delays to equipment delivery. Some delay is expected because of problems in reworking beamsplitter and optics. A companion motion here is to correct the optical set- up determining the mark size and image quality at the film plane. The near 1:1 magnification lens formerly used had physical inter- ference that made sharp focusing the laser reticle impossible when visual optics were focused on the film. When image was Approved For Release 2006/06/22 : CIA-RDP78B04747A002200010027-8 focused by the lens in its other conjugate position image size increased significantly to about 5/32 diameter, making laser marking very unreliable with current laser output. By lengthening the relay lens focal length proper mark size is obtained, but reticle position had to be shifted by approximately 3 inches. A part of the relay lens focal length change is the re- design of the prismatic lens and the optics at the laser. Since the ray geometry has been substantially altered new lenses are required. To minimize delay of the system debugging, plastic lenses will be temporarily used while their glass counterparts are being made. The main plate will be modified and optics reassembled during the next reporting period. Sample of film marks will be forwarded during that period for inspection. ENCODER - COUNTER SUBSYSTEM All preliminary work of design, material ordering has been completed. Fabrication of switch/connector coupler and the small sloped front cabinet with associated mounting hardware should be completed early in next reporting period. Delivery of cabinets is seriously delayed with delivery in late February or March. To overcome this upset, present cabinet will be substituted and delivered with system, if necessary. D Wiring is being delayed because of noise tests has recommended we make to prevent counting errors. though recommended shielded wire is being used, we want to be certain the long lengths required will not require mounting the 15EL44 models next to the encoders. WORK FOR NEXT REPORTING PERIOD 1) Continue debugging 552, Serial 101. -2- Approved For Release 2006/06/22 : CIA-RDP78B04747A002200010027-8 STAT STAT Approved For Release 2006/06/22 : CIA-RDP78B04747AO02200010027-8 Enclosures 1) CD-143 and CD-144 2) Financial Statement Approved For Release 2006/06/22 : CIA-RDP78B04747AO02200010027-8 Approved For Release 2006/06/22 : CIA-RDP78B04747AO02200010027-8 6 December 1965 552 - CD-144 WWB:rf 5--- Purpose of this visit was to.recheck system with corrections and to introduce RB to system. Except for image rotation, left channel jammed, and was later satisfactorily repaired. Approved For Release 2006/06/22 : CIA-RDP78B04747AO02200010027-8 6 December 1965 552 - CD-143. WWB:rf The following were customer' comments during the plant acceptance. S ` a_; . r 1) Left - Y counter drops counts at lower speed ranges (check rotopulse action, magnetism of cover). 2) Loop forming rollers jam upon return up vertical flight (slip 1 tooth of coupling gears. May require resetting switch). 3) Vacuum holddown OK but has leak outer left. Stated new manifolds and platens are to be installed on machine at delivery. 4) Spool brakes appear to lag. 5) Eyelenses do not accommodate a very near sighted person (a step on eyelens barrel prevents this adjustment). 6) Obstacle appears in right upper field - 11 o'clock Obstacle appears in left upper field - 1 o'clock 7) Correct penta mirror alignment, dot superimposed, and lens centering. Correct runout (2) rollers left side. 9) Customer sees no problem that would prevent delivery 7 December 1965. All of the above were corrected the evening of 2 December 1965. Approved For Release 2006/06/22 : CIA-RDP78B04747A002200010027-8