(Sanitized) PROGRESS REPORT DECEMBER 1966 - PROJECTS 552 AND 552A

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A002200010022-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 2, 2004
Sequence Number: 
22
Case Number: 
Publication Date: 
January 18, 1967
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A002200010022-3.pdf109.05 KB
Body: 
25X1 Approved Fo (ease 2004/0 26?y CUA.Rt RZkB0477002200010022-3 18 January 1967 552 - OD-318 LHB:aw 25X1 *004 25X1 Arlington, Virginia 22209 Rosslyn Station Post Office Box 7 Subject : December 1966 - Projects 552 and 552A Enclosed are three (3) copies of Progress Report on Projects 552 and 552A for the period December 1966. Very truly yours, 25X1 25X1 Enc. (3) P. R. Cert. #855536 DECLASS REVIEW by NGA Approved For Release 2004/03/26 : CIA-RDP78B04747A002200010022-3 CLUDED GROUP FRD DOWN AUtOAq r.. GRA Du VG A"1D 1DEC1ASSIFiCAr1CA( 25X1 25X1 18 January 1967 552 - OD-318 LHB:ow 25X1 Subject: Progress Report Deceuiber 1966 - Projects 552 and 552A are three (3) copies of progress Report on Projects 552 and 552A. for the period December 1966. Very truly you Enc. (3) P. R. "25X1 25X1 Approved For Release 2004/03/26 : CIA-RDP78BO4747AO02200010022-3 25X1 PROGRESS REPORT For 552/552A for December 1966 Period Covered: December 1966 Dated: January 16, 1967 Job No.: 552/552A Document go.: OD - 316 Approved For Release 2004/03/26 : CIA-RDP78B04747A002200010022-3 25X1 PROGRESS REPORT 552, 552A FOR DECEMBER 1966 The following work has been done on these systems: 552 101 Mercury displacement relays to interrupt laser high voltage has been received and is in a test circuit to check its performance. These relays will require modification of laser power supplies for their mounting. Power transistors to replace marginally rated units in laser reticle drive circuit have been received and are ready to be installed in system. To install relays we are making plans to return laser power supplies to factory. This will assure minimum interuption of customers equipment area. Transistor replacement and laser checkout at customers shop will follow completion of relay rework at factory. 552A #103 Service call to search out repeated failure in scanning drive was made early in December. An open joystick potentiometer proved to be the trouble and was sent promptly to its manufacturer for repair. Potentiometer is expected to be installed in January. At that time joystick mechanism will be thoroughly adjusted and checked out. 552A #104 installation work on Image Alternator and Power Assist Film Drive is advancing well. Image Alternator is wired and will be checked out in January. Film Drive modification has wiring and mechanical assembly about 70% completed. Work on film drive is expected to be completed in January. Approved For Release 2004/03/26 : CIA-RDP78B04747A002200010022-3 25X1 A continuing problem in scanning drive has prevented completion of its adjustment. After damaging (2) joystick potentiometers due to excessive output currents, an intensive search for the circuit fault is being made to prevent further dam- age. Resolving this difficulty will determine when system is ready for shipment, hopefully by the end of January. Enclosure - Financial Report "ItT Approved For Release 2004/03/26 : CIA-RDP78BO4747AO02200010022-3