(Sanitized) BRIEF AT NPIC ON 9 FEBRUARY 1966
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001900010035-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
June 13, 2001
Sequence Number:
35
Case Number:
Publication Date:
February 10, 1966
Content Type:
MFR
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001900010035-3.pdf | 97.91 KB |
Body:
SECRET
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01900010035-3
NPIC/P&DS/D/6-778
10 February 1966
25X1A
25X1A
MEMORANDUM FOR THE RECORD
SUBJECT: - Brief at NPIC on 9 February 1966
Attachments 1 and 2. The level of discussion was kept at Secret or lower
because the appropriate clearances have not come through for the = 25X1A
personnel. It is now hoped to get the clearances and project underway by
1 March 1966. The Phasel study is scheduled for completion 9 months after
1. the Project Manager, along with eight other members
of the -team made a presentation on the planned course for the Informa-
tion Flow Analysis (Project #991316). One or more representatives of each
Division attended the meeting and received the information contained in
the starting date of the Project.
25X1A 2. The following is a further expansion of the chart shown on the
front page of Attachment 1.
Users' Requirements - The what and why of the system through 1972. The
needs, use and the purpose of the requirements. The system will be designed
to meet these requirements.
25X1A Analysis of Users' Requirements - Mreviews for duplication, similarity,
overlap, etc., and synthesizes a list of requirements.
25X1A Operational System - = Gathers all information on current operational
- system, detail organization, procedures, programming, data flow, security,
etc.
25X1A Inputs & Outputs - This will enable = to define the boundries of the
system, the general output for the users' requirements plus the form range
and volume of information.
Current System Flow Charts - Documentation and present flow charts.
Time required, volume and types of information. Explore means to improve
current system without interrupting present flow.
System Constraints - Physical factors, legal, government rules, security
restrictions on flow. Limit on changes in structure. Limits of space,
people, money, etc.
Design & Evaluation Criteria - Select systems as to: cost, time, size,
automation, flexibility. Identify what the order of importance is in the
design criteria.
DECLASS REVIEW by NIMA/DOD
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01900010
SECRET
SECRET
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01900010035-3
Alternate Conceptual Design - What changes are needed to make the design
capable of handling the requirements? Areas where automation is best,
alternate equipment and techniques considered, and evaluate the designs and
select the best design.
Conceptual Design - Select the design that will best fit the needs,
the function and performance characteristics.
Functional Specifications - Costs, types, etc., of equipment.
Required R&D - Select areas where R&D is necessary.
3. During the first week in NPIC, the = team would like to have a
short general briefing from each Division on their present programs. This
would include the organizational setup, the requirements levied, the input-
output products, their files, the planned modifications, the new equipment
and procedures that are planned, and inspect sample input-output.
Attachment 2 contains approximately the type of forms and information
they would expect to get from each Division.
4. A short question period was held after the briefing but very little
was discussed due to the limited clearances of the Seam.
rojec Monitor
Distribution:
Original - Project File/DB (#99131-6)
1 - Chief/SSS/DB/P&DS
1 - Chief/PB/P&DS
Attachment: 1 - System Development Phase 1.
2 - Collection of Basic Data for Design or Improvement of a
Data Handling System.
Approved For Release 2001/08/13 : CIA-RDP78BO4747AO01900010035-3
SECRET