TECHNICAL BACKGROUND PROCUREMENT INFORMATION

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001900010005-6
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 15, 2002
Sequence Number: 
5
Case Number: 
Publication Date: 
October 10, 1965
Content Type: 
CONT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001900010005-6.pdf296.88 KB
Body: 
991316 Approved Forilt ease 2002/09/05': CIA-RDP78BO474TV01900010005-6 SECRET (When Filled In) TECHNICAL. BACKGROUND PROCURELAENT INFORMATION 1. Contractor A. Name and address:a B. Evaluation of previous performance: Excellent based on v rS,l r from GIMRADA (Digital Mapping Study) and Air Force (43 L Air Weather systems Analysis) 25X1A II. Brief description of this procurement: An analysis of NPIC substantive data base and projection of, requirements for an integrated information processing- Estimated total amt. $ 25X1 A ? A. Deliverable items: 1. NPIC Review and functional flow diagrams 2. Specifications for System Design 3. Detailed Implementation Plan 25X1A B. Is this procurement for other than a standard, "off the shelf" or slightly modified commercial item? Yes If "yes", is it anticipated that any more of this unit will be procured? NA If so, a complete set of directly reproducible manufacturing drawings and specifications would normallybe included in. this procurement. Comments: C. Will contract cover a period of more than 90 days? yes If "yes", are progress reports desired? Yes If so, indicate fre- quency, content and number of copies desired: 5 copies of monthly reports D. Is any Government owned property to be provided to the contractor? etc. ) If so, list and indicate its availability (where, when, SECRET (When Filled In) DECLASS REVIEW by NIMA/DOD Approved For Release 2002/09/05 : CIA-RDP78BO4747AO01900010005-6 Approved Forll lease 2002/09/05 : CIA-RDP78B0474 01900010005-6 SECRET (When Filled In) 25X1A 1 -r ------------ E. Is any special tooling involved? 'F. Security: 1. Association with the Sponsor is Confidential 2. The specifications and/or drawings are Majority -will be Secret ossibility of code word supplement. Y p 3. The item is Same as Item 2 4. Contractor personnel known to be aware of this proposed procurement: 5. Other security information f the Agency l 25X1,II' has other contracts with 25X1A Reasons for selection of this source. If'other sources were considered, indi- cate results. If no other sources were considered, list the reasons why this firm is considered to be uniquely qualified to perform this work. as re selected ::= were 25X1A evaluated. i y all the interdisciplinary talents required for such a study; the interdisciplinary talent and tools are within a single administrative entity; they are willing to commit personnel of the Ughest level of competence; they will commit themselves to completion of the study within a minimal time frame; they are not committed to use a particular manufacturers hardware and techniques; and they are committed to work within the current state-of-the-art. IV. If contract will cover deliverable item(s) state room location where equip- ment will be installed NA (It is extremely important that the Engineering Data Sheet including room location and any other pertinent facts be submitted to NPIC Engineering Section as far as possible in advance of delivery.) 25X1A 25X1) Technical contact Oct. 10 1965 Name Date In the event additional space is required, use the reverse side(s) of this form, with a reference to the item number to which the comment applies. SECRET (When Filled In) Approved For Release 2002/09/05 : CIA-RDP78B04747A001900010005-6 Approved ForMlease 2002/09/05 : CIA-RDP78B0474%*001900010005-6 This analysis will deal strictly with an advanced information handlirrg- system and not delve into a materials handling system or a data link system. This study will result in the formulation of an integrated infor- mation processing system concept and of the design specifications which the concept embodies. The physical movement, storage and retrieval of materials such as roll- film, maps, charts, and reports will not be studied under this contract. On the other hand, remote display of comparative coverage and the Minicard system in relation to remote display will be studied. This contract will not cover the development of data block and time pip readers. Approved For Release 2002/09/05 : CIA-RDP78B04747A001900010005-6 ase 2002/09/05: GIA-RDP781304747, CLASSIFICATION RECEIPT RBI OS SUPPORT/SERVICE REQUIREMENT RESPONSIBLE COMPONENT DISSEMINATED RB/OS (The following info is required when rqmts are levied by external organizations) OFFICE DATE OF RQMT CONTROL NO. NPIC DIV/DETACH PROCESSING RQMT PROJ OFF PHONE SUPPORT REQUESTED.OF PRIORITY DATE REQUIRED 25X1A (The following info is required when rqmts are levied for internal support) DIV/STAFF IPD DATE OF RQMT 18 (1c .nhey 1 AF,-', CONTROL NO. SUPPORT REQUESTED OF P&DS PROD OFF PRIORITY DATE REQUIRED 15 November 1965 non-photo interpretation project.: It will result Project Description: Information Flow Analysis, 2. 'SPECIFIC SUPPORT/SERVICE REQUESTED: Support 'rom.NPIC will probably consist of: Photographic; Reproduction; 'Mensuration;. Graphics; ADP; Editing; x Other. (explain below) -- (Include statement as to estimated amount of work required of support component(s); i.e. number of contact 'prints. enlargements. beards, pt.(--l LDA:1i1-V ,1.) Take necessary action to contract with for an Information 4.