LINEAR PHASOLVER MEASURING ENGINE

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001800120041-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 4, 2001
Sequence Number: 
41
Case Number: 
Publication Date: 
July 26, 1963
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001800120041-5.pdf58.7 KB
Body: 
Approve~or Release 2001/08/13: CIA-RDP78B~1''47A001800120041-5 DECLASS REVIEW by NIMA/DOD Fridap, July 26, 1963 Linear phasolver Measuring Engine Contract start date was Monday, July 15, 1963 Phase I demonstration with existing pattern due at the end of the 10th week, 9/23/63. Phase I will be completed 10/14/63 according to their present pro- ect plan. Phase II which is the preparation of a new pattern to achieve 1 micron measuring accurae~y and demon- strating measuring capability,-runs concurrently.. Completion due 6/22/64. First monthly progress report is due in the mai$ Aug. 10. They have made a flying start an this Sob, They found a coupler existing which can be used for the demonstration. Accuracy of the existing pattern is unknown and it does have distortion at both ends. T'he demonstration will however demonstrate the principle of unambiguous position measurement with- out oounting pulses. 'The Driver has 128 pole pairs and the co~:pler will average over 80 pole pairs! so quite good accuracy can be expected< For phase II they hive started the design of a new sine pattern. 'T'hey want to work with a .001 ~ t gap between the plates and there for want to improve the crossing angle between the driver and coupler patterns. ~'wh They are also planning to use multiple symmetrical patterns to reduce sensitivity to skew. ~. important capability which they may ultimately +~ want to take advantage of is the electrical compen- sation of systematic errors. D~~LASS REVIEW by NIMA/DOD ~re~d''~or Release 2001/08/13: CIA-RDP78B04747A001800120041-5