LINEAR PHASOLVER MEASURING ENGINE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001800120006-4
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
October 31, 2002
Sequence Number:
6
Case Number:
Publication Date:
December 7, 1963
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001800120006-4.pdf | 131.09 KB |
Body:
ApprovecL or Release 2002/11/15 : CIA-RDP78B44.747A001800120006-4
December 7. 1963
STAT
STAT
STAT
STAT
STAT
STATINTL
STATINTL
DECLASS REVIEW by NIMA/DOD
Linear Phasolver Measuring 4iglne
The heart of the Phasolver Is the driver pattern to be
ladd down on a glass substrate and they coupler pattern
to be laid down on a parallel glass plate.
designed a now pattern to minimize errors and insure
achieving the S mioron accuracy. it is a sinusoidal
pattern similar to the one used in their rotary
phase iv er.
They are having trc-u ` le vetting definitive bids for making
the p tternw.
will rake the glass blocks for substrate
bid to make the coupler only r ich is straight ruling
bid the, Driver pattern only, II on ,doss.
has promised to bid the driver manu a'turo from
pattern
Suva hem a telephone- quote on both the driver
an e- coupler, but they cannot got a written quote
from him.
The trr able with getting the pattern work placed is
putting them behind schedule. If hey got the orders
p1 aced 1.)y l Jan., it ct-uld be as late as l July before
they receive t1he finiabed driver.
This is the pacing item and everything else is well
in hand. They are putting a lot of pressure on
getting the Driver work under way.
STAT
STATINTL
Approved For Release 2002/11/15 : CIA-RDP78B04747A001800120006-4
Approved For Release 2002/11/15: CIA-RDP78
STATINTL
STAT
STATINTL
Work was started last July and delivery is due 30 Marcie.
They are presently a few weeks behind schedule, but
give them the month of March to check it out,
That estimate seems a little optimistic, I doubt if they
can make up their time. I suspect a few weeks delay
isn't critical, so I did not press the point,
hopes to have the machine +4ady-1lep assembled
and ready for test by the end of February. That would
"has done an excellent job of checking out the un-
knowns bf this gear In the breadboard stage. I wish
their sister subsidiary in West wood did as well.
The opera&ingmodel of the liquid gate worked beautifully.
To eliminate bubbles going across. the gate, they are
building a low meatin pressure, high volume slow acting
pneumatic operated pump. It will operate about 5
strokes per minute so there will be no vibrations gener-
ated by It,
They are greatly goncerned about operator convenience
in changing spools and are working hard an this aspect.
It is difficult because the spools are enclosed in the
liquid chamber and the rollers and gate are submerged.
Permanent leader seems the beat answer for threading.
is doing their optics. He is probably
es - ono or his wide an le anamorphic
STATINTL
STATINTL .otinn Picture Lens. I I recomended STAT
STATINTL for the projection opt cs and he is currently wor
ing on the condenser optics. This will probanly be one
lens witn auxiliary elements for the different powers.
STAT
STAT
STATINTL
STAT
work is behind schedule a1 d is holding up some of their
other design work.
is not presently satisfied with the uniformity
or illumination he is gettin>>; on the screen, The optics
They will use a 5 KYV arc lamp as a light source. STATINTL
The lamp is in hand an hey are about Lo start testing
it. The digital counter for the 0 rea ing head STAT
will be delivered to =by by STATINTL
the end cif' next week.
STATINTL
project engineer seems to have
11 n says the have
mo s'AP~Fo4ATJR SWW Ot2g j/j 1 : G - -7 ~08r A0~1 0 -sac et .
good control or triera a g