(Sanitized).
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001600020100-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
April 18, 2000
Sequence Number:
100
Case Number:
Publication Date:
September 6, 1963
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001600020100-2.pdf | 45.53 KB |
Body:
(When Filled In)
Approved 9*wasI%Q9fiW=07n,QL&-RDP78B04 0A0b11 X60020 0-2
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO, (If final, so state
ESTIMATED COMPLETION DATE
I June 196k
DECLASSIFICATION REVIEW BY NIMA /
DOD-
TOR
YES ^ N O
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
YES ^ NO
? YES N 0
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
OVERALL PERFORMANCE OF CONTRACTOR
U r"" rc 4. U HIGHLY SATISFACTORY 6. BARELY ADEQUATE
HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? DYES Na (If yes, give details on reverse side.)
(If HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD?
yes, indicate items, quantity, and cost on reverse side.)
El r9'V
YES NO
tt2
U WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
Lj --rcmIrvgfE
LI OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT, CERTIFY THAT ALL DELIVERABLE ITEMS
UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING:
DRAWINGS AND SPECIFICATIONS
PRODUCTION AND/OR OTHER
END ITEMS
WILL PROBABLY REMAIN WITHIN ALLOCATED
?