PROJECT ASSIGNMENT: HIGH SPEED PRECISION COORDINATOGRAPH

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001600020057-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 19, 2000
Sequence Number: 
57
Case Number: 
Publication Date: 
December 10, 1963
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001600020057-1.pdf46.28 KB
Body: 
.~~~' 25X1 A Approved For Release~00/06/0 ~ DP78B04747A001 . ~ ~ ~: ~f ,# DECLASSIFICATION REVIEW BY NIMA / DoD 10 December 1963 MQ~'IORANDLfi~! FOR: 25X1 A 25X1A 25X1A SUBJECT Project Assignment: High Speed Precision Coordina.tograph;, REFERENCE 1. Under subject contract, effective 21 June 1963, a. prototype hi h speed, high precision plotter is being fabricated by 25X1A 2. The plotter, to be operated on-line-from a, 25X1A being developed in response to requirements from TID t b1e photographic representations to be processed through the photo-measurement cycle in real time or quasi rea.1-time, and for the prepa.ra,tion of coverage extent keyed to specific map formats. A p~oba.ble third application will be a. orbital plot, based upon available da.ta., to a.11ow for selection and screening of existing materials, to be followed by a. corrected plot once the orbital track ha.s been established and the mission is in progress. 3? Contract progress is very good with delivery a.nticipa,ted on sched- ule (1 June 196+). Certain tentative commitments or trade-off ha.s been entered into - such a.s the Agency providing vacuum and air conditioning in return for no increase in cost due to disassembly and reassembly neces- sary to get the plotter into the opera.tiona.l area. ~-. After check-out and a. reasonable length of operation, it will be determined what, if any, changes a.re desirable, and also work-load. parameters to determine the total number of instruments required. 25X1A eve opment Br nch, P8cDS Approved For Release 2000/06/p7 :...CIA-RDP78B04747A0016