MONTHLY CONTRACT STATUS REPORT #8 ADVANCED LIGHT TABLES PERIOD: 1 FEBRUARY 1966 TO 28 FEBRUARY 1966
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001400040028-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
February 8, 2002
Sequence Number:
28
Case Number:
Publication Date:
February 24, 1966
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001400040028-3.pdf | 87.95 KB |
Body:
Approved Fbr&Kelease 2002/06/17: CIA-RDP78B04WA001400040028-3
STATINTL
DATE: 24 February 1966
Monthly contract Status Report #8
Advanced. Light Tables
Period: 1 February 1966 to 28 February 1966
1. Objective:
To design and develop three Advanced Light Tables.
2. mary of Work Performed During the Reporting' Period:
Castings for Tables #1 and #2 were delivered
STATINTL
or machining. Table
#1 casting machining will be complete by 15 March '66. The castings
for Table #2 will be complete by 1 April '66.
The film transport mechanisms are assembled for Tables #1 and
#2. These units will be installed immediately upon delivery of the
castings.
Table #3 design is progressing in the area of the tracking light
source transport mechanism and casting design. The configuration
for the tracking light sources has been established by the customer.
Three separate cold cathode pans will be used to provide the required
illumination for the microscopes in the normal and 900 positions.
Switching from normal to 90 configuration will be done electrically
rather than rotating the pans. Three transformers for the light pans
will be mounted to the tracking light source carriage on the exterior
of the table.
3. Work Schedule Conformance:
Delivery of Light Table #1 is anticipated on 1 April '66. Delivery
of Table #2 will be on 15 April '66 if the microscope table and castings
are delivered on schedule. The delivery of Table #3 is yet to be
determined.
4. Analysis of Work Program Covering the Reporting Period:
Considerable progress has been made during the month of February
in the final fabrication and assembly of Tables #1 and #2. Design
is progressing on Table #3. It has been discovered that a cooling
problem exists in the high intensity light sources. The magnitude
of the problem has been determined and a forced air cooling system
is. being selected to remove the heat. Several engineering problems
still remain to be solved before detail drawings of all components can
be completed.
Declass Review by NIMA-/ DoD
Approved For Release 2002/06/17 : CIA-RDP78B04747A001400040028-3
on
Approved Felease 2002/06/17 : CIA-RDP78B04XA001400040028-3
Monthly Contract Status Report #8(Cont'd) 24 February 1966
5. Changes in Key Personnel:
6. Trips, Meetings, and Special Conferences:
The customer's representatives visited plant on
14 February '66. A mock-up of a portion of the i m transport
mechanism for Table #1 was demonstrated. It was determined
from this demonstration that friction must be reduced in the unit
to provide a suitable cranking force. The high intensity light
source configuration was discussed for Table #3. It was decided
that a three source configuration would be used rather than the
two sources previously agreed upon. New cold cathode lamps
were demonstrated which have been developed to reduce flicker
at low light levels.
7. Plans for the Next Reporting Period:
1. Complete the assembly of Table #1.
2. Begin the assembly of Table #2.
3. Continuation of Table #3 design.
4. Procurement of tracking light sources.
STATINTL
STATINTL